Loading...
HomeMy WebLinkAbout20201403 Ver 2_Buffer Approval Letter_20210602DocuSign Envelope ID: F5BF26F5-CB2C-4080-9FDD-8B212AB935B3 ROY COOPER Governor DONNE DELLI-GATTI Secretary S. DANIEL SMITH Director NORTH CAROLINA Environmental Quality June 2, 2021 Piedmont Natural Gas Attn: Aaron Weldon 4720 Piedmont Row Drive Charlotte, NC 28210 (via email aaron.weldon@duke-energy.com) DWR # 20201403 v2 Johnston County Subject: APPROVAL OF NEUSE RIVER BASIN RIPARIAN BUFFER IMPACTS WITH ADDITIONAL CONDITIONS Piedmont Natural Gas -Line 473 Dear Mr. Weldon: You have our approval for the impacts listed below for the purpose described in your application dated April 16, 2021 received by the Division of Water Resources (Division) Aril 16, 2021 and payment received April 19, 2021. These impacts are covered by the Neuse River Buffer Rules and the conditions listed below. Please note that you should get any other federal, state or local permits before proceeding with your project, including those required by (but not limited to) Sediment and Erosion Control, Non - Discharge, and Water Supply Watershed regulations. This Authorization replaces the Authorization issued on December 18, 2020. This Authorization shall expire five (5) years from the date of this letter. The following impacts are hereby approved, provided that all of the Conditions listed below, and all of the conditions of the Neuse River Buffer Rules are met. No other impacts are approved, including incidental impacts. [15A NCAC 02B Neuse .0611(b)(2)] Type of Impact Amount Approved (units) Permanent Amount Approved (units) Temporary Buffers — Zone 1 B3: Pipeline Construction/Easement 3,988 (square feet) 4,269 (square feet) B4: Pipeline Construction/Easement 1,911 (square feet) 1,203 (square feet) B9: Pipeline Construction/Easement 2,224 (square feet) 1,424 (square feet) Buffers — Zone 2 B1: Pipeline Construction/Easement 2,612 (square feet) 2,813 (square feet) B2: Pipeline Construction/Easement 1,263 (square feet) 824 (square feet) B3: Pipeline Construction/Easement 1,483 (square feet) 1,083 (square feet) This approval is for the purpose and design described in your application. The plans and specifications for this project are incorporated by reference as part of this Authorization Certificate. If you change your project, you must notify the Division and you may be required to submit a new application package. If the property is sold, the new owner must be given a copy of this Authorization Certificate and is responsible for complying with all conditions. [15A NCAC 02B .0611(b)(2)] NoRTH DE nm aoa,CAROLINA mat or eawronnum ai uuai� North Carolina Department of Environmental Quality I Division of Water Resources Raleigh Regional Office 13800 Barrett Drive I Raleigh, North Carolina 27609 919.791.4200 DocuSign Envelope ID: F5BF26F5-CB2C-4080-9FDD-8B212AB935B3 Piedmont Natural Gas -Line 473 DWR# 20201403 v2 Buffer Authorization Certificate Page 2 of 2 If you are unable to comply with any of the conditions below, you must notify the Raleigh Regional Office within 24 hours (or the next business day if a weekend or holiday) from the time the permittee becomes aware of the circumstances. The permittee shall report to the Raleigh Regional Office any noncompliance with the conditions of this Authorization Certificate and/or any violation of state regulated riparian buffer rules [15A NCAC 02B .0714]. Information shall be provided orally within 24 hours (or the next business day if a weekend or holiday) from the time the applicant became aware of the circumstances. This approval and its conditions are final and binding unless contested. [G.S. 143-215.5] This Authorization Certificate can be contested as provided in Chapter 150B of the North Carolina General Statutes by filing a Petition for a Contested Case Hearing (Petition) with the North Carolina Office of Administrative Hearings (OAH) within sixty (60) calendar days. Requirements for filing a Petition are set forth in Chapter 150B of the North Carolina General Statutes and Title 26 of the North Carolina Administrative Code. Additional information regarding requirements for filing a Petition and Petition forms may be accessed at http://www.ncoah.com/ or by calling the OAH Clerk's Office at (919) 431-3000. One (1) copy of the Petition must also be served to the North Carolina Department of Environmental Quality: William F. Lane, General Counsel Depailinent of Environmental Quality 1601 Mail Service Center Raleigh, NC 27699-1601 This letter completes the review of the Division under the Neuse River Riparian Buffer Rules as described in 15A NCAC 02B .0714. Please contact Stephanie Goss at 919-791-4256 or Stephanie.Goss@ncdenr.gov if you have any questions or concerns. Sincerely, —DocuSigned by: '—BCDA9D825D4A46D... Scott Vinson, Regional Supervisor Water Quality Regional Operations Section Raleigh Regional Office Division of Water Resources, NCDEQ cc: Sara Kent, Burns & McDonnell (via email) DWR 401 & Buffer Permitting via Laserfiche