PROJECT INFORMATION
1
Project Name
Cresswind - Phase 2
2
Project Area (ac)
44.1
3
Coastal Wetland Area (ac)
0
4
Surface Water Area (ac)
0.5
5
Is this project High or Low Density?
High
6
1 Does this project use an off -site SCM?
No
COMPLIANCE WITH 02H .1003(4)
7
Width of vegetated setbacks provided (feet)
30
8
Will the vegetated setback remain vegetated?
Yes
I
9
Is BUA other that as listed in .1 003(4)(c-d) out of the setbask?
Yes
10
Is streambank stabilization proposed on this project?
No
NUMBER AND TYPE OF SCMs:
11
Infiltration System
0
12
Bioretention Cell
0
13
Wet Pond
1
14
Stormwater Wetland
0
15
Permeable Pavement
0
16
Sand Filter
0
17
Rainwater Harvesting (RWH)
0
18
Green Roof
0
19
Level Spreader -Filter St p (LS-FS)
0
20
Disconnected Impervious Surface (DIS)
0
21
Treatment Swale
0
22
1 Dry Pond
0
23
StormFilter
0
24
Silva Cell
0
25
Bayfilter
0
26
Filterra
0
I FORMS LOADED
DESIGNER CERTIFICATION
27
Name and Title:
Matthew S. Kiker
28
Organization:
Thomas & Hutton
29
Street address:
1020 Euclid Avenue
30
City, State, Zip:
Charlotte, NC 28203
31
Phone number(s):
980-201-5507
32
Email:
kiker.m@tandh.com
Certification Statement:
I certify, under penalty of law that this Supplement-EZ form and all supporting information were prepared under my direction or
supervision; that the information provided in the form is, to the best of my knowledge and belief, true, accurate, and complete; and
that the engineering plans, specifications, operation and maintenance agreements and other supporting information are consistent
with the information provided here.
A c
R o�
�Esslo
C
-S E AT-
�'/VGI N F-��
EW S.
ZAO �-
Signature of Designer
-S-Ato-&�
Date
DRAINAGE AREAS
Is this a high density project?
Yes
2
If so, number of drainage areas/SCIVIs
1
3
Is all/part of this project subject to previous rule
versions?
No
I CLICK TO LOAD FORM
DRAINAGE AREA INFORMATION
Entire Site
1 (SUB-01B)
2 (SUB-01C FUTURE)
4
Type of SCM
N/A
Wet Pond
Wet Pond
5
Total BUA in project (sq ft)
1319710 sf
594207 sf
725503 sf
6
New BUA on subdivided lots (subject to permitting)
(sq ft)
860000 sf
380000 sf
480000 sf
7
New BLIA outside of subdivided lots (subject to
permitting) (sf)
459710 sf
214207 sf
245503 sf
8
Offsite - total area (sq ft)
sf
sf
sf
9
Offsite BUA (sq ft)
sf
sf
sf
10
Breakdown of new BUA outside subdivided lots:
Parking (sq ft)
sf
sf
sf
Sidewalk �sq ft)
57027 sf
26890 sf
30137 sf
Roof (sq ft)
sf
sf
sf
I
Roadway (sq ft)
402683 sf
187317 sf
215366 sf
Future (sq ft)
Other, please specify in the comment box
below (sq ft)
See Column 2 this
sheet
See Column 2 this sheet
sf
sf
sf
sf
11
New infiltrating permeable pavement on subdivided
lots (sq ft)
sf
sf
sf
12
New infiltrating permeable pavement outside of
subdivided lots (sq ft)
sf
sf
sf
13
Exisitng BUA that will remain (not subject to
permitting) (sq ft)
sf
sf
sf
14
Existing BUA that is already permitted (sq ft)
sf
sf
sf
15
Existing BUA that will be removed (sq ft)
sf
sf
sf
16
Percent BUA
67%
11%
0%
17
Design storm (inches)
1 in
1 in
1 in
18
Design volume of SCM (cu ft)
107158 cf
107158 cf
107158 cf
19
Ualculation method for design volume
Simple
Simple
Simple
FDDITIONAL INFORMATION
20 �Please use this space to provide any additional information about the
drainage area(s):
The future area is intended to account for a portion of a future phase to be
managed with this Phase 2 pond.
L
WETPOND
____1]Drainage area number 1
2IDesign volume ofSCM (cu ft) 107158 cf
GENERAL MDC FROM 02H.1050
3 Is the SCM sized to treat the SW from all surfaces at build -out? yes
4
Is the SCM located away from contaminated soils?
Yes
5
What are the side slopes of the SCM (H:V)?
3-1
6
Does the SCM have retaining walls, gabion walls or other engineered
side slopes?
No
71(10-year
Are the inlets, outlets, and receiving stream protected from erosion
storm)?
Yes
8
Is there an overflow or bypass for inflow volume in excess ofthe
design volume?
Yes
9
What is the method for clewatering the SCM for maintenance?
Drawdown Orifice
10
If applicable, will the SCM be cleaned out after construction?
Yes
11
Does the maintenance access comply with General MDC (8)?
Yes
12
Does the drainage easement comply with General MDC (9)?
Yes
13
Ifthe SCM is on a single family lot, does (will?) the plat comply with
General MDC (10)?
No
14
Is there an O&M Agreement that complies with General MDC (11)?
Yes
15
Is there an O&M Plan that complies with General MDC (12)?
Yes
16
Does the SCM follow the device specific MDC?
Yes
17 Was the SCM designed by an INC licensed professional?
OND MQC FROM 02H.1053
18 Method used
Yes
SA/DA
19
Has a stage/storage table been provided in the calculations?
Yes
20
Elevation of the excavated main pool depth (bottom of sediment
removal) (fimsl)
56050
21
Elevation of the main pool bottom -(top of sediment removal) (fmsi)
56100
22
Elevation of the bottom ofthe vegetated shelf (fimsl)
56450
23
Elevation of the permanent pool (fmsi)
56500
24
Elevation of the top of the vegetated shelf (fimsl)
56550
25
Elevation of the temporary pool (fimsl)
56676
26
Surface area of the main permanent pool (square feet)
38860
27
Volume of the main permanent pool (cubic feet)
132396 cf
28
Average depth of the main pool (feet)
289 ft
29
Average deFth-equation used
Equation 3
30
If using equation 3, main pool perimeter (feet)
11600 ft
31
If using equation 3, width of submerged veg- shelf (feet)
30 ft
32
Volume of the forebay (cubic feet)
26361 cf
33
Is this 15-20% of the volume in the main pool?
Yes
34
Clean -out depth for forebay (inches)
48 in
35
Design volume of SCM (cu ft)
107158 cf
36
Is the outlet an orifice or a weir?
Orifice
37
If orifice, orifice diameter (inches)
5- in
38
If weir, weir height (inches)
39
If weir, weir length (inches)
-
40
Drawdown time for the temporary pool (days)
3
41
Are the inlet(s) and outlet located in a manner that avoids short-
circuiting?
Yes
42
Are berms or baffles provided to improve the flow path?
No
43
Depth of forebay at entrance (inches)
60 in
44
Depth offorebay at exit (inches)
54 in
45
Does water flow out of the forebay in a non -erosive manner?
Yes
46
Width of the vegetated shelf (feet)
6 ft
47
Slope of vegetated shelf (H:V)
6-1
48
Does the orifice drawdown from below the top surface of the
permanent pool?
Yes
49
Does the pond minimize impacts to the receiving channel from the 1-
yr, 24-hr storm?
Yes
50
Are fountains proposed? (IfY, please provide documentation that
MDC(9) is met-)
No
51
Is a trash rack or other device provided to protect the outlet system?
Yes
52JAre
the dam and embankment planted in non -clumping turf grass?
Yes
531Species
ofturfthat will be used on the dam and embankment
Bermuda
b4l
Has a planting plan I)een provided for the vegetated shelf.?
Yes
ADDIMONAL INFORMAMON
551Please
use this space to provide any additional information about the
wet pond(s):