Loading...
HomeMy WebLinkAboutSW3210301_Design Calculations (Stormwater - Phase 2)_20210602.1r. Iq STORMWATER MANAGEMENT REPORT FOR: CRESSWIND WESLEY CHAPEL - PHASE02 I I I I I I I E S S/O/�.. WESLEY CHAPEL., NC PREPARED FOR: KH WESLEY CHAPEL.. LLC �A C 0� T H 0 M A S HUTTON ENGINEERING co N F-0871 R\� 1,, 4 OF J-#27842.0002 FEBUARARY 16..2021 LATEST REVISION: JUNE 1., 2021 Prepared by: THOMAS & HUTTON STORMWATER MANAGEMENT REPORT Cresswind Wesley Chapel - Phase 02 Project: Cresswind Wesley Chapel - Phase 02 T&H Job Number: J-27842.0002 Location: Potter Road Wesley Chapel, NC 28173 Date Prepared: February 16, 2021 Owner: KH Wesley Chapel, LLC Owner Address: 8913 Silver Springs Court Drive Charlotte, NC 28215 Engineer: Thomas & Hutton Engineer Address: 1020 Euclid Avenue Charlotte, NC 28203 Phone: 980-201-5505 FJ THOMAS & HUTTON Page 1 TABLE OF CONTENTS Section 1 -Summary of Results ....................................................................................................... Page 3 Section 2 - Project Narrative ........................................................................................................... Page 4 Section3 - Purpose ........................................................................................................................... Page 4 Section 4 - Regulatory Summary .................................................................................................... Page 5 Section5 - Methodology ................................................................................................................. Page 5 Section6 - Hydrology ....................................................................................................................... Page 6 Section 7 - Runoff Calculations ...................................................................................................... Page 6 Section 8 - Existing Conditions ........................................................................................................ Page 8 Section 9 - Post Development Conditions ..................................................................................... Page 8 APPENDICES ProjectMapping ...................................................................................................................... Appendix A Aerial Location Map .......................................................................................................... Exhibit A FEMAMap ........................................................................................................................... Exhibit B WetlandsMap .................................................................................................................... Exhibit D SoilsMap .............................................................................................................................. Exhibit E Pre Development Drainage Map ........................................................................................... Appendix B Pre Development Conditions Drainage Calculations ......................................................... Appendix C Post Development Drainage Map ........................................................................................ Appendix D Post Development Conditions Drainage Calculations ........................................................ Appendix E Water Quality Calculations ...................................................................................................... Appendix F FJ THOMAS & HUTTON Page 2 SECTION I - SUMMARY OF RESULTS Table I - Pre Development Runoff Rates TABLE I Summary of Results - Existing Conditions Storm Event Ouffaill 01 Ouffaill 02 Combined (cfs) (cfs) (cfs) 2-year 66 14 80 1 0-Year 134 31 16 25-Year 173 41 214 50-Year 208 51 259 Table 2 - Post Development Runoff Rates TABLE I Summary of Results - Proposed Conditions Storm Event Ouffaill 01 Ouffaill 02 Combined (cfs) WS) WS) 2-year 60 9 69 1 0-Year 129 19 148 25-Year 172 25 197 50-Year 184 31 215 Fj THOMAS & HUTTON Page 3 SECTION 2 - PROJECT NARRATIVE Cresswind is a residential subdivision within Wesley Chapel, North Carolina. Phase 2 consists of approximately 76 single family detached units. The site is located in Union County along Potter Road, north of Newtown Road and south of Weddington Road. The majority of the site is currently wooded with an understory of brush. Pre -development run- off is discharged into an existing wetland system and FEMA Floodplain. The pre -development drainage basins have been delineated and are illustrated on the Pre -Development Drainage Exhibit found at the end of this report. For the purpose of this report we will compare the preclevelopment runoff rates to the post development runoff rates as shown in the summary at the beginning of this report. The pre - development basins SUB-01 and SUB-02 will be routed through one wet detention ponds during post development conditions and outfall into the existing wetlands and floodplain. The post -development sub -basins were delineated and are illustrated on the Post -Development Drainage Exhibit found at the end of this report. All design information for ponds and associated drainage pipes and structures can be found in the appendices of this report. The soils on this site consist of type B, C and D hydrologic soil groups which are shown on the attached NRCS soils map within Appendix A. SECTION 3 - PURPOSE The purposes of this report are: 1. To delineate all pre -development basins that are within this project and determine which drainage basins will be affected by the proposed development. To develop a stormwater model that will: a. Be in compliance with the NCDEQ stormwater regulations. b. Simulate the pre- and post -development conditions for the project. c. Predict water elevations for all proposed ponds. d. Demonstrate that all culverts are of adequate size for drainage under post - development conditions. e. Provide design flows (under future build out conditions) for the major drainage structures that can be used to properly size improvements, if needed. 3. To document that the stormwater management measures and equipment installed on site will be adequate for all existing and proposed development on the site. Two drainage models are included in this report; • Pre -Development: examines the drainage basin prior to any development within the site. • Post -Development: examines the drainage basin after site improvements have been installed. The model may need to be revised and updated as the site plan evolves for each phase that is permitted. FJ THOMAS & HUTTON Page 4 SECTION 4 - REGULATORY SUMMARY NCDEQ - Stormwater The North Carolina Department of Environmental Quality (NCDEQ) is responsible for administering the storm water management program. Development or re-clevelopment activities are required to apply for and receive a stormwater permit from NCDEQ. These permits address water quality and quantity. NCDEQ regulations require that peak post -development discharge rates from the basin shall be at or below pre -development rates for the 10 and 25-year storms events. The regulations also specify the I -inch volume drawdown shall be released over a time of 48 to 120 hours to minimize hydrologic impacts to the receiving channel. See attached Exhibit E for post -development peak flow control calculations, and Exhibit F for water quality calculations. The stormwater treatment shall be designed to achieve average annual 85% Total Suspended Solids (TSS) removal and must apply to the volume of post -development runoff resulting from the one -inch rainfall. See attached Exhibit E for post -development peak flow control calculations, and Exhibit F for water quality and channel protection calculations. SECTION 5 - METHODOLOGY The pre- and post -development conditions of the site were analyzed using the Storm and Sanitary Analysis (SSA) program developed by Autodesk. The program is used to model rainfall and stormwater runoff and to perform hydraulic routing through the storm drainage system (including existing and proposed storage/detention features such as wetlands, ponds, and lakes). SSA is an advanced, powerful, and comprehensive modeling package for analyzing and designing drainage systems, stormwater sewers, and sanitary sewers. The software can simultaneously model complex hydrology, hydraulics, and water quality. The SSA program is built on the highly tested and widely utilized SWMM methodologies. For this application of the SSA program, the hydrology was simulated using the NRCS (SCS) TR-55 methodology. The hydraulics was simulated utilizing hydrodynamic routing. Hydrodynamic routing solves the complete St. Venant equations throughout the drainage network and includes modeling of backwater effects, flow reversal, surcharging, looped connections, pressure flow, tidal outfalls, and interconnected ponds. The SSA program graphical user interface (GUI) allows for the input of hydrologic data for each drainage sub -basin. See the appendices for input variables including runoff curve number, rainfall distribution pattern, hydrograph peaking factor, area of each drainage sub -basin, and time of concentration. The SSA program generates runoff hydrographs for each sub -basin based on these user -specified variables. Hydrographs are generated by SSA using the NRCS Unit Hydrograph (TR-55) Method. The model's hydraulic input data consists of a system of nodes and links. Nodes represent locations where flows enter or exit the system, pipe or channel characteristics change, or where stage/storage/time relationships are provided. Links represent traditional types of hydraulic Fj THOMAS & HUTTON Page 5 conveyance such as pipes, channels, control structures, weirs, etc. The sizes, inverts, lengths, and Manning "n" values for all pipes connecting the ponds or lakes are input into the model. In addition to pipe information, all pond, lake, and detention area stage -area information and the respective control structure information is input into the model. The node and link conditions are analyzed within the model for a given storm, and flow conditions are determined. Hydrographs for each drainage area are merged within the SSA program, and the hydrologic results are then combined with the hydraulic information to model the hydraulic interactions of the entire drainage system. The results include pond area and discharge rates and stage/storage information during the storm events. The storm drainage infrastructure onsite was modelled using the Storm Sewers program developed by Autodesk. This program utilizes the model rainfall and stormwater runoff through the storm drainage infrastructure to provide hydraulic grade line calculations and profiles for analyzing the proposed storm drain network. SECTION 6 - HYDROLOGY 0 SCS TR-55 Method was used. The rainfall distribution used for each storm event was obtained from rainfall data publicly available for Union County, NC. The following design storms are used in the model simulations: - 2-year, 24-hour Design Storm = 3.50 inches - 1 0-year, 24-hour Design Storm = 5.20 inches - 25-year, 24-hour Design Storm = 6. 10 inches - 50-year, 24-hour Design Storm = 6.90 inches - I 00-year, 24-hour Design Storm 7.50 inches SCS Type 11 Statistical Rainfall Distribution was used. This distribution pattern is determined by the Soil Conservation Service comparing regional rain -gage data. 0 Soils present on site consist of the following: - Badin channery silty clay loam, 2 to 8 percent slopes (BdB2) - HSG C - Chewacla silt loam, 0 to 2 percent slopes (ChA) - HSG B/D - Goldstone-Badin complex (GsC), 8 to 15 percent slopes - HSG C - Tarrus gravelly silty clay loam, 2 to 8 percent slopes (TbB2) - HSG B SECTION 7 - RUNOFF CALCULATIONS Peak flow rates for the watersheds were calculated by the SSA Program for each design storm. The pre- and post -development drainage basins are shown in appenclicies that follow this report. Curve Numbers Curve numbers were generated according to procedures set forth in SCS Technical Release 55. The composite curve numbers for each drainage basin were calculated using soils information from the Soil Survey of Union County, NC provided by The United Fj THOMAS & HUTTON Page 6 States Department of Agriculture Soil Conservation Service. Curve numbers were weighted based on the land use and soil group within each basin. Time of Concentration Times of concentration were calculated according to procedures set forth in SCS technical Release (TR) 55. The travel times (Tt) for overland flow, shallow concentrated flow, and channel flow are added together for the drainage basin to get the time of concentration Tc. Basin information for the area of interest was collected for use in the SSA models. Basins were delineated using surveyed topographic information. Basins were drawn and the longest flow paths were found. The times of concentration were calculated based on the NRCS, three part travel time method documented in TR-55. The three equations used are summarized below: Sheet Flow: (hr) 0.007(nL)')-8 ti � P2 0.05 x S 0.4 Shallow Concentrated Flow: (hr) L t2 - - 3600 X V Channel Flow: (hr) L t3 - - 3600 X V Time of Concentration: (hr) t, � t1 + t2 + t3 Symbol Dimension Units n Manning's n L Length of flow ft P2 2 yr event rainfall in S Slope ft/ft Symbol Dimension Units L Length of flow ft V* Velocity f t/s *Based on TR-55 velocity -slope relationship Symbol Dimension Units L Length of flow ft V* Velocity f t/s *Assumed to be 2 ft/s Appendices C and E with time of concentration information are attached. Mr. 14 THOMAS & HUTTON Page 7 SECTION 8 - EXISTING CONDITIONS The total acreage of the drainage basins analyzed in the stormwater calculations is approximately 81 acres. The existing conditions described in this narrative will refer to the pre - development condition of the site. The pre -development conditions for the site consists predominantly of woods with an understory of brush. Stormwater runoff on the site was delineated according to the existing drainage patterns found at the site and upon the field topographic survey completed within the site. The watershed delineation was conducted to provide a comparison for pre -development and post - development flows. Outfall "01" and Outfall "02" discharge into an existing wetland (See Pre Development Drainage Map - Appendix B). SECTION 9 - POST - DEVELOPMENT CONDITIONS The post -development drainage basins are shown on the Post -Development conditions watershed map located in Appendix D of this report. The total post -development watershed area analyzed for this project is approximately 82 acres. This site maintains all pre -development discharge points in the post -development condition. Post -development peak flows are less than pre -development conditions for the 2-yr, 10-yr, and 25-yr storm events. See Appendices B through H for pre- and post -development SSA model input and results. See Summary of pre - development versus post -development results at the beginning of report. After development, the site will consist of approximately 76 single family lots in Phase 2 and 96 lots in a future phase, public roads, private driveways, and stormwater management features such as drainage swales and stormwater detention ponds. Stormwater runoff from site will be conveyed to a proposed wet detention pond. The detention pond will meet NCDEQ pre- and post -development flows and meet freeboard requirements for the ten (10) year, twenty-five (25) year, fifty (50) year and one hundred (100) year storm events. The proposed detention ponds were designed to meet criteria found in the NCDEQ BMP Design Manual. Additionally, the required freeboard has been provided beneath the emergency spillways and the pond embankments for the (50) year storm event. The following tables illustrate the maximum water surface elevation for the two (2) year, ten (10) year, twenty-five (25) year, fifty (50) and one hundred (100) year storm events. FJ THOMAS & HUTTON Table 3 - Wet Detention Pond 03 Bottom of Pond = 559.00 Crest of Emergency Spillway = 571.00 Top of Embankment = 571.50 Wet Detention Pond 03 Storm Event Max Elevation (ft) 1 0-Year 568.94 25-Year 569.31 50-Year 569.75 1 00-Year 570.13 Fj THOMAS & HUTTON Page 9 STORMWATER MANAGEMENT REPORT CRESSWIND WESLEY CHAPEL - PHASE 02 APPENDix A PROJECT MAPPING 27842.0002 Fq THOMAS & HUTTON N ai u N m N U ro c u u UD -0 m r,4 u ro ai -0 E D c ai E c co < D C" ai ro 0 u 'j Q- < OJ -0 N < 0 -c' < ai < El 19 19 El 0 0 0 0 > ai M'j El LU Ad < 4P.- .1 - N"N Lu pm 7 91 co N M N C'4 E U-) ro ro 0 < u M C" 'j ai Q_ < 1:119 19 El ai u N U ro OJ -0 N _C, 0 0 0 W ai > ai Mj E < El am 0 LL. Lij LLI LU Q '20 -aC No 10 x N c N 4) _1 No x CL CL CL m c E E wo S CL c 16 0 c 0 Vo c c; .2 -0 (0 x F= 0 8 (0 4) CL E 0 0 E '0' '21 E (0 > 00 00 B- cc , .0 (NO 0 .0 (0 0 E 2 .0 (0 N .0 LLI 0 0 0 4) 4) — < No 00 .0� R '2 E 10 '0 0 '0 4) o -Z .0 'a - % (0 1=1 z 0 :00 - .0 0 UR -0 (0 N '00 0 CO CC) 0 (o o c N 4) i .E E 0 0 2 (0 (00 M(O (0 (CO 00 E 11 (00 �2 .1.1 -0. (co 00 E 0 F, 4) 00 (o =0 2 (N o , .0 0 1 2 s 70 . -7 M 4) > — 0 4) 0 4) (>O 4) -p . -C '0 0 t: .0 (L E '0 4) 4) E 'o 4) Z -0 '0 0 0 0 o 0 z F, E . c 4) 0 0 LL, CO z c 0 CL 0 2 W, 2 .0 Lu 4) (D 'o -Z '40) 4) . 0 0 > 0 E 0 LL, c 0 0 0 4) .— 10 z C o U) (0 CL (o (0 4) -0 CL 4) m CO > 6 .> 0 .0 E > - 0 8 CL (o (,0, c (CO 4) < - 4) > 0 z 0 75 c 4) U) U) o 0 - CL 0. (0 4) > (0 .- 4i6 .0 I- 0 (0 S 4) (0 '0 E C z < =0 R CL (o 0 C (o 0 M (o 2 i5 -a 0 E 7a S 0 :t! 0 > 40) 0 C -0 .5 4) OC 4) 0 2 '0 IN, C, "0' (o 2 o (0 u co o u IL 0 z c za '0 C 75 LL, 0 7EL E 3: 4) 4) .0 (00 — .0 4) E 0 CL 0 c CL (0 E o 0 3: Eo -.0 C-1, 'C' C. 4) 0) E 2 (o .0 �L- �3 8 .0 m CL -0 CIL (0 0 0> CL E E 3: -ow CL 0 — c - -, — . ; = 0 (0 . (0 -, C 'a (o '- -(oo E E CL �z ol - 4) 4) o za E 0 M LL 0 < LLI LLI LLI -1 0 > 4) z CL 0 M -0 (o — CL '0 w (n < N LLI LLI LLI z 0 0 E CL 2 4) (0 - . CCO '0 0 2 0 o CL 4) U 0 4) 1 CL c 4) S (o (o CL 0 LL LLI < z LLI C.) E 0 8) 0 E E - F —i m LLI LL CL :t! 0 0 E E t"D C.) 0 (00 715, LLI N CL LLI 0 LL 0 80o4O'4.87"W CD CD CD cq Lo 0 Lo N o 007zsc ONZzec 000zzsc OD6�ZSC 002�zsc ooz�zsc 009�zsc oc&zsc OOKZSC ooc�zsc M../VkE .08 0 z 0 2 0 U) 0 2 M..si7.0t, .08 00=2 ONZZsc 000zzsc OD6�ZSC om�zsc ooz.�zsc 0ONZsc OD9�zsc OOKZSC ODUZK o Z� 2 M..IVLE .08 0 0 0) (U IL U) U) 0 U) CL 00 .0 z Ll Ln 00 x > C/) Lf) 0. 0 0 > 0 C) z iiijc 0 z z 2 0 LL z CL a z LU 0 LU —j CL CL CL m E 0 0 An L E 0 0 00 (N. 0 0 0) E C: 6 EL (u CL E cu E 0) 0 U) (U CL 0 C: cu = a) E to cu > c > cu -0 0 0 CL (U 0 cu to E E cL C- cu 0 2) CU E tc/) (i) E o) E 'E 2'c -a 2 q) (1) -� -Fu c 0 0 LCLJ: - I = 0 (n_ U) (n 0 'o CL OE U) a) 2 m E U) U) 0 C/) 06 o E LO 2 a) U) C)r U) E m u) -a o a) `� a) m CM0 U) =; a a) a) 0 !G 2 3 --) =a) — — = — c 0 L -0 " z o m N CL cu (n U) c IL 101) (1) -0 M U) -5 m 0 3: !E 2 E 0 U) 0 W U) -r- -2 -�u CL IQ) U) 0 Z a) 2 U) 0 —a) < �;, 2 m o m 0 0 a) >� 0 m a- 0) 0 CL uj M m E 2 0 >, ol -�= 0 E — S cL E m u) 0 a2 o 70 = m 0- 0 U) (u -(Qu E a) w 0 2 -�5 U) a) -�� CL �: , a) C) c2: .2 (UU) -0 a) 0 to u) = L 2 )— a) 2) ' a) a) 3: 'T -i 0 a) Q-'E 0 U) U) U) — 2 :C:): > z U) = C: 0 z E a) 0 0 -0 'E a) 0) m �6 wm E 0 0 (D In a) -E U) -Fu .2 -0 C L -0 0 C a) m U) U) 0 cm -FU < �;, (au) = 0 m = c Ln E E a) 0 E 0 0 (1) (1) W < 0 CL 0 CL M 0 4E U) U) (1) 0 2 41= .- (.) j� U) 2 > a) a) m o E C� co 0 EL c a) a) 09 o a) (u 2 Ln -2 mn 0 0 LP 0)- a) E m 15 FL E cn CL -0 < m U) (7) uo) N Oo.E I to > CL 0 .0 0 0 to 0 0 0 m 0- m 0 FZ U) 0 0 0 z < .2 El 0 0 13 LL 0 r_ u 'It > 0 Z: 0) 0 0 2, 'a) ao m 0 0 0 Z 0) S 16 F 0 0 0 41 .— 0 a. m 6-0 o z 0) < m ib S El El 13 13 0 U) Z� 2 0 0 0) m IL U) U) 0 U) CL 0 0 0 0 m z > Cl) o . 0 > 0 Hydrologic Soil Group —Union County, North Carolina Hydrologic Soil Group Map unit symbol Map unit name Rating Acres in AOI Percent of AOI 2mx85 Badin channery silty C 52.7 65.2% clay loam, 2 to 8 percent slopes, moderately eroded 2mx8q Tarrus gravelly silty clay B 3.1 3.9% loam, 2 to 8 percent slopes, moderately eroded 3wOp Chewacla silt loam, 0 to B/D 14.3 17.7% 2 percent slopes, frequently flooded 3wl 2 Goldston-Badin D 10.7 13.2% complex, 8 to 15 percent slopes Totals for Area of Interest 80.9 100.0% USDA Natural Resources Web Soil Survey 2/17/2021 a-= Conservation Service National Cooperative Soil Survey Page 3 of 4 Hydrologic Soil Group —Union County, North Carolina Description Hydrologic soil groups are based on estimates of runoff potential. Soils are assigned to one of four groups according to the rate of water infiltration when the soils are not protected by vegetation, are thoroughly wet, and receive precipitation from long -duration storms. The soils in the United States are assigned to four groups (A, B, C, and D) and three dual classes (A/D, B/D, and C/D). The groups are defined as follows: Group A. Soils having a high infiltration rate (low runoff potential) when thoroughly wet. These consist mainly of deep, well drained to excessively drained sands or gravelly sands. These soils have a high rate of water transmission. Group B. Soils having a moderate infiltration rate when thoroughly wet. These consist chiefly of moderately deep or deep, moderately well drained or well drained soils that have moderately fine texture to moderately coarse texture. These soils have a moderate rate of water transmission. Group C. Soils having a slow infiltration rate when thoroughly wet. These consist chiefly of soils having a layer that impedes the downward movement of water or soils of moderately fine texture or fine texture. These soils have a slow rate of water transmission. Group D. Soils having a very slow infiltration rate (high runoff potential) when thoroughly wet. These consist chiefly of clays that have a high shrink -swell potential, soils that have a high water table, soils that have a claypan or clay layer at or near the surface, and soils that are shallow over nearly impervious material. These soils have a very slow rate of water transmission. If a soil is assigned to a dual hydrologic group (A/D, B/D, or C/D), the first letter is for drained areas and the second is for undrained areas. Only the soils that in their natural condition are in group D are assigned to dual classes. Rating Options Aggregation Method: Dominant Condition Component Percent Cutoff.- None Specified Tie -break Rule: Higher USDA Natural Resources Web Soil Survey 2/17/2021 Conservation Service National Cooperative Soil Survey Page 4 of 4 STORMWATER MANAGEMENT REPORT CRESSWIND WESLEY CHAPEL - PHASE 02 APPENDIX B PRE -DEVELOPMENT DRAINAGE MAP 27842.0002 Fq THOMAS & HUTTON (Alz P x STORMWATER MANAGEMENT REPORT CRESSWIND WESLEY CHAPEL - PHASE 02 APPENDIX C PRE -DEVELOPMENT CONDITIONS DRAINAGE CALCULATIONS 27842.0002 Fq THOMAS & HUTTON 277842.0002 CRESSWIND WESLEY CHAPEL - PHASE 02 PRE -DEVELOPMENT BASINS MODEL Pre -Development 002 - Year Page 1 Project Description File Name .................................................... 27842.0002 - Pre Development.SPF Project Options Flow Units ................................................... CIFS Elevation Type ............................................ Elevation Hydrology Method ....................................... SCS TR-55 Time of Concentration (TOC) Method ........ SCS TR-55 Link Routing Method ................................... Hydrodynamic Enable Overflow Poncling at Nodes ............ YES Skip Steady State Analysis Time Periods NO Analysis Options Start Analysis On ........................................ Dec 03, 2019 000000 End Analysis On .......................................... Dec 04, 2019 000000 Start Reporting On ...................................... Dec 03, 2019 000000 Antecedent Dry Days .................................. 0 days Runoff (Dry Weather) Time Step ................ 001 0000 days hh:mm:ss Runoff (Wet Weather) Time Step ............... 0000500 days hh:mm:ss Reporting Time Step ................................... 0000500 days hh:mm:ss Routing Time Step ...................................... 15 seconds Number of Elements Qty RainGages ................................................. 1 Subbasins.................................................... 2 Nodes........................................................... 2 Junctions -------------------------------------------- 0 Outfalls ----------------------------------------------- 2 Flow Diversions ---------------------------------- 0 Inlets--------------------------------------------------- 0 Storage Nodes ----------------------------------- 0 Links............................................................. 0 Channels -------------------------------------------- 0 Pipes-------------------------------------------------- 0 Pumps------------------------------------------------ 0 Orifices----------------------------------------------- 0 Weirs-------------------------------------------------- 0 Outlets------------------------------------------------ 0 Pollutants.................................................... 0 LandUses ................................................... 0 Rainfall Details SIN Rain Gage Data Data Source Rainfall Rain State County Return Rainfall Rainfall ID Source ID Type Units Period Depth Distribution (years) (inches) 1 Time Series TS-002 Intensity inches NorthCarolina Union 2 3.50 SCS Type 11 24-hr Pre -Development 002 - Year Page 2 Subbasin Summary SN Subbasin Area Peak Rate Weighted Total Total Total Peak Time of ID Factor Curve Rainfall Runoff Runoff Runoff Concentration Number Volume (ac) (in) (in) (ac-in) (cfs) (days hh:mm:ss) 1 SUB-01 63.74 484.00 75.96 3.50 1.36 86.88 65.63 0 003613 2 SUB-02 17.12 484.00 71.63 3.50 1.10 18.84 13.90 0 003502 Pre -Development 002 - Year Page 3 Node Summary SIN Element Element Invert Ground/Rim Initial Surcharge Poncled Peak Max HGL Max Min Time of Total Total Time ID Type Elevation (Max) Water Elevation Area Inflow Elevation Surcharge Freeboard Peak Flooded Flooded Elevation Elevation Attained Depth Attained Flooding Volume Attained Occurrence (ft) (ft) (ft) (ft) (ft') (cfs) (ft) (ft) (ft) (days hh:mm) (ac-in) (min) 1 Out-01 Outfall 540.00 0.00 0.00 2 Out-02 Outfall 556.00 0.00 0.00 Pre -Development 002 - Year Subbasin Hydrology Page 4 Subbasin : SUB-01 Input Data Area(ac) ........................................................................ 63.74 Peak Rate Factor ........................................................... 484.00 Weighted Curve Number ............................................... 75.96 Rain Gage I D ................................................................. Rain Gage-001 Composite Curve Number Area Soil Curve Soii/Surface Description (acres) Group Number Woods, Fair 14.32 D 79.00 Woods, Fair 10.68 D 79.00 Pasture, grassland, or range, Good 38.74 C 74.00 Composite Area & Weighted CN 63.74 75.96 Time of Concentration TOC Method SCSTR-55 Sheet Flow Equation : Tc = (0.007 * ((n * Lf)^0.8)) / ((PAO.5) * (SfAO.4)) Where Tc = Time of Concentration (hr) n = Manning's roughness Lf =Flow Length (ft) P = 2 yr, 24 hr Rainfall (inches) Sf =Slope (fVft) Shallow Concentrated Flow Equation V = 16.1345 (SfAO.5) (unpaved surface) V = 20.3282 (SfAO.5) (paved surface) V = 15.0 (SfAO.5) (grassed waterway surface) V = 10.0 (SfAO.5) (nearly bare & untilled surface) V = 9 0 (SfAO.5) (cultivated straight rows surface) V = 7.0 (SfAO.5) (short grass pasture surface) V = 5.0 (SfAO.5) (woodland surface) V = 2.5 (SfAO.5) (forest w/heavy litter surface) Tc = (U V) / (3600 sec/hr) Where Tc Time of Concentration (hr) Lf Flow Length (ft) V Velocity (fVsec) Sf Slope (fVft) Channel Flow Equation: * = (1.49 - (RA(2/3)) * (SfAO.5)) / n * =Aq/Wp Tc = (U / V) / (3600 sec/hr) Where Tc Time of Concentration (hr) Lf Flow Length (ft) R =Hydraulic Radius (ft) Aq = Flow Area (ft2) Wp = Wetted Perimeter (ft) V = Velocity (fVsec) Sf = Slope (ft/ft) n = Manning's roughness Pre -Development Sheet Flow Computations Manning's Roughness: Flow Length (ft): Slope (%): 2 yr, 24 hr Rainfall (in) Velocity (ft/sec) : Computed Flow Time (min): Shallow Concentrated Flow Computations Flow Length (ft): Slope (%): Surface Type Velocity (ft/sec) Computed Flow Time (min): Total TOC (min) .................. 36.23 Subbasin Runoff Results 002 - Year Page 5 Flowpath Flowpath Flowpath A B C 0.4 0.00 0.00 100 0.00 0.00 1 0.00 0.00 3.50 0.00 0.00 0.06 0.00 0.00 27.09 0.00 0.00 Flowpath Flowpath Flowpath A B C 1771 0.00 0.00 4 0.00 0.00 Unpaved Unpaved Unpaved 3.23 0.00 0.00 9.14 0.00 0.00 Total Rainfall (in) ............................................................ 3.50 Total Runoff (in) ............................................................. 1.36 Peak Runoff (cfs) ........................................................... 65.63 Weighted Curve Number ............................................... 75.96 Time of Concentration (days hh:mm:ss) ........................ 0003614 Pre -Development 002 - Year Page 6 Subbasin : SUB-01 5 4.8 4.6 44 4.2 4 3.8 3.6 3.4 3.2 3 2.8 2.b 2.4 m 22 ry 2 1.8 1.6 1.4 1.2 1 0.8 0.6 04 0.2 75 70 BF, 60 55 50 45 40 35 ry 30 25 20 15 10 F, Rainfall Intensity Graph 0 1 2 3 4 F, 6 7 a 9 in 11 12 13 14 1 F, 16 17 18 19 20 21 22 23 Time (hrs) Runoff Hydrograph 01234567891011121314151617181920212223 Time (hrs) Pre -Development 002 - Year Subbasin : SUB-02 Page 7 Input Data Area(ac) ........................................................................ 17.12 Peak Rate Factor ........................................................... 484.00 Weighted Curve Number ............................................... 71.63 Rain Gage I D ................................................................. Rain Gage-001 Composite Curve Number Area Soil Curve Soil/Surface Description (acres) Group Number Pasture, grassland, or range, Good 14.00 C 74.00 Pasture, grassland, or range, Good 3.12 B 61.00 Composite Area & Weighted CN 17.12 71.63 Time of Concentration Flowpath Flowpath Flowpath Sheet Flow Computations A B C Manning's Roughness: .4 0.00 0.00 Flow Length (ft): 100 0.00 0.00 Slope (%): 1.11 0.00 0.00 2 yr, 24 hr Rainfall (in) 3.50 0.00 0.00 Velocity (fUsec) : 0.06 0.00 0.00 Computed Flow Time (min): 25.99 0.00 0.00 Flowpath Flowpath Flowpath Shallow Concentrated Flow Computations A B C Flow Length (ft): 1531.55 0.00 0.00 Slope (%): 3.06 0.00 0.00 Surface Type Unpaved Unpaved Unpaved Velocity (fUsec) 2.82 0.00 0.00 Computed Flow Time (min): 9.05 0.00 0.00 Total TOC (min) .................. 35.04 Subbasin Runoff Results Total Rainfall (in) ............................................................ 3.50 Total Runoff (in) ............................................................. 1.10 Peak Runoff (cfs) ........................................................... 13.90 Weighted Curve Number ............................................... 71.63 Time of Concentration (days hh:mm:ss) ........................ 0003502 Pre -Development 002 - Year Page 8 Subbasin : SUB-02 5 4.8 4.6 44 4.2 4 3.8 3.6 3.4 3.2 3 2.8 2.b 2.4 m 22 ry 2 1.8 1.6 1.4 1.2 1 0.8 0.6 04 0.2 14.5 14 13.5 13 12.5 12 11.5 11 in JI 10 9.5 9 8.5 8 7.5 7 6.5 ry 5.5 5 4.5 4 3.5 3 2.5 2 1 JI 0.5 Rainfall Intensity Graph 0 1 2 3 4 F, 6 7 a 9 in 11 12 13 14 1 F, 16 17 18 19 20 21 22 23 Time (hrs) Runoff Hydrograph 01234567891011121314151617181920212223 Time (hrs) Pre -Development 010 - Year Page 1 Project Description File Name .................................................... 27842.0002 - Pre Development.SPF Project Options Flow Units ................................................... CIFS Elevation Type ............................................ Elevation Hydrology Method ....................................... SCS TR-55 Time of Concentration (TOC) Method ........ SCS TR-55 Link Routing Method ................................... Hydrodynamic Enable Overflow Poncling at Nodes ............ YES Skip Steady State Analysis Time Periods NO Analysis Options Start Analysis On ........................................ Dec 03, 2019 000000 End Analysis On .......................................... Dec 04, 2019 000000 Start Reporting On ...................................... Dec 03, 2019 000000 Antecedent Dry Days .................................. 0 days Runoff (Dry Weather) Time Step ................ 001 0000 days hh:mm:ss Runoff (Wet Weather) Time Step ............... 0000500 days hh:mm:ss Reporting Time Step ................................... 0000500 days hh:mm:ss Routing Time Step ...................................... 15 seconds Number of Elements Qty RainGages ................................................. 1 Subbasins.................................................... 2 Nodes........................................................... 2 Junctions -------------------------------------------- 0 Outfalls ----------------------------------------------- 2 Flow Diversions ---------------------------------- 0 Inlets--------------------------------------------------- 0 Storage Nodes ----------------------------------- 0 Links............................................................. 0 Channels -------------------------------------------- 0 Pipes-------------------------------------------------- 0 Pumps------------------------------------------------ 0 Orifices----------------------------------------------- 0 Weirs-------------------------------------------------- 0 Outlets------------------------------------------------ 0 Pollutants.................................................... 0 LandUses ................................................... 0 Rainfall Details SIN Rain Gage Data Data Source Rainfall Rain State County Return Rainfall Rainfall ID Source ID Type Units Period Depth Distribution (years) (inches) 1 Time Series TS-010 Intensity inches NorthCarolina Union 10 5.20 SCS Type 11 24-hr Pre -Development 010 - Year Page 2 Subbasin Summary SN Subbasin Area Peak Rate Weighted Total Total Total Peak Time of ID Factor Curve Rainfall Runoff Runoff Runoff Concentration Number Volume (ac) (in) (in) (ac-in) (cfs) (days hh:mm:ss) 1 SUB-01 63.74 484.00 75.96 5.20 2.70 171.97 134.44 0 003613 2 SUB-02 17.12 484.00 71.63 5.20 2.32 39.76 31.33 0 003502 Pre -Development 010 - Year Page 3 Node Summary SIN Element Element Invert Ground/Rim Initial Surcharge Poncled Peak Max HGL Max Min Time of Total Total Time ID Type Elevation (Max) Water Elevation Area Inflow Elevation Surcharge Freeboard Peak Flooded Flooded Elevation Elevation Attained Depth Attained Flooding Volume Attained Occurrence (ft) (ft) (ft) (ft) (ft') (cfs) (ft) (ft) (ft) (days hh:mm) (ac-in) (min) 1 Out-01 Outfall 540.00 0.00 0.00 2 Out-02 Outfall 556.00 0.00 0.00 Pre -Development 010 - Year Subbasin Hydrology Page 4 Subbasin : SUB-01 Input Data Area(ac) ........................................................................ 63.74 Peak Rate Factor ........................................................... 484.00 Weighted Curve Number ............................................... 75.96 Rain Gage I D ................................................................. Rain Gage-001 Composite Curve Number Area Soil Curve Soii/Surface Description (acres) Group Number Woods, Fair 14.32 D 79.00 Woods, Fair 10.68 D 79.00 Pasture, grassland, or range, Good 38.74 C 74.00 Composite Area & Weighted CN 63.74 75.96 Time of Concentration TOC Method SCSTR-55 Sheet Flow Equation : Tc = (0.007 * ((n * Lf)^0.8)) / ((PAO.5) * (SfAO.4)) Where Tc = Time of Concentration (hr) n = Manning's roughness Lf =Flow Length (ft) P = 2 yr, 24 hr Rainfall (inches) Sf =Slope (fVft) Shallow Concentrated Flow Equation V = 16.1345 (SfAO.5) (unpaved surface) V = 20.3282 (SfAO.5) (paved surface) V = 15.0 (SfAO.5) (grassed waterway surface) V = 10.0 (SfAO.5) (nearly bare & untilled surface) V = 9 0 (SfAO.5) (cultivated straight rows surface) V = 7.0 (SfAO.5) (short grass pasture surface) V = 5.0 (SfAO.5) (woodland surface) V = 2.5 (SfAO.5) (forest w/heavy litter surface) Tc = (U V) / (3600 sec/hr) Where Tc Time of Concentration (hr) Lf Flow Length (ft) V Velocity (fVsec) Sf Slope (fVft) Channel Flow Equation: * = (1.49 - (RA(2/3)) * (SfAO.5)) / n * =Aq/Wp Tc = (U / V) / (3600 sec/hr) Where Tc Time of Concentration (hr) Lf Flow Length (ft) R =Hydraulic Radius (ft) Aq = Flow Area (ft2) Wp = Wetted Perimeter (ft) V = Velocity (fVsec) Sf = Slope (ft/ft) n = Manning's roughness Pre -Development Sheet Flow Computations Manning's Roughness: Flow Length (ft): Slope (%): 2 yr, 24 hr Rainfall (in) Velocity (ft/sec) : Computed Flow Time (min): Shallow Concentrated Flow Computations Flow Length (ft): Slope (%): Surface Type Velocity (ft/sec) Computed Flow Time (min): Total TOC (min) .................. 36.23 Subbasin Runoff Results 010 - Year Page 5 Flowpath Flowpath Flowpath A B C 0.4 0.00 0.00 100 0.00 0.00 1 0.00 0.00 3.50 0.00 0.00 0.06 0.00 0.00 27.09 0.00 0.00 Flowpath Flowpath Flowpath A B C 1771 0.00 0.00 4 0.00 0.00 Unpaved Unpaved Unpaved 3.23 0.00 0.00 9.14 0.00 0.00 Total Rainfall (in) ............................................................ 5.20 Total Runoff (in) ............................................................. 2.70 Peak Runoff (cfs) ........................................................... 134.44 Weighted Curve Number ............................................... 75.96 Time of Concentration (days hh:mm:ss) ........................ 0003614 Pre -Development 010 - Year Page 6 Subbasin : SUB-01 7.5 7 6.5 6 5.5 5 4.5 -E 3.5 3 2.5 2 0.5 140 135 130 125 120 115 110 105 100 95 90 85 00 75 70 65 60 55 50 46 40 35 30 25 20 15 10 5 Rainfall Intensity Graph 0 1 2 3 4 F, 6 7 a 9 in 11 12 13 14 1 F, 16 17 18 19 20 21 22 23 Time (hrs) Runoff Hydrograph 01234567891011121314151617181920212223 Time (hrs) Pre -Development 010 - Year Subbasin : SUB-02 Page 7 Input Data Area(ac) ........................................................................ 17.12 Peak Rate Factor ........................................................... 484.00 Weighted Curve Number ............................................... 71.63 Rain Gage I D ................................................................. Rain Gage-001 Composite Curve Number Area Soil Curve Soil/Surface Description (acres) Group Number Pasture, grassland, or range, Good 14.00 C 74.00 Pasture, grassland, or range, Good 3.12 B 61.00 Composite Area & Weighted CN 17.12 71.63 Time of Concentration Flowpath Flowpath Flowpath Sheet Flow Computations A B C Manning's Roughness: .4 0.00 0.00 Flow Length (ft): 100 0.00 0.00 Slope (%): 1.11 0.00 0.00 2 yr, 24 hr Rainfall (in) 3.50 0.00 0.00 Velocity (fUsec) : 0.06 0.00 0.00 Computed Flow Time (min): 25.99 0.00 0.00 Flowpath Flowpath Flowpath Shallow Concentrated Flow Computations A B C Flow Length (ft): 1531.55 0.00 0.00 Slope (%): 3.06 0.00 0.00 Surface Type Unpaved Unpaved Unpaved Velocity (fUsec) 2.82 0.00 0.00 Computed Flow Time (min): 9.05 0.00 0.00 Total TOC (min) .................. 35.04 Subbasin Runoff Results Total Rainfall (in) ............................................................ 5.20 Total Runoff (in) ............................................................. 2.32 Peak Runoff (cfs) ........................................................... 31.33 Weighted Curve Number ............................................... 71.63 Time of Concentration (days hh:mm:ss) ........................ 0003502 Pre -Development 010 - Year Page 8 Subbasin : SUB-02 8 7.5 7 6.5 6 5.5 4.5 4 3.5 ry 3 2.5 2 0.5 34 32 30 28 26 24 22 20 18 16 ry 14 12 in 8 6 4 2 Rainfall Intensity Graph 0 1 2 3 4 F, 6 7 a 9 in 11 12 13 14 1 F, 16 17 18 19 20 21 22 23 Time (hrs) Runoff Hydrograph 01234567891011121314151617181920212223 Time (hrs) Pre -Development 025 - Year Page 1 Project Description File Name .................................................... 27842.0002 - Pre Development.SPF Project Options Flow Units ................................................... CIFS Elevation Type ............................................ Elevation Hydrology Method ....................................... SCS TR-55 Time of Concentration (TOC) Method ........ SCS TR-55 Link Routing Method ................................... Hydrodynamic Enable Overflow Poncling at Nodes ............ YES Skip Steady State Analysis Time Periods NO Analysis Options Start Analysis On ........................................ Dec 03, 2019 000000 End Analysis On .......................................... Dec 04, 2019 000000 Start Reporting On ...................................... Dec 03, 2019 000000 Antecedent Dry Days .................................. 0 days Runoff (Dry Weather) Time Step ................ 001 0000 days hh:mm:ss Runoff (Wet Weather) Time Step ............... 0000500 days hh:mm:ss Reporting Time Step ................................... 0000500 days hh:mm:ss Routing Time Step ...................................... 15 seconds Number of Elements Qty RainGages ................................................. 1 Subbasins.................................................... 2 Nodes........................................................... 2 Junctions -------------------------------------------- 0 Outfalls ----------------------------------------------- 2 Flow Diversions ---------------------------------- 0 Inlets--------------------------------------------------- 0 Storage Nodes ----------------------------------- 0 Links............................................................. 0 Channels -------------------------------------------- 0 Pipes-------------------------------------------------- 0 Pumps------------------------------------------------ 0 Orifices----------------------------------------------- 0 Weirs-------------------------------------------------- 0 Outlets------------------------------------------------ 0 Pollutants.................................................... 0 LandUses ................................................... 0 Rainfall Details SIN Rain Gage Data Data Source Rainfall Rain State County Return Rainfall Rainfall ID Source ID Type Units Period Depth Distribution (years) (inches) 1 Time Series TS-025 Intensity inches NorthCarolina Union 25 6.10 SCS Type 11 24-hr Pre -Development 025 - Year Page 2 Subbasin Summary SN Subbasin Area Peak Rate Weighted Total Total Total Peak Time of ID Factor Curve Rainfall Runoff Runoff Runoff Concentration Number Volume (ac) (in) (in) (ac-in) (cfs) (days hh:mm:ss) 1 SUB-01 63.74 484.00 75.96 6.10 3.46 220.73 173.39 0 003613 2 SUB-02 17.12 484.00 71.63 6.10 3.04 52.06 41.46 0 003502 Pre -Development 025 - Year Page 3 Node Summary SIN Element Element Invert Ground/Rim Initial Surcharge Poncled Peak Max HGL Max Min Time of Total Total Time ID Type Elevation (Max) Water Elevation Area Inflow Elevation Surcharge Freeboard Peak Flooded Flooded Elevation Elevation Attained Depth Attained Flooding Volume Attained Occurrence (ft) (ft) (ft) (ft) (ft') (cfs) (ft) (ft) (ft) (days hh:mm) (ac-in) (min) 1 Out-01 Outfall 540.00 0.00 0.00 2 Out-02 Outfall 556.00 0.00 0.00 Pre -Development 025 - Year Subbasin Hydrology Page 4 Subbasin : SUB-01 Input Data Area(ac) ........................................................................ 63.74 Peak Rate Factor ........................................................... 484.00 Weighted Curve Number ............................................... 75.96 Rain Gage I D ................................................................. Rain Gage-001 Composite Curve Number Area Soil Curve Soii/Surface Description (acres) Group Number Woods, Fair 14.32 D 79.00 Woods, Fair 10.68 D 79.00 Pasture, grassland, or range, Good 38.74 C 74.00 Composite Area & Weighted CN 63.74 75.96 Time of Concentration TOC Method SCSTR-55 Sheet Flow Equation : Tc = (0.007 * ((n * Lf)^0.8)) / ((PAO.5) * (SfAO.4)) Where Tc = Time of Concentration (hr) n = Manning's roughness Lf =Flow Length (ft) P = 2 yr, 24 hr Rainfall (inches) Sf =Slope (fVft) Shallow Concentrated Flow Equation V = 16.1345 (SfAO.5) (unpaved surface) V = 20.3282 (SfAO.5) (paved surface) V = 15.0 (SfAO.5) (grassed waterway surface) V = 10.0 (SfAO.5) (nearly bare & untilled surface) V = 9 0 (SfAO.5) (cultivated straight rows surface) V = 7.0 (SfAO.5) (short grass pasture surface) V = 5.0 (SfAO.5) (woodland surface) V = 2.5 (SfAO.5) (forest w/heavy litter surface) Tc = (U V) / (3600 sec/hr) Where Tc Time of Concentration (hr) Lf Flow Length (ft) V Velocity (fVsec) Sf Slope (fVft) Channel Flow Equation: * = (1.49 - (RA(2/3)) * (SfAO.5)) / n * =Aq/Wp Tc = (U / V) / (3600 sec/hr) Where Tc Time of Concentration (hr) Lf Flow Length (ft) R =Hydraulic Radius (ft) Aq = Flow Area (ft2) Wp = Wetted Perimeter (ft) V = Velocity (fVsec) Sf = Slope (ft/ft) n = Manning's roughness Pre -Development Sheet Flow Computations Manning's Roughness: Flow Length (ft): Slope (%): 2 yr, 24 hr Rainfall (in) Velocity (ft/sec) : Computed Flow Time (min): Shallow Concentrated Flow Computations Flow Length (ft): Slope (%): Surface Type Velocity (ft/sec) Computed Flow Time (min): Total TOC (min) .................. 36.23 Subbasin Runoff Results 025 - Year Page 5 Flowpath Flowpath Flowpath A B C 0.4 0.00 0.00 100 0.00 0.00 1 0.00 0.00 3.50 0.00 0.00 0.06 0.00 0.00 27.09 0.00 0.00 Flowpath Flowpath Flowpath A B C 1771 0.00 0.00 4 0.00 0.00 Unpaved Unpaved Unpaved 3.23 0.00 0.00 9.14 0.00 0.00 Total Rainfall (in) ............................................................ 6.10 Total Runoff (in) ............................................................. 3.46 Peak Runoff (cfs) ........................................................... 173.39 Weighted Curve Number ............................................... 75.96 Time of Concentration (days hh:mm:ss) ........................ 0003614 Pre -Development 025 - Year Page 6 Subbasin : SUB-01 7.5 7 6.5 6 5.5 5 4.5 -E 4 3.6 3 2.5 2 1 JI 0.5 190 180 170 160 150 140 130 120 110 100 90 80 70 60 60 40 30 20 in Rainfall Intensity Graph 0 1 2 3 4 F, 6 7 a 9 in 11 12 13 14 1 F, 16 17 18 19 20 21 22 23 Time (hrs) Runoff Hydrograph 01234567891011121314151617181920212223 Time (hrs) Pre -Development 025 - Year Subbasin : SUB-02 Page 7 Input Data Area(ac) ........................................................................ 17.12 Peak Rate Factor ........................................................... 484.00 Weighted Curve Number ............................................... 71.63 Rain Gage I D ................................................................. Rain Gage-001 Composite Curve Number Area Soil Curve Soil/Surface Description (acres) Group Number Pasture, grassland, or range, Good 14.00 C 74.00 Pasture, grassland, or range, Good 3.12 B 61.00 Composite Area & Weighted CN 17.12 71.63 Time of Concentration Flowpath Flowpath Flowpath Sheet Flow Computations A B C Manning's Roughness: .4 0.00 0.00 Flow Length (ft): 100 0.00 0.00 Slope (%): 1.11 0.00 0.00 2 yr, 24 hr Rainfall (in) 3.50 0.00 0.00 Velocity (fUsec) : 0.06 0.00 0.00 Computed Flow Time (min): 25.99 0.00 0.00 Flowpath Flowpath Flowpath Shallow Concentrated Flow Computations A B C Flow Length (ft): 1531.55 0.00 0.00 Slope (%): 3.06 0.00 0.00 Surface Type Unpaved Unpaved Unpaved Velocity (fUsec) 2.82 0.00 0.00 Computed Flow Time (min): 9.05 0.00 0.00 Total TOC (min) .................. 35.04 Subbasin Runoff Results Total Rainfall (in) ............................................................ 6.10 Total Runoff (in) ............................................................. 3.04 Peak Runoff (cfs) ........................................................... 41.46 Weighted Curve Number ............................................... 71.63 Time of Concentration (days hh:mm:ss) ........................ 0003502 Pre -Development 025 - Year Page 8 Subbasin : SUB-02 9 8.5 8 7.5 7 6.6 6 5.5 5 4.5 4 ry 3 F, 3 2.5 2 1.5 0 F, 44 42 40 38 36 34 32 30 28 26 24 22 o 20 ry 18 16 14 12 10 8 6 4 2 Rainfall Intensity Graph 0 1 2 3 4 F, 6 7 a 9 in 11 12 13 14 1 F, 16 17 18 19 20 21 22 23 Time (hrs) Runoff Hydrograph 01234567891011121314151617181920212223 Time (hrs) Pre -Development 050 - Year Page 1 Project Description File Name .................................................... 27842.0002 - Pre Development.SPF Project Options Flow Units ................................................... CIFS Elevation Type ............................................ Elevation Hydrology Method ....................................... SCS TR-55 Time of Concentration (TOC) Method ........ SCS TR-55 Link Routing Method ................................... Hydrodynamic Enable Overflow Poncling at Nodes ............ YES Skip Steady State Analysis Time Periods NO Analysis Options Start Analysis On ........................................ Dec 03, 2019 000000 End Analysis On .......................................... Dec 04, 2019 000000 Start Reporting On ...................................... Dec 03, 2019 000000 Antecedent Dry Days .................................. 0 days Runoff (Dry Weather) Time Step ................ 001 0000 days hh:mm:ss Runoff (Wet Weather) Time Step ............... 0000500 days hh:mm:ss Reporting Time Step ................................... 0000500 days hh:mm:ss Routing Time Step ...................................... 15 seconds Number of Elements Qty RainGages ................................................. 1 Subbasins.................................................... 2 Nodes........................................................... 2 Junctions -------------------------------------------- 0 Outfalls ----------------------------------------------- 2 Flow Diversions ---------------------------------- 0 Inlets--------------------------------------------------- 0 Storage Nodes ----------------------------------- 0 Links............................................................. 0 Channels -------------------------------------------- 0 Pipes-------------------------------------------------- 0 Pumps------------------------------------------------ 0 Orifices----------------------------------------------- 0 Weirs-------------------------------------------------- 0 Outlets------------------------------------------------ 0 Pollutants.................................................... 0 LandUses ................................................... 0 Rainfall Details SIN Rain Gage Data Data Source Rainfall Rain State County Return Rainfall Rainfall ID Source ID Type Units Period Depth Distribution (years) (inches) 1 Time Series TS-050 Intensity inches NorthCarolina Union 50 6.90 SCS Type 11 24-hr Pre -Development 050 - Year Page 2 Subbasin Summary SN Subbasin Area Peak Rate Weighted Total Total Total Peak Time of ID Factor Curve Rainfall Runoff Runoff Runoff Concentration Number Volume (ac) (in) (in) (ac-in) (cfs) (days hh:mm:ss) 1 SUB-01 63.74 484.00 75.96 6.90 4.16 265.41 208.73 0 003613 2 SUB-02 17.12 484.00 71.63 6.90 3.71 63.44 50.84 0 003502 Pre -Development 050 - Year Page 3 Node Summary SIN Element Element Invert Ground/Rim Initial Surcharge Poncled Peak Max HGL Max Min Time of Total Total Time ID Type Elevation (Max) Water Elevation Area Inflow Elevation Surcharge Freeboard Peak Flooded Flooded Elevation Elevation Attained Depth Attained Flooding Volume Attained Occurrence (ft) (ft) (ft) (ft) (ft') (cfs) (ft) (ft) (ft) (days hh:mm) (ac-in) (min) 1 Out-01 Outfall 540.00 0.00 0.00 2 Out-02 Outfall 556.00 0.00 0.00 Pre -Development 050 - Year Subbasin Hydrology Page 4 Subbasin : SUB-01 Input Data Area(ac) ........................................................................ 63.74 Peak Rate Factor ........................................................... 484.00 Weighted Curve Number ............................................... 75.96 Rain Gage I D ................................................................. Rain Gage-001 Composite Curve Number Area Soil Curve Soii/Surface Description (acres) Group Number Woods, Fair 14.32 D 79.00 Woods, Fair 10.68 D 79.00 Pasture, grassland, or range, Good 38.74 C 74.00 Composite Area & Weighted CN 63.74 75.96 Time of Concentration TOC Method SCSTR-55 Sheet Flow Equation : Tc = (0.007 * ((n * Lf)^0.8)) / ((PAO.5) * (SfAO.4)) Where Tc = Time of Concentration (hr) n = Manning's roughness Lf =Flow Length (ft) P = 2 yr, 24 hr Rainfall (inches) Sf =Slope (fVft) Shallow Concentrated Flow Equation V = 16.1345 (SfAO.5) (unpaved surface) V = 20.3282 (SfAO.5) (paved surface) V = 15.0 (SfAO.5) (grassed waterway surface) V = 10.0 (SfAO.5) (nearly bare & untilled surface) V = 9 0 (SfAO.5) (cultivated straight rows surface) V = 7.0 (SfAO.5) (short grass pasture surface) V = 5.0 (SfAO.5) (woodland surface) V = 2.5 (SfAO.5) (forest w/heavy litter surface) Tc = (U V) / (3600 sec/hr) Where Tc Time of Concentration (hr) Lf Flow Length (ft) V Velocity (fVsec) Sf Slope (fVft) Channel Flow Equation: * = (1.49 - (RA(2/3)) * (SfAO.5)) / n * =Aq/Wp Tc = (U / V) / (3600 sec/hr) Where Tc Time of Concentration (hr) Lf Flow Length (ft) R =Hydraulic Radius (ft) Aq = Flow Area (ft2) Wp = Wetted Perimeter (ft) V = Velocity (fVsec) Sf = Slope (ft/ft) n = Manning's roughness Pre -Development Sheet Flow Computations Manning's Roughness: Flow Length (ft): Slope (%): 2 yr, 24 hr Rainfall (in) Velocity (ft/sec) : Computed Flow Time (min): Shallow Concentrated Flow Computations Flow Length (ft): Slope (%): Surface Type Velocity (ft/sec) Computed Flow Time (min): Total TOC (min) .................. 36.23 Subbasin Runoff Results 050 - Year Page 5 Flowpath Flowpath Flowpath A B C 0.4 0.00 0.00 100 0.00 0.00 1 0.00 0.00 3.50 0.00 0.00 0.06 0.00 0.00 27.09 0.00 0.00 Flowpath Flowpath Flowpath A B C 1771 0.00 0.00 4 0.00 0.00 Unpaved Unpaved Unpaved 3.23 0.00 0.00 9.14 0.00 0.00 Total Rainfall (in) ............................................................ 6.90 Total Runoff (in) ............................................................. 4.16 Peak Runoff (cfs) ........................................................... 208.73 Weighted Curve Number ............................................... 75.96 Time of Concentration (days hh:mm:ss) ........................ 0003614 Pre -Development 050 - Year Page 6 Subbasin : SUB-01 8 7.5 7 6.5 6 5.5 5 4.5 ry 4 3.5 3 2.5 2 1.5 1 0.5 220 210 200 190 180 170 160 160 140 130 120 110 o 100 ry 90 an 70 60 60 40 30 20 10 Rainfall Intensity Graph 0 1 2 3 4 F, 6 7 a 9 in 11 12 13 14 1 F, 16 17 18 19 20 21 22 23 Time (hrs) Runoff Hydrograph 01234567891011121314151617181920212223 Time (hrs) Pre -Development 050 - Year Subbasin : SUB-02 Page 7 Input Data Area(ac) ........................................................................ 17.12 Peak Rate Factor ........................................................... 484.00 Weighted Curve Number ............................................... 71.63 Rain Gage I D ................................................................. Rain Gage-001 Composite Curve Number Area Soil Curve Soil/Surface Description (acres) Group Number Pasture, grassland, or range, Good 14.00 C 74.00 Pasture, grassland, or range, Good 3.12 B 61.00 Composite Area & Weighted CN 17.12 71.63 Time of Concentration Flowpath Flowpath Flowpath Sheet Flow Computations A B C Manning's Roughness: .4 0.00 0.00 Flow Length (ft): 100 0.00 0.00 Slope (%): 1.11 0.00 0.00 2 yr, 24 hr Rainfall (in) 3.50 0.00 0.00 Velocity (fUsec) : 0.06 0.00 0.00 Computed Flow Time (min): 25.99 0.00 0.00 Flowpath Flowpath Flowpath Shallow Concentrated Flow Computations A B C Flow Length (ft): 1531.55 0.00 0.00 Slope (%): 3.06 0.00 0.00 Surface Type Unpaved Unpaved Unpaved Velocity (fUsec) 2.82 0.00 0.00 Computed Flow Time (min): 9.05 0.00 0.00 Total TOC (min) .................. 35.04 Subbasin Runoff Results Total Rainfall (in) ............................................................ 6.90 Total Runoff (in) ............................................................. 3.71 Peak Runoff (cfs) ........................................................... 50.84 Weighted Curve Number ............................................... 71.63 Time of Concentration (days hh:mm:ss) ........................ 0003502 Pre -Development 050 - Year Page 8 Subbasin : SUB-02 10 9.5 9 8.6 8 7 F, 7 6.5 6 5.5 5 4.5 ry 4 3.6 3 2.5 2 1.6 1 0.6 54 52 50 48 46 44 42 40 30 36 34 32 F 30 28 26 r ' 24 y 22 20 18 16 14 12 in 8 6 4 2 Rainfall Intensity Graph 0 1 2 3 4 F, 6 7 a 9 in 11 12 13 14 1 F, 16 17 18 19 20 21 22 23 Time (hrs) Runoff Hydrograph 01234567891011121314151617181920212223 Time (hrs) STORMWATER MANAGEMENT REPORT CRESSWIND WESLEY CHAPEL - PHASE 02 APPENDix D POST- DEVELOPMENT DRAINAGE MAP A THOMAS & HUTTON t 0 z 4- g �Al '14 III STORMWATER MANAGEMENT REPORT CRESSWIND WESLEY CHAPEL - PHASE 02 APPENDix E POST- DEVELOPMENT CONDITIONS DRAINAGE CALCULATIONS A THOMAS & HUTTON 277842.0002 CRESSWIND WESLEY CHAPEL - PHASE 02 POST -DEVELOPMENT BASINS MODEL Post -Development 002 - Year Page 1 Project Description File Name .................................................... 27842.0002 - Post Development.SPF Project Options Flow Units ................................................... CIFS Elevation Type ............................................ Elevation Hydrology Method ....................................... SCS TR-55 Time of Concentration (TOC) Method ........ SCS TR-55 Link Routing Method ................................... Hydrodynamic Enable Overflow Poncling at Nodes ............ YES Skip Steady State Analysis Time Periods NO Analysis Options Start Analysis On ........................................ Dec 03, 2020 000000 End Analysis On .......................................... Dec 04, 2020 000000 Start Reporting On ...................................... Dec 03, 2020 000000 Antecedent Dry Days .................................. 0 days Runoff (Dry Weather) Time Step ................ 001 0000 days hh:mm:ss Runoff (Wet Weather) Time Step ............... 0000500 days hh:mm:ss Reporting Time Step ................................... 0000500 days hh:mm:ss Routing Time Step ...................................... 1 seconds Number of Elements Qty RainGages ................................................. 1 Subbasins.................................................... 3 Nodes........................................................... 5 Junctions -------------------------------------------- 2 Outfalls ----------------------------------------------- 2 Flow Diversions ---------------------------------- 0 Inlets--------------------------------------------------- 0 Storage Nodes ----------------------------------- 1 Links............................................................. 6 Channels -------------------------------------------- 1 Pipes-------------------------------------------------- 1 Pumps------------------------------------------------ 0 Orifices----------------------------------------------- 2 Weirs-------------------------------------------------- 2 Outlets------------------------------------------------ 0 Pollutants.................................................... 0 LandUses ................................................... 0 Rainfall Details SIN Rain Gage Data Data Source Rainfall Rain State County Return Rainfall Rainfall ID Source ID Type Units Period Depth Distribution (years) (inches) 1 Time Series TS-002 Intensity inches NorthCarolina Union 2 3.50 SCS Type III 24-hr Post -Development 002 - Year Page 2 Subbasin Summary SN Subbasin Area Peak Rate Weighted Total Total Total Peak Time of ID Factor Curve Rainfall Runoff Runoff Runoff Concentration Number Volume (ac) (in) (in) (ac-in) (cfs) (days hh:mm:ss) 1 POST-DEVELOPMENT-BASIN-SUB-01B 45.50 484.00 85.92 3.50 2.09 95.19 98.63 0 000500 2 UNDISTURBED-BASIN-SUB-01A 23.79 484.00 79.00 3.50 1.57 37.25 22.56 0 003657 3 UNDISTURBED-BASIN-SUB-02 13.14 484.00 70.54 3.50 1.04 13.64 8.32 0 003148 Post -Development 002 - Year Page 3 Node Summary SIN Element Element Invert Ground/Rim Initial Surcharge Poncled Peak Max HGL Max Min Time of Total Total Time ID Type Elevation (Max) Water Elevation Area I nflow Elevation Surcharge Freeboard Peak Flooded Flooded Elevation Elevation Attained Depth Attained Flooding Volume Attained Occurrence (ft) (ft) (ft) (ft) (ft) (cfs) (ft) (ft) (ft) (days hh:mm) (ac-in) (min) 1 CS Junction 555.00 570.20 558.00 999.00 0.00 43.89 558.00 0.00 12.20 0 0000 0.00 0.00 2 Jun-03 Junction 559.00 570.20 559.00 999.00 0.00 21.64 559.79 0.00 10.41 0 0000 0.00 0.00 3 Out-01 Outfall 553.30 59.58 553.30 4 Out-02 Outfall 560.00 8.32 560.00 5 Pond-03 Storage Node 559.00 571.50 565.00 0.00 97.05 567.99 0.00 0.00 0 0 E 0 0 0- w o 0 1 w 0 w 1 0 0 E w 00 E o o 0 0 m m 0 0 m o o 0 W 0 3: 0 M. 0 0 > 3:.o m o 0 00 o o 0 w 0 0 N mo t000 00 W M 0 0 0 0 N ol �2 0 00 00 0 0 0 00 0 0 0 0 W 0000 z N 00 E 0 m . C, w 00 00 m 0 00 > 00 E000000 om0000 0 � m m 0 m > 000000 w 000000 w Z4,fg E000000 Ew000000 > 000000 000000 w 0 0 tt� 0 0 00 00 C? C? C? U) 0 U) 0 0 0 m m C? C? C? C? E C? . . . . 2w.'o U) C? C? w m w m C? I C? < N E In 0 C? E wE W U) w 0 0 U') U) r Post -Development 002 - Year Subbasin Hydrology Page 5 Subbasin : POST-DEVELOPMENT-BASIN-SUB-01B Input Data Area(ac) ........................................................................ 45.50 Peak Rate Factor ........................................................... 484.00 Weighted Curve Number ............................................... 85.92 Rain Gage I D ................................................................. Rain Gage-001 Composite Curve Number Area Soil Curve Sol/Surface Description (acres) Group Number Paved parking & roofs 13.67 B 98.00 � 75% grass cover, Good 14.69 B 61.00 Future -Paved parking & roofs 16.63 B 98.00 Composite Area & Weighted CN 44.99 85.92 Time of Concentration TOC Method SCSTR-55 Sheet Flow Equation : Tc = (0.007 * ((n * Lf)^0.8)) / ((PAO.5) * (SfAO.4)) Where Tc = Time of Concentration (hr) n = Manning's roughness Lf =Flow Length (ft) P = 2 yr, 24 hr Rainfall (inches) Sf =Slope (fVft) Shallow Concentrated Flow Equation V = 16.1345 (SfAO.5) (unpaved surface) V = 20.3282 (SfAO.5) (paved surface) V = 15.0 (SfAO.5) (grassed waterway surface) V = 10.0 (SfAO.5) (nearly bare & untilled surface) V = 9 0 (SfAO.5) (cultivated straight rows surface) V = 7.0 (SfAO.5) (short grass pasture surface) V = 5.0 (SfAO.5) (woodland surface) V = 2.5 (SfAO.5) (forest w/heavy litter surface) Tc = (Lf V) / (3600 sec/hr) Where Tc Time of Concentration (hr) Lf Flow Length (ft) V Velocity (fVsec) Sf Slope (fVft) Channel Flow Equation: * = (1.49 - (RA(2/3)) * (SfAO.5)) / n * =Aq/Wp Tc = (Lf / V) / (3600 sec/hr) Where Tc Time of Concentration (hr) Lf Flow Length (ft) R =Hydraulic Radius (ft) Aq = Flow Area (ft2) Wp = Wetted Perimeter (ft) V = Velocity (fVsec) Sf = Slope (ft/ft) n = Manning's roughness User -Defined TOC override (minutes): 5.00 Subbasin Runoff Results Total Rainfall (in) ............................................................ 3.50 Total Runoff (in) ............................................................. 2.09 Peak Runoff (cfs) ........................................................... 98.63 Weighted Curve Number ............................................... 85.92 Time of Concentration (days hh:mm:ss) ........................ 0000500 Post -Development 002 - Year Page 6 Subbasin : POST-DEVELOPMENT-BASIN-SUB-01B 3 2.9 2.8 2.7 2.6 2.5 2.4 2.3 2.2 2.1 2 1.9 1.8 1.7 1 6 1.5 -E 1.4 r m 1.3 y 1.2 1.1 1 0.9 0.8 0.7 06 0.5 0.4 0.3 0.2 0.1 105 100 95 90 05 80 75 70 65 60 55 50 45 40 35 30 25 20 15 10 5 Rainfall Intensity Graph 0 1 2 3 4 41 6 7 a 9 in 11 12 13 14 1 F, 16 17 18 19 20 21 22 23 Time (hrs) Ru n off Hyd ro g raph 01234567891011121314151617181920212223 Time (hrs) Post -Development 002 - Year Subbasin : UNDISTURBED-BASIN-SUB-01A Page 7 Input Data Area(ac) ........................................................................ 23.79 Peak Rate Factor ........................................................... 484.00 Weighted Curve Number ............................................... 79.00 Rain Gage I D ................................................................. Rain Gage-001 Composite Curve Number Area Soil Curve Soil/Surface Description (acres) Group Number Woods, Fair 23.79 D 79.00 Composite Area & Weighted CN 23.79 79.00 Time of Concentration Subarea Subarea Subarea Sheet Flow Computations A B C Manning's Roughness: .4 0.00 0.00 Flow Length (ft): 100 0.00 0.00 Slope (%): 9.5 0.00 0.00 2 yr, 24 hr Rainfall (in) 3.50 0.00 0.00 Velocity (fUsec) : 0.15 0.00 0.00 Computed Flow Time (min) 11.01 0.00 0.00 Subarea Subarea Subarea Shallow Concentrated Flow Computations A B C Flow Length (ft): 1370 0.00 0.00 Slope (%): .3 0.00 0.00 Surface Type Unpaved Unpaved Unpaved Velocity (fUsec) 0.88 0.00 0.00 Computed Flow Time (min): 25.95 0.00 0.00 Total TOC (min) .................. 36.96 Subbasin Runoff Results Total Rainfall (in) ............................................................ 3.50 Total Runoff (in) ............................................................. 1.57 Peak Runoff (cfs) ........................................................... 22.56 Weighted Curve Number ............................................... 79.00 Time of Concentration (days hh:mm:ss) ........................ 0003658 Post -Development 002 - Year Page 8 Subbasin : UNDISTURBED-BASIN-SUB-01A 3.1 3 2.9 28 2.7 2.6 2.5 24 2.3 2.2 2.1 2 1.9 1.8 E 1.7 1.6 1.6 1 4 ry 1.3 1.2 1 1 1 0.9 0.8 0.7 0.6 0.5 04 0.3 0.2 0 1 24 23 22 21 20 19 18 17 16 15 14 13 12 o 11 11 ch 10 9 8 7 6 F, 4 3 2 1 Rainfall Intensity Graph 0 1 2 3 4 41 6 7 a 9 in 11 12 13 14 1 F, 16 17 18 19 20 21 22 23 Time (hrs) Ru n off Hyd ro g raph 01234567891011121314151617181920212223 Time (hrs) Post -Development 002 - Year Subbasin : UNDISTURBED-BASIN-SUB-02 Page 9 Input Data Area(ac) ........................................................................ 13.14 Peak Rate Factor ........................................................... 484.00 Weighted Curve Number ............................................... 70.54 Rain Gage I D ................................................................. Rain Gage-001 Composite Curve Number Area Soil Curve Soil/Surface Description (acres) Group Number Pasture, grassland, or range, Good 3.13 B 61.00 9.65 74.00 0.37 61.00 Composite Area & Weighted CN 13.15 70.54 Time of Concentration Sheet Flow Computations Manning's Roughness: Flow Length (ft): Slope (%): 2 yr, 24 hr Rainfall (in) Velocity (fUsec) : Computed Flow Time (min): Total TOC (min) .................. 31.80 Subbasin Runoff Results Subarea Subarea Subarea A B C .4 0.00 0.00 100 0.00 0.00 .67 0.00 0.00 3.50 0.00 0.00 0.05 0.00 0.00 31.80 0.00 0.00 Total Rainfall (in) ............................................................ 3.50 Total Runoff (in) ............................................................. 1.04 Peak Runoff (cfs) ........................................................... 8.32 Weighted Curve Number ............................................... 70.54 Time of Concentration (days hh:mm:ss) ........................ 00031 48 Post -Development 002 - Year Page 10 Subbasin : UNDISTURBED-BASIN-SUB-02 3.1 3 2.9 28 2.7 2.6 2.5 24 2.3 2.2 2.1 2 1.9 1.8 E 1.7 1.6 1.6 1 4 ry 1.3 1.2 1 1 1 0.9 0.8 0.7 0.6 0.5 04 0.3 0.2 0 1 9 7.5 7 6.5 6 5.5 4.5 o 4 ry 3.5 3 2.5 2 1.5 1 0.5 Rainfall Intensity Graph 0 1 2 3 4 41 6 7 a 9 in 11 12 13 14 1 F, 16 17 18 19 20 21 22 23 Time (hrs) Ru n off Hyd ro g raph 01234567891011121314151617181920212223 Time (hrs) Post -Development 002 - Year Page 11 Channel Input SIN Element Length Inlet Inlet Outlet Outlet Total Average Shape Height Width Manning's Entrance Exit/Bend Additional Initial Flap ID Invert Invert Invert Invert Drop Slope Roughness Losses Losses Losses Flow Gate Elevation Offset Elevation Offset (ft) (ft) (ft) (ft) (ft) (ft) (%) (ft) (ft) (cfs) 1 Link-02 50.00 555.00 0.00 554.90 1.60 0.10 0.2000 Rectangular 2.000 5.000 0.0010 0.5000 0.5000 0.0000 0.00 No Post -Development 002 - Year Page 12 Channel Results SN Element Peak Time of Design Flow Peak Flow/ Peak Flow Travel Peak Flow Peak Flow Total Time Froucle Reported ID Flow Peak Flow Capacity Design Flow Velocity Time Depth Depth/ Surcharged NumberConclition Occurrence Ratio Total Depth Ratio (cfs) (days hh:mm) (cfs) (fUsec) (min) (ft) (min) 1 Link-02 59.58 0 0000 712.92 0.08 15.05 0.06 0.97 0.59 0.00 Post -Development 002 - Year Page 13 Pipe Input SIN Element Length Inlet Inlet Outlet Outlet Total Average Pipe Pipe Pipe Manning's Entrance Exit/Bend Additional Initial Flap ID Invert Invert Invert Invert Drop Slope Shape Diameteror Width Roughness Losses Losses Losses Flow Gate Elevation Offset Elevation Offset Height (ft) (ft) (ft) (ft) (ft) (ft) (%) (in) (in) (cfs) 1 Outlet-Pipe-03 65.00 559.00 0.00 555.00 0.00 4.00 6.1500 CIRCULAR 42.000 42.000 0.0130 0.5000 0.5000 0.0000 0.00 No Post -Development 002 - Year Page 14 No. of Barrels Post -Development 002 - Year Page 15 Pipe Results SN Element Peak Time of Design Flow Peak Flow/ Peak Flow Travel Peak Flow Peak Flow Total Time Froucle Reported ID Flow Peak Flow Capacity Design Flow Velocity Time Depth Depth/ Surcharged NumberConclition Occurrence Ratio Total Depth Ratio (cfs) (days hh:mm) (cfs) (fUsec) (min) (ft) (min) 1 Outlet-Pipe-03 21.64 0 1235 249.58 0.09 8.98 0.12 1.21 0.43 0.00 Calculated Post -Development 002 - Year Page 16 Storage Nodes Storage Node : Pond-03 Input Data Invert Elevation (ft) .................................................................... 559.00 Max (Rim) Elevation (ft) ............................................................ 571.50 Max (Rim) Offset (ft) ................................................................. 12.50 Initial Water Elevation (ft) .......................................................... 565.00 Initial Water Depth (ft) ............................................................... 6.00 Poncled Area (ft2) ....................................................................... 0.00 Evaporation Loss ....................................................................... 0.00 OutflowWeirs SIN Element Weir Flap Crest Crest Length WeirTotal Discharge ID Type Gate Elevation Offset Height Coefficient (ft) (ft) (ft) (ft) 1 Spillway-03 Trapezoidal No 571.00 12.00 50.00 0.50 3.33 2 Weir-03A Rectangular No 566.80 7.80 5.00 1.20 3.33 Outflow Orifices SIN Element Orifice Orifice Flap Circular Rectangular Rectangular Orifice Orifice ID Type Shape Gate Orifice Orifice Orifice Invert Coefficient Diameter Height Width Elevation (in) (in) (in) (ft) 1 CS-Rim-03 Bottom Rectangular No 60.00 60.00 568.00 0.63 2 WQ-Orifice-03 Side CIRCULAR No 5.00 565.00 0.61 Output Summary Results Peak Inflow (cfs) ........................................................................ 97.05 Peak Lateral Inflow (cfs) ............................................................ 97.05 Peak Outflow (cfs) ..................................................................... 21.64 Peak Exfiftration Flow Rate (cfm) .............................................. 0.00 Max HGL Elevation Attained (ft) ................................................ 567.99 Max HGL Depth Attained (ft) ..................................................... 8.99 Average HGL Elevation Attained (ft) ......................................... 566.13 Average HGL Depth Attained (ft) .............................................. 7.13 Time of Max HGL Occurrence (days hh:mm) ........................... 0 1235 Total Exfiltration Volume (1 000-ft3) ........................................... 0.000 Total Flooded Volume (ac-in) .................................................... 0 Total Time Flooded (min) .......................................................... 0 Total Retention Time (sec) ........................................................ 0.00 Post -Development 010 - Year Page 1 Project Description File Name .................................................... 27842.0002 - Post Development.SPF Project Options Flow Units ................................................... CIFS Elevation Type ............................................ Elevation Hydrology Method ....................................... SCS TR-55 Time of Concentration (TOC) Method ........ SCS TR-55 Link Routing Method ................................... Hydrodynamic Enable Overflow Poncling at Nodes ............ YES Skip Steady State Analysis Time Periods NO Analysis Options Start Analysis On ........................................ Dec 03, 2020 000000 End Analysis On .......................................... Dec 04, 2020 000000 Start Reporting On ...................................... Dec 03, 2020 000000 Antecedent Dry Days .................................. 0 days Runoff (Dry Weather) Time Step ................ 001 0000 days hh:mm:ss Runoff (Wet Weather) Time Step ............... 0000500 days hh:mm:ss Reporting Time Step ................................... 0000500 days hh:mm:ss Routing Time Step ...................................... 1 seconds Number of Elements Qty RainGages ................................................. 1 Subbasins.................................................... 3 Nodes........................................................... 5 Junctions -------------------------------------------- 2 Outfalls ----------------------------------------------- 2 Flow Diversions ---------------------------------- 0 Inlets--------------------------------------------------- 0 Storage Nodes ----------------------------------- 1 Links............................................................. 6 Channels -------------------------------------------- 1 Pipes-------------------------------------------------- 1 Pumps------------------------------------------------ 0 Orifices----------------------------------------------- 2 Weirs-------------------------------------------------- 2 Outlets------------------------------------------------ 0 Pollutants.................................................... 0 LandUses ................................................... 0 Rainfall Details SIN Rain Gage Data Data Source Rainfall Rain State County Return Rainfall Rainfall ID Source ID Type Units Period Depth Distribution (years) (inches) 1 Time Series TS-010 Intensity inches NorthCarolina Union 10 5.20 SCS Type III 24-hr Post -Development 010 - Year Page 2 Subbasin Summary SN Subbasin Area Peak Rate Weighted Total Total Total Peak Time of ID Factor Curve Rainfall Runoff Runoff Runoff Concentration Number Volume (ac) (in) (in) (ac-in) (cfs) (days hh:mm:ss) 1 POST-DEVELOPMENT-BASIN-SUB-01B 45.50 484.00 85.92 5.20 3.65 165.89 167.52 0 000500 2 UNDISTURBED-BASIN-SUB-01A 23.79 484.00 79.00 5.20 2.98 70.77 43.39 0 003657 3 UNDISTURBED-BASIN-SUB-02 13.14 484.00 70.54 5.20 2.23 29.30 18.96 0 003148 Post -Development 010 - Year Page 3 Node Summary SIN Element Element Invert Ground/Rim Initial Surcharge Poncled Peak Max HGL Max Min Time of Total Total Time ID Type Elevation (Max) Water Elevation Area I nflow Elevation Surcharge Freeboard Peak Flooded Flooded Elevation Elevation Attained Depth Attained Flooding Volume Attained Occurrence (ft) (ft) (ft) (ft) (ft') (cfs) (ft) (ft) (ft) (days hh:mm) (ac-in) (min) 1 CS Junction 555.00 570.20 558.00 999.00 0.00 129.39 561.01 0.00 9.19 0 0000 0.00 0.00 2 Jun-03 Junction 559.00 570.20 559.00 999.00 0.00 94.90 563.04 0.00 7.16 0 0000 0.00 0.00 3 Out-01 Outfall 553.30 129.37 553.30 4 Out-02 Outfall 560.00 18.85 560.00 5 Pond-03 Storage Node 559.00 571.50 565.00 0.00 165.82 568.94 0.00 0.00 0 E 0 0 0- o 0 w 0 D Ir 0 U) w , 0 0 E w 0 0 —0 0 0 0 00 0 � 00 w m —0 1 Ir m 0 0 3: 0 w cq 0 > 3:.o 0 0 4,� M 0 0 0 '3: mo t�MNMOM W m 0 0 m N 0 0 c �2 0 0 0 00 0 0 0 0 0 0 0 0 0 W 0000 z N 0 0 E 0 m . C, w 00 00 m 0 00 > 00 g000000 om0000 0 � m m 0 m > 000000 w 000000 w Z4,fg g000000 -Ew000000 > 000000 000000 w 0 0 tt� 0 0 00 00 C? C? C? U) 0 U) 0 0 0 C? C? C? C? E C? . . . . 2 'o U) 'o 'o 'o 'o C? C? C? I C? < N E In 0 C? E wE U) w 0 0 ?: U') ?: U) r Post -Development 010 - Year Subbasin Hydrology Page 5 Subbasin : POST-DEVELOPMENT-BASIN-SUB-01B Input Data Area(ac) ........................................................................ 45.50 Peak Rate Factor ........................................................... 484.00 Weighted Curve Number ............................................... 85.92 Rain Gage I D ................................................................. Rain Gage-001 Composite Curve Number Area Soil Curve Sol/Surface Description (acres) Group Number Paved parking & roofs 13.67 B 98.00 � 75% grass cover, Good 14.69 B 61.00 Future -Paved parking & roofs 16.63 B 98.00 Composite Area & Weighted CN 44.99 85.92 Time of Concentration TOC Method SCSTR-55 Sheet Flow Equation : Tc = (0.007 * ((n * Lf)^0.8)) / ((PAO.5) * (SfAO.4)) Where Tc = Time of Concentration (hr) n = Manning's roughness Lf =Flow Length (ft) P = 2 yr, 24 hr Rainfall (inches) Sf =Slope (fVft) Shallow Concentrated Flow Equation V = 16.1345 (SfAO.5) (unpaved surface) V = 20.3282 (SfAO.5) (paved surface) V = 15.0 (SfAO.5) (grassed waterway surface) V = 10.0 (SfAO.5) (nearly bare & untilled surface) V = 9 0 (SfAO.5) (cultivated straight rows surface) V = 7.0 (SfAO.5) (short grass pasture surface) V = 5.0 (SfAO.5) (woodland surface) V = 2.5 (SfAO.5) (forest w/heavy litter surface) Tc = (Lf V) / (3600 sec/hr) Where Tc Time of Concentration (hr) Lf Flow Length (ft) V Velocity (fVsec) Sf Slope (fVft) Channel Flow Equation: * = (1.49 - (RA(2/3)) * (SfAO.5)) / n * =Aq/Wp Tc = (Lf / V) / (3600 sec/hr) Where Tc Time of Concentration (hr) Lf Flow Length (ft) R =Hydraulic Radius (ft) Aq = Flow Area (ft2) Wp = Wetted Perimeter (ft) V = Velocity (fVsec) Sf = Slope (ft/ft) n = Manning's roughness User -Defined TOC override (minutes): 5.00 Subbasin Runoff Results Total Rainfall (in) ............................................................ 5.20 Total Runoff (in) ............................................................. 3.65 Peak Runoff (cfs) ........................................................... 167.52 Weighted Curve Number ............................................... 85.92 Time of Concentration (days hh:mm:ss) ........................ 0000500 Post -Development 010 - Year Page 6 Subbasin : POST-DEVELOPMENT-BASIN-SUB-01B 4.4 4.2 4 3.8 3.6 3.4 3.2 3 2.8 2.6 E 2.4 2.2 S 2 1.8 1.6 1 4 1.2 1 0.8 0.6 0.4 02 100 170 160 150 140 130 120 110 100 90 o r 1 80 y 70 60 50 40 30 20 10 Rainfall Intensity Graph 0 1 2 3 4 41 6 7 a 9 in 11 12 13 14 1 F, 16 17 18 19 20 21 22 23 Time (hrs) Ru n off Hyd ro g raph 01234567891011121314151617181920212223 Time (hrs) Post -Development 010 - Year Subbasin : UNDISTURBED-BASIN-SUB-01A Page 7 Input Data Area(ac) ........................................................................ 23.79 Peak Rate Factor ........................................................... 484.00 Weighted Curve Number ............................................... 79.00 Rain Gage I D ................................................................. Rain Gage-001 Composite Curve Number Area Soil Curve Soil/Surface Description (acres) Group Number Woods, Fair 23.79 D 79.00 Composite Area & Weighted CN 23.79 79.00 Time of Concentration Subarea Subarea Subarea Sheet Flow Computations A B C Manning's Roughness: .4 0.00 0.00 Flow Length (ft): 100 0.00 0.00 Slope (%): 9.5 0.00 0.00 2 yr, 24 hr Rainfall (in) 3.50 0.00 0.00 Velocity (fUsec) : 0.15 0.00 0.00 Computed Flow Time (min) 11.01 0.00 0.00 Subarea Subarea Subarea Shallow Concentrated Flow Computations A B C Flow Length (ft): 1370 0.00 0.00 Slope (%): .3 0.00 0.00 Surface Type Unpaved Unpaved Unpaved Velocity (fUsec) 0.88 0.00 0.00 Computed Flow Time (min): 25.95 0.00 0.00 Total TOC (min) .................. 36.96 Subbasin Runoff Results Total Rainfall (in) ............................................................ 5.20 Total Runoff (in) ............................................................. 2.98 Peak Runoff (cfs) ........................................................... 43.39 Weighted Curve Number ............................................... 79.00 Time of Concentration (days hh:mm:ss) ........................ 0003658 Post -Development 010 - Year Page 8 Subbasin : UNDISTURBED-BASIN-SUB-01A 4.6 4.4 4.2 4 3.8 3.6 3.4 3.2 3 2.8 2.6 Z 4 2.2 2 ry 1.8 1.6 1.4 1.2 1 0.8 0.6 0.4 0.2 46 44 42 40 38 36 34 32 30 20 -u� 26 24 22 20 10 16 14 12 10 a 6 4 2 Rai nfal I I nte n s ity G rap h 0 1 2 3 4 41 6 7 a 9 in 11 12 13 14 1 F, 16 17 18 19 20 21 22 23 Time (hrs) Ru n off Hyd ro g raph 01234567891011121314151617181920212223 Time (hrs) Post -Development 010 - Year Subbasin : UNDISTURBED-BASIN-SUB-02 Page 9 Input Data Area(ac) ........................................................................ 13.14 Peak Rate Factor ........................................................... 484.00 Weighted Curve Number ............................................... 70.54 Rain Gage I D ................................................................. Rain Gage-001 Composite Curve Number Area Soil Curve Soil/Surface Description (acres) Group Number Pasture, grassland, or range, Good 3.13 B 61.00 9.65 74.00 0.37 61.00 Composite Area & Weighted CN 13.15 70.54 Time of Concentration Sheet Flow Computations Manning's Roughness: Flow Length (ft): Slope (%): 2 yr, 24 hr Rainfall (in) Velocity (fUsec) : Computed Flow Time (min): Total TOC (min) .................. 31.80 Subbasin Runoff Results Subarea Subarea Subarea A B C .4 0.00 0.00 100 0.00 0.00 .67 0.00 0.00 3.50 0.00 0.00 0.05 0.00 0.00 31.80 0.00 0.00 Total Rainfall (in) ............................................................ 5.20 Total Runoff (in) ............................................................. 2.23 Peak Runoff (cfs) ........................................................... 18.96 Weighted Curve Number ............................................... 70.54 Time of Concentration (days hh:mm:ss) ........................ 00031 48 Post -Development 010 - Year Page 10 Subbasin : UNDISTURBED-BASIN-SUB-02 4.6 4.4 4.2 4 3.8 3.6 3.4 3.2 3 2.8 2.6 Z 4 2.2 2 ry 1.8 1.6 1.4 1.2 1 0.8 0.6 0.4 0.2 20 19 18 17 16 15 14 13 12 11 10 o ry 7 6 5 4 3 2 1 Rai nfal I I nte n s ity G rap h 0 1 2 3 4 41 6 7 a 9 in 11 12 13 14 1 F, 16 17 18 19 20 21 22 23 Time (hrs) Ru n off Hyd ro g raph 01234567891011121314151617181920212223 Time (hrs) Post -Development 010 - Year Page 11 Channel Input SIN Element Length Inlet Inlet Outlet Outlet Total Average Shape Height Width Manning's Entrance Exit/Bend Additional Initial Flap ID Invert Invert Invert Invert Drop Slope Roughness Losses Losses Losses Flow Gate Elevation Offset Elevation Offset (ft) (ft) (ft) (ft) (ft) (ft) (%) (ft) (ft) (cfs) 1 Link-02 50.00 555.00 0.00 554.90 1.60 0.10 0.2000 Rectangular 2.000 5.000 0.0010 0.5000 0.5000 0.0000 0.00 No Post -Development 010 - Year Page 12 Channel Results SN Element Peak Time of Design Flow Peak Flow/ Peak Flow Travel Peak Flow Peak Flow Total Time Froucle Reported ID Flow Peak Flow Capacity Design Flow Velocity Time Depth Depth/ Surcharged NumberConclition Occurrence Ratio Total Depth Ratio (cfs) (days hh:mm) (cfs) (fUsec) (min) (ft) (min) 1 Link-02 129.37 0 1221 712.92 0.18 19.75 0.04 1.31 0.66 0.00 Post -Development 010 - Year Page 13 Pipe Input SIN Element Length Inlet Inlet Outlet Outlet Total Average Pipe Pipe Pipe Manning's Entrance Exit/Bend Additional Initial Flap ID Invert Invert Invert Invert Drop Slope Shape Diameteror Width Roughness Losses Losses Losses Flow Gate Elevation Offset Elevation Offset Height (ft) (ft) (ft) (ft) (ft) (ft) (%) (in) (in) (cfs) 1 Outlet-Pipe-03 65.00 559.00 0.00 555.00 0.00 4.00 6.1500 CIRCULAR 42.000 42.000 0.0130 0.5000 0.5000 0.0000 0.00 No Post -Development 010 - Year Page 14 No. of Barrels Post -Development 010 - Year Page 15 Pipe Results SN Element Peak Time of Design Flow Peak Flow/ Peak Flow Travel Peak Flow Peak Flow Total Time Froucle Reported ID Flow Peak Flow Capacity Design Flow Velocity Time Depth Depth/ Surcharged NumberConclition Occurrence Ratio Total Depth Ratio (cfs) (days hh:mm) (cfs) (fUsec) (min) (ft) (min) 1 Outlet-Pipe-03 94.78 0 1218 249.58 0.38 9.85 0.11 3.50 1.00 10.00 SURCHARGED Post -Development 010 - Year Page 16 Storage Nodes Storage Node : Pond-03 Input Data Invert Elevation (ft) .................................................................... 559.00 Max (Rim) Elevation (ft) ............................................................ 571.50 Max (Rim) Offset (ft) ................................................................. 12.50 Initial Water Elevation (ft) .......................................................... 565.00 Initial Water Depth (ft) ............................................................... 6.00 Poncled Area (ft2) ....................................................................... 0.00 Evaporation Loss ....................................................................... 0.00 OutflowWeirs SIN Element Weir Flap Crest Crest Length WeirTotal Discharge ID Type Gate Elevation Offset Height Coefficient (ft) (ft) (ft) (ft) 1 Spillway-03 Trapezoidal No 571.00 12.00 50.00 0.50 3.33 2 Weir-03A Rectangular No 566.80 7.80 5.00 1.20 3.33 Outflow Orifices SIN Element Orifice Orifice Flap Circular Rectangular Rectangular Orifice Orifice ID Type Shape Gate Orifice Orifice Orifice Invert Coefficient Diameter Height Width Elevation (in) (in) (in) (ft) 1 CS-Rim-03 Bottom Rectangular No 60.00 60.00 568.00 0.63 2 WQ-Orifice-03 Side CIRCULAR No 5.00 565.00 0.61 Output Summary Results Peak Inflow (cfs) ........................................................................ 165.82 Peak Lateral Inflow (cfs) ............................................................ 165.82 Peak Outflow (cfs) ..................................................................... 94.90 Peak Exfiftration Flow Rate (cfm) .............................................. 0.00 Max HGL Elevation Attained (ft) ................................................ 568.94 Max HGL Depth Attained (ft) ..................................................... 9.94 Average HGL Elevation Attained (ft) ......................................... 566.31 Average HGL Depth Attained (ft) .............................................. 7.31 Time of Max HGL Occurrence (days hh:mm) ........................... 0 1218 Total Exfiltration Volume (1 000-ft3) ........................................... 0.000 Total Flooded Volume (ac-in) .................................................... 0 Total Time Flooded (min) .......................................................... 0 Total Retention Time (sec) ........................................................ 0.00 Post -Development 025 - Year Page 1 Project Description File Name .................................................... 27842.0002 - Post Development.SPF Project Options Flow Units ................................................... CIFS Elevation Type ............................................ Elevation Hydrology Method ....................................... SCS TR-55 Time of Concentration (TOC) Method ........ SCS TR-55 Link Routing Method ................................... Hydrodynamic Enable Overflow Poncling at Nodes ............ YES Skip Steady State Analysis Time Periods NO Analysis Options Start Analysis On ........................................ Dec 03, 2020 000000 End Analysis On .......................................... Dec 04, 2020 000000 Start Reporting On ...................................... Dec 03, 2020 000000 Antecedent Dry Days .................................. 0 days Runoff (Dry Weather) Time Step ................ 001 0000 days hh:mm:ss Runoff (Wet Weather) Time Step ............... 0000500 days hh:mm:ss Reporting Time Step ................................... 0000500 days hh:mm:ss Routing Time Step ...................................... 1 seconds Number of Elements Qty RainGages ................................................. 1 Subbasins.................................................... 3 Nodes........................................................... 5 Junctions -------------------------------------------- 2 Outfalls ----------------------------------------------- 2 Flow Diversions ---------------------------------- 0 Inlets--------------------------------------------------- 0 Storage Nodes ----------------------------------- 1 Links............................................................. 6 Channels -------------------------------------------- 1 Pipes-------------------------------------------------- 1 Pumps------------------------------------------------ 0 Orifices----------------------------------------------- 2 Weirs-------------------------------------------------- 2 Outlets------------------------------------------------ 0 Pollutants.................................................... 0 LandUses ................................................... 0 Rainfall Details SIN Rain Gage Data Data Source Rainfall Rain State County Return Rainfall Rainfall ID Source ID Type Units Period Depth Distribution (years) (inches) 1 Time Series TS-025 Intensity inches NorthCarolina Union 25 6.10 SCS Type III 24-hr Post -Development 025 - Year Page 2 Subbasin Summary SN Subbasin Area Peak Rate Weighted Total Total Total Peak Time of ID Factor Curve Rainfall Runoff Runoff Runoff Concentration Number Volume (ac) (in) (in) (ac-in) (cfs) (days hh:mm:ss) 1 POST-DEVELOPMENT-BASIN-SUB-01B 45.50 484.00 85.92 6.10 4.50 204.57 203.91 0 000500 2 UNDISTURBED-BASIN-SUB-01A 23.79 484.00 79.00 6.10 3.77 89.65 54.85 0 003657 3 UNDISTURBED-BASIN-SUB-02 13.14 484.00 70.54 6.10 2.94 38.58 25.20 0 003148 Post -Development 025 - Year Page 3 Node Summary SIN Element Element Invert Ground/Rim Initial Surcharge Poncled Peak Max HGL Max Min Time of Total Total Time ID Type Elevation (Max) Water Elevation Area I nflow Elevation Surcharge Freeboard Peak Flooded Flooded Elevation Elevation Attained Depth Attained Flooding Volume Attained Occurrence (ft) (ft) (ft) (ft) (ft) (cfs) (ft) (ft) (ft) (days hh:mm) (ac-in) (min) 1 CS Junction 555.00 570.20 558.00 999.00 0.00 172.53 564.13 0.00 6.07 0 0000 0.00 0.00 2 Jun-03 Junction 559.00 570.20 559.00 999.00 0.00 132.53 567.97 0.00 2.23 0 0000 0.00 0.00 3 Out-01 Outfall 553.30 172.45 553.30 4 Out-02 Outfall 560.00 24.96 560.00 5 Pond-03 Storage Node 559.00 571.50 565.00 0.00 202.24 569.31 0.00 0.00 0 E 0 0 0- o 0 w 0 D Ir 0 U) w , 0 0 E w 0 0 0 0 0 0 m 0 � 00 w m —0 1 Ir m 0 0 3: 0 0 > 3:.o m 0 0 4C� 0 0 0 0 '3: -j��Oomop m 0 t M M 0 W N N m 00 �2 �� m m 0 c �2 0 0 0 00 0 0 0 00 0 0 0 0 W 0000 z N 00 E 0 m . C, w 00 00 m 0 00 > 00 g000000 om0000 0 � m m 0 m > 000000 w 000000 w Z4,fg g000000 -Ew000000 > 000000 000000 w 0 0 tt� 0 0 00 00 C? C? C? U) 0 U) 0 0 0 m m C? C? C? C? E C? . . . . 2 'o U) 'o 'o 'o 'o C? C? m w m C? I C? < N E In 0 C? E wE U) w 0 0 ?: U') ?: U) r Post -Development 025 - Year Subbasin Hydrology Page 5 Subbasin : POST-DEVELOPMENT-BASIN-SUB-01B Input Data Area(ac) ........................................................................ 45.50 Peak Rate Factor ........................................................... 484.00 Weighted Curve Number ............................................... 85.92 Rain Gage I D ................................................................. Rain Gage-001 Composite Curve Number Area Soil Curve Sol/Surface Description (acres) Group Number Paved parking & roofs 13.67 B 98.00 � 75% grass cover, Good 14.69 B 61.00 Future -Paved parking & roofs 16.63 B 98.00 Composite Area & Weighted CN 44.99 85.92 Time of Concentration TOC Method SCSTR-55 Sheet Flow Equation : Tc = (0.007 * ((n * Lf)^0.8)) / ((PAO.5) * (SfAO.4)) Where Tc = Time of Concentration (hr) n = Manning's roughness Lf =Flow Length (ft) P = 2 yr, 24 hr Rainfall (inches) Sf =Slope (fVft) Shallow Concentrated Flow Equation V = 16.1345 (SfAO.5) (unpaved surface) V = 20.3282 (SfAO.5) (paved surface) V = 15.0 (SfAO.5) (grassed waterway surface) V = 10.0 (SfAO.5) (nearly bare & untilled surface) V = 9 0 (SfAO.5) (cultivated straight rows surface) V = 7.0 (SfAO.5) (short grass pasture surface) V = 5.0 (SfAO.5) (woodland surface) V = 2.5 (SfAO.5) (forest w/heavy litter surface) Tc = (Lf V) / (3600 sec/hr) Where Tc Time of Concentration (hr) Lf Flow Length (ft) V Velocity (fVsec) Sf Slope (fVft) Channel Flow Equation: * = (1.49 - (RA(2/3)) * (SfAO.5)) / n * =Aq/Wp Tc = (Lf / V) / (3600 sec/hr) Where Tc Time of Concentration (hr) Lf Flow Length (ft) R =Hydraulic Radius (ft) Aq = Flow Area (ft2) Wp = Wetted Perimeter (ft) V = Velocity (fVsec) Sf = Slope (ft/ft) n = Manning's roughness User -Defined TOC override (minutes): 5.00 Subbasin Runoff Results Total Rainfall (in) ............................................................ 6.10 Total Runoff (in) ............................................................. 4.50 Peak Runoff (cfs) ........................................................... 203.91 Weighted Curve Number ............................................... 85.92 Time of Concentration (days hh:mm:ss) ........................ 0000500 Post -Development 025 - Year Page 6 Subbasin : POST-DEVELOPMENT-BASIN-SUB-01B 5.2 5 4.8 4.6 4.4 42 4 3.8 3.6 34 3.2 3 E 2.8 2.6 .'E 2.4 m ry 2.2 2 1.0 1 6 1.4 1.2 1 na 06 0.4 0.2 220 210 200 190 180 170 160 160 140 130 120 110 o 100 ry 90 an 70 60 60 40 30 20 10 Rainfall Intensity Graph 0 1 2 3 4 41 6 7 a 9 in 11 12 13 14 1 F, 16 17 18 19 20 21 22 23 Time (hrs) Ru n off Hyd ro g raph 01234567891011121314151617181920212223 Time (hrs) Post -Development 025 - Year Subbasin : UNDISTURBED-BASIN-SUB-01A Page 7 Input Data Area(ac) ........................................................................ 23.79 Peak Rate Factor ........................................................... 484.00 Weighted Curve Number ............................................... 79.00 Rain Gage I D ................................................................. Rain Gage-001 Composite Curve Number Area Soil Curve Soil/Surface Description (acres) Group Number Woods, Fair 23.79 D 79.00 Composite Area & Weighted CN 23.79 79.00 Time of Concentration Subarea Subarea Subarea Sheet Flow Computations A B C Manning's Roughness: .4 0.00 0.00 Flow Length (ft): 100 0.00 0.00 Slope (%): 9.5 0.00 0.00 2 yr, 24 hr Rainfall (in) 3.50 0.00 0.00 Velocity (fUsec) : 0.15 0.00 0.00 Computed Flow Time (min) 11.01 0.00 0.00 Subarea Subarea Subarea Shallow Concentrated Flow Computations A B C Flow Length (ft): 1370 0.00 0.00 Slope (%): .3 0.00 0.00 Surface Type Unpaved Unpaved Unpaved Velocity (fUsec) 0.88 0.00 0.00 Computed Flow Time (min): 25.95 0.00 0.00 Total TOC (min) .................. 36.96 Subbasin Runoff Results Total Rainfall (in) ............................................................ 6.10 Total Runoff (in) ............................................................. 3.77 Peak Runoff (cfs) ........................................................... 54.85 Weighted Curve Number ............................................... 79.00 Time of Concentration (days hh:mm:ss) ........................ 0003658 Post -Development 025 - Year Page 8 Subbasin : UNDISTURBED-BASIN-SUB-01A 5.4 F, 2 6 4.8 4.6 4.4 4.2 4 3.8 3.6 34 3.2 3 2.0 m 2.b 2.4 2.2 2 1.0 1 6 1 4 1 2 1 0.8 0.6 0.4 0.2 ry Rai nfal I I nte n s ity G rap h 0 1 2 3 4 41 6 7 a 9 in 11 12 13 14 1 F, 16 17 18 19 20 21 22 23 Time (hrs) Ru n off Hyd ro g raph 01234567891011121314151617181920212223 Time (hrs) Post -Development 025 - Year Subbasin : UNDISTURBED-BASIN-SUB-02 Page 9 Input Data Area(ac) ........................................................................ 13.14 Peak Rate Factor ........................................................... 484.00 Weighted Curve Number ............................................... 70.54 Rain Gage I D ................................................................. Rain Gage-001 Composite Curve Number Area Soil Curve Soil/Surface Description (acres) Group Number Pasture, grassland, or range, Good 3.13 B 61.00 9.65 74.00 0.37 61.00 Composite Area & Weighted CN 13.15 70.54 Time of Concentration Sheet Flow Computations Manning's Roughness: Flow Length (ft): Slope (%): 2 yr, 24 hr Rainfall (in) Velocity (fUsec) : Computed Flow Time (min): Total TOC (min) .................. 31.80 Subbasin Runoff Results Subarea Subarea Subarea A B C .4 0.00 0.00 100 0.00 0.00 .67 0.00 0.00 3.50 0.00 0.00 0.05 0.00 0.00 31.80 0.00 0.00 Total Rainfall (in) ............................................................ 6.10 Total Runoff (in) ............................................................. 2.94 Peak Runoff (cfs) ........................................................... 25.20 Weighted Curve Number ............................................... 70.54 Time of Concentration (days hh:mm:ss) ........................ 00031 48 Post -Development 025 - Year Page 10 Subbasin : UNDISTURBED-BASIN-SUB-02 5.4 F, 2 6 4.8 4.6 4.4 4.2 4 3.8 3.6 34 3.2 3 2.0 m 2.b 2.4 2.2 2 1.0 1 6 1 4 1 2 1 0.8 0.6 0.4 0.2 26 2F, 24 23 22 21 20 19 18 17 16 15 14 13 o ' 12 cl� i i 10 9 0 7 6 5 4 3 2 1 Rainfall Intensity Graph 0 1 2 3 4 41 6 7 a 9 in 11 12 13 14 1 F, 16 17 18 19 20 21 22 23 Time (hrs) Ru n off Hyd ro g raph 01234567891011121314151617181920212223 Time (hrs) Post -Development 025 - Year Page 11 Channel Input SIN Element Length Inlet Inlet Outlet Outlet Total Average Shape Height Width Manning's Entrance Exit/Bend Additional Initial Flap ID Invert Invert Invert Invert Drop Slope Roughness Losses Losses Losses Flow Gate Elevation Offset Elevation Offset (ft) (ft) (ft) (ft) (ft) (ft) (%) (ft) (ft) (cfs) 1 Link-02 50.00 555.00 0.00 554.90 1.60 0.10 0.2000 Rectangular 2.000 5.000 0.0010 0.5000 0.5000 0.0000 0.00 No Post -Development 025 - Year Page 12 Channel Results SN Element Peak Time of Design Flow Peak Flow/ Peak Flow Travel Peak Flow Peak Flow Total Time Froucle Reported ID Flow Peak Flow Capacity Design Flow Velocity Time Depth Depth/ Surcharged NumberConclition Occurrence Ratio Total Depth Ratio (cfs) (days hh:mm) (cfs) (fUsec) (min) (ft) (min) 1 Link-02 172.45 0 1220 712.92 0.24 25.09 0.03 1.37 0.69 0.00 Post -Development 025 - Year Page 13 Pipe Input SIN Element Length Inlet Inlet Outlet Outlet Total Average Pipe Pipe Pipe Manning's Entrance Exit/Bend Additional Initial Flap ID Invert Invert Invert Invert Drop Slope Shape Diameteror Width Roughness Losses Losses Losses Flow Gate Elevation Offset Elevation Offset Height (ft) (ft) (ft) (ft) (ft) (ft) (%) (in) (in) (cfs) 1 Outlet-Pipe-03 65.00 559.00 0.00 555.00 0.00 4.00 6.1500 CIRCULAR 42.000 42.000 0.0130 0.5000 0.5000 0.0000 0.00 No Post -Development 025 - Year Page 14 No. of Barrels Post -Development 025 - Year Page 15 Pipe Results SN Element Peak Time of Design Flow Peak Flow/ Peak Flow Travel Peak Flow Peak Flow Total Time Froucle Reported ID Flow Peak Flow Capacity Design Flow Velocity Time Depth Depth/ Surcharged NumberConclition Occurrence Ratio Total Depth Ratio (cfs) (days hh:mm) (cfs) (fUsec) (min) (ft) (min) 1 Outlet-Pipe-03 132.34 0 1214 249.58 0.53 13.75 0.08 3.50 1.00 28.00 SURCHARGED Post -Development 025 - Year Page 16 Storage Nodes Storage Node : Pond-03 Input Data Invert Elevation (ft) .................................................................... 559.00 Max (Rim) Elevation (ft) ............................................................ 571.50 Max (Rim) Offset (ft) ................................................................. 12.50 Initial Water Elevation (ft) .......................................................... 565.00 Initial Water Depth (ft) ............................................................... 6.00 Poncled Area (ft2) ....................................................................... 0.00 Evaporation Loss ....................................................................... 0.00 OutflowWeirs SIN Element Weir Flap Crest Crest Length WeirTotal Discharge ID Type Gate Elevation Offset Height Coefficient (ft) (ft) (ft) (ft) 1 Spillway-03 Trapezoidal No 571.00 12.00 50.00 0.50 3.33 2 Weir-03A Rectangular No 566.80 7.80 5.00 1.20 3.33 Outflow Orifices SIN Element Orifice Orifice Flap Circular Rectangular Rectangular Orifice Orifice ID Type Shape Gate Orifice Orifice Orifice Invert Coefficient Diameter Height Width Elevation (in) (in) (in) (ft) 1 CS-Rim-03 Bottom Rectangular No 60.00 60.00 568.00 0.63 2 WQ-Orifice-03 Side CIRCULAR No 5.00 565.00 0.61 Output Summary Results Peak Inflow (cfs) ........................................................................ 202.24 Peak Lateral Inflow (cfs) ............................................................ 202.24 Peak Outflow (cfs) ..................................................................... 132.53 Peak Exfiftration Flow Rate (cfm) .............................................. 0.00 Max HGL Elevation Attained (ft) ................................................ 569.31 Max HGL Depth Attained (ft) ..................................................... 10.31 Average HGL Elevation Attained (ft) ......................................... 566.40 Average HGL Depth Attained (ft) .............................................. 7.4 Time of Max HGL Occurrence (days hh:mm) ........................... 0 1216 Total Exfiltration Volume (1 000-ft3) ........................................... 0.000 Total Flooded Volume (ac-in) .................................................... 0 Total Time Flooded (min) .......................................................... 0 Total Retention Time (sec) ........................................................ 0.00 Post -Development 050 - Year Page 1 Project Description File Name .................................................... 27842.0002 - Post Development.SPF Project Options Flow Units ................................................... CIFS Elevation Type ............................................ Elevation Hydrology Method ....................................... SCS TR-55 Time of Concentration (TOC) Method ........ SCS TR-55 Link Routing Method ................................... Hydrodynamic Enable Overflow Poncling at Nodes ............ YES Skip Steady State Analysis Time Periods NO Analysis Options Start Analysis On ........................................ Dec 03, 2020 000000 End Analysis On .......................................... Dec 04, 2020 000000 Start Reporting On ...................................... Dec 03, 2020 000000 Antecedent Dry Days .................................. 0 days Runoff (Dry Weather) Time Step ................ 001 0000 days hh:mm:ss Runoff (Wet Weather) Time Step ............... 0000500 days hh:mm:ss Reporting Time Step ................................... 0000500 days hh:mm:ss Routing Time Step ...................................... 1 seconds Number of Elements Qty RainGages ................................................. 1 Subbasins.................................................... 3 Nodes........................................................... 5 Junctions -------------------------------------------- 2 Outfalls ----------------------------------------------- 2 Flow Diversions ---------------------------------- 0 Inlets--------------------------------------------------- 0 Storage Nodes ----------------------------------- 1 Links............................................................. 6 Channels -------------------------------------------- 1 Pipes-------------------------------------------------- 1 Pumps------------------------------------------------ 0 Orifices----------------------------------------------- 2 Weirs-------------------------------------------------- 2 Outlets------------------------------------------------ 0 Pollutants.................................................... 0 LandUses ................................................... 0 Rainfall Details SIN Rain Gage Data Data Source Rainfall Rain State County Return Rainfall Rainfall ID Source ID Type Units Period Depth Distribution (years) (inches) 1 Time Series TS-050 Intensity inches NorthCarolina Union 50 6.90 SCS Type III 24-hr Post -Development 050 - Year Page 2 Subbasin Summary SN Subbasin Area Peak Rate Weighted Total Total Total Peak Time of ID Factor Curve Rainfall Runoff Runoff Runoff Concentration Number Volume (ac) (in) (in) (ac-in) (cfs) (days hh:mm:ss) 1 POST-DEVELOPMENT-BASIN-SUB-01B 45.50 484.00 85.92 6.90 5.26 239.38 236.38 0 000500 2 UNDISTURBED-BASIN-SUB-01A 23.79 484.00 79.00 6.90 4.49 106.88 65.23 0 003657 3 UNDISTURBED-BASIN-SUB-02 13.14 484.00 70.54 6.90 3.59 47.19 30.95 0 003148 Post -Development 050 - Year Page 3 Node Summary SIN Element Element Invert Ground/Rim Initial Surcharge Poncled Peak Max HGL Max Min Time of Total Total Time ID Type Elevation (Max) Water Elevation Area I nflow Elevation Surcharge Freeboard Peak Flooded Flooded Elevation Elevation Attained Depth Attained Flooding Volume Attained Occurrence (ft) (ft) (ft) (ft) (ft) (cfs) (ft) (ft) (ft) (days hh:mm) (ac-in) (min) 1 CS Junction 555.00 570.20 558.00 999.00 0.00 183.78 565.02 0.00 5.18 0 0000 0.00 0.00 2 Jun-03 Junction 559.00 570.20 559.00 999.00 0.00 137.79 568.43 0.00 1.77 0 0000 0.00 0.00 3 Out-01 Outfall 553.30 183.77 553.30 4 Out-02 Outfall 560.00 30.60 560.00 5 Pond-03 Storage Node 559.00 571.50 565.00 0.00 234.58 569.75 0.00 0.00 0 0 0 E 0 0 0- o 0 w 0 D Ir 0 U) w , 0 0 E w 0 0 0 0 0 00 0 � 0 � w m —0 1 Ir m 0 m 0 3: 0.5 0 > 3:.o 00 0 0 4,� 0 N 0 0 0 m 0 m mo tN�Omoo W � m 0- 0 �2 �2 12 m 0 c �2 0 0 0 00 0 0 0 00 0 0 0 0 W 0000 z N 0 0 E 0 m . C, w 00 00 m 0 00 > 00 g000000 om0000 0 � m m 0 m > 000000 w 000000 w Z4,fg g000000 —Ew000000 > 000000 000000 w 0 0 tt� 0 0 00 00 C? C? C? U) 0 U) 0 0 0 C? C? C? C? E C? . . . . 2 'o U) 'o 'o 'o 'o C? C? C? I C? < N E In 0 C? E wE U) w 0 0 ?: U') ?: U) r Post -Development 050 - Year Subbasin Hydrology Page 5 Subbasin : POST-DEVELOPMENT-BASIN-SUB-01B Input Data Area(ac) ........................................................................ 45.50 Peak Rate Factor ........................................................... 484.00 Weighted Curve Number ............................................... 85.92 Rain Gage I D ................................................................. Rain Gage-001 Composite Curve Number Area Soil Curve Sol/Surface Description (acres) Group Number Paved parking & roofs 13.67 B 98.00 � 75% grass cover, Good 14.69 B 61.00 Future -Paved parking & roofs 16.63 B 98.00 Composite Area & Weighted CN 44.99 85.92 Time of Concentration TOC Method SCSTR-55 Sheet Flow Equation : Tc = (0.007 * ((n * Lf)^0.8)) / ((PAO.5) * (SfAO.4)) Where Tc = Time of Concentration (hr) n = Manning's roughness Lf =Flow Length (ft) P = 2 yr, 24 hr Rainfall (inches) Sf =Slope (fVft) Shallow Concentrated Flow Equation V = 16.1345 (SfAO.5) (unpaved surface) V = 20.3282 (SfAO.5) (paved surface) V = 15.0 (SfAO.5) (grassed waterway surface) V = 10.0 (SfAO.5) (nearly bare & untilled surface) V = 9 0 (SfAO.5) (cultivated straight rows surface) V = 7.0 (SfAO.5) (short grass pasture surface) V = 5.0 (SfAO.5) (woodland surface) V = 2.5 (SfAO.5) (forest w/heavy litter surface) Tc = (Lf V) / (3600 sec/hr) Where Tc Time of Concentration (hr) Lf Flow Length (ft) V Velocity (fVsec) Sf Slope (fVft) Channel Flow Equation: * = (1.49 - (RA(2/3)) * (SfAO.5)) / n * =Aq/Wp Tc = (Lf / V) / (3600 sec/hr) Where Tc Time of Concentration (hr) Lf Flow Length (ft) R =Hydraulic Radius (ft) Aq = Flow Area (ft2) Wp = Wetted Perimeter (ft) V = Velocity (fVsec) Sf = Slope (ft/ft) n = Manning's roughness User -Defined TOC override (minutes): 5.00 Subbasin Runoff Results Total Rainfall (in) ............................................................ 6.90 Total Runoff (in) ............................................................. 5.26 Peak Runoff (cfs) ........................................................... 236.38 Weighted Curve Number ............................................... 85.92 Time of Concentration (days hh:mm:ss) ........................ 0000500 Post -Development 050 - Year Page 6 Subbasin : POST-DEVELOPMENT-BASIN-SUB-01B 6 5.0 5.6 5.4 5.2 5 4.8 4.6 4.4 4.2 4 3.0 3.6 �z 3.4 32 3 -E 2.0 r m 2.6 y 2.4 2.2 2 1.8 1.6 1.4 1 2 1 0.8 0.6 0.4 0.2 250 240 230 220 210 200 190 180 170 160 150 140 130 120 ry 110 ion 90 00 70 60 50 40 30 20 10 Rainfall Intensity Graph 0 1 2 3 4 41 6 7 a 9 in 11 12 13 14 1 F, 16 17 18 19 20 21 22 23 Time (hrs) Ru n off Hyd ro g raph 01234567891011121314151617181920212223 Time (hrs) Post -Development 050 - Year Subbasin : UNDISTURBED-BASIN-SUB-01A Page 7 Input Data Area(ac) ........................................................................ 23.79 Peak Rate Factor ........................................................... 484.00 Weighted Curve Number ............................................... 79.00 Rain Gage I D ................................................................. Rain Gage-001 Composite Curve Number Area Soil Curve Soil/Surface Description (acres) Group Number Woods, Fair 23.79 D 79.00 Composite Area & Weighted CN 23.79 79.00 Time of Concentration Subarea Subarea Subarea Sheet Flow Computations A B C Manning's Roughness: .4 0.00 0.00 Flow Length (ft): 100 0.00 0.00 Slope (%): 9.5 0.00 0.00 2 yr, 24 hr Rainfall (in) 3.50 0.00 0.00 Velocity (fUsec) : 0.15 0.00 0.00 Computed Flow Time (min) 11.01 0.00 0.00 Subarea Subarea Subarea Shallow Concentrated Flow Computations A B C Flow Length (ft): 1370 0.00 0.00 Slope (%): .3 0.00 0.00 Surface Type Unpaved Unpaved Unpaved Velocity (fUsec) 0.88 0.00 0.00 Computed Flow Time (min): 25.95 0.00 0.00 Total TOC (min) .................. 36.96 Subbasin Runoff Results Total Rainfall (in) ............................................................ 6.90 Total Runoff (in) ............................................................. 4.49 Peak Runoff (cfs) ........................................................... 65.23 Weighted Curve Number ............................................... 79.00 Time of Concentration (days hh:mm:ss) ........................ 0003658 Post -Development 050 - Year Page 8 Subbasin : UNDISTURBED-BASIN-SUB-01A 6.2 6 5.8 F, 6 5.4 6.2 5 48 4.6 4.4 4.2 4 3.8 3.6 E 3.4 3.2 3 28 ry 2.6 2.4 22 2 1.8 1.6 1.4 1.2 1 08 0.6 0.4 02 75 70 BF, 60 55 50 45 40 35 ry 30 25 20 15 10 F, Rai nfal I I nte n s ity G rap h 0 1 2 3 4 41 6 7 a 9 in 11 12 13 14 1 F, 16 17 18 19 20 21 22 23 Time (hrs) Ru n off Hyd ro g raph 01234567891011121314151617181920212223 Time (hrs) Post -Development 050 - Year Subbasin : UNDISTURBED-BASIN-SUB-02 Page 9 Input Data Area(ac) ........................................................................ 13.14 Peak Rate Factor ........................................................... 484.00 Weighted Curve Number ............................................... 70.54 Rain Gage I D ................................................................. Rain Gage-001 Composite Curve Number Area Soil Curve Soil/Surface Description (acres) Group Number Pasture, grassland, or range, Good 3.13 B 61.00 9.65 74.00 0.37 61.00 Composite Area & Weighted CN 13.15 70.54 Time of Concentration Sheet Flow Computations Manning's Roughness: Flow Length (ft): Slope (%): 2 yr, 24 hr Rainfall (in) Velocity (fUsec) : Computed Flow Time (min): Total TOC (min) .................. 31.80 Subbasin Runoff Results Subarea Subarea Subarea A B C .4 0.00 0.00 100 0.00 0.00 .67 0.00 0.00 3.50 0.00 0.00 0.05 0.00 0.00 31.80 0.00 0.00 Total Rainfall (in) ............................................................ 6.90 Total Runoff (in) ............................................................. 3.59 Peak Runoff (cfs) ........................................................... 30.95 Weighted Curve Number ............................................... 70.54 Time of Concentration (days hh:mm:ss) ........................ 00031 48 Post -Development 050 - Year Page 10 Subbasin : UNDISTURBED-BASIN-SUB-02 6.2 6 5.8 F, 6 5.4 6.2 5 48 4.6 4.4 4.2 4 3.8 3.6 E 3.4 3.2 3 28 ry 2.6 2.4 22 2 1.8 1.6 1.4 1.2 1 08 0.6 0.4 02 34 32 30 28 26 24 22 20 18 16 ry 14 12 in 8 6 4 2 Rai nfal I I nte n s ity G rap h 0 1 2 3 4 41 6 7 a 9 in 11 12 13 14 1 F, 16 17 18 19 20 21 22 23 Time (hrs) Ru n off Hyd ro g raph 01234567891011121314151617181920212223 Time (hrs) Post -Development 050 - Year Page 11 Channel Input SIN Element Length Inlet Inlet Outlet Outlet Total Average Shape Height Width Manning's Entrance Exit/Bend Additional Initial Flap ID Invert Invert Invert Invert Drop Slope Roughness Losses Losses Losses Flow Gate Elevation Offset Elevation Offset (ft) (ft) (ft) (ft) (ft) (ft) (%) (ft) (ft) (cfs) 1 Link-02 50.00 555.00 0.00 554.90 1.60 0.10 0.2000 Rectangular 2.000 5.000 0.0010 0.5000 0.5000 0.0000 0.00 No Post -Development 050 - Year Page 12 Channel Results SN Element Peak Time of Design Flow Peak Flow/ Peak Flow Travel Peak Flow Peak Flow Total Time Froucle Reported ID Flow Peak Flow Capacity Design Flow Velocity Time Depth Depth/ Surcharged NumberConclition Occurrence Ratio Total Depth Ratio (cfs) (days hh:mm) (cfs) (fUsec) (min) (ft) (min) 1 Link-02 183.77 0 1230 712.92 0.26 26.43 0.03 1.39 0.70 0.00 Post -Development 050 - Year Page 13 Pipe Input SIN Element Length Inlet Inlet Outlet Outlet Total Average Pipe Pipe Pipe Manning's Entrance Exit/Bend Additional Initial Flap ID Invert Invert Invert Invert Drop Slope Shape Diameteror Width Roughness Losses Losses Losses Flow Gate Elevation Offset Elevation Offset Height (ft) (ft) (ft) (ft) (ft) (ft) (%) (in) (in) (cfs) 1 Outlet-Pipe-03 65.00 559.00 0.00 555.00 0.00 4.00 6.1500 CIRCULAR 42.000 42.000 0.0130 0.5000 0.5000 0.0000 0.00 No Post -Development 050 - Year Page 14 No. of Barrels Post -Development 050 - Year Page 15 Pipe Results SN Element Peak Time of Design Flow Peak Flow/ Peak Flow Travel Peak Flow Peak Flow Total Time Froucle Reported ID Flow Peak Flow Capacity Design Flow Velocity Time Depth Depth/ Surcharged NumberConclition Occurrence Ratio Total Depth Ratio (cfs) (days hh:mm) (cfs) (fUsec) (min) (ft) (min) 1 Outlet-Pipe-03 137.24 0 1209 249.58 0.55 14.26 0.08 3.50 1.00 38.00 SURCHARGED Post -Development 050 - Year Page 16 Storage Nodes Storage Node : Pond-03 Input Data Invert Elevation (ft) .................................................................... 559.00 Max (Rim) Elevation (ft) ............................................................ 571.50 Max (Rim) Offset (ft) ................................................................. 12.50 Initial Water Elevation (ft) .......................................................... 565.00 Initial Water Depth (ft) ............................................................... 6.00 Poncled Area (ft2) ....................................................................... 0.00 Evaporation Loss ....................................................................... 0.00 OutflowWeirs SIN Element Weir Flap Crest Crest Length WeirTotal Discharge ID Type Gate Elevation Offset Height Coefficient (ft) (ft) (ft) (ft) 1 Spillway-03 Trapezoidal No 571.00 12.00 50.00 0.50 3.33 2 Weir-03A Rectangular No 566.80 7.80 5.00 1.20 3.33 Outflow Orifices SIN Element Orifice Orifice Flap Circular Rectangular Rectangular Orifice Orifice ID Type Shape Gate Orifice Orifice Orifice Invert Coefficient Diameter Height Width Elevation (in) (in) (in) (ft) 1 CS-Rim-03 Bottom Rectangular No 60.00 60.00 568.00 0.63 2 WQ-Orifice-03 Side CIRCULAR No 5.00 565.00 0.61 Output Summary Results Peak Inflow (cfs) ........................................................................ 234.58 Peak Lateral Inflow (cfs) ............................................................ 234.58 Peak Outflow (cfs) ..................................................................... 137.79 Peak Exfiftration Flow Rate (cfm) .............................................. 0.00 Max HGL Elevation Attained (ft) ................................................ 569.75 Max HGL Depth Attained (ft) ..................................................... 10.75 Average HGL Elevation Attained (ft) ......................................... 566.48 Average HGL Depth Attained (ft) .............................................. 7.48 Time of Max HGL Occurrence (days hh:mm) ........................... 0 1218 Total Exfiltration Volume (1 000-ft3) ........................................... 0.000 Total Flooded Volume (ac-in) .................................................... 0 Total Time Flooded (min) .......................................................... 0 Total Retention Time (sec) ........................................................ 0.00 Post -Development 100 - Year Page 1 Project Description File Name .................................................... 27842.0002 - Post Development.SPF Project Options Flow Units ................................................... CIFS Elevation Type ............................................ Elevation Hydrology Method ....................................... SCS TR-55 Time of Concentration (TOC) Method ........ SCS TR-55 Link Routing Method ................................... Hydrodynamic Enable Overflow Poncling at Nodes ............ YES Skip Steady State Analysis Time Periods NO Analysis Options Start Analysis On ........................................ Dec 03, 2020 000000 End Analysis On .......................................... Dec 04, 2020 000000 Start Reporting On ...................................... Dec 03, 2020 000000 Antecedent Dry Days .................................. 0 days Runoff (Dry Weather) Time Step ................ 001 0000 days hh:mm:ss Runoff (Wet Weather) Time Step ............... 0000500 days hh:mm:ss Reporting Time Step ................................... 0000500 days hh:mm:ss Routing Time Step ...................................... 1 seconds Number of Elements Qty RainGages ................................................. 1 Subbasins.................................................... 3 Nodes........................................................... 5 Junctions -------------------------------------------- 2 Outfalls ----------------------------------------------- 2 Flow Diversions ---------------------------------- 0 Inlets--------------------------------------------------- 0 Storage Nodes ----------------------------------- 1 Links............................................................. 6 Channels -------------------------------------------- 1 Pipes-------------------------------------------------- 1 Pumps------------------------------------------------ 0 Orifices----------------------------------------------- 2 Weirs-------------------------------------------------- 2 Outlets------------------------------------------------ 0 Pollutants.................................................... 0 LandUses ................................................... 0 Rainfall Details SIN Rain Gage Data Data Source Rainfall Rain State County Return Rainfall Rainfall ID Source ID Type Units Period Depth Distribution (years) (inches) 1 Time Series TS-100 Intensity inches NorthCarolina Union 100 7.50 SCS Type III 24-hr Post -Development 100 - Year Page 2 Subbasin Summary SN Subbasin Area Peak Rate Weighted Total Total Total Peak Time of ID Factor Curve Rainfall Runoff Runoff Runoff Concentration Number Volume (ac) (in) (in) (ac-in) (cfs) (days hh:mm:ss) 1 POST-DEVELOPMENT-BASIN-SUB-01B 45.50 484.00 85.92 7.50 5.84 265.63 260.52 0 000500 2 UNDISTURBED-BASIN-SUB-01A 23.79 484.00 79.00 7.50 5.04 119.98 73.04 0 003657 3 UNDISTURBED-BASIN-SUB-02 13.14 484.00 70.54 7.50 4.10 53.83 35.31 0 003148 Post -Development 100 - Year Page 3 Node Summary SIN Element Element Invert Ground/Rim Initial Surcharge Poncled Peak Max HGL Max Min Time of Total Total Time ID Type Elevation (Max) Water Elevation Area I nflow Elevation Surcharge Freeboard Peak Flooded Flooded Elevation Elevation Attained Depth Attained Flooding Volume Attained Occurrence (ft) (ft) (ft) (ft) (ft') (cfs) (ft) (ft) (ft) (days hh:mm) (ac-in) (min) 1 CS Junction 555.00 570.20 558.00 999.00 0.00 190.20 565.54 0.00 4.66 0 0000 0.00 0.00 2 Jun-03 Junction 559.00 570.20 559.00 999.00 0.00 138.14 568.81 0.00 1.39 0 0000 0.00 0.00 3 Out-01 Outfall 553.30 190.17 553.30 4 Out-02 Outfall 560.00 34.89 560.00 5 Pond-03 Storage Node 559.00 571.50 565.00 0.00 258.69 570.13 0.00 0.00 0 �2 E 0 0 0- o 0 w 0 D Ir 0 U) w , 0 0 E w 0 0 0 0 0 0 0 0 � 0 � w m —0 1 Ir m e� 0 0 0 3: 0 0 > 3:.o 0 0 0 4,� 0 0 0 0 0 m 0 m 0 t 0 M 0 0 W 0 0 0 �2 ',� 12 m 0( �2 0 00 00 0 0 0 0 0 0 0 0 0 W 0000 z N 0 0 E 0 m . C, w 00 00 m 0 00 > 00 E000000 om0000 0 � m m 0 m > 000000 w 000000 w Z4,fg E000000 Ew000000 > 000000 000000 w 0 0 tt� 0 0 00 00 C? C? C? U) 0 U) 0 0 0 m m C? C? C? C? E C? . . . . 2 'o U) 'o 'o 'o 'o C? C? m w m C? I C? < N E In 0 C? E wE U) w 0 0 ?: U') ?: U) r Post -Development 100 - Year Subbasin Hydrology Page 5 Subbasin : POST-DEVELOPMENT-BASIN-SUB-01B Input Data Area(ac) ........................................................................ 45.50 Peak Rate Factor ........................................................... 484.00 Weighted Curve Number ............................................... 85.92 Rain Gage I D ................................................................. Rain Gage-001 Composite Curve Number Area Soil Curve Sol/Surface Description (acres) Group Number Paved parking & roofs 13.67 B 98.00 � 75% grass cover, Good 14.69 B 61.00 Future -Paved parking & roofs 16.63 B 98.00 Composite Area & Weighted CN 44.99 85.92 Time of Concentration TOC Method SCSTR-55 Sheet Flow Equation : Tc = (0.007 * ((n * Lf)^0.8)) / ((PAO.5) * (SfAO.4)) Where Tc = Time of Concentration (hr) n = Manning's roughness Lf =Flow Length (ft) P = 2 yr, 24 hr Rainfall (inches) Sf =Slope (fVft) Shallow Concentrated Flow Equation V = 16.1345 (SfAO.5) (unpaved surface) V = 20.3282 (SfAO.5) (paved surface) V = 15.0 (SfAO.5) (grassed waterway surface) V = 10.0 (SfAO.5) (nearly bare & untilled surface) V = 9 0 (SfAO.5) (cultivated straight rows surface) V = 7.0 (SfAO.5) (short grass pasture surface) V = 5.0 (SfAO.5) (woodland surface) V = 2.5 (SfAO.5) (forest w/heavy litter surface) Tc = (Lf V) / (3600 sec/hr) Where Tc Time of Concentration (hr) Lf Flow Length (ft) V Velocity (fVsec) Sf Slope (fVft) Channel Flow Equation: * = (1.49 - (RA(2/3)) * (SfAO.5)) / n * =Aq/Wp Tc = (Lf / V) / (3600 sec/hr) Where Tc Time of Concentration (hr) Lf Flow Length (ft) R =Hydraulic Radius (ft) Aq = Flow Area (ft2) Wp = Wetted Perimeter (ft) V = Velocity (fVsec) Sf = Slope (ft/ft) n = Manning's roughness User -Defined TOC override (minutes): 5.00 Subbasin Runoff Results Total Rainfall (in) ............................................................ 7.50 Total Runoff (in) ............................................................. 5.84 Peak Runoff (cfs) ........................................................... 260.52 Weighted Curve Number ............................................... 85.92 Time of Concentration (days hh:mm:ss) ........................ 0000500 Post -Development 100 - Year Page 6 Subbasin : POST-DEVELOPMENT-BASIN-SUB-01B 6.5 6 5.5 5 4.5 4 3.5 'E 3 2.5 2 1.5 1 0.5 270 260 250 240 230 220 210 200 190 180 170 160 150 140 130 r 1 120 y 110 100 90 00 70 60 Flo 40 30 20 10 Rainfall Intensity Graph 0 1 2 3 4 41 6 7 a 9 in 11 12 13 14 1 F, 16 17 18 19 20 21 22 23 Time (hrs) Ru n off Hyd ro g raph 01234567891011121314151617181920212223 Time (hrs) Post -Development 100 - Year Subbasin : UNDISTURBED-BASIN-SUB-01A Page 7 Input Data Area(ac) ........................................................................ 23.79 Peak Rate Factor ........................................................... 484.00 Weighted Curve Number ............................................... 79.00 Rain Gage I D ................................................................. Rain Gage-001 Composite Curve Number Area Soil Curve Soil/Surface Description (acres) Group Number Woods, Fair 23.79 D 79.00 Composite Area & Weighted CN 23.79 79.00 Time of Concentration Subarea Subarea Subarea Sheet Flow Computations A B C Manning's Roughness: .4 0.00 0.00 Flow Length (ft): 100 0.00 0.00 Slope (%): 9.5 0.00 0.00 2 yr, 24 hr Rainfall (in) 3.50 0.00 0.00 Velocity (fUsec) : 0.15 0.00 0.00 Computed Flow Time (min) 11.01 0.00 0.00 Subarea Subarea Subarea Shallow Concentrated Flow Computations A B C Flow Length (ft): 1370 0.00 0.00 Slope (%): .3 0.00 0.00 Surface Type Unpaved Unpaved Unpaved Velocity (fUsec) 0.88 0.00 0.00 Computed Flow Time (min): 25.95 0.00 0.00 Total TOC (min) .................. 36.96 Subbasin Runoff Results Total Rainfall (in) ............................................................ 7.50 Total Runoff (in) ............................................................. 5.04 Peak Runoff (cfs) ........................................................... 73.04 Weighted Curve Number ............................................... 79.00 Time of Concentration (days hh:mm:ss) ........................ 0003658 Post -Development 100 - Year Page 8 Subbasin : UNDISTURBED-BASIN-SUB-01A 7 6 4 4 3.5 3 ry 2.5 2 1.5 0.5 00 7F, 70 65 60 F; F, 50 45 40 o ry 3F, 30 25 20 15 10 5 Rai nfal I I nte n s ity G rap h 0 1 2 3 4 41 6 7 a 9 in 11 12 13 14 1 F, 16 17 18 19 20 21 22 23 Time (hrs) Ru n off Hyd ro g raph 01234567891011121314151617181920212223 Time (hrs) Post -Development 100 - Year Subbasin : UNDISTURBED-BASIN-SUB-02 Page 9 Input Data Area(ac) ........................................................................ 13.14 Peak Rate Factor ........................................................... 484.00 Weighted Curve Number ............................................... 70.54 Rain Gage I D ................................................................. Rain Gage-001 Composite Curve Number Area Soil Curve Soil/Surface Description (acres) Group Number Pasture, grassland, or range, Good 3.13 B 61.00 9.65 74.00 0.37 61.00 Composite Area & Weighted CN 13.15 70.54 Time of Concentration Sheet Flow Computations Manning's Roughness: Flow Length (ft): Slope (%): 2 yr, 24 hr Rainfall (in) Velocity (fUsec) : Computed Flow Time (min): Total TOC (min) .................. 31.80 Subbasin Runoff Results Subarea Subarea Subarea A B C .4 0.00 0.00 100 0.00 0.00 .67 0.00 0.00 3.50 0.00 0.00 0.05 0.00 0.00 31.80 0.00 0.00 Total Rainfall (in) ............................................................ 7.50 Total Runoff (in) ............................................................. 4.10 Peak Runoff (cfs) ........................................................... 35.31 Weighted Curve Number ............................................... 70.54 Time of Concentration (days hh:mm:ss) ........................ 00031 48 Post -Development 100 - Year Page 10 Subbasin : UNDISTURBED-BASIN-SUB-02 7 6 4 4 3.5 3 ry 2.5 2 1.5 0.5 30 36 34 32 30 28 26 24 22 20 18 16 14 12 10 8 6 4 2 Rai nfal I I nte n s ity G rap h 0 1 2 3 4 41 6 7 a 9 in 11 12 13 14 1 F, 16 17 18 19 20 21 22 23 Time (hrs) Ru n off Hyd ro g raph 01234567891011121314151617181920212223 Time (hrs) Post -Development 100 - Year Page 11 Channel Input SIN Element Length Inlet Inlet Outlet Outlet Total Average Shape Height Width Manning's Entrance Exit/Bend Additional Initial Flap ID Invert Invert Invert Invert Drop Slope Roughness Losses Losses Losses Flow Gate Elevation Offset Elevation Offset (ft) (ft) (ft) (ft) (ft) (ft) (%) (ft) (ft) (cfs) 1 Link-02 50.00 555.00 0.00 554.90 1.60 0.10 0.2000 Rectangular 2.000 5.000 0.0010 0.5000 0.5000 0.0000 0.00 No Post -Development 100 - Year Page 12 Channel Results SN Element Peak Time of Design Flow Peak Flow/ Peak Flow Travel Peak Flow Peak Flow Total Time Froucle Reported ID Flow Peak Flow Capacity Design Flow Velocity Time Depth Depth/ Surcharged NumberConclition Occurrence Ratio Total Depth Ratio (cfs) (days hh:mm) (cfs) (fUsec) (min) (ft) (min) 1 Link-02 190.17 0 1230 712.92 0.27 27.17 0.03 1.40 0.70 0.00 Post -Development 100 - Year Page 13 Pipe Input SIN Element Length Inlet Inlet Outlet Outlet Total Average Pipe Pipe Pipe Manning's Entrance Exit/Bend Additional Initial Flap ID Invert Invert Invert Invert Drop Slope Shape Diameteror Width Roughness Losses Losses Losses Flow Gate Elevation Offset Elevation Offset Height (ft) (ft) (ft) (ft) (ft) (ft) (%) (in) (in) (cfs) 1 Outlet-Pipe-03 65.00 559.00 0.00 555.00 0.00 4.00 6.1500 CIRCULAR 42.000 42.000 0.0130 0.5000 0.5000 0.0000 0.00 No Post -Development 100 - Year Page 14 No. of Barrels Post -Development 100 - Year Page 15 Pipe Results SN Element Peak Time of Design Flow Peak Flow/ Peak Flow Travel Peak Flow Peak Flow Total Time Froucle Reported ID Flow Peak Flow Capacity Design Flow Velocity Time Depth Depth/ Surcharged NumberConclition Occurrence Ratio Total Depth Ratio (cfs) (days hh:mm) (cfs) (fUsec) (min) (ft) (min) 1 Outlet-Pipe-03 137.50 0 1207 249.58 0.55 14.29 0.08 3.50 1.00 47.00 SURCHARGED Post -Development 100 - Year Page 16 Storage Nodes Storage Node : Pond-03 Input Data Invert Elevation (ft) .................................................................... 559.00 Max (Rim) Elevation (ft) ............................................................ 571.50 Max (Rim) Offset (ft) ................................................................. 12.50 Initial Water Elevation (ft) .......................................................... 565.00 Initial Water Depth (ft) ............................................................... 6.00 Poncled Area (ft2) ....................................................................... 0.00 Evaporation Loss ....................................................................... 0.00 OutflowWeirs SIN Element Weir Flap Crest Crest Length WeirTotal Discharge ID Type Gate Elevation Offset Height Coefficient (ft) (ft) (ft) (ft) 1 Spillway-03 Trapezoidal No 571.00 12.00 50.00 0.50 3.33 2 Weir-03A Rectangular No 566.80 7.80 5.00 1.20 3.33 Outflow Orifices SIN Element Orifice Orifice Flap Circular Rectangular Rectangular Orifice Orifice ID Type Shape Gate Orifice Orifice Orifice Invert Coefficient Diameter Height Width Elevation (in) (in) (in) (ft) 1 CS-Rim-03 Bottom Rectangular No 60.00 60.00 568.00 0.63 2 WQ-Orifice-03 Side CIRCULAR No 5.00 565.00 0.61 Output Summary Results Peak Inflow (cfs) ........................................................................ 258.69 Peak Lateral Inflow (cfs) ............................................................ 258.69 Peak Outflow (cfs) ..................................................................... 138.14 Peak Exfiftration Flow Rate (cfm) .............................................. 0.00 Max HGL Elevation Attained (ft) ................................................ 570.13 Max HGL Depth Attained (ft) ..................................................... 11.13 Average HGL Elevation Attained (ft) ......................................... 566.54 Average HGL Depth Attained (ft) .............................................. 7.54 Time of Max HGL Occurrence (days hh:mm) ........................... 0 1220 Total Exfiltration Volume (1 000-ft3) ........................................... 0.000 Total Flooded Volume (ac-in) .................................................... 0 Total Time Flooded (min) .......................................................... 0 Total Retention Time (sec) ........................................................ 0.00 25-YR CAPACITY HEC-22 Energy Grade Line Computations Struct. ID Q (cfs) I EGLo (ft) I HGLo (ft) I Total Pipe Loss (ft) EGU (ft) HGU (ft) Ea (ft) EGLa (ft) SU face Elev. (ft) 2 569.31 569.31 569.92 0.37 572.75 571.20 7.5 573.37 580.59 1 141.9 572.38 570.86 3 133.1 573.80 572.71 0.70 574.50 573.41 8.6 575.25 580.87 4 78.2 575.49 574.89 0.18 575.67 575.06 9.2 576.17 580.61 5 77.9 576.41 575.81 0.08 576.49 575.89 9.9 576.99 580.63 6 78.2 577.23 576.63 0.29 577.52 576.92 10.1 577.71 579.77 7 64.3 577.87 577.46 0.32 578.19 577.78, 10.0 578.38, 580.96 8 64.3 578.54 578.14 0.06 578.60 578.19 10.3 578.84 581.33 20 8.4 578.98 578.63 0.23 579.21 578.86 9.3 579.39 581.33 21 7.9 579.51 579.20 0.14 579.66 579.34 9.5 579.80 581.61 22 5.1 579.86 579.72 0.24 580.09 579.96 2.5 580.13 582.44 23 4.2 580.16 580.07 0.16 580.32 580.23 1.8 580.38 583.28 24 2.0 580.38 580.36 0.01 580.40 580.38, 1.4 580.41, 583.42 25 1.9 579.81 579.79 0.01 579.82 579.80 9.3 579.83 581.76 9 55.8 578.96 578.66 0.16 579.12 578.82 6.7 579.23 584.35 10 41.1 579.34 579.06 581.83 578.61 4.4 581.83 593.38 11 40.1 581.93 581.66 585.07 581.89 4.4 585.07 597.70 12 40.0 585.27 584.77 0.85 586.12 585.62 3.8 586.30 596.59 13 36.9 586.47 586.05 588.17 586.37, 3.3 588.17, 595.03 14 31.4 588.29 587.98 0.23 588.52 588.21 3.2 589.08 595.95 15 16.0 589.15 588.96 591.22 590.29 1.9 591.22 600.79 16 15.9 591.32 591.08 592.03 591.08 2.0 592.03 602.46 17 6.0 594.39 593.12 599.47 598.20 1.8 599.47 606.49 18 4.9 599.48 599.44 600.68 600.00 1.3 600.68 609.27 19 1.6 600.69 600.67 601.41 600.80, 0.9 601.41, 609.26, 38 8.2 592.09 591.94 592.76 592.35 1.8 593.09 596.81 39 7.0 593.12 593.03 593.12 592.75 1.6 593.12 596.81 14 13.8 589.20 588.90 0.14 589.34 589.03 3.2 589.49 596.11 34 9.1 589.54 589.41 0.25 589.79 589.66 2.1 589.90 595.08 49 4.8 590.00 589.76 0.73 590.73 590.49 1.9 590.84 593.03 33 1.8 590.85 590.82 591.24 590.99, 0.8 591.26, 595.11 35 4.0 591.24 589.99 593.79 592.54 1.7 593.79 596.73 36 2.9 593.83 593.74 597.72 596.68 1.5 597.72 600.70 50 3.1 588.20 588.12 588.39 588.00 1.0 588.39 595.03 53 1.8 586.31 586.29 0.01 586.32 586.30 3.5 586.35 596.60 9 13.9 579.25 579.19 0.02 579.27 579.21 6.0 579.31 585.71 26 10.7 579.32 579.28 0.04 579.36 579.32, 4.5 579.37, 580.63 28 4.6 579.39 579.35 0.05 579.43 579.40 3.8 579.44 581.28 29 3.2 579.46 579.41 0.10 579.56 579.51 3.3 579.59 582.90 30 1.6 579.60 579.58 0.03 579.63 579.62 2.6 579.63 581.49 31 1.8 579.38 579.36 587.64 586.68 1.2 587.64 593.45 51 10.2 577.77 577.61 0.14 577.92 577.75 4.4 577.97 579.46 52 7.1 578.01 577.93 0.17 578.18 578.10, 3.7 578.22, 581.50 48 3.3 577.73 577.68 0.03 577.76 577.70 6.0 577.78 579.77 43 6.4 573.45 573.24 0.41 573.86 573.65 3.4 573.93 577.47 44 4.5 573.97 573.87 0.27 574.24 574.14 2.2 574.28 578.97 45 3.3 574.33 574.21 0.40 574.72 574.61 1.2 574.77 580.47 46 2.5 574.80 574.73 575.96 575.58 1.0 576.02 579.58 47 0.8 576.02 576.01 577.24, 577.05, 0.5 57 581.33 40 3.4 573.39 573.33 0.10 573.491 573.431 6.4 573.52 581.89 41 1 2.7 573.551 573.47 0.271 573.821 573.741 .2 573.89 584.30 142 1 1.31 573.891 573.881 0.051 573.951 573.931 4.0 573.97 586.29 PiTHOMAS - HUTTON Z.,�27842�27842.0002�Engineering�Calculations and Reports�Ston,n Water�HEC-22�2021-06-01�Copy of HEC-22 Reporting HEC-22 Storm Drain Computations Structure ID Length (ft) Drainage Area I (a c) Runoff Coeff"C" Tc (min) I Rain "I" (in/hr) Runoff 1. Q1. I (cfs) Known Q (cfs) I Total Q (cfs) Pipe Dia. (i n) I Velocity Design (ft/s) Invert Elevation I Slope =Fr . :.= U/S I D/S 2 1 74, 0.01, 0.55, 5. 7.32 75.5 . 141.91 54 10.0 565.87, 565.501 0.50% 3_ 12 1 1521 0.041 0.551 51 738 66.81 55.01 133.11 54, 10.01 566.641 565.871 0.. q5O % "i" - 1 +1 66.81 1 78.21 481 8.91 566.941 566.641 0 13 1 601 0.091 0.551 5 0.509 r4 7.4 . 500%. PiTHOMAS - HUTTON Z.,�27842�27842.0002�Engineering�Calculations and Reports�Ston,n Water�HEC-22�2021-06-01�Copy of HEC-22 Reporting 4 IN/HR INLET SPREAD CL) U u LLJ U 4- CL) 0. u ;:- P -tr rn r, -i LD -i 00 m m -i 0 Ln m -4 0 -4 m w 0 . Ln . fli . -4 . 0 . -! "Zk N N N a� N q q -! "Zk " In -i -i 00000000 000000000 m 0 cr -u 00 rn a, rn Iq ,I: ,I: a� 'ZI: Iq q a 6 cs 2 cs o -4 o o -4 o o o o _4 ci 6 6 6 �4 ci ci ci �4 �4 ci ci ci ci �4 ci '66666 w u -u .2 b.0 . . . . . . . . . . . . . . N N N . . . . . u . . . . . . . . . . . . . . Lr) Lr) Lri Lri Lri Lri m m m m m m m r� m m m m m m m m m rn m m r, u zr- 0 - I = cq OR OR OR OR OR OR OR OR OR cq cq cq cq cq cq OR Iq Iq Iq Iq Iq Iq Iq LO LO LO LO LO Iq Iq Iq Iq Iq Iq Iq Iq Iq Iq cq cq cq cq cq cq cq cq cq cq cq cq cq cq cq cq cq LQ LQ LQ LQ LQ LQ LQ LQ 9 LQ LQ LQ LQ LQ LQ LQ LQ LQ LQ 9 . . . . . . . . m . rn . rn . rn . rn . rn . m . Ln m Ln m Ln m Ln m Ln m Ln m Ln m Ln m -4 r, Ln m Ln m L6 m Ln m Ln m Ln m Ln m Ln m ui m Ln m Ln m Ln m -i r, r r r r r r r r r r r r r r r r r r r r r r - - - - - - - - - - - - - - - - - - 0 .0 .0 .0 .0 .0 .0 .0 .0 .0 .0 .0 .0 .0 .0 .0 .0 .0 .0 .0 .0 .0 F= Q) w w w w w w w w w w w wwww Q) - - - - - - - I.E - I.E - I.E - - - - I.E - I.E - - IS E E E E E E E E E E E E E E E E E E E E E E o o o o o o o o o o o o o o o o o o o o o o rl Ui cq cq " "i Iq -i LQ cq Ui a� Iq r-� Ui r-� "Zt "Zt -i a� 9 In In a� -i 9 In Ui 9 "Zt cq Iq C5 0' -4 0 0 -4 0 0 -4 0 0 0 ci 0 0 0 0 00 'T LO 'T 0 0 r-: 0 0 m 0 LO LO 0 0 m -4 Ln 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 . . . . . . . . . . . . . . . . . . . . . . N N Ln In In "Zk N "Zk In N N In N N N N N N N N N N N N N N 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 C6 0 0 0 0 0 cs 0 0 0 0 w F� rn a� a� m ko T T m ;T ko o ko F, T m w w ko o o o ko F, m m U m F, o -i F, F, o -i w cu o o o o o In m 0 0 0 0 0 0 0 0 0 0 0 -u f co cn:�� 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 b.2 Ln — I rn m m m m m r"4 r4 r4 r4 r4 rT In rn rn In rn 0 -05 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 010 0 010 0 0 0 0 0 0 b 10 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1-1 1-1 m m 0 -, " Ln Ln Ln 1-1 1-1 1-1 1-1 0 0 1-1 0 0 0 0 0 0 4-4-4-4-4,�,�,�,�,�,�00000000,v000000000,v,vo,v 0 Ln M c 0 3: 0 cr -u c �d . . . . . . . . . . . . . . . . . u cq rl� In C� C� Ui In Iq "Zt ,I: C� "Zt Iq I? Iq rl� "Zt a� Iq OR Iq Iq a� q LQ ,I: a� rn Iq a� rl� q li LQ LQ Ln -4 00 0 0 r4 0 0 -4 0 0 -4 0 0 0 0 -4 0 0 0 0 0 0 -4 0 0 -4 " -4 0 0 0 0 -4 -4 -4 0 0 0 0 —u u p m U, LO Ln T m 0 -4 -4 -4 1-4 CA 1-4 -4 1-1 1-1 co r-I LO a CL) U u LLJ U 4- CL) E m 0. u ;:- P co co 'T -ZT 0 Ln m 0 0 0 co - - - - - - - - - - - " -i a� 1p q a� cq -i 1p r-� 0 0 0 0 " 0 -4 0 0 0 -4 0 u a tw . . . . . r1l -tr -tr -tr -tr tw u w 0. W Z7- 0 - - - - - - - - - - tw ui ui ui ui q q q Ln Ln Lnn Ln Ln -4 1-1 oo Ln rn r m m r, r, rn u w 0. o 'W 1p LP LP LP 1p cq 1p cq q cq cq m-a W ui ui ui ui q cq q cq q cq cq Ln m Ln m Ln m Ln m -4 r, m " -4 r, m r4 oo r4 m " m " ui m w 0. 0 0 0 0 0 0 0 0 W -0 Q) Q) -0 E E E E E E E 0 0 0 0 0 u UO 0 u 0 a "z,: q Lq "z,: m -4 rn -4 LO r, 0 Ln 0 -4 r-I Ln Ln r4 r4 r4 o r4 o r4 r4 r4 f-I 000000000000 'R q ai cq 'R C7 76 o o o _4 " o _4 o o o _4 0-1 0 .2 —u 0 .2 -Zr 0 0 0 0 0 0 0 0 0 0 Ln . q . q . q . q r4 q rn en r4 q rn en r4 q r4 q r4 q r4 q 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 m 0 0 1-1 0 0 0 0 C� q q q q q q q C . 0 . 0 0 0 0 0 0 Ln M c 0 3: 0 cr —u u 0� Li q le cq le a� 0000-401-40001-40 —u u m Ln m Ln " 1_1 I Ln I Ln I Ln a STORMWATER MANAGEMENT REPORT CRESSWIND WESLEY CHAPEL - PHASE 02 APPENDix F WATER QUALITY CALCULATIONS A THOMAS & HUTTON Water Quality Calculations Cresswind - Wesley Chapel Proiect No. 27842.002 WET POND 03 Project/Drainage Area: 45.46 Acres Required Water Quality Volume: 107,241 Cubic Feet Impervious Area: 3030 Acres (Project Area (Acres) X 43,560 SF X 1"/12 - Required Cubic Feet Volume) Percent Impervious Runoff Coeifficient: R-05,0.9 (1) - 1 0.65 jined Collection of First I" of Rainfall from the Project Site and Release over a Minimum 48 Hour (Maximum 120 Hours) in Cubic Feet Per Second) 48-Hour Release Rate: CFS Required Orifice Si— Drawdown Time (Hours): Quality Elevation Elev. "e, Area Storage ft) ( ff') (sf) (cu. ft) 65.00 5 56500 48,889.00 0.00 571.00 57� 00 72,687.00 364,728.00 ,ZWater Elevation e'ahrm Pond Depth Storage ff') fft) fft (cu. ft) 565.00 56500 0.00 0.00 566.76 1.76 107,241.09 571.00 6.60 364,728.00 Average Depth Calculation Vpp Designed @ Elevation 71565.0000 65 190,429.00 SA Designed @ Elevation 39,712.00 Area of wet pond at the bottom ofthe shelf 36,949.00 Dmax over shelf 0.50 Perimeter of Permanent Pool 1,055.00 Width of submerged part of shelf 3.00 Volumeoverthesh Ifonly 791.25 V;-- — v .g�a,� 5.13 'W SA/DA Method Drainage Area 45 -1111011- Table value 61acres 1�� 8 Surface Area Required 1 33,267.99 Isquare feet Q-CdA*sqrt(2gh) Cd - 0.62 (Sharp Orifice A - 0.136 sf 9- 32.174 ft/s, h - 1.76 ft Q- 0.637 cf,; VPP-Vshelf D., Abottomofshelf v, TM,1 & p,r.,.,.t ­1 &01) —u.. th. —1-1y (--) - — — A ... f — .111. —1— .1h. v—, � 0.5 ' DIPth— el---. ­ ' Widft.—­ ­ .h- =­r1tth,d, id,�thllhllfll d t --t ­1 Wid--- dr, 'r— d" = f - --rn=n- �1 Stage Storage Calculations Cresswind - Wesley Chapel Project No. 27842.0002 WET POND 03 FOREBAY01VOLUME INC. VOL..AVG. CUM. VOL. AVG. END F�w I!= END (CU FT.) (CU. FT.) 559 1,761 N/A N/A 0 560 2,102 1 1,932 1,932 561 2,474 1 2,288 4,220 562 2,875 1 2,674 6,894 563 3,306 1 3,090 9,984 564 3,766 1 3,536 13,520 564.5 4,128 0.5 1,973 15,493 565 4,647 0.5 2,194 17,687 'MM' qr INC. VOL..AVG. CUM. VOL. AVG. END F�w ffm END (CU FT.) (CU. FT.) 559 1,074 N/A N/A 0 560 1,368 1.00 1,221 1,221 561 1,692 1.00 1,530 2,751 562 2,045 1.00 1,869 4,620 563 2,428 1.00 2,237 6,857 564 2,840 1.00 2,634 9,491 564.5 3,137 0.50 1,494 10,985 565 3,667 0.50 1,701 12,686 TOTAL FOREBAY VOLUME: I 30,3731CU. FT. PERCENTAGE OF PERMANENT POOL VOLUME:j 15.951% PERMANENT POOL VOLUME CONTOUR AREA CONTOUR ELEV DEPTH (FT) 559 25710 N/A N/A 0 560 27625 1 26,667 26,667 561 29,582 1 28,603 55,270 562 31,581 1 30,582 85,852 563 33,618 1 32,599 118,451 564 35,690 1 34,654 153,105 564.5 36,949 0.5 18,159 171,264 565 39,712 0.5 19,165 190,429 PERMANENT POOL VOLUME: I 190,4291CU.FT TEMPORARY PONDING ZONE A&. CONTOUR ELEV CONTOUR AREA DEPTH (FT) INC. VOL. AVG. CUM. VOL. AVG. END (SF) END (CU. FT.) (CU. FT.) 565 48,889 N/A N/A 0 565.5 52,395 0.5 25,321 25,321 566 54,139 0.5 26,634 51,955 567 57,738 1 55,939 107,894 568 61,391 1 59,565 167,458 569 65,091 1 63,241 230,699 570 68,845 1 66,968 297,667 571 72,687 1 70,766 368,433 TEMPORARY PONDING ZONE VOLUME: I 368,4331CU. FT. Cresswind Wesley Chapel - Phase 02 Job: J-27842.0002 KH Wesley Chapel, LLC Date: 2/18/21 Thomas & Hutton Engineering Co. Revised: Anti -Flotation Design Considerations By: MSK ANTI -FLOTATION DESIGN CONSIDERATIONS FOR: Wet Pond 02 1 CONTROL STUCTURE ELEVATIONS Top Structure Elevation: 570.20 Bottom Structure Elevation: 558.80 CONTROL STRUCTURE FLOTATION Buoyant Force, Calculate submerged volume: Vs = (As x H,$) Where: Vs = Submerged volume (cf) L,s = Length of control structure (ft) 6.00 ft W,s = Width of Control structure (ft) 6.00 ft A,s - Cross -sectional area of control structure (ft) 36.00 ft H,s = Height of control structure (ft) 11.40 ft Solve equation for Vs: V, = (A,s x H,$) 410.40 cf Calculate buoyant force: Fb = V� X 7w.W, Where: Fb = buoyant force (lbf) y,,,, = Specific weight of water 62.40 lbf/cf Fb = 25,609 lbf Z:\27842\27842.0002\Engineering\Calculations and Reports\Storm Water\Anti Flotation\27842.0002 - Wet Pond 03 - Anti Flotation Design Calculations Pagel of3 Cresswind Wesley Chapel - Phase 02 Job: J-27842.0002 KH Wesley Chapel, LLC Date: 2/18/21 Thomas & Hutton Engineering Co. Revised: Anti -Flotation Design Considerations By: MSK Downward Force Calculate Downward Force of Control Structure Fdc� = (V.� - V�& - V.rj&�) x yconcrete Where: Wt,s = Weight of control structure (lbs) ,y,on .. t, = Specific weight of concrete — 140.00 lbf/cf A,s = Cross -sectional area of control structure (ft) — 36.00 ft H,s = Height of control structure (ft) — 11.40 ft T,s = Wall thickness of control structure (ft) — 0.50 ft V,, = Volume of control structure (cf) — 125.40 cf W,,i, = Width of weir (ft) — 5.00 ft H,,i, = Height of weir opening (ft) — 1.20 ft A,,i, = Area of weir opening(ft) — 6.00 sf V,,,, = Volume of weir — 3.00 cf DIAO,ifi,, = Diameter of orifice opening (in) — 5.00 in AO,jfj,, = Area of orifice opening (sf) — 0.136 sf VO,jfj,, = Volume of orifice opening (sf) — 0.068 cf Fd,, = 17,126 lbf Size Anti -Flotation Footing to Resist BoLlyant Force Fd,s + Fdft > Fb Fdft = (Lb X Wb x Db) X 7concrete Where: Fd,s = downward force of control structure (Ibf) — 17126 Ibf Fb = buoyant force (Ibf) — 25609 Ibf ,y,on,r,, = Specific weight of concrete — 77.60 Ibf/cf Lb = Length of Concrete Block — 12.00 ft Wb = Width of Concrete Block — 12.00 ft Db = Depth of Concrete Block — 12.00 in Fdft = downward force of anti -flotation footing (Ibf) — 11174 Ibf Z:\27842\27842.0002\Engineering\Calculations and Reports\Storm Water\Anti Flotation\27842.0002 - Wet Pond 03 - Anti Flotation Design Calculations Page 2 of 3 Cresswind Wesley Chapel - Phase 02 KH Wesley Chapel, LLC 'Ibomas & Hutton Engineering Co. Job: J-27842.0002 Date: 2/18/21 Revised: Anti -Flotation Design Considerations By: MSK Fd, + Fdft = 28301 Ibf > Fb = 25609 IV Factor of Safety Confinn anti -flotation block is sized for minimum factor of safe1y (F,) of 1. 10. Fs (Fdcs + Fdft)/Fb 1.11 > 1.10 Z:\27842\27842.0002\Engineering\Calculations and Reports\Storm Water\Anti Flotation\27842.0002 - Wet Pond 03 - Anti Flotation Design Calculations Page 3 of 3