Loading...
HomeMy WebLinkAboutNC0028916_Performance Annual Report_20100301Performance Annual Report I. General Information Facility/System Name: Town of Troy Wastewater Treatment Plant ResponsibleEntity: Town of Troy Person in Charge/Contact: Gray Walls Applicable Permit(s): NC0028916, WQCS00134 Description of Treatment Process and Collection System: The wastewater treatment plant is permitted for 1.2 MGD. The plant is an extended aeration system with dual oxidation ditches running in series, two final clarifiers and ultraviolet disinfection. The sewer collection system is comprised of 6", 8" 10" 15" 18" and 21" clay, cast iron, and pvc sewer piping. The piping system is predominately 6" and 8" diameter pipe with brick and precast manholes. The Town of Troy owns a sewer jet machine capable of washing 600 L.F. of sewer collection pipe. II. Performance System Performance from April 1, 2009 through March 1, 2010 WASTEWATER TREATMENT PLANT: The WWTP has performed' essentially to the standards of a plant with sand filtration installed after final clarification. NPDES monitored pollutants have been discharged well below permitted limits. The plant has had no spills and no NOV's for this year. Monthly violation history: Month , Violation • Environmental Impacts Corrective Measures April None N/A N/A May None N/A N/A June None N/A N/A July None N/A N/A August None . N/A N/A September None" N/A N/A October None N/A N/A November None N/A N/A December None N/A N/A January None N/A N/A February None N/A N/A March None N/A N/A 2009-10 Sewer Performance Report SEWER COLLECTION SYSTEM:, The sewer collection system has performed very well with no reportable spill having occurred during the previous year. Monthly violation history: Month Violation Environmental Impacts Corrective Measures April None N/A N/A May None N/A N/A June None N/A N/A July None N/A N/A August None N/A N/A September None N/A N/A October None N/A N/A November None N/A N/A December None N/A N/A January None N/A N/A February None N/A N/A March None N/A N/A III. Notification This Report will be put on public display at the Troy Town Hall. Copies will be made available to any user or customer upon request. Notice of the availability of the report will be placed in the April water billing. IV. Certification I certify under penalty of law that this report is complete and accurate to the best of my knowledge. I further certify that this report will be made available to the users or customers of the Town of Troy system and that those users will be notified of its availability. E. Gray Walls Town Engineer and Public Services Director Town of Troy Date: 03/01/10 2009-10 Sewer Performance Report Performance Annual Report I. General Information Facility/System Name: Town of Troy Wastewater Treatment Plant Responsible Entity: Town of Troy Person in Charge/Contact: Gray Walls Applicable Permit(s): NC0028916, WQCS00134 Description of Treatment Process and Collection System: MAR 022011 M' The wastewater treatment plant is permitted for 1.2 MGD. The plant is an extended aeration system with dual oxidation ditches running in series, two fmal clarifiers and ultraviolet disinfection. The sewer collection system is comprised of 6", 8" 10" 15" 18" and 21" clay, cast iron, and pvc sewer piping. The piping system is predominately 6" and 8" diameter pipe with brick and precast manholes. The Town of Troy owns a sewer jet machine capable of washing 600 L.F. of sewer collection pipe. II. Performance System Performance from January 1, 2010 through December 31, 2010 WASTEWATER TREATMENT PLANT: The WWTP has performed essentially to the standards of a plant with sand filtration installed after final clarification. NPDES monitored pollutants have been discharged well below permitted limits. The plant has had no spills and no NOV's for this year. Monthly violation history: Month January February March -April_ May June July August September October November December Violation Environmental Impacts Corrective Measures None None None None - None None None None None None None None N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A _N/A _ N/A N/A N/A N/A N/A N/A N/A N/A Sewer Performance Report SEWER COLLECTION SYSTEM: The sewer collection system has performed very well with no reportable spill having occurred during the previous year. Monthly violation history: Month Violation Environmental Impacts Corrective Measures January None N/A N/A February None N/A N/A March None N/A N/A April None N/A N/A May None N/A N/A June None N/A N/A July None N/A N/A August -- - - None - - - - N/A N/A September None N/A N/A October None N/A N/A November None N/A - N/A December None N/A N/A DI. Notification This Report will be put on public display at the Troy Town Hall. Copies will be made available to any user or customer upon request. Notice of the availability of the report will be placed in the April water billing. IV. Certification I certify under penalty of law that this report is complete and accurate to the best of my knowledge. I further certify that this report will be made available to the users or customers of the Town of Troy system and that those users will be notified of its availability. Le)cel E. Gray Walls Town Engineer and Public Services Director Town of Troy Date: 02/18/11 Sewer Performance Report