Loading...
HomeMy WebLinkAbout20051795 Ver 1_No Written Concurrence_20210602Strickland, Bev From: Snider, Holley Sent: Wednesday, June 2, 2021 10:51 AM To: Bodnar, Gregg Subject: FW: [External] SAW 2005-01105CL-32 Letter Port City Marina Reconfiguration Good morning Gregg, The DWR has no objection to the minor modification request for DWR project #20051795. Please be reminded that you must still comply with the activity specific conditions and the general conditions set forth in GC# 4175 that corresponds to the USACE's RGP291 and RGP56 and: The docking facility is permitted for 204 number of slips. Dockage of vessels other than the permitted slips will require re-evaluation by DWR of the use of the dockage facility. Handrails or other devices, including signage, should be used to discourage use of any dock space other than the 204 number of designated slips. [15A NCAC 07H .0208] Justification: A project that affects waters shall not be permitted unless the existing uses, and the water quality to protect such uses, are protected. In determining that the proposed activity will comply with state water quality standards (including designated uses, numeric criteria, narrative criteria and the state's antidegradation policy), the Division must evaluate if the activity has avoided and minimized impacts to waters, would cause or contribute to a violation of standards or would result in secondary or cumulative impacts. Feel free to call or email me if you have any questions or I may be of assistance to you in any way. Sincerely, Holley Snider .., ,><((((°>•..•.,,..><((((°>.•.- Environmental Specialist 11 Division of Water Resources North Carolina Department of Environmental Quality Phone: (910) 796-7304 roN/imnM al ka.rnnmpntal quallly 127 Cardinal Drive Ext. Wilmington, NC 28405 Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties From: Currey, Gregory E CIV USARMY CESAW (USA) <Gregory.E.Currey@usace.army.mil> Sent: Wednesday, May 26, 2021 4:34 PM To: Anthony Lucchino <anthony@usainvestco.com> Cc: Morrison, Stephen <smorrison@lmgroup.net>; Howell, Jonathan <jonathan.howell@ncdenr.gov>; MacPherson, Tara <tara.macpherson@ncdenr.gov>; Snider, Holley <holley.snider@ncdenr.gov>; Bodnar, Gregg <gregg.bodnar@ncdenr.gov>; Wojoski, Paul A <Paul.Wojoski@ncdenr.gov>; Pete_Benjamin@fws.gov; kathryn_matthews@fws.gov; Bowers, Todd <bowers.todd@epa.gov>; Bertram, Paul J BOSN3 <Paul.J.Bertram@uscg.mil>; Horton, J Todd CIV USARMY CESAW (USA) <James.T.Horton@usace.army.mil>; Arnette, Justin R CIV USARMY CESAW (USA) <Justin.R.Arnette@usace.army.mil> Subject: [External] SAW 2005-01105CL-32 Letter Port City Marina Reconfiguration 1 CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to Report Spam. Anthony, attached is your authorization letter and related documents. Let me know if you have any questions. Greg Greg Currey Project Manager USACE, Wilmington 69 Darlington Ave. Wilmington, NC 28403 PH 910-251-4707 2