Loading...
HomeMy WebLinkAbout20071841 Ver 5_More Info Received_20130222Higgins, Karen From: Clement Riddle [clement @cwenv.com] Sent: Friday, February 22, 2013 8:48 AM To: Higgins, Karen Subject: RE: DWQ Project No. 07 -1841 v5 Attachments: Corp Letter Asheville Airport Mitigation.pdf, Corps AVL _permitmod 2 19- 13.pdf Karen, Good morning. I also left you a voicemail this morning regarding the Asheville Airport Mitigation modification. We have received our modification from the Corps, (attached). Please note that our January 14 modification correspondence requested a change to the mitigation that would allow: 399 feet to Wash Creek Mitigation bank and 172 linear feet to EEP However, based on further review by the Corps (attached) Wash Creek only has 397 linear feet available. Therefore we need to change our 401 modification request to allow: 397 linear feet of mitigation from Wash Creek and 174 linear feet from EEP. I apologize for our mistake in calculating the credits and the inconvenience. Please do not hesitate to contact me 828- 698 -9800 if you have any questions or comments. Thank you for your assistance, Clement From: Clement Riddle Sent: Thursday, February 14, 2013 12:15 PM To: 'Higgins, Karen' Subject: DWQ Project No. 07 -1841 v5 Karen, I'm just following up on DWQ's letter for additional information on January 22, 2012. We have submitted a response letter by regular mail (also attached) regarding this information. We expect, Amanda Jones, Corps of Engineers, to be issuing the permit tomorrow or the next few days. I just wanted to reach and see if you had any questions regarding our submittal. Please do not hesitate to contact me if you have any questions or comments. Sincerely, Clement Riddle 224 South Grove Street, Suite F Hendersonville, NC 28792 Office 828 -698 -9800 Mobile 828 - 606 -5168 clementAmenv.com The information in this email is confidential and may be legally privileged. It is intended solely for the addressee(s). Disclosure to other parties is prohibited. If you are not the intended recipient, any disclosure, copying, distribution or any action taken or omitted to be taken in reliance on it, is prohibited and may be unlawful. DEPARTMENT OF THE ARMY WILMINGTON DISTRICT, CORPS OF ENGINEERS 151 PATTON AVENUE ROOM 208 ASHEVILLE, NORTH CAROLINA 28801 -5006 February 19, 2013 Regulatory Division Action ID: SAW- 2011 -00874 Mr. Clement Riddle French Broad Mitigation Partners, LLC 224 South Grove Street, Suite F Hendersonville, North Carolina 28792 Dear Mr. Riddle: Please reference the Mitigation Banking Instrument (1VIBI) for the unnamed tributary to Wash Creek Mitigation Bank and our subsequent acceptance letter for this bank dated March 9, 2012. This plan will generate approximately 1,323 stream mitigation units (SMUs). On February 14, 2013, we received the financial assurances described in Section IX of the MBI, recordation of the long -term protection mechanism described in Section X, and an acceptable title opinion covering the property. Due to the submittal of these documents as outlined in the MBI, you are authorized to initially release 30% of the total available credits which calculates to 397 SMU's provided those credits are associated with one permitted project. Based upon a letter submitted by you on behalf of the Asheville Regional Airport (Airport), the Airport is requesting to modify their permit to use this bank as their mitigation provider for 399 linear feet of required mitigation. We intend to modify the Airport's permit to grant this request; however, the maximum credit available to the Airport at this time is 397 SMU's. If you have any questions, please contact me at (828) 271 -7980 extension 231. Sincerely, Amanda Jones Project Manager Asheville Regulatory Field Office February 19, 2013 Regulatory Division Action ID: SAW- 2010 -00036 Mr. Lew Bleiweis Asheville Regional Airport Authority 61 Terminal Drive, Suite 1 Fletcher, North Carolina 28732 Dear Mr. Bleiweis: Please reference your Department of the Army (DA) permit dated October 28, 2011 in which we authorized the placement of fill into 1,796 linear feet of stream channel and 0.09 acres of wetlands for the airport expansion of the Asheville Regional Airport, in Fletcher, Buncombe County, North Carolina. On January 4, 2013, a request to modify the mitigation conditions of your permit was submitted on your behalf by C1euWater Environmental Consultants, Inc. The original permit condition stated that you would provide mitigation in two phases through payment for the entire amounf of required mitigation into the North Carolina Ecosystem Enhancement Program ( NCEEP). Phase 1 mitigation has been completed through payment into NCEEP for 1,225 linear feet. For Phase 2, you are requesting to make payment into NCEEP for 172 linear feet and the UT to Wash Creek Mitigation Bank (Bank) for 399 linear feet. This request is approved; however, the Bank is only authorized to release 397 stream mitigation units at this time and therefore your request to NCEEP for mitigation should be in the amount of 174 linear feet. In accordance with this permit modification to compensate for impacts associated with the authorized work, mitigation shall be provided in accordance with the provisions outlined on the most recent version of the enclosed Compensatory Mitigation Responsibility Transfer Forms. The requirements of this form, including any special conditions listed on this form, are hereby incorporated as special conditions of this permit authorization. If you have questions, please contact Amanda Jones at the Asheville Regulatory Field Office, telephone (828) 271 -7980 extension 231. - 2 - Sincerely, FILENAME: AVL_modifiedpermit021513.docx/nw SAW- RG- A/Jones /s N-1�5MAIL CESAW- RG -A/file Scott Jones, PWS Chief, Asheville Regulatory Field Office Enclosures Copy furnished w /enclosures: Mr. Clement Riddle ClearWater Environmental Consultants, Inc. 224 South Grove Street, Suite F Hendersonville, North Carolina 28792