HomeMy WebLinkAbout20130402 Ver 1_CAMA Application_20130417• 20130402
fCLD E�IR
North Carolina Department of Environment and Natural Resources
Division of Coastal Management
Pat McCrory Braxton C. Davis John E. Skvarla, III
Governor Director Secretary
April 15, 2013
MEMORANDUM:._._�-
TO: Karen Higgins
Division of Water Quality APR 1 7 1013
FROM: Doug Huggett _ WAY&
Major Permits Processing Coordinator
SUBJECT: CAMA/DREDGE & FILL Permit Application Review
Applicant: Ruddy Duck Tavern
Project Location: Carteret County, at 509 Evans Street, Morehead City, along the Morehead
City waterfront.
Proposed Project: Proposes the relocation of the existing floating pier and platform, the addition
of three fixed platforms and the loss of one slip area ( from 4 to 3). No
highground work is proposed.
Please indicate below your agency's position or viewpoint on the proposed project and return this form by
May 5h, 2013 . If you have any questions regarding the proposed project, please contact Heather Styron,
Permit officer at (252) 808 -2808 Ext. 216. When appropriate, in -depth comments with supporting data is
requested.
REPLY: This agency has no objection to the project as proposed.
This agency has no comment on the proposed project.
This agency approves of the project only if the recommended changes are
incorporated. See attached.
This agency objects to the project for reasons described in the attached comments.
SIGNED DATE
400 Commerce Ave., Morehead City, NC 28557
Phone: 252 -808 -28081 FAX: 252 - 247 -3330 Internet: www.neCoaStalmanagement.net
An Equal Opportunity 1 Affirmative Action Employer
ajor Permit Fee Schedule
Circle One
DCM %
DWQ %
Development Type
Fee
(14300160143510009316256253)
(2430016024351000952341)
I. Private, non - commercial
development that does not involve
the filling or excavation of any
wetlands or open water areas:
$250
100%($250)
0%($0)
II. Public or commercial
development that does not involve
the tilling or excavation of any
wetlands or open water areas:
$400
100%($400)
0%($0)
III. For development that involves
the filling and /or excavation of up
to 1 acre of wetlands and /or open
water areas, determine if A,B, C,
or 0 below applies:
III(A). Private, non - commercial
development, if General Water
Quality Certification No. 3490
(See attached) can be applied:
$250
100% ($250)
0%($0)
HIM. Public or commercial
development, If General Water
Quality Certification No. 3490
(See attached) can be applied:
$400
100% ($400)
0%($0)
III(C). If General Water Quality
Certification No. 3490 (see
attached) could be applied, but
DCM staff determined that
additional review and written
DWQ concurrence is needed
because of concerns relle
water quality or aquatic f
60%($240)
40%($160)
III(D). If General Water
Certification No. 3490
attached) cannot be a
$400
60% ($240)
40%($160)
IV. Development that Inv
filling and/or excavation
than one acre of wetlandopen
water areas:
$475
60%($285)
40%($190)
DIVISION OF COASTAL MANAGEMENT
FIELD INVESTIGATION REPORT
1. APPLICANT'S NAME: Ruddy Duck Tavern C/O Bearing Point Consulting, Inc.
2. LOCATION OF PROJECT SITE: Located at 509 Evans Street in Morehead City along
the Morehead City Waterfront area.
Photo Index - 2000: 41 -526 grids (S- 15 &16, T- 15 &16)
2006: 42 -6410 grid (S -6 &7)
State Plane Coordinates - X: 2688252.171 Y: 360944.471
Longitude: 76 °42'33.85 Latitude: 34043'11.75
3. INVESTIGATION TYPE: CAMA
4. INVESTIGATIVE PROCEDURE: Dates of Site Visit – 4/9/13
Was Applicant Present – No
5. PROCESSING PROCEDURE: Application Received – 4/3/2013
Application Complete -4 /9/2013
Office – Morehead City
6. SITE DESCRIPTION:
(A) Local Land Use Plan – Morehead City dated 2007
Land Classification from LUP – Downtown Mixed Use /Conservation
(B) AEC(s) Involved: EW, PTA
(C) Water Dependent: (yes)
(D) Intended Use: Commercial
(E) Wastewater Treatment: Existing – Municipal sewer
Planned - None
(F) Type of Structures: Existing – bulkhead, pilings, two restaurants with docking
facilities and five commercial fishing boat slips
Planned – relocation of existing floating pier and platform
and the construction of three fixed platforms.
(G) Estimated Annual Rate of Erosion: N/A
Source – N/A
7. HABITAT DESCRIPTION:
DREDGED FILLED OTHER
—T (A) Open Water (platforms)
N/A
N/A
1,920Ft' Incorp.
773Ft2 Shaded
(D) Total Area Disturbed: 1,920ftz
(E) Primary Nursery Area: No
(F) Water Classification: SC Open: No
8. PROJECT SUMMARY: The project proposed is located along the Urban Waterfront
area of Morehead City. Although the project area is along one parcel of land with two
restaurants and five commercial fishing slips, each site has a historical use as an individual
entity. The project involves the relocation of the existing floating pier and platform, the
addition of three fixed platforms and the loss of one slip area (going from 4 to 3). There is
no high ground work proposed.
Field Investigation Report:
Ruddy Duck Tavern
Page 02
9. Narrative Description
The Ruddy Duck Tavern project is located along the Morehead City waterfront
(designated as urban waterfront area) within the Morehead City Harbor area of Bogue
Sound at 509 Evans Street. The tract is bordered by DMA Charter LLC to the east and 513
LLC (Jacks Waterfront Bar) to the west.
The Ruddy Duck Tavern property is 34,703.09 square feet (.80 acres) in its entirety, has a
shoreline length of 335' and is an average of 4' above NHW. Presently there is an existing
bulkhead, two restaurants with docking facilities', one private slip with boatlift for the
adjacent neighbor and five commercial fishing boat slips. Each site along the tract has a
historical use as a separate entity. There are no coastal wetlands or high ground vegetation
on this tract.
The Morehead City Land Use Plan classifies this property as Downtown Mixed Use, with
all AEC's classified Conservation. This section of the Bogue Sound (Morehead City
Harbor) is not designated as Primary Nursery Area, is closed to the taking of shellfish and
carries a water classification of SC. There are historic riparian corridors within this area
and shall pertain to the newest proposal and meet all required setbacks. Substrate in the
Morehead City Harbor is mostly sand and silt. No SAV's or shellfish beds were observed
within the proposal project area. There is a USACOE federal channel setback within the
project vicinity (approximately 99' from nhw /mhw).
10. Project Description:
The applicant's current proposal is to construct three fixed platforms, remove one of the
four existing slips for a total of 3 and relocate the existing floating pier and platform
to the edge of the USACOE channel setback.
The applicants are proposing to shift the existing floating pier and platform 1' -2' south so
it is located along the USACOE channel setback. The shift of the floating pier and
platform would not encroach over the setback. The applicants have stated there would not
be any pilings located within this area. They are also proposing the construction of three
fixed platforms along the existing docking facility. There would be a 6' x 30' fixed
platform starting along the southeast portion of the existing restaurant. It would run
parallel with the existing restaurant and extend west for 30'. It would attach to an 8' x 8'
fixed landing that would be used for the existing pier and platform gangway. A 23' x 23'
fixed platform would extend from the west side of the proposed 8' x 8' fixed landing. The
water depths within the slip areas are approximately 10' to 14' nlw /mlw depending on
location. The development encroaches within the 15' riparian setback on the west side;
however 513 LLC has signed the 15' waiver. The tidal amplitude within this area is
approximately 3.08'. The total length of the shoreline is 335'. The waterward edge of the
proposed platform would be located a distance of 99 feet from nhw /mhw and along the
USACOE channel setback. The width of the Morehead City Harbor is approximately 397'
in this area. The proposed pier and platform shift would extend a maximum of 99'
waterward of nhw /mhw within a 397' wide waterbody. According to the applicant, the
typical boat would be 12'- 25'with a mixed use open runabout design. The slips would be
of a transient nature, would prohibit overboard discharge, as well as prohibit fueling and
Field Investigation Report:
Ruddy Duck Tavern
Page 03
overnight or live aboard dockage. There are no impervious surface impacts due to the
project is entirely over estuarine waters.
11. Anticipated Impacts:
The proposed pier and platform would shade 773 ft2 and incorporate 1,920ft2 of open
waters. The setting of pilings would cause temporary turbidity. There would be no
hindrance to navigation due to the fact that the docking facility would be located a
maximum distance of 99' waterward of nhw /mhw and along the channel setback but not
encroach within it. No pilings would be within that area either. The width of two portions of
the new access areas would be greater than six feet however, the two 8' wide accesses
would provide for greater safety and improve public use access. The additions would meet
15A NCAC 0711.0208 (b) (6) (b). All portions of the development would not extend farther
than 99' waterward of nhw /mhw within the 397'wide waterbody. This project has the
potential to improve public benefit by adding additional public access.
Name: Heather Styron Date: 4/15/13 Morehead City
J
Major CAMA Permit Application
Ruddy Duck Tavern Dock Relocation &
Fixed Timber Platform
Town of Morehead City, North Carolina
April 3, 2013
Applicant:
Ruddy Duck Tavern
509 Evans Street
Morehead City, NC 28557
Prepared For:
North Carolina Department of Environment &
Natural Resources
Division of Coastal Management
400 Commerce Avenue
Morehead City, NC 28557
Prepared RECEIVED
BEARING POINT CONSULTING, INC. APR 0 3 2013
910 Arendell Street
Morehead City, North Carolina 28557
(252) 247 -4200 ��:�? %T Ci:v
MAJOR CAMA PERMIT APPLICATION
RUDDY DUCK TAVERN DOCK RELOCATION & FIXED TIMBER PLATFORM
MOREHEAD CITY, CARTERET COUNTY, NORTH CAROLINA
Table of Contents
DCM MP —1 Application for Major Development Permit
DCM MP — 4 Structures
PROJECT NARRATIVE
INTRODUCTION
EXISTING CONDITIONS
PROJECT DESCRIPTION
Demolition and Removal
Excavation
Upland Development
Stormwater Management
NAVIGATION CONDITIONS
METHOD OF CONSTRUCTION
PROJECT SCHEDULE
COMPLIANCE WITH N. C. ENVIRONMENTAL POLICY ACT
ADJACENT RIPARIAN PROPERTY OWNERS
Application Drawings
Sheet 1 — Vicinity Map
Sheet 2 — Existing Conditions
Sheet 3 — Proposed Plan
Sheet 4 — Sections
Sheet 5 — Riparian Property Owners
Deed
Adjacent Property Owner Notification Letters
Property Owner Letter of Approval for Project
Authorized Agent Letter
RECEIVED
APR 032013
1'C.b?- 'V.NTD CITE"
J
RUDDY DUCK TAVERN DOCK RELOCATION & FIXED TIMBER PLATFORM
RUDDY DUCK TAVERN
MOREHEAD CITY, CARTERET COUNTY, NORTH CAROLINA
PROJECT NARRATIVE
April 3, 2013
Revised April 9, 2013
INTRODUCTION
The project site is an approximately 0.80 acre site located in of the Town of Morehead City's
corporate limits and is adjacent to the Morehead Harbor Channel. The property currently has
two restaurants located on it, the Ruddy Duck Tavern and the Sanitary Fish Market and is
owned by the Vernon Jackson Garner, Jr. Trust. There are five, approximately 55' boat slips
between the two restaurants for use by charter fishing boats. The Ruddy Duck Tavern facility
currently has a "T" shaped floating dock landward of the U.S. Army Corps of Engineers Setback
Line. The Ruddy Duck Tavern Dock Relocation and Fixed Timber Platform project includes
moving the channelward edge of the current floating dock system to the Channel Setback Line
and the construction of two fixed timber platforms. No additional boat slips are being proposed
as part of this project.
EXISTING CONDITIONS
The Ruddy Duck Tavern currently has a fixed timber platform on the southern side of-the
structure. A gangway connects this platform to a "T' shaped floating dock that is landward of
the Channel Setback Line. The portion of the floating dock that is parallel to the Morehead
Harbor Channel is 52'x 8' and the perpendicular portion is 20'x 8'. The floating dock currently
has four (4) boat slips associated with it. There is a 10' x 26' private boat lift owned by the
adjacent property owner on the western portion of the project between the platform and the
adjacent property.
PROJECT DESCRIPTION
RECEWED
APR 0 9 2013
Demolition and Removal — The only demolition and removal proposed in this project is MHDCITy
removal of the existing handrail once construction of the entire platform is constructed.
Ruddy Duck Tavern Dock Relocation & Fixed Timber Platform April 3, 2013, Rev. April 9, 2013
Major CAMA Permit Application — Narrative Page 1 of 2
V
Excavation — There is no excavation included with this project.
Upland Development —There is no Upland Development planned as part of this project.
Stormwater Management — No upland improvements, pavements, walkways or other
impervious surfaces will be constructed as part of the project. No stormwater management or
additional stormwater measures are required for this project.
NAVIGATION CONDITIONS
The federal channel boundary and channel setback run along the entire southern margin of the
project site. The federal channel is 100 feet wide. The channel and setback lines shown on the
drawings were obtained from the Navigation Section, U.S. Army Corps of Engineers,
Wilmington District.
METHODS OF CONSTRUCTION
Construction of the timber platform will be by conventional marine construction equipment
including barges and cranes. The equipment will be onsite only a sufficient time to complete the
pile driving and pier installation work.
PROJECT SCHEDULE
After the required CAMA Major permit is obtained, construction of the dock relocation and fixed
timber platforms will begin immediately.
COMPLIANCE WITH THE N. C. ENVIRONMENTAL POLICY ACT
The work proposed as part of this application is private development and does not involve
expenditure of public funds. Since the project involves construction of no additional boat slips,
review under N.C. Environmental Policy Act is not required.
ADJACENT RIPARIAN PROPERTY OWNERS (See Sheet 5)
513 LLC
104 North 21St Street
Morehead City, NC 28557
DMA Charter LLC
5224 Driftwood Lane
Morehead City, NC 28557
RECEiIED
APR 0 9 2013
DCV- V.HDCITY
Ruddy Duck Tavern Dock Relocation & Fixed Timber Platform April 3, 2013, Rev. April 9, 2013
Major CAMA Permit Application — Narrative Page 2 of 2
16111 NF4
APPLICATION mr
Niger Development Permit
(last revised 12/27106)
North Carolina DIVISION OF COASTAL MANAGEMENT
1. Primary Applicant/ Landowner Information
Business Name
Project Name (if applicable)
Ruddy Duck Tavern
Ruddy Duck Tavern Dock Relocation & Fixed Timber
Platform
Applicant 1: First Name
MI
Last Name
William
Kingery
Applicant 2: First Name
MI
Last Name
If additional applicants, please attach an additional page(s) with names listed.
Mailing Address
PO Box
City
State
509 Evans Street
Last Name
Morehead City
NC
ZIP
Country
Phone No
FAX No
28557
PO Box
252 - 726- 7500 ext.
- -
Street Address (if different from above)
City
State
ZIP
Email
2. Agent(Contractor Information
Business Name
Bearing Point Consulting, Inc.
Agent/ Contractor 1: First Name
MI
Last Name
John
J.
Wade, E.I.
Agent/ Contractor 2 First Name
MI
Last Name
J.W. (Bill)
Forman, Jr., P.E.
Mailing Address
PO Box
City
State
910 Arendell Street
Morehead City
NC
ZIP
Phone No. 1
Phone No. 2
28857
252 -247 -4200 ext.
- -
ext.
FAX No.
Contractor #
252 247 7300
C -3736
Street Address (if different from above)
City
State
ZIP
Email
��CEI�JEgD
john.wade @bearingpt.com
APR 0 3 2013
<Form continues on back>
)C-,;4 M .19 G4-Y
Rf-- tea, "i -n"233� .. ..Sod ACGT `,cJ':- w: e �L �. nz",
Form DCM MP -1 (Page 2 of 5)
APPLICATION for
Major Development Permit
RECEIVED
APR Q 3 2013
DCM -NIRD CITY
252- 808 -2808 :: 1- 888- 4RC®ASoT :: ww►w.necoastaimanagement.net
Form DCM MP -1 (Page 3 of 5)
APPLICATION for
Major Development Permit
I Project Location
County (can be multiple)
Street Address
State Rd #
Carteret
509 Evans Street
d Approximate elevation of tract above NHW (normal high water) or
Subdivision Name
City
State
Zip
N/A
Morehead City
NC
28557-
Phone No
Lot No. (s) (if many, attach additional page with list)
- - ext.
I I I ,
a. In which NC river basin is the project located?
b Name of body of water nearest to proposed project
White Oak
Morehead Harbor Channel
c Is the water body identified in (b) above, natural or manmade?
d Name the closest major water body to the proposed project site.
®Natural []Manmade ❑Unknown
Bogue Sound
e. Is proposed work within city limits or planning jurisdiction?
f. If applicable, list the planning jurisdiction or city limit the proposed
®Yes []No
work falls within.
k. Has a professional archaeological assessment been done for the tract? If yes, attach a copy. ❑Yes ®No ❑NA
Town of Morehead City
4. Site Description
a. Total length of shoreline on the tract (ft.)
b. Size of entire tract (sq.ft.)
335.0
34,703.09.
c Size of individual lot(s)
d Approximate elevation of tract above NHW (normal high water) or
N /A, I I
NWL (normal water level)
(If many lot sizes, please attach additional page with a list)
4' ®NHW or ❑NWL iu� RECEM0
e Vegetation on tract
N/A APR 0 9 2013
f. Man -made features and uses now on tract
There are two structures on the tract that extend from a concrete bulkhead beyond Mean High Water. Both structures have
timber decks extending channelward of the building footprintsand have floating docks connected to the timber decks. There
is a private boat lift on the west side of the "Ruddy Duck Tavern" structure and five commercial fishing boat slips between
the two structures.
g. Identify and describe the existing land uses adiacent to the proposed project site.
The property adjacent to the property site on the west side is owned by 513, LLC and is currently used as a bar. The
Owner of this property also owns the property directly to the east which includes five boat slips and an art studio. The next
parcel contains approximately 3 boat slips and the Owner is stated as "Other Exemption" with no contact information listed.
The next parcel to the east is owned by DMA Charter LLC and has a two -story structure with 3 commercial fishing boat slips
waterward of the structure.
h. How does local government zone the tract?
i. Is the proposed project consistent with the applicable zoning?
Downtown Business
(Attach zoning compliance certificate, if applicable)
®Yes ❑No ❑NA
j. Is the proposed activity part of an urban waterfront redevelopment proposal? ®Yes ❑No
k. Has a professional archaeological assessment been done for the tract? If yes, attach a copy. ❑Yes ®No ❑NA
If yes, by whom?
1. Is the proposed project located in a National Registered Historic District or does it involve a ❑Yes ®No ❑NA
National Register listed or eligible property?
<Form continues on next page>
252 - 808 -2808 :: 1- 888- 4RCOAST :: www.nccoastalmanagement.net
Form DCM MP -1 (Page 4 of 5)
APPLICATION for
Major Development Permit
m. (i) Are there wetlands on the site? ❑Yes ®No
(ii) Are there coastal wetlands on the site? ❑Yes ®No
(iii) If yes to either (i) or (ii) above, has a delineation been conducted? []Yes []No
(Attach documentation, if available)
n. Describe existing wastewater treatment facilities.
Wastewater from the two structures on the property is connected to the Town of Morehead City's sewer collection system.
o. Describe existing drinking water supply source.
The two structures are served by the Town of Morehead City Water System.
p. Describe existing storm water management or treatment systems.
There is no stormwater management or treatment system on the project site.
5. Activities and Impacts
a. Will the project be for commercial, public, or private use? ®Commercial ❑PubliclGovemment
❑Private /Community
b. Give a brief description of purpose, use, and daily operations of the project when complete.
This project will expand the existing fixed timber platform used by the restaurant.
c. Describe the proposed construction methodology, types of construction equipment to be used during construction, the number of each type
of equipment and where it is to be stored.
Proposed construction will be of standard marine construction including barges and cranes. The equipment will be onsite
only a sufficient time to complete thepile driving and pier installation work.
d. List all development activities you propose.
Project includes extending the existing floating dock approximately 1 foot channelward to the channel setback line. No piles
will be installed within the setback. There will be a 23'x 23' fixed timber platform which will be an extension to the existing
platform. There will also be a 30'x 6' fixed timber platform on the eastern side of the south facing portion of the building. A
new 8'x 8' fixed platform will be constructed to provide access to the existing floating dock.
e. Are the proposed activities maintenance of an existing project, new work, or both? New Work
f. What is the approximate total disturbed land area resulting from the proposed project? N/A - Project is entirely waterward of
MHW ❑Sq Ft or ❑Acres
g. Will the proposed project encroach on any public easement, public accessway or other area ®Yes ❑No ❑NA
that the public has established use of?
h. Describe location and type of existing and proposed discharges to waters of the state.
Proposed Discharges - No new discharges will result from the project.
i. Will wastewater or stormwater be discharged into a wetland? ❑Yes ®No []NA
If yes, will this discharged water be of the same salinity as the receiving water? ❑Yes ❑No ❑NA
j. Is there any mitigation proposed? ❑Yes ®No ❑NA
If yes, attach a mitigation proposal. ICEIxJEt�
<Form continues on back> APR ® ' 20!13
252 - 808 -2808 .. 1- 888- 4FRCOAST :: www.nccoastalmanagemenf:`net`
Form DCM MP -1 (Page 5 of 5)
APPLICATION for
Major Development Permit
6. Additional Information
In addition to this completed application form, (MP -1) the following items below, if applicable, must be submitted in order for the application
package to be complete. Items (a) — (t) are always applicable to any major development application. Please consult the application
instruction booklet on how to properly prepare the required items below.
a. A project narrative.
b. An accurate, dated work plat (including plan view and cross - sectional drawings) drawn to scale. Please give the present status of the
proposed project. Is any portion already complete? If previously authorized work, clearly indicate on maps, plats, drawings to distinguish
between work completed and proposed.
c. A site or location map that is sufficiently detailed to guide agency personnel unfamiliar with the area to the site.
d. A copy of the deed (with state application only) or other instrument under which the applicant claims title to the affected properties.
e. The appropriate application fee. Check or money order made payable to DENR.
f. A list of the names and complete addresses of the adjacent waterfront (riparian) landowners and signed return receipts as proof that such
owners have received a copy of the application and plats by certified mail. Such landowners must be advised that they have 30 days in
which to submit comments on the proposed project to the Division of Coastal Management
Name 513 LLC Phone No.
Address 104 North 21" Street, Morehead City, NC 28557
Name DMA Charter, LLC Phone No.
Address 5224 Driftwood Lane, Morehead City, NC 28557
Name Phone No.
Address
g. A list of previous state or federal permits issued for work on the project tract. Include permit numbers, permittee, and issuing dates.
h. Signed consultant or agent authorization form, if applicable.
i. Wetland delineation, if necessary
j. A signed AEC hazard notice for projects in oceanfront and inlet areas. (Must be signed by property owner)
k. A statement of compliance with the N.C. Environmental Policy Act (N.C.G.S. 113A 1 -10), if necessary If the project involves expenditure
of public funds or use of public lands, attach a statement documenting compliance with the North Carolina Environmental Policy Act.
7. Certification and Permission to Enter on Land
I understand that any permit issued in response to this application will allow only the development described in the application.
The project will be subject to the conditions and restrictions contained in the permit.
I certify that I am authorized to grant, and do in fact grant permission to representatives of state and federal review agencies to
enter on the aforementioned lands in connection with evaluating information related to this permit application and follow -up
monitoring of the project.
I further certify t at the information provided in this application i truth a es f y knowledge.
Date 0 N Print Name �llillia N K' g
Signature
Please indicate application attachments pertaining to your proposed project.
❑DCM MP -2 Excavation and Fill Information ❑DCM MP -5 Bridges knd Culverts
❑DCM MP -3 Upland Development
®DCM MP-4 Structures Information
APR a 3 ktil"
252 - 808 -2808 :: 1- 888- 4RCOAST :: www.nccoastaimanagement.net
'If D CITY
J
Form DCM MP -4
STRUCTURES
(Construction within Public Trust Areas)
Attach this form to Joint Application for CAMA Major Permit, Form DCM MP -1. Be sure to complete all other sections of the Joint
Application that relate to this proposed project. Please include all supplemental information.
1. DOCKING FACILITY /MARINA CHARACTERISTICS
a (i) Is the docking facddy /manna•
®Commercial ❑Public/Government ❑Private /Community
c (i) Dock(s) and /or pier(s)
(ii) Number
(iii) Length
(iv) Width
(v) Floating []Yes []No
e (i) Are Platforms included? ®Yes ❑No
If yes-
(h) Number 3
(iii) Length (1) 23'. (2) 8'. (3) 30'
(iv) Width (1) 23'. (2) 8'. (3) 6'
(v) Floating ❑Yes ®No
Note: Roofed areas are calculated from drrpline dimensions.
g (i) Number of slips proposed
0
(ii) Number of slips existing
4
i. Check the proposed type of siting
❑ Land cut and access channel
[]Open water; dredging for basin and /or channel
®Open water, no dredging required
❑Other; please describe
k• Typical boat length: 12' -25'
m (i) Will the facility have tie pilings?
❑Yes ®No
(ii) If yes number of tie pilings?
[I This section not applicable
b. (i) Will the facility be open to the general public?
®Yes ❑No
d (i) Are Finger Piers included? ❑Yes ®No
If yes-
(ii) Number
(iii) Length
(iv) Width
(v) Floating ❑Yes ❑No
f. (i) Are Boatlifts included? []Yes ®No
If yes:
(ii) Number
(iii) Length
(iv) Width
h Check all the types of services to be provided.
❑ Full service, including travel lift and/or rail, repair or
maintenance service
❑ Dockage, fuel, and marine supplies
® Dockage ("wet slips") only, number of slips:
❑ Dry storage; number of boats.
❑ Boat ramp(s); number of boat ramps:
® Other, please describe:
Transient slips, no overnight dockage. 3 slips to remain.
j. Describe the typical boats to be served (e.g , open runabout,
charter boats, sail boats, mixed types).
Mixed Types RECMD
r
APR 0 9 2013
DCM MO Cl'1'Y
I (i) Will the facility be open to the general public?
®Yes []No
252 -808 -2808 :: 1- 888 -4RC ®AST :: wrww.nccoastalmanaaement.net revised: 12/27/06
B
Form DCM MP -4 (Structures, Page 2 of 4)
2. DOCKING FACIUMMARINA OPERATIONS ®This section not applicable
a. Check each of the following sanitary facilities that will be included in the proposed project.
❑ Office Toilets
❑ Toilets for patrons; Number: ; Location:
❑ Showers
❑ Boatholding tank pumpout; Give type and location:
b. Describe treatment type and disposal location for all sanitary wastewater.
c. Describe the disposal of solid waste, fish offal and trash.
d How will overboard discharge of sewage from boats be controlled?
e. (i) Give the location and number of "No Sewage Discharge" signs proposed
(ii) Give the location and number of " Pumpout Available" signs proposed.
f. Describe the special design, if applicable, for containing industrial type pollutants, such as paint, sandblasting waste and petroleum products.
g. Where will residue from vessel maintenance be disposed of?
h. Give the number of channel markers and "No Wake" signs proposed.
1. Give the location of fuel - handling facilities, and describe the safety measures planned to protect area water quality.
i. What will be the marina policy on overnight and live- aboard dockage?
k. Describe design measures that promote boat basin flushing?
I. If this project is an expansion of an existing marina, what types of services are currently provided?
m. Is the marina/docking facility proposed within a primary or secondary nursery area? APR 0 3 1013
❑Yes ❑No
r)CM -MaD CITY
252 - 808 -2808 :: 1- 888- 4RCOAST :: www.nccoastaimanagement.net revised: 12/27/06
Form DOM MP -4 (structures, Page 3 of 4)
r
n Is the marina/docking facility proposed within or adjacent to any shellfish harvesting area?
[]Yes []No
o. Is the marina/docking facility proposed within or adjacent to coastal wetlands /marsh (CW), submerged aquatic vegetation (SAV), shell bottom
(SIB), or other wetlands (WL)? If any boxes are checked, provide the number of square feet affected.
❑CW ❑SAV ❑SB
OWL ❑None
p. Is the proposed marina/docking facility located within or within close proximity to any shellfish leases? ❑Yes ❑No
If yes, give the name and address of the leaseholder(s), and give the proximity to the lease.
3. BOATHOUSE (including covered lifts) ®This section not applicable
a. (i) Is the boathouse structure(s):
❑Commercial ❑Public/Govemment ❑Private / Community
(ii) Number
(iii) Length
(iv) Width
Note: Roofed areas are calculated from dripline dimensions.
4. GROIN (e.g., wood, sheetpile, etc. If a rock groin, use MP -2, Excavation and Fill.) ®This section not applicable
a. (i) Number
(ii) Length
(iii) Width
5. BREAKWATER (e.g., wood, sheetpile, etc.) ID This section not applicable
a• Length b. Average distance from NHW, NWL, or wetlands
c. Maximum distance beyond NHW, NWL or wetlands
6. MOORING PILINGS and BUOYS ®This section not applicable
a Is the structure(s):
❑Commercial ❑Public/Govemment ❑Private /Community
c• Distance to be placed beyond shoreline
Note: This should be measured from marsh edge, if present.
e. Arc of the swing
7. GENERAL
b• Number
d. Description of buoy (color, inscription, size, anchor, etc.)
RECEIVED
APR o 3 ?013
Wr:'/( IVIT" 7 ciry
252- 808 -2808 :: 1- 888- 4RC®AST :: www.necoastaimanagement.net revised: 12/27/06
Form DCM MP -4 (Structures, Page 4 of 4)
a Proximity of structure(s) to adjacent riparian property lines
Within Riparian Setback, see Approval Letter from Adjacent
Property Owner.
Note. For buoy or mooring piling, use arc of swing including length
of vessel.
c. Width of water body
397'
e. (i) Will navigational aids be required as a result of the project?
[]Yes; ®No ❑NA
(ii) If yes, explain what type and how they will be implemented
b. Proximity of structure(s) to adjacent docking facilities.
Proposed 23' x 23' Fixed Timber Platform is in line with boat
lift on western portion of project. The proposed 30'x6'
fixed timber platform is flush with the existing approximately
55' charter fishing boat slip. See Sheet 03 for clarification.
d. Water depth at waterward end of structure at NLW or NWL
-17'
& OTHER ❑This section not applicable
a. Give complete description:
The Ruddy Duck Tavern Dock Relocation and Fixed Timber Platform project includes moving the channelward edge of the
existing floating dock approximately 1 foot so that it is flush with the federal channel setback line. There will be no piles
located within the channel setback line. A new 23'x 23' fixed timber platform will be constructed off of the existing timber
platform with an 8'x 8' landing where the gangway will be installed to reach the existing floating dock. A railing will be
installed along the entire perimeter of the fixed deck. A 30'x 6' fixed timber platform will constructed on the eastern half of the
south facing portion of the structure. The Owner has received approval from the adjacent property owner, 513 LLC, for
construction within the 15' Riparian Buffer and a letter will be included with the submittal package.
0
Date
Ruddy Duck T
Project Name
William Kina
Applicant Name
Applicant Signature
Timber Platform
252-808-2808:- 1- 888 - RCOAST :: www.nccoastaimanagement.net
RECEWED
a`t"iri-N1 h1 MY
revised: 12/27/06
I
4
LENOIR CRAVEN
JONES
DUPLIN
ONSLOW
PENDER
sriage _ Calico Creek
•-View
' HIGHWAY 70 ~�
�a �A
CO ASAL T Beacon O
o Beaton
O Light
U R BOGUE SOUND
PAMLICO
CARTERET COUNTY
PROJECT LOCATION 'I
an uwu
Chap 3
garb � ?• � •� � �
L. --
WATfRWAY 0000
Dolph s
N.C. STATE PORT
S0 U N D
R (3 1 2093
Cif if
AREA OF INTEREST
NEWPORT Q� I `'
RIVER -
TO BEAUFORT
................. •
- —
Caplg_grea-- --- -- lj
i Towers
`4
%
-
ort Terminal
• �,®
RADIO
Light
ISLAND
l OF sc
.+u
RWdo
s,I,. A N
PREPARED BY' PROJECT TITLE PREPARED FOR DRAWING TIME s AS SHOWN ex�ra
RUDDY DUCK TAVERN DAIS 04103n3
WILLIAM KINGERY ♦
DOCK RELOCATION AND VICINITY MAP WYM E r anni o 1
FIXED TIMBER PLATFORM RUDDY DUCK TAVERN
vnaecrr
13005
----------------------
i
i
I
I
1
I
I
I
1
I
1
I I I
L_J 1
_ -- -- - - - - - - - - — - - - - - — - - - - - J
BULKHEAD WITH
CONCRETE CAP
ARENDELL STREET
r__- ___— _____T —_____
aura
1' =100
wte 04103/13
I I I
�T���SV fiSd� I
I
I
/,�,
-
I I
1
I
, � I
I I
' I I
APR 0 9 Z9g11
I
I
I I
F-------- - - - --L
I
I
L +
DrhilltsgiDCITY �
- - - --
_
--
I
LU F- - - - - -- -T - - -J
I
,
f I
LU I
LLI 1 1
--;�-
LLI
D- I
,F—
V / , ,
i
VJ
of I r —
RIPARIAN
MHW /MLW AT
--
' CORRIDOR
1 = = = -!- ______________
BULKHEAD
I
I
_______
______ ______________J
L -----
N/F
N.C. RAILROAD CO.
"QS.
f
SCALE (IN FEET):
ism
EVANS STREET / PILES, TYP.
ccc . —41 s
'/�° ---- GARN ER, VERNON
-- -- °-- JACKSON JRTRUST
N/F '
\ ,
GARNER, VERNON
_ \ ; JACKSON JR TRUST
EXISTING FLOATING DOCK 30' '
TO BE EXTENDED (4 SLIPS) \
71
_ --
-100 - --
- -�--_ - - -- �� - -- , - - - -- .-
\ I ------------ - - - --`
------- - - - - -- -----------------------
----------------- ---- - - - - --
-- - - - - - -- -
.----- - - - - -- FEDERAL - ------------------
----- - - - - -- -- �-
----------- CHANNEL LINE - -__ -- `-- -- - - - --
SUGARLOAF ISLAND
1� SLIP NUMBER
NOTE:
CONTOUR ELEVATIONS RELATIVE
TO NAVD 88 VERTICAL DATUM.
PREPARED BY. PROJECT TITLE PREPARED FOR: DRAWING TITLE:
RUDDY DUCK TAVERN WILLIAM KINGERY EXISTING
DOCK RELOCATION AND CONDITIONS
TIMBER PLATFORM RUDDY DUCK TAVERN
or
aura
1' =100
wte 04103/13
Rev. 04109/13
®�
6''ei 6 N/F
JJW
/,�,
-
'N/F
-
- - -N.C. RAILROAD CO.
513 LLC_
_
--
--;�-
—�— -----
---- -- _ - - -�
--
FEDERAL ,� "�� EXISTING
CHANNEL LINE
BOAT LIFT
_ EDGE OF DECK 31
HARBOR CHANNEL
FEDERAL CHANNEL ��-
14' - -� cBOGUESOUND —
OFFSET LINE
- - - - --
-- - --
,�--- ---- --- i --- --------
i
i
--------------------
- - - - - --
-----------1a-----------
-- - - - - --
"QS.
f
SCALE (IN FEET):
ism
EVANS STREET / PILES, TYP.
ccc . —41 s
'/�° ---- GARN ER, VERNON
-- -- °-- JACKSON JRTRUST
N/F '
\ ,
GARNER, VERNON
_ \ ; JACKSON JR TRUST
EXISTING FLOATING DOCK 30' '
TO BE EXTENDED (4 SLIPS) \
71
_ --
-100 - --
- -�--_ - - -- �� - -- , - - - -- .-
\ I ------------ - - - --`
------- - - - - -- -----------------------
----------------- ---- - - - - --
-- - - - - - -- -
.----- - - - - -- FEDERAL - ------------------
----- - - - - -- -- �-
----------- CHANNEL LINE - -__ -- `-- -- - - - --
SUGARLOAF ISLAND
1� SLIP NUMBER
NOTE:
CONTOUR ELEVATIONS RELATIVE
TO NAVD 88 VERTICAL DATUM.
PREPARED BY. PROJECT TITLE PREPARED FOR: DRAWING TITLE:
RUDDY DUCK TAVERN WILLIAM KINGERY EXISTING
DOCK RELOCATION AND CONDITIONS
TIMBER PLATFORM RUDDY DUCK TAVERN
or
aura
1' =100
wte 04103/13
Rev. 04109/13
®�
Br
JJW
eaogcre
13005
MOREHEAD CITY MCE7�Rfil
APR 0 9 2013
EVANS STREET MHW /MLW AT _
-oCNZ -N cT?S;r
BULKHEAD
RIPARIAN EXISTING BULKHEAD
CORRIDOR WITH CONCRETE CAP
----- r------ -------------- -r - - - - -- ----- 1---- ----------------------
-------- ________ —____°
i
i
j17-17-X
WF
- 513 LLC -
='0AWAm
MWAWIA
EXISTING
-BOAT LIFT _
PROPOSED FIXED
TIMBER PLATFORM
------ ----- -- ------------ 8'---- - - - - -I
wF
GARNER, VERNON - - --
JACKSON JR TRUST
_ MOORING DOLPHIN, TYP.
__ -'-
_I _ - -- - - -- PROPOSED FIXED - ---1a' - - --" "-
TIMBER PLATFORM
---- - - - - --
1231 - '------- @- - - - - -- - -,1s' -- - - - - - --
14.5' 14 EXISTING FLOATING
0 DOCK & GANGWAY
--� 10' 8'
151-4
A�
30' FLOATING DOCK, 52'
3 SLIPS TO REMAIN
-- - - - - -- I -------- - - - - -- L—.". L� FEDERAL CHANNEL
- -'
� ------ ----- - - - - -A
- --
�- —� SETBACK LINE
i HARBOR CHANNEL
BOGUE SOUND FEDERAL
CHANNEL LINE
Ni
SCALE (IN FEET):
3
0' 30' 60'
Q SLIP NUMBER
NOTE:
CONTOUR ELEVATIONS RELATIVE
TO NAVD 88 VERTICAL DATUM.
PREPARED BY: PROJECT TITLE PREPARED FOR DRAWING TITLE.
RUDDY DUCK TAVERN WILLIAM KINGERY
DOCK RELOCATION AND PROPOSED PLAN
FIXED TIMBER PLATFORM RUDDY DUCK TAVERN
ec�ue
ere
1'=W
DAM 0403A3
Rev. 04/09113
®�
owemer
JJW
acre
13005
LL
o�
Z OW
L-
za
U'
ww
Mm
EXISTING
TIMBER PLATFORM ~
olm
EXISTING PILES, x'17 Li
DEPTH UNKNOWN
EXISTING
TIMBER PLATFORM
EXISTING PILES,
DEPTH UNKNOWN
u-
0
0
Z
z
Z
w
m
m
O
H
g
a
m
w
m
w Lu
Z J
Q Y
= U
U Q
w
Z
J
J
W
Z
Z
Q
U
'CE'l to
APR 0 3 2013
11 ■ 1
_RELOCATED
FLOATING DOCK
SECTION A -A
SCALE: 1" = 20'
J
w
z
Q
_
U
W
z
J
Y
Q
m
w
m
W
z
J
J
W
z
z
x
U
DECK EL. APPROX. 5.00'
--------- - - - - -_ MHW EL. I.1T
--------- - - - - -- MLW EL. -1.94'
RELOCATED
FLOATING DOCK
SECTION B -B
SCALE: I"= 20'
PREPARED BY' PROJECT THEE PREPARED FOR: DRAWING nRE:
RUDDY DUCK TAVERN WILLIAM KINGERY
DOCK RELOCATION AND SECTIONS
FIXED TIMBER PLATFORM RUDDY DUCK TAVERN
SCAIE
SHWR
AS SHOWN
04
DATE 04103113
mm �
JJW
PROUCn
13005
a
I
I
I
I
I
I
I
I
I
1
I
1
i
i
NIF
513 LLC
ARENDELL STREET
----------- _ _ _ _ _
I 1 ,
I I 1 I
1
1 1
I 1 I
1 1 ,
1 I ,
I I I
I I I
' I I
I I I
I I 1
- N/F -------------
GARNER. VERNON
JACKSON JR TRUST GARNER, VERNON
■
JACKSON JR TRUST
r---- - - ---1 r - - - - - - - - - - - - -- ---I r - - - - - - r
I I
I
I I I I I 1 I
I I I I I I I I
I I I 1 1
I ,
1 11 I
1 1 r._ - __- ____-r____, 1 1
I I i I I I I
I I ,
�----- - - - --1 L--------- L - - - --1 L - - - - - - - - - j
NIF N/F
- 'OTHER EXEMPTION' r DMA CHARTER LLC
• U °
• , I
1 I I
- -
PROJECT
- - - _ \ • •
I
15' RIPARIAN LOCATION
CORRIDOR SETBACK
_ I
/ MOREHEAD HARBOR
CHANNEL SINE NFC SRA(�
CK
• �N� I/NE
N
SUGARLOAF ISLAND
RECEiM
APR 09 2013
SCALE (IN FEET):
Dc'm -Nm CITY
0' 120' 240'
PREPARED BY. PROJECT TITLE PREPARED FOP, DRAWING TITLE:
G RUDDY DUCK TAVERN WILLIAM KINGERY RIPARIAN PROPERTY
DOCK RELOCATION AND OWNERS
FIXED TIMBER PLATFORM RUDDY DUCK TAVERN
1■ _,2OF.
DATE 04103/13
Rev. 04109113
O
oRllym er
JJW
PROJECT•
13005