Loading...
HomeMy WebLinkAbout20052253 Ver 4_More Info Received_20130412NCDENR North Carolina Department of Environment and Natural Resources Division of Water Quality Pat McCrory Charles Wakild, P. E. John E. Skvarla, III Governor Director Secretary March 14, 2013 John Koenig, Inc. DWQ #: 2005 -2253 v4 Onslow County 235 John Koenig !_N. 0235 Green Street �Fayetteville, NC 28301 Subject: REQUEST FOR ADDITIONAL INFORMATION AP1 2 E�' Williamsburg Plantation Subdivision ,- Dear Mr. Koenig: On February 15, 2013, the Division of Water Quality (Division) received your application requesting a 401 Water Quality Certification for your project. The Division received the February 4, 2013 Public Notice from the U.S. Army Corps of Engineers on February 7, 2013. The Division has determined that your application is incomplete and cannot be processed. The application is on -hold until all of the following information is received: 1. The Division would like to have a better overview map of the entire subdivision that shows the Impacts and their location. The map in the application covers up the impact with the impact letter. This can be done in two parts and can be sent to the Division digitally so we can print it out in the appropriate size. 2. The cross sectional drawings need to show a fill slope line or proposed contour lines on the plan view. The Division needs to identify the toe-of slope for future compliance purposes. 3. The drawings also need to show a riprap pad if one is to be installed on the outlet ends of the pipes. 4. Show on the drawings the length of pipe to be used and separate out the impacts due to riprap. Include any temporary impacts that will be required to set the pipes in appropriately (usually there is a temporary impact necessary to get the pipe to align correctly with the stream and the area needs to be dug out further than the impact to get the pipe in correctly). 5. Indicate on the drawing with the double pipe that one will be placed at the flood plain level to catch the storm events and if not indicate if a sill in the pipe(s) will be used to keep the stream in original channel and to keep the channel from flattening out due to the width of the pipes. Show a cross section looking down the pipe to show these features. The DOT website has really good explanations and drawings showing these issues and solutions. Y.'et w4s, buff, fs, Sion 'ar. - .oml iaw�3 anu Oe -it-g ,Net.wpel Un,i One 1b:JL- A 8('Vw rC ae: �aiGigl 'I0111' l , ,in Z' IS -;ori" ration 5 [N ;,aiu'ury alegh vurh - N-S1ortfiiCai-olijri ?h art: 91 r, r 300', F• 9 HTA' �uSi . j t: 1 E °S$7`•� /1,Ef � l�li/ [Fy �r'. 'F� R erq ' •n. - 1 yi V Williamsburg Plantation Subdivision Page 2 of 2 March 14, 2013 Pursuant to Title 15A NCAC 02H .0502(c), the applicant shall furnish all of the above requested information for the proper donsideration of the application. If all of the requested information is not received in writing within 30 calendar days of receipt of this letter, the Division will be unable to approve the application and it will be returned. The return of this project will necessitate reapplication to the Division for approval. Respond in writing within 30 calendar days of receipt of this letter by sending four copies of all of the above requested information to the Wetlands, Buffers, Stormwater —Compliance and Permitting (Webscape) Unit, 1650 Mail Service Center, Raleigh, NC 27699 -1650. Please be aware that you have no authorization under Section 401 of the Clean Water Act for this activity and any work done within waters of the state may be a violation of North Carolina General Statutes and Administrative Code. Contact Joanne Steenhuis 910 - 796 -7215 if you have any questions. Sincerely, �&-W l Karen Higgins, Supery o Wetlands, Buffers, St ater — Compliance & Permitting Unit cc: Samual Adam Carter, Wetland Solutions, LLC, PO Box 244, Bunnlevel, NC 28323 David Bailey, USACE Wilmington Office Joanne Steenhuis, DWQ —Wilmington Regional Office File Copy File name: 052253v4WllliamsburgPlantationSD (Onslow)401_IC_Hold.docx 205-3 Ward Road Swansboro, NC 26584 Tel: (910) 325 -0006 Fax: (910) 325 -0060 To: John L Pierce & Associates ft Williamsburg Plantation Crossings From: David K. Newsom Date: April 8, 2013 ❑ Urgent ❑ For Review ❑ Please Comment ❑ Please Reply ❑ Please Recycle Attached: Calcs for Crossings F, I and N LEG O APR 1 2 2013 Peak Flow Determination for Large (> 10 Ac) Watersheds Project: Willamsburg Plantation Crossing "F" Crystal Coast Engineen •PA . I R Pipe: Future Street at Crossing "F" 205-3 Ward Road ` Q� O •� By: DKN Swansboro, NC 28584 ' ���EES ,U Date: 3/30/2013 910 - 325 -0006 SE Business License: C -2553 is 8 Using USGS Regression Equations for NC Coastal Plain: �' f Q10 = 188DA0.eis ;, 90��E3ftvE�Pc•O Qzs = 281DA0.593 Qso = 367De"' Area = 66.2 Ac DA= 0.1034 Sq miles so: Qio = 46.6 cfs Qu = 73.2 cfs Q100 = 98.7 cfs Using Rational Method: Q =CIA where: Ccum = 0.40 (Qdev =0.45, Qundev =0.15) 110= 4.38 (at duration= tc) 125= 5.04 (at duration = tc) 1100= 6.13 (at duration = tc) Tc=0.0078(1.3/h).381 where: D= 3000 h= 18 Tc= 26.6 say 30 min so: Q10 = 116.0 Q25 = 133.5 Q200 = 162.3 / r� 75" PROJECT:,,//// 1 i •'•E ^ �. i !!!,� y�,..• "' /, i LT� DESIGNER: `Y it DATE: HYDROLOGIC AND CHANNEL INFORMATION SKETCH STATION EL.�� ; Q I o= i , T WI = AHW= t; i . TW2 EL: F iL• so° �--"? -T TW T / 0, = DESIGN DISCHARGE I\ , SAY 025 \ EL =" MEAN STREAM VELOCITY= 02 CHECK DISCHARGE SAY 050 oR o100 J MAX. STREAM VELOCITY= CULVERT HEADWATER COMPUTATION ? r INLET CON T. OUTLET CONTROL HW =H + ho -LSo DESCRIPTION 0 SIZE 0 i o COST COMMENTS HW D HW K e H IC �� TW ho LSO HW (ENTRANCE TYPE) H o J o> 2 v j i `Y { r� PROJECT: X,! DESIGNER: n DATE: HYDROLOGIC AND CHANNEL INFORMATION SKETCH t STATION EL.' t It AHW=` 1 rr1 OI = TIN = T W I�r. --, J = — 71'7 7 EL (0, DESIGN DISCHARGE , SAY 025 LIEAN STREAM VELOCITY Q = CHECK DISCHARGE SAY 0 OR 0 z so loo / MAX. STREAM VELOCITY= CULVERT HEADWATER COMPUTATION z T INLET CONT. OUTLET CONTROL HW =H + ho -LSO DESCRIPTION 0 SIZE s i 5 o COST COMMENTS D HW Ke H do dc+D TW ho LSO HW (ENTRANCE TYPEI 0; Peak Flow Determination for Large (>I 0 Ac) Watersheds Project: Willamsburg Plantation Crossing "I" Crystal Coast Engineering, PA Pipe: Future Street at Crossing "1" 205-3 Ward Road By: DKN Swansboro, NC 28584 (N C Date: 3/30/2013 910-325-0006 •Qp S��M�� Business License: C -2553 Using USGS Regression Equations for NC Coastal Plain: EAL 188DA0.615 5143 f/ Q30 Q25 = 281DA 0.593 '�,G1NE�P. OAS Qso = 367DAo.s29 K. N� Iti Z�// T Area = 63.7 : Ac DA= 0.0995 Sq miles so: 010 = 45.5 cfs (In = 71.5 cfs Q10 = 96.5 cfs Using Rational Method: Q =CIA 025 = where: Q100 = Ccum = 0.36 (Qdev =0.45, Qundev =0.15) 110= 4.38 (at duration = tc) 125= 5.04 (at duration = tc) 1100= 6.13 (at duration = tc) Tc= 0.0078(I-3/h).385 where: D= 4000 h= 39 Tc= 27.5 say 30 min so: 010 = 100.4 025 = 115.6 Q100 = 140.6 r� PROJECT— l t" .:1. ?> l �-- -' fif 1 , � DESIGNER: ?`r ` DATE: !2—,� Z" HYDROLOGIC AND CHANNEL INFORMATION SKETCH STATION E L. W f , ,r, AHW= 02 = , t 11 TW2 — TW ELl1JiJ EL�- 01 o DESIGN DISCHARGE , SAY 025 1 MEAN STREAM VELOCITY= 02 = CHECK DISCHARGE , SAY 0S0 OR 0100 J MAX. STREAM VELOCITY= CULVERT HEADWATER COMPUTATION z , DESCRIPTION O SIZE 0 i -10 cosy COMMENTS INLET CONT. OUTLET CONTROL HW =H + h° -LSO p HW Ke H d° dc+D TW ho LSO HW (ENTRANCE TYPE) 9 °> 2 u 1� 't •l � .J L o.� --V C• � .� �a Tji1 1 � t✓ � �J I / ✓ 1 � � 8 l °� { " ? • t i -- Y J , Peak Flow Determination for Large (>I 0 Ac) Watersheds Project: Willamsburg Plantation Crossing "N" Crystal Coast Engineerirwj�M.,,,, Pipe: Future Street at Crossing "N" 205-3 Ward Road CARO O P fESSrV�� /y1, By: DKN Swansboro, NC 28584 ' � •O 9,•yj Date: 3/30/2013 910-325 -0006 - EA1 JI All Business License: C -2553 = ' 18148 !/ Using USGS Regression Equations for NC Coastal Plain: Q10 188DAo.eis O ••• P.: A Q25 = 281DAo.113 Q100 = 468DA °'566 Area = 453.7 Ac DA= 0.7089 Sq miles so: Ql° = 152.1 cfs C6 = 229.1.1. Q10 = 385.2 cfs U Using Rational Method: Q =CIA Q25 = where: Q100 = Ccum = 0.34 (Qdev =0.45, Qundev =0.1! 110= 2.85 (at duration = tc) 125= 3.36 (at duration = tc) 1100= 4.22 (at duration = tc) Tc= 0.0078(L3/h)" where: D= 7600 h= 40 Tc= 57.2 say 60 min so: Qio = 439.6 Q25 = 518.3 Q100 = 651.0 u�� TCCxl��it� �IZ�;�UIV v j u�� TCCxl��it� �IZ�;�UIV v r� PROJECT: % ' r `° rZ L4- . "f"l / DESIGNER: DATE: HYDROLOGIC AND CHANNEL INFORMATION SKETCH STATION o t1 E L. , AHW =j�T / TW2 - EL3 °_� IF TW~ t / 01 = DESIGN DISCHARGE , SAY 025 EL << MEAN STREAM VELOCITY= J j\ 02 = CHECK DISCHARGE SAY 050 OR 0 10 i MAX. STREAM VELOCITY= CULVERT j HEADWATER COMPUTATION Z r INLET CONT. OUTLET CONTROL HW =H + h0 -LSO DESCRIPTION �0 LL SIZE o ; x �� H p COST COMMENTS H WW D HW Kg H dc + TW h° LSO HW (ENTRANCE TYPE) , o Ll vt I C: min G: \Projects \KOENIG WETLANDS 2012 \dwg \LOT_LAYOUF2013.dwg, 4/10/2013 9:32:14 AM, brianjarman