Loading...
HomeMy WebLinkAboutSW6210506_Stormwater Narrative_20210528Cotswold Storm Water Narrative The site is currently undeveloped. The site is being developed as a single-family residential and townhome development. The existing site drains generally from the north to the south into an existing pond. Storm water will sheet drain across the lots into the roadways and will then be collected into the underground storm system via curb inlets. Some areas will be collected outside of the street into drop inlets which will convey the runoff into the same underground storm system. The storm water will then be conveyed through the drainage system into one of two new on -site wet ponds adjacent to the existing pond. The ponds will discharge into the existing pond at a rate less than the existing runoff rate for the 1-yr storm. The wet ponds have been designed in accordance with the latest NCDEQ MDC Stormwater Design Manual. 409 Ch i ca g o Dri ve, Su i te 112, rayettevi I le. N C 28 3 0 6 office 1910-426-6777 fax 1910-426-5777 On ti me, every time. I w ww.4 Dsitesolut !on s.com