HomeMy WebLinkAbout20060447 Ver 3_Cert of Completion and As Builts_20210601From: Sue Homewood
To: Homewood. Sue
Subject: [External] Fw: Olde Towne Stream Re -Location As -Built
Date: Tuesday, June 1, 2021 2:43:30 PM
Attachments: 2021-05-28 Olde Towne Stream Relocation Record Drawinas.pdf
2021-05-28 As -Built Package.pdf
imaae001.pnq
CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an
attachment to Report Spam.
Forwarded Message
From: Burdette, Jennifer <burdette@mcadamsco.com>
Akers, Ryan <akers@mcadamsco.com>; Williamson, Nick <williamson@mcadamsco.com>; Garcia, Kelli
<garcia@mcadamsco.com>; Stubbs, Rebecca <rstubbs@mcadamsco.com>
Sent: Tuesday, June 1, 2021, 2:34:36 PM EDT
Subject: FW: Olde Towne Stream Re -Location As -Built
Hi,
Attached are as -built plans for the stream relocation at Olde Towne (SAW-2006-20287 & 2006-0447 V3).
The restored stream length ended up 18 feet longer than proposed. Please let me know if you have any
questions or would like to schedule a site visit.
Thanks,
Jennifer
Jennifer Burdette 1 Sr. Environmental Consultant, Water Resources
McAdams
2905 Meridian Parkway, Durham, NC 27713
office 919. 361. 5000 x137 1 direct 919.287.0743 1 cell 919.422.3605 1 burdette@mcadamsco.com
www.mcadamsco.com I linkedin 1 twitter 1 instagram I join our team
JMcADAMS
creating experiences through experience
From: Stubbs, Rebecca <rstubbs@mcadamsco.com>
Sent: Friday, May 28, 2021 1:06 PM
To: Michael Williams<mwilliams@hallebuildinggroup.com>; Burdette, Jennifer
<burdette@mcadamsco.com>
Cc: Akers, Ryan <akers@mcadamsco.com>; Williamson, Nick <williamson@mcadamsco.com>; Garcia,
Kelli <garcia@mcadamsco.com>
Subject: Olde Towne Stream Re -Location As -Built
All,
Attached are the signed record drawings and as -built package ready for submittal to the permitting
agencies.
Thanks!
Rebecca Stubbs, PE I Project Manager, Water Resources
McAdams
2905 Meridian Parkway, Durham, NC 27713
office 919. 361. 5000 x224 1 direct 919. 287. 0740 1 mobile 336. 339. 1648 l rstubbs@mcadamsco.com
www.mcadamsco.com I linkedin 1 twitter 1 instagram I join our team
111 MCADAMS
creating experiences through experience
AS-BUILT NARRATIVE > HLE-18020
2905 Meridian Parkway, Durham, NC 27713 / 919. 361. 5000 creating experiences through experience
STREAM RELOCATION
Olde Towne
PROJECT DESCRIPTION + NEED
Olde Towne is a proposed 574-acre master planned community comprised of five residential sub -communities, a
commercial district, amenity center, greenways, a multi-use path, a road network and public gathering spaces located
at the northeast quadrant of S. New Hope Road and Rock Quarry Road in southeast Raleigh, North Carolina. The
project’s purpose is to create a large -scale master-planned community to meet the current demand for residential
housing mixed with commercial space near downtown Raleigh. To move forward with the Olde Towne development,
offsite road improvements on Rock Quarry Road were required by TIA for Phase 1. Widening of Rock Quarry Road
results in impacting 351 lf of existing stream channel, requiring mitigation as part of the project’s issuance of an Induvial
Permit and Water Quality Certification. To offset impacts of widening Rock Quarry Rd, 351 lf of stream was relocated
using natural channel design techniques.
The restored stream was designed to have natural channel dimension, pattern, profile, and vegetation based on
regional stream data. The stream was relocated and connected to the surrounding forested floodplain using a “Priority
One” approach of grading the channel so that bankfull stage (incipient flooding) was at the elevation of the existing
floodplain area with minor floodplain grading to provide sufficient flood prone area width to dissipate hydraulic energy
during bankfull and greater flood events. This geomorphic condition will be sustained by increased sinuosity, creation
of a stable slope, and grading appropriate channel depth and width for stability, thereby reducing bankfull shear stress
and velocity. Stream longitudinal profile and bedform diversity were improved with the design of riffle and pool
sequences and incorporation of log structures for habitat diversity and grade control. The streambanks and surrounding
floodplain will be planted extensively with native riparian and wetland vegetation to establish a native forested riparian
plant community.
DESIGN MODIFICATIONS
During the onsite pre-construction meeting, it was requested to protect additional existing hardwood trees in the
project area. Trees on the plans and identified in the field were flagged to be avoided by the stream restoration work.
As a result, the proposed stream channel alignment was modified slightly during construction as a field change,
specifically between stations 1+30 to 2+00 to protect the mature trees and their extensive root systems.
Another design modification included stabilizing the proposed stream channel at its downstream tie-in with the existing
stream channel. Onsite rock equivalent in size to Class ‘B’ riprap was embedded in the channel bottom from stations
3+50 to 3+56 to protect against potential erosion in the channel bed. The top of stone matches channel bottom grade
and the bank area was stabilized with erosion control matting and permanently protected with riparian vegetation.
During construction, the relic stream channel was observed to overtop the constructed channel plug prior to its
connection with the relocated stream channel. The future road widening will fill in the remaining relic channel and
prevent this from occurring in the future. Therefore, in order to protect the channel plug in this interim condition, a
log sill was buried at the upstream end of the channel plug and installed perpendicular to the relic stream channel.
Additionally, temporary sandbag sills were placed on top of the channel plug within the floodplain and angled towards
the proposed stream channel, promoting dissipated flow across the floodplain and into the relocated stream channel.
AS-BUILT NARRATIVE > SPEC-18131
creating experiences through experience 2 of 2
AS-BUILT CONDITION
At the time of as-built survey, two cross sections, 1 riffle and 1 pool were selected and surveyed to establish a baseline
geometry for monitoring. A centerline survey was also performed to determine total restored length of 369 linear feet
of the stream channel. The as-built centerline and location of the cross sections and their surveyed geometry points
can be found on the as-built survey prepared by the John R. McAdams company signed May 10, 2021. Approximate
location of the cross sections is shown on the as-built record drawings.
General condition of the channel and surrounding project area can be observed in the attached photo journal. It should
be noted that sediment load contributed from upstream reach has resulted in sediment deposition within the
restored/constructed channel. Photos taken at time of construction completion should be considered the baseline
condition for monitoring.
AS-BUILT PHOTO JOURNAL > HLE-18020
2905 Meridian Parkway, Durham, NC 27713 / 919. 361. 5000 creating experiences through experience
OLDE TOWNE STREAM RELOCATION
APRIL 28, 2021
Figure 1. Project Start (View Upstream). Approximately Sta 0+00 to 1+30.
Figure 2. View Downstream: Approximately Sta 0+50 to 4+00. Log Sill #2 photographed
LOG SILL #2
AS-BUILT PHOTO JOURNAL > HLE-18020
creating experiences through experience 2 of 8
Figure 3. View Upstream: Approximately Sta Sta 0+10 to 0+77.
Figure 4. View Upstream: Approximately Sta 0+10 to 0+90.
AS-BUILT PHOTO JOURNAL > HLE-18020
creating experiences through experience 3 of 8
Figure 5. View Downstream: Approximately Sta 1+10 to 1+30.
Figure 6. View Upstream: Approximately Sta 1+30 to 2+10.
AS-BUILT PHOTO JOURNAL > HLE-18020
creating experiences through experience 4 of 8
Figure 7. View Downstream: Approximately Sta 1+80 to 2+60.
Figure 8. View Upstream: Approximately Sta 2+00 to 2+50.
AS-BUILT PHOTO JOURNAL > HLE-18020
creating experiences through experience 5 of 8
Figure 9. View Downstream: Approximately Sta 2+20 to 2+30.
Figure 10. View Downstream: Approximately Sta 2+30 to 2+50.
AS-BUILT PHOTO JOURNAL > HLE-18020
creating experiences through experience 6 of 8
Figure 11. View Downstream: Approximately Sta 2+80 to 3+10.
Figure 12. View Upstream: Approximately Sta 2+80 to 3+10.
AS-BUILT PHOTO JOURNAL > HLE-18020
creating experiences through experience 7 of 8
Figure 13. Project End (View Downstream). Approximately Sta 3+16 to 3+50. Log Sill #3 photographed
LOG SILL #3
AS-BUILT PHOTO JOURNAL > HLE-18020
creating experiences through experience 8 of 8
MAY 3, 2021
Figure 14. View Upstream: Surveyed Cross Section #1 (Riffle). Station 0+86
Figure 15. View Downstream: Surveyed Cross Section #2 (Pool). Station 2+42
ROY COOPER
Governor
MICHAEL S. REGAN
Secretary
LINDA CULPEPPER
Director
DWR Project No.:
Applicant:
Project Name:
n`i:,
w { €D;i
ESA (UAM V1't'0.
NORTH CAROLINA
Environmental Quality
County:
Date of Issuance of 401 Water Quality Certification:
Certificate of Completion
Upon completion of all work approved within the 401 Water Quality Certification or applicable Buffer Rules, and
any subsequent modifications, the applicant is required to return this certificate to the DWR Central Office —
Wetlands and Buffers Permitting Unit at 1650 Mail Service Center, Raleigh, NC 27699-1650. This form may be
returned to DWR by the applicant, the applicant's authorized agent, or the project engineer. It is not necessary
to send certificates from all of these.
Applicant's Certification
I, , hereby state that, to the best of my abilities, due care and
diligence was used in the observation of the construction such that the construction was observed to be built
within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved
plans and specifications, and other supporting materials.
Signature:
Agent's Certification
Date:
I, , hereby state that, to the best of my abilities, due care and
diligence was used in the observation of the construction such that the construction was observed to be built
within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved
plans and specifications, and other supporting materials.
Signature: Date:
If this project was designed by a Certified Professional
I, , as a duly registered Professional (i.e., Engineer,
Landscape Architect, Surveyor, etc.) in the State of North Carolina, having been authorized to observe
periodically, weekly, full time) the construction of the project, for the Permitee hereby state that, to the best of
my abilities, due care and diligence was used in the observation of the construction such that the construction
was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and
Buffer Rules, the approved plans and specifications, and other supporting materials.
Signature:
Date
Registration No.
North Carolina Department of Environmental Quality Division of Water ResourcesDF11',R'.ARCLJNA.
ayetteville Regional Office j 225 Green Street, Suite 714 Fayetteville, North Carolina 28301
N(;R.
Department of Environmental Quality 910.433.3300
CLIENT
X:\Projects\HLE\HLE-18020\Storm\Stream Relocation\As-builts\Current Drawings\HLE18020-CS1.dwg, 5/26/2021 11:17:53 AM, Garcia, KelliThe John R. McAdams Company, Inc.
2905 Meridian Parkway
Durham, NC 27713
phone 919. 361. 5000
fax 919. 361. 2269
license number: C-0293
www.mcadamsco.com
CONTACT
PROJECT DIRECTORY
RALEIGH, NORTH CAROLINA
AS-BUILT RECORD DRAWINGS
PROJECT NUMBER: HLE-18020
DATE: MAY 27, 2021
VICINITY MAP
1" = 3000'
REVISIONS
N0.DATE
RECORD DRAWINGS
FOR:
OLDE TOWNE
STREAM RELOCATION
OLDE TOWNE
RALEIGH, NORTH CAROLINA
PROJECT NUMBER: HLE-18020
HALLE BUILDING GROUP
56 HUNTER STREET, SUITE 110
APEX, NORTH CAROLINA 27502
PHONE: 919. 387. 1885
REBECCA STUBBS
rstubbs@mcadamsco.com
PHONE: 919. 361. 5000
SHEET INDEX
AS-BUILT STREAM RELOCATION SURVEY
C3.00 GRADING AND EROSION CONTROL PLAN
C3.01 EROSION CONTROL DETAILS
C5.00 PLAN AND PROFILE - UT TO BIG BRANCH STA. 0+00.00 THRU STA. 2+30.00
C5.01 PLAN AND PROFILE - UT TO BIG BRANCH STA. 2+00.00 THRU STA. 3+78.00
C8.00 STREAM DETAILS
L5.00 PLANTING PLAN
RECORD DRAWINGS - NOT RELEASED FOR CONSTRUCTION
CONTRACTOR SHALL NOTIFY "NC811" (811) OR (1-800-632-4949) AT
LEAST 3 FULL BUSINESS DAYS PRIOR TO BEGINNING CONSTRUCTION
OR EXCAVATION TO HAVE EXISTING UTILITIES LOCATED.
CONTRACTOR SHALL CONTACT ANY LOCAL UTILITIES THAT PROVIDE
THEIR OWN LOCATOR SERVICES INDEPENDENT OF "NC811".
REPORT ANY DISCREPANCIES TO THE ENGINEER IMMEDIATELY.
R
ALL CONSTRUCTION SHALL CONFORM WITH THE LATEST
VERSION OF THE CITY OF RALEIGH AND NCDOT STANDARDS,
SPECIFICATIONS AND DETAILS.
TOTAL LIMITS OF DISTURBANCE = 0.43 AC.
PROJECT SITE
BARWELL RDI-40
ROC
K
Q
U
A
R
R
Y
R
D
JONES SAUSAGE RDS NEW HOPE RDI-440
AUBURNCHURCH RD
P
O
O
L
E
R
D
STREAM
RELOCATION
AREA
THIS DESIGN IS A PORTION OF THE OVERALL PROJECT WITH CITY
OF RALEIGH. SITE PERMIT REVIEW CASE #SPR-0079-2020 AND
SUBDIVISION CASE # S-21-19 RECORD DR A W I N G S ON
L
Y
RECORD DRAWINGS ONLY
CROSS SECTION 1
CROSS SECTION 2
CLIENT
REVISIONS
PROJECT NO.HLE18020
FILENAME HLE18020-STREAM-ASB
CHECKED BY SMH
DRAWN BY ATC
SCALE 1"=20'
DATE 4/30/2021
N0.DATE
X:\Projects\HLE\HLE-18020\Construction Administration\As-Builts\HLE18020-STREAM.dwg, 5/7/2021 11:03:52 AM, Cole, AustinThe John R. McAdams Company, Inc.
2905 Meridian Parkway
Durham, NC 27713
phone 919. 361. 5000
fax 919. 361. 2269
license number: C-0293, C-187
www.mcadamsco.com
OLDE TOWNE PHASE 1STEAM RELOCATION SURVEYRALEIGH, NORTH CAROLINASHEET
PLAN INFORMATION
NAME
ADDRESS
ADDRESS
PHONE: XXX. XXX. XXXX
(B.M. 2020, PG. 2007)
GRAPHIC SCALE
0 10 20 40
1 inch = 20 ft.
GENERAL NOTES
VICINITY MAP
(NOT TO SCALE)
1 OF 1
LEGEND
5/10/21
GRAPHIC SCALE
0 15 30 60
1 inch = 30 ft.
C3.00
HLE18020-EC1
1" = 30'
ALL CONSTRUCTION SHALL BE IN
ACCORDANCE WITH THE CURRENT CITY OF
RALEIGH ENGINEERING DESIGN AND
CONSTRUCTION STANDARDS
FUTURE STORMWATER
CONTROL MEASURE
GRADING AND EROSION
CLIENT
REVISIONS
PROJECT NO.HLE-18020
FILENAME
CHECKED BY
DRAWN BY
SCALE
DATE 05. 27. 2021
X:\Projects\HLE\HLE-18020\Storm\Stream Relocation\As-builts\Current Drawings\HLE18020-EC1.dwg, 5/26/2021 10:44:08 AM, Garcia, KelliThe John R. McAdams Company, Inc.
2905 Meridian Parkway
Durham, NC 27713
phone 919. 361. 5000
fax 919. 361. 2269
license number: C-0293
www.mcadamsco.com
OLDE TOWNE - PHASE 1 SUBDIVISIONSTREAM RELOCATIONRECORD DRAWINGSRALEIGH, NORTH CAROLINASHEET
PLAN INFORMATION
HALLE BUILDING GROUP
56 HUNTER STREET, SUITE 110
APEX, NORTH CAROLINA 27502
PHONE: 919. 387. 1885
RECORD DRAWINGS
CONTROL PLAN
RAS
KEG
SITE LEGEND
TREE LEGEND
EROSION CONTROL LEGENDGENERAL NOTES
1.CONSTRUCTION OPERATIONS SHALL BE CARRIED OUT IN SUCH A MANNER THAT EROSION AND WATER
POLLUTION IS MINIMIZED.
2.WASHED STONE AND WIRE BACKING SHALL BE USED WITH SILT FENCE WHENEVER SILT FENCE IS PLACE AT
THE TOE OF A SLOPE >10' VERTICAL OR ALONG ANY CHANNEL OR WATER COURSE WHERE 50' OF BUFFER
IS NOT PROVIDED.
3.ANY UNUSABLE TREES & BRUSH REMOVED DURING CLEARING & GRUBBING OF SITE SHALL BE CHIPPED ON
SITE AND HAULED OFF SITE FOR DISPOSAL.
4.ALL DISTURBED AREAS TO BE SEEDED PER SEEDING SCHEDULE ON SHEET L5.00.
5.NO DEMOLITION TO OCCUR PRIOR TO PRE-CONSTRUCTION MEETING.
6.CONTRACTOR SHALL MINIMIZE DISTURBANCE TO EXISTING BUFFER VEGETATION AND CONSTRUCTION
CORRIDOR TO THE MAXIMUM EXTENT PRACTICAL.
7.THERE MAY BE WETLANDS WITHIN THIS SITE. IT IS THE OWNER'S RESPONSIBILITY FOR WETLANDS
JURISDICTION AND PERMIT DISTURBANCE PRIOR TO ANY GRADING ACTIVITY.
8.STREAM RELOCATION CONSTRUCTION IS INDEPENDENT OF CONSTRUCTION SEQUENCE FOR THE FINAL
OVERALL SITE AND ROAD WIDENING PORTION OF THE PROJECT.
SITE PREPARATION: CLEARING & TOPSOIL/SUBSOIL EXCAVATION
1.ALL SHRUBS AND SMALL TREES DESIGNATED BY THE ENGINEER WILL BE SAVED FOR TRANSPLANTING. PLANTS
THAT ARE TO BE TRANSPLANTED WILL BE MARKED WITH HIGHLY VISIBLE TAPE.
2.ANY UNUSABLE TREES & BRUSH REMOVED DURING CLEARING & GRUBBING OF SITE SHALL BE CHIPPED ON
SITE AND HAULED OFF SITE FOR DISPOSAL.
3.ALL TREES SHOWN ON THE PLANS SHALL REMAIN UNDAMAGED DURING CONSTRUCTION.
4.CONTRACTOR SHALL MANAGE EXCAVATED TOPSOIL SEPARATELY FROM EXCAVATED SUBSOIL. EXCAVATED
TOPSOIL SHALL BE PLACED WITHIN THE DESIGNATED TEMPORARY STOCKPILE AREAS AWAY FROM THE
CHANNEL TO BE FILLED (SEE PLANS). TOPSOIL SHALL BE FREE OF STONES OVER 1" IN DIAMETER, ROOTS,
STICKS, RUBBISH, STIFF CLAY, AND EXTRANEOUS MATTER.
5.EXCAVATED SUBSOIL SHALL BE PLACED NEAR THE CHANNEL TO BE FILLED. ONCE THE NEW STREAM IS
CONSTRUCTED, SUBSOIL SHALL BE USED TO FILL THE EXISTING CHANNEL FIRST, THEN STOCKPILED TOPSOIL
SHALL BE USED FOR THE FINAL 6 INCHES OF FILL TO ACHIEVE DESIGN GRADES AND CREATE A SOIL BASE FOR
VEGETATION.
6.IF FILL MATERIAL IS REQUIRED, IT SHALL BE FREE OF DEBRIS AND MEET THE FOLLOWING GRADATION TESTED
IN ACCORDANCE WITH ASTM D-422
SIEVE SIZE PERCENT PASSING
2 INCH 100
1 INCH 90-100
3
4 INCH 60-90
NO. 40 0-60
NO. 200 0-35
PLASTICITY INDEX (PI) < 15 AND LIQUID LIMIT <40 PER ASTM D-4318.
6.1.THE MAXIMUM AGGREGATE SIZE SHALL BE LIMITED TO 1
2 INCH
6.2.FILL MATERIAL MAY BE SITE-EXCAVATED SOILS WHERE THE ABOVE
6.3.REQUIREMENTS CAN BE MET. UNSUITABLE SOILS FOR BACKFILL (HIGH PLASTIC CLAYS OR ORGANIC
SOILS) SHALL NOT BE USED IN THE BACKFILL OR IN THE REINFORCED SOIL MASS. VISUAL OBSERVATION
SHALL BE SUFFICIENT FOR THE APPROVAL OF SITE-EXCAVATED SOILS.
7.IMPORTED TOPSOIL SHALL HAVE A LOAMY TEXTURE AND HAVE SAND, SILT, AND CLAY PERCENTAGES THAT
MEET THE U.S. DEPARTMENT OF AGRICULTURE CHARACTERISTICS OF A LOAMY SOIL. ORGANIC CONTENT
SHALL NOT BE LESS THAN 1.5% BY WEIGHT. PH RANGE SHALL BE FROM 6-7.5. IF PH IS LESS THAN 6, LIME
SHALL BE ADDED. SOLUBLE SALTS SHALL NOT EXCEED 500PPM. IMPORTED TOPSOIL SHALL BE FREE OF DEBRIS,
ROOTS, PLANTS, STICKS, RUBBISH, STIFF CLAYS, AND STONES OVER 1 INCH IN DIAMETER.
EROSION & SEDIMENT CONTROL NOTES:
1.GRADING AND EROSION CONTROL METHODS SHALL ADHERE TO THE NORTH CAROLINA DEPARTMENT
OF ENVIRONMENTAL QUALITY (NC DEQ) DIVISION OF ENERGY, MINERAL, AND LAND RESOURCES (NC
DEMLR) STANDARDS AND SPECIFICATIONS. WHERE METHODS DIFFER FROM CITY OF RALEIGH, THE
MORE STRINGENT METHOD SHALL BE APPLIED.
2.EROSION AND SEDIMENT CONTROL (E & SC) PERMIT AND A CERTIFICATE OF COVERAGE (COC) MUST BE
OBTAINED BEFORE ANY LAND DISTURBANCE ACTIVITIES.
3.WHEN PROJECT IS COMPLETE, THE PERMITEE SHALL VISIT DEQ.NC.GOV/NCG01 TO SUBMIT AN
ELECTRONIC NOTICE OF TERMINATION (E-NOT). A $100 ANNUAL GENERAL FEE WILL BE CHARGED
UNTIL THE E-NOT HAS BEEN FILLED OUT.
4.E & SC DEVICES MUST BE INSTALLED AND INSPECTED PRIOR TO ANY GRADING ON SITE. THE
CONTRACTOR SHALL CONTACT ONLINE FOR AN INSPECTION BY CITY OF RALEIGH ONCE INITIAL
MEASURES ARE IN PLACE VIA PERMITPORTAL.RALEIGHNC.GOV
5.A COPY OF THE APPROVED EROSION CONTROL PLAN MUST BE ON FILE AT THE JOB SITE AT ALL TIMES.
FAILURE TO FOLLOW THE APPROVED PLAN SEQUENCE AND DETAILS COULD SUBJECT THE CONTRACTOR
TO FINES AND PENALTIES ISSUED BY THE CITY OF RALEIGH.
6.CONSTRUCTION, MAINTENANCE, AND REMOVAL OF ALL EROSION CONTROL DEVICES ARE THE
RESPONSIBILITY OF THE GRADING CONTRACTOR UNLESS OTHERWISE NOTED.
7.ANY GRADING BEYOND THE DENUDED LIMITS SHOWN ON THE PLAN IS A VIOLATION OF THE APPROVED
EROSION CONTROL PLAN AND IS SUBJECT TO A FINE BY THE CITY OF RALEIGH.
8.DISTURBANCE OUTSIDE OF THE SITE PROPERTY LIMITS OR PUBLIC R/W SHALL ONLY BE ALLOWED BY
SIGNED GRADING AGREEMENTS AND/OR EASEMENTS BETWEEN THE DEVELOPER AND OFFSITE
PROPERTY OWNER.
9.THE CONTRACTOR IS RESPONSIBLE TO MAINTAIN SAFE OPEN ACCESS TO ALL PROPERTIES ALONG
ADJACENT PROPERTIES DURING CONSTRUCTION PERIOD FOR IMPROVEMENTS.
10.GRADING MORE THAN ONE ACRE WITHOUT AN APPROVED EROSION CONTROL PLAN IS A VIOLATION OF
THE CITY EROSION CONTROL ORDINANCE AND IS SUBJECT TO A FINE.
11.CONTRACTOR SHALL SEED AND STABILIZE ALL STEEP SLOPES (GREATER THAN 3H:1V) WITHIN 7 DAYS, 10
DAYS FOR MODERATE SLOPES (3H:1V OR LESS) AND WITHIN 14 CALENDAR DAYS EVERYWHERE ELSE
ACCORDING TO THE TEMPORARY SEEDING SCHEDULE ON SHEET L5.00.
12.FOR ANY LAND DISTURBING ACTIVITY WHERE GRADING ACTIVITIES HAVE BEEN COMPLETED,
TEMPORARY OR PERMANENT GROUND COVER (SHEET L5.00) SUFFICIENT TO RESTRAIN EROSION SHALL
BE PROVIDED AS SOON AS PRACTICAL, BUT IN NO CASE LATER THAN SEVEN (7) DAYS AFTER
COMPLETING THE WORK. STABILIZATION IS THE BEST FORM OF EROSION CONTROL. TEMPORARY
SEEDING IS NECESSARY TO ACHIEVE EROSION CONTROL ON LARGE DENUDED AREAS AND ESPECIALLY
WHEN SPECIFICALLY REQUIRED AS PART OF THE CONSTRUCTION SEQUENCE ON THE PLAN.
13.THE EROSION CONTROL INSPECTOR MAY REQUIRE ADDITIONAL FIELD MEASURES AS NECESSARY TO
PROVIDE ADEQUATE PROTECTION FROM RECEIVING WATER COURSES.
14.PROTECTION OF EXISTING VEGETATION: AT THE START OF GRADING INVOLVING THE STRIPPING OF
TOPSOIL OR LOWERING OF EXISTING GRADE AROUND A TREE, A CLEAN, SHARP, VERTICAL CUT SHALL BE
MADE AT THE EDGE OF THE TREE SAVE AREA AT THE SAME TIME AS OTHER EROSION CONTROL
MEASURES ARE INSTALLED. THE TREE PROTECTION FENCING SHALL BE INSTALLED ON THE SIDE OF THE
CUT FARTHEST AWAY FROM THE TREE TRUNK AND SHALL REMAIN IN PLACE UNTIL ALL CONSTRUCTION
IN THE VICINITY OF THE TREES IS COMPLETE. NO STORAGE OF MATERIALS, FILL, OR EQUIPMENT AND
NO TRESPASSING SHALL BE ALLOWED WITHIN THE BOUNDARY OF THE PROTECTED AREA AND SHALL BE
POSTED ON THE PROTECTION FENCE. A PROTECTION FENCE CONSTRUCTED OF MATERIAL RESISTANT TO
DEGRADATION BY SUN, WIND, AND MOISTURE FOR THE DURATION OF THE CONSTRUCTION, SHALL BE
INSTALLED AT THE SAME TIME AS THE EROSION CONTROL MEASURES AND SHALL BE IN PLACE UNTIL
ALL CONSTRUCTION IN THE VICINITY OF THE TREES IS COMPLETE (SEE DETAIL ON SHEET C3.01).
15.A CONSTRUCTION SEQUENCE HAS BEEN PROVIDED (SEE THIS SHEET). INSTALLATION OF ALL PROPOSED
E & SC MEASURES IN THE SEQUENCE(S) PROVIDED AND MAINTENANCE OF THOSE DEVICES IS
REQUIRED. THE CONTRACTOR MAY BE ALLOWED, WITH PRIOR APPROVAL FROM THE OWNER, TO
COORDINATE CHANGES TO THE PLAN WITH THE ON-SITE E & SC INSPECTOR AND THE ENGINEER.
16.CONTRACTOR SHALL INSPECT AND REPAIR ALL EROSION CONTROL DEVICES AT LEAST ONCE PER WEEK
AND AFTER EVERY SIGNIFICANT RAINFALL EVENT. EACH DEVICE IS TO BE MAINTAINED OR REPLACED IF
SEDIMENT ACCUMULATION HAS REACHED ONE HALF THE CAPACITY OF THE DEVICE.
17.CONTRACTOR WILL FIELD LOCATE SILT FENCE OUTLETS AT LOW POINTS IN SILT FENCE AS REQUIRED TO
PROVIDE RELIEF FROM CONCENTRATED FLOWS. SILT FENCE OUTLETS SHOWN ON THESE PLANS ARE
BASED ON THE BEST TOPOGRAPHIC INFORMATION AVAILABLE AT THE TIME OF DESIGN. CONTRACTOR
TO FIELD VERIFY AND ADJUST LOCATIONS OF SILT FENCE OUTLETS AND/OR PLACE ADDITIONAL OUTLETS
TO INSURE THAT ALL LOW SPOTS ALONG THE SILT FENCE HAVE AN OUTLET.
18.WASHED STONE AND WIRE BACKING SHALL BE USED WITH SILT FENCE WHENEVER SILT FENCE IS PLACE
AT THE TOE OF A SLOPE >10' VERTICAL OR ALONG ANY CHANNEL OR WATER COURSE WHERE 50' OF
BUFFER IS NOT PROVIDED.
19.ALL DIMENSIONS AND GRADES SHOWN ON THE PLANS SHALL BE FIELD VERIFIED BY THE CONTRACTOR
PRIOR TO CONSTRUCTION. CONTRACTOR SHALL NOTIFY THE OWNER IF ANY DISCREPANCIES EXIST
PRIOR TO PROCEEDING WITH CONSTRUCTION FOR NECESSARY PLAN OR GRADE CHANGES. NO EXTRA
COMPENSATION SHALL BE PAID TO THE CONTRACTOR FOR ANY WORK DONE DUE TO DIMENSIONS OR
GRADES SHOWN INCORRECTLY ON THESE PLANS IF SUCH NOTIFICATION HAS NOT BEEN GIVEN.
20.STORM DRAINAGE STRUCTURE LOCATIONS AND PIPE SIZES SUBJECT TO FINAL CONSTRUCTION
DRAWING APPROVAL.
21.NO DEBRIS SHALL BE TRACKED ONTO PUBLIC RIGHT OF WAY. IF THE SITUATION OCCURS WHERE MUD,
ROCKS AND DEBRIS IS TRACKED ONTO PAVEMENT, THE CONTRACTOR SHALL CLEAN THE PAVEMENT
AND INSTALL ADDITIONAL MEASURES TO PREVENT FUTURE OCCURRENCES.
22.INSTALL SILT FENCE FOR ALL STAGING AND STOCKPILE AREAS (SEE DETAIL ON THIS SHEET). ANY
STOCKPILE AREAS SHALL USE TWO (2) ROWS OF SILT FENCE.
23.IF CONCRETE WASHOUTS ARE UTILIZED, THESE AREAS ARE TO BE WITHIN THE LIMITS OF DISTURBANCE
AND SHOULD BE LOCATED AT LEAST 50 FT. AWAY FROM STORM DRAIN INLETS AND SURFACE WATER.
EROSION & SEDIMENT CONTROL MAINTENANCE PLAN:
1.QUALIFIED PERSONNEL, ON A DAILY BASIS WILL EVALUATE ALL TEMPORARY EROSION AND SEDIMENT
CONTROL PRACTICES FOR STABILITY AND OPERATION.
2.INSPECT AND MAINTAIN ALL EROSION CONTROL MEASURES EVERY 7 DAYS AND AFTER EACH SIGNIFICANT
RAINFALL (0.5" OR GREATER) AND DOCUMENT WITH INSPECTION REPORTS AND WRITTEN LOGS SHALL BE
KEPT.
3.A RAIN GAUGE WILL ALSO BE KEPT ON-SITE AND DAILY RAINFALL AMOUNTS WILL BE RECORDED.
4.ANY REPAIRS NEEDED WILL BE PERFORMED IMMEDIATELY TO MAINTAIN ALL PRACTICES AS DESIGNED.
5.THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE MAINTENANCE OF TEMPORARY ON-SITE E & SC
MEASURES.
6.THE CONTRACTOR SHALL BE RESPONSIBLE FOR IMPLEMENTING AND FOLLOWING THE APPROVED E & SC
PLAN.
CONSTRUCTION SEQUENCE:
1.OBTAIN PLAN APPROVAL AND OTHER APPLICABLE PERMITS.
2.OBTAIN AN APPROVED (STAMPED) EROSION & SEDIMENT CONTROL PLAN AND KEEP IT ON-SITE EITHER IN
THE INSPECTION BOX, CONSTRUCTION OFFICE, OR WITH THE CONTRACTOR.
3.SCHEDULE AND HOLD AN ON-SITE PRE-CONSTRUCTION CONFERENCE AT LEAST ONE WEEK PRIOR TO
BEGINNING ANY LAND-DISTURBING ACTIVITIES. THE CONFERENCE SHOULD BE ATTENDED BY THE CITY OF
RALEIGH EROSION CONTROL INSPECTOR, THE GENERAL CONTRACTOR, ANY SUBCONTRACTORS, THE
ENGINEER, AND A REPRESENTATIVE OF THE OWNER.
4.CONTRACTOR SHALL NOTIFY "NC811" (811) OR (1-800-632-4949) AT LEAST 3 FULL BUSINESS DAYS PRIOR
TO BEGINNING CONSTRUCTION OR EXCAVATION TO HAVE EXISTING UTILITIES LOCATED. CONTRACTOR
SHALL CONTACT ANY LOCAL UTILITIES THAT PROVIDE THEIR OWN LOCATOR SERVICES INDEPENDENT OF
"NC811". REPORT ANY DISCREPANCIES TO THE ENGINEER IMMEDIATELY.
5.ALL DIMENSIONS AND GRADES SHOWN ON THE PLANS SHALL BE FIELD VERIFIED BY THE CONTRACTOR
PRIOR TO CONSTRUCTION. CONTRACTOR SHALL NOTIFY THE ENGINEER IF ANY DISCREPANCIES EXIST
PRIOR TO PROCEEDING WITH CONSTRUCTION, FOR NECESSARY PLAN OR GRADE CHANGES. NO EXTRA
COMPENSATION SHALL BE PAID TO THE CONTRACTOR FOR ANY WORK DONE DUE TO DIMENSIONS OR
GRADES SHOWN INCORRECTLY ON THESE PLANS IF SUCH NOTIFICATION HAS NOT BEEN GIVEN.
6.ACCESS THE SITE THROUGH THE ESTABLISHED CONSTRUCTION ENTRANCE (SEE OLDE TOWNE MASS
GRADING PLANS CASE #MASS-0079-2019). ESTABLISH STAGING AREA WITHIN LIMITS OF DISTURBANCE
AREA.
7.INSTALL SILT FENCE, INLET PROTECTION, SEDIMENT TRAPS, DIVERSION DITCHES, TREE PROTECTION, AND
OTHER MEASURES AS SHOWN ON PLANS, CLEARING ONLY AS NECESSARY TO INSTALL THESE DEVICES.
8.LIMITS OF DISTURBANCE, ALONG WITH ADDITIONAL TREE PROTECTION AREAS, SHALL BE MARKED BY SILT
FENCE OR ORANGE TREE PROTECTION FENCE (SEE DETAIL ON SHEET C3.01).
9.USE THE AREA DESIGNATED ON THE PLANS FOR ALL STAGING ACTIVITIES RELATED TO THE PROJECT.
10.PARK ALL CONSTRUCTION EQUIPMENT, INCLUDING TRUCKS AND HEAVY EQUIPMENT WITHIN THE LIMITS
OF DISTURBANCE.
11.WHEN ACCESS TO A CONSTRUCTION AREA REQUIRES CROSSING A DELINEATED JURISDICTIONAL FEATURE,
IMPACTS SHALL BE MINIMIZED BY PLACING A TEMPORARY STREAM/WETLAND CROSSING ACROSS THE
FEATURE PRIOR TO ACCESSING THE AREA WITH HEAVY EQUIPMENT PER APPROVED PLANS AND
SPECIFICATIONS.
12.INSTALL REMAINING EROSION CONTROL MEASURES AS SHOWN ON SHEET C3.01. CLEAR AND GRUB ONLY
AS NECESSARY TO INSTALL THESE DEVICES.
13.BEGIN GRADING ACTIVITIES. IN GENERAL, THE CONTRACTOR SHALL WORK FROM UPSTREAM TO
DOWNSTREAM AND CONSTRUCTION IN A LIVE CHANNEL UTILIZE A PUMP-AROUND OR FLOW DIVERSION
MEASURE AS SHOWN ON THE PLANS. MAINTAIN AND ADJUST E & SC MEASURES AS GRADING
PROGRESSES.
14.AFTER EXCAVATING THE CHANNEL TO DESIGN GRADES, INSTALLING IN-STREAM STRUCTURES, SEED AND
MULCH, MATTING, AND TRANSPLANTS, THE NEW CHANNEL CAN RECEIVE FLOW AFTER APPROVAL BY THE
ENGINEER.
15.WATER WILL BE TURNED INTO THE CONSTRUCTED CHANNEL ONCE THE AREA IN AND AROUND THE NEW
CHANNEL HAS BEEN STABILIZED. NO WATER SHALL BE TURNED INTO ANY SECTION OF CHANNEL PRIOR
TO THE CHANNEL BEING COMPLETELY STABILIZED WITH ALL STRUCTURES INSTALLED.
16.ANY GRADING ACTIVITIES ADJACENT TO THE STREAM CHANNEL SHALL BE COMPLETED PRIOR TO
TURNING WATER INTO THE NEW STREAM CHANNEL SEGMENTS. THE CONTRACTOR SHALL NOT GRADE
OR ROUGHEN ANY AREAS WHERE EXCAVATION ACTIVITIES HAVE NOT BEEN COMPLETED.
17.THE CONTRACTOR SHALL DILIGENTLY AND CONTINUOUSLY MAINTAIN ALL EROSION CONTROL DEVICES
AND STRUCTURES.
18.FOR PHASED EROSION CONTROL PLANS, CONTRACTOR SHALL MEET WITH EROSION CONTROL INSPECTOR
PRIOR TO COMMENCING WITH EACH PHASE OF EROSION CONTROL MEASURES. ALL INSPECTIONS SHALL
BE SCHEDULED ONLINE VIA: PERMITPORTAL.RALEIGHNC.GOV
19.STABILIZE SITE AS AREAS ARE BROUGHT TO FINISHED GRADE. AT THE CONCLUSION OF GRADING AND
CONSTRUCTION OR IF LAND-DISTURBING ACTIVITY STOPPED FOR MORE THAN 14 CONSECUTIVE
CALENDAR DAYS, PERMANENT VEGETATIVE COVER SHALL BE INSTALLED ACCORDING TO SHEET L5.00.
20.CONTRACTOR SHALL PLANT WOODY VEGETATION AND LIVE STAKES, ACCORDING TO PLANTING DETAILS
AND SPECIFICATIONS. THE CONTRACTOR SHALL COMPLETE THE LIVE STAKING AND REFORESTATION
(BARE-ROOT PLANTING) PHASE OF THE PROJECT AND APPLY PERMANENT SEEDING AT THE APPROPRIATE
TIME OF YEAR.
21.COORDINATE WITH EROSION CONTROL INSPECTOR PRIOR TO REMOVAL OF ANY EROSION CONTROL
MEASURES.
22.STABILIZE ALL DISTURBED AREAS. REMOVE STAGING AREA AND CONSTRUCTION ENTRANCE.
23.REMOVE ALL EROSION CONTROL MEASURES AND CONTACT THE CITY OF RALEIGH FOR FINAL INSPECTION
ONCE PERMANENT VEGETATION HAS BEEN ESTABLISHED VIA PERMITPORTAL.RALEIGHNC.GOV
24.DEMOBILIZE ALL EQUIPMENT AND MATERIALS FROM SITE.
25.ALL EROSION CONTROL MEASURES SHALL BE CONSTRUCTED IN ACCORDANCE WITH THE N. C. EROSION
AND SEDIMENT CONTROL PLANNING AND DESIGN MANUAL, U. S. DEPT. OF AGRICULTURE, AND CITY OF
RALEIGH.
CHANNEL CONSTRUCTION (PUMP AROUND):
1.INSTALL PUMP AROUND ALONG 200' TO 300' OF STREAM CHANNEL, OR NO MORE THAN CAN BE
CONSTRUCTED IN ONE (1) WORKING DAY (DEWATERING AND PUMP AROUND DETAILS ON SHEET C3.01).
2.HARVEST MATERIAL FROM THE BOTTOM OF THE EXISTING CHANNEL TO BE PLACED IN THE BOTTOM OF
THE PROPOSED CHANNEL. THIS SHALL INCLUDE THE SURFACE MATERIAL AND UP TO ONE (1) FOOT
BELOW TO INCLUDE THE HYPORHEIC ZONE. ADDITIONAL RIVER STONE SHALL BE MIXED WITH EXISTING
CHANNEL MATERIAL AS NECESSARY.
3.IN-STREAM STRUCTURES WILL BE INSTALLED ACCORDING TO THE DETAILS PRESENTED ON SHEET C8.00.
4.FILL EXISTING CHANNEL ON THE SAME WORKING DAY AS COMPLETING THE PROPOSED CHANNEL. IN NO
EVENT SHALL THE EXISTING CHANNEL BE FILLED PRIOR TO THE COMPLETE CONSTRUCTION OF THE
CORRESPONDING PROPOSED CHANNEL.
5.ANY EXCAVATED MATERIAL CONTAINING MANMADE MATERIAL IS NOT SUITABLE MATERIAL FOR
CHANNEL FILL AND MUST BE DISPOSED OF OFFSITE UNLESS OTHERWISE DIRECTED BY OWNER.
6.IN ANY SECTION WHERE THE NEW CHANNEL ALIGNMENT CROSSES THE EXISTING CHANNEL A CLAY PLUG
WILL BE INSTALLED IN THE EXISTING CHANNEL AS PER DETAIL ON SHEET C8.00.
7.THE PROPOSED CHANNEL BANKS SHALL BE STABILIZED WITH EROSION CONTROL MATTING AND
TEMPORARY SEEDING UPON COMPLETION OF EACH SECTION AS PER DETAILS ON SHEET C3.10 AND L5.00.
8.COMPLETE ALL EARTHWORK, STRUCTURE INSTALLATION, AND STABILIZATION IN THE PUMP AROUND
AREA.
9.CONTRACTOR SHALL NOTIFY ENGINEER UPON DISCOVERY OF ANY CONSTRAINTS DISCOVERED IN THE
CONSTRUCTION OF THE PROPOSED CHANNEL OR STRUCTURE PLACEMENT AND ADJUSTMENTS CAN BE
MADE ON SITE.
10.GRADING OF THE PROPOSED FLOODPLAIN MAY NEED TO BE DELAYED UNTIL AFTER WORK IN
SUBSEQUENT SECTIONS HAS BEEN COMPLETED, ESPECIALLY NEAR CONFLUENCES. HAUL ROADS AND
TEMPORARY SILT FENCE MAY ALSO NEED TO BE REMOVED BEFORE THE PROPOSED FLOODPLAIN CAN BE
COMPLETED AND/OR UNUSED EXISTING CHANNEL CAN BE FILLED.
TOTAL DISTURBED AREA = 0.43 AC.
CONTRACTOR SHALL NOTIFY "NC811" (811) OR (1-800-632-4949) AT
LEAST 3 FULL BUSINESS DAYS PRIOR TO BEGINNING CONSTRUCTION
OR EXCAVATION TO HAVE EXISTING UTILITIES LOCATED.
CONTRACTOR SHALL CONTACT ANY LOCAL UTILITIES THAT PROVIDE
THEIR OWN LOCATOR SERVICES INDEPENDENT OF "NC811".
REPORT ANY DISCREPANCIES TO THE ENGINEER IMMEDIATELY.
R
E
X
I
S
T
I
N
G
R
O
C
K
Q
U
A
R
R
Y
R
O
A
D
S
R
2
5
4
2
(
V
A
R
I
A
B
L
E
W
I
D
T
H
P
U
B
L
I
C
R
/W
)
BM
2
0
1
0
,
P
G
1
1
2EXISTINGS NEW HOPE ROADSR 2697(110' PUBLIC R/W)BM 2008, PG 280
STREAM RELOCATION CONSTRUCTION IS
INDEPENDENT OF CONSTRUCTION SEQUENCE
FOR THE FINAL OVERALL SITE AND ROAD
WIDENING PORTION OF THE PROJECTRECORD DR A W I N G S ON
L
Y
RECORD DRAWINGS ONLYAS-BUILT GENERAL NOTES:
1. ONLY THOSE ITEMS SHOWN ON THIS SHEET THAT ARE RED IN COLOR ARE AS-BUILT
VERIFIED. ALL OTHER INFORMATION ON THIS SHEET WAS TAKEN FROM THE
APPROVED DESIGN DRAWINGS AND SHOULD NOT BE TAKEN AS AS-BUILT
INFORMATION, BUT RATHER FOR GRAPHICAL PRESENTATION ONLY.
C3.01
HLE18020-EC2
RAS
KEG
N.T.S.
EROSION CONTROLDETAILS
CLIENT
REVISIONS
PROJECT NO.HLE-18020
FILENAME
CHECKED BY
DRAWN BY
SCALE
DATE 05. 27. 2021
X:\Projects\HLE\HLE-18020\Storm\Stream Relocation\As-builts\Current Drawings\HLE18020-EC2.dwg, 5/26/2021 11:20:26 AM, Garcia, KelliThe John R. McAdams Company, Inc.
2905 Meridian Parkway
Durham, NC 27713
phone 919. 361. 5000
fax 919. 361. 2269
license number: C-0293
www.mcadamsco.com
OLDE TOWNE - PHASE 1 SUBDIVISIONSTREAM RELOCATIONRECORD DRAWINGSRALEIGH, NORTH CAROLINASHEET
PLAN INFORMATION
HALLE BUILDING GROUP
56 HUNTER STREET, SUITE 110
APEX, NORTH CAROLINA 27502
PHONE: 919. 387. 1885
RECORD DRAWINGS
NON-WOVEN GEOTEXTILE FABRIC
MATERIAL SPECIFICATIONS
’
CHANNEL PLUG NOTES:
1.CHANNEL PLUGS TO BE LOCATED AS SHOWN ON PLAN SHEETS C5.01 AND AT OTHER LOCATIONS AS DIRECTED BY THE CONSTRUCTION MANAGER.
2.CHANNEL PLUG MATERIAL SHALL BE CLAY SOIL HARVESTED ON SITE OR BROUGHT INTO THE SITE AS WELL AS MATERIAL USED IN REMOVED ROCK CHECK DAMS IF SUITABLE.
3.CHANNEL MATERIAL SHALL BE FREE OF ALL VISIBLE ORGANIC DEBRIS SUCH AS ROOTS AND LIMBS. SOILS WITH ORGANIC MATTER CONTENT EXCEEDING 5% BY WEIGHT SHALL
NOT BE USED.
4.ROCKS AND STONES WITH A DIAMETER GREATER THAN 3 INCHES (IN ANY DIRECTION) SHALL BE REMOVED FROM FILL PRIOR TO COMPACTION.
5.FILL MATERIAL PLACED AT DENSITIES LOWER THAN SPECIFIED MINIMUM DENSITIES OR AT MOISTURE CONTENTS OUTSIDE THE SPECIFIED RANGES OR OTHERWISE NOT
CONFORMING TO THE SPECIFIED REQUIREMENTS SHALL BE REMOVED AND REWORKED AND REPLACED WITH ACCEPTABLE MATERIALS.
6.TOPSOIL SHALL BE PLACED ON TOP OF THE SOIL LIFTS IN THE SAME MANOR AS THE REST OF THE GRADED CONSTRUCTION SITE
7.CHANNEL PLUGS WILL BE PLANTED ACCORDING TO THE PLANTING PLAN ON SHEETS C5.02.
N.T.S.
IMPERVIOUS CHANNEL PLUG DETAILS
SECTION A-A'
SECTION B-B'
PLAN VIEW
CROSS-SECTION VIEW
N.T.S.
EROSION CONTROL BLANKET DETAILS
NOTES:
1.AN EROSION CONTROL BLANKET SHALL BE USED TO STABILIZE THE NEWLY CONSTRUCTED CHANNEL FROM THE TOP OF BANK TO TOE
OF SLOPE AND SHALL BE 100% BIODEGRADABLE.
2.THE CHANNEL SIDE SLOPES SHALL BE FINE GRADED, SEEDED, FERTILIZED, AND LIMED PRIOR TO INSTALLING THE EROSION CONTROL
BLANKET. REMOVE ROOTS, TWIGS, AND OTHER DEBRIS WHICH WOULD CAUSE BULGES IN THE MATTING AS WELL AS PREVENT THE
MATTING FROM BEING LAID FLUSH TO THE FINISHED SURFACE.
3.KEY-IN EDGES OF MATTING A MINIMUM OF 6 INCHES INTO FINISHED GRADE. LAY MATTING SHINGLED DOWNSTREAM TO UPSTREAM,
OVERLAPPING AT EDGES A MINIMUM OF 1 FOOT.
4.INSTALL STAKES TO ENSURE GOOD GROUND CONTACT OF THE MATTING TO WITHSTAND MEDIUM TO HIGH FLOWS. STAKES SHALL BE
100% BIODEGRADABLE AND INSTALLED PER THE MANUFACTURER'S SPECIFICATIONS INCLUDING, BUT NOT LIMITED TO, THE
MANUFACTURER'S RECOMMENDED DENSITY AND PATTERN.
5.KEY-IN EDGES OF MATTING A MINIMUM OF 6 INCHES, PARTICULARLY NEAR RESTORATION STRUCTURES, BOULDERS, LOGS, ETC.
CHECK MATTING FOR LOOSE ENDS, FLAPS, OR OTHER WEAKNESSES OR DAMAGE WHICH MAY CAUSE IT TO BECOME LOOSE UNDER
FLOW CONDITIONS.
6.THE EROSION CONTROL BLANKET SHALL CONSIST OF A MACHINE-PRODUCED BLANKET MADE OF COCONUT FIBER AND BE
EQUIVALENT OR BETTER THAN THE FOLLOWING SPECIFICATION. SOIL STABILIZATION MATTING WHICH USES PLASTICS, METALS, OR
OTHER MAN-MADE MATERIALS IN THE CONSTRUCTION OF THE MATERIAL WILL NOT BE PERMITTED.
WEIGHT = 13.6 OZ/SY
TENSILE STRENGTH DRY (ASTM D 4595) = 780 LBS/FT MACHINE DIRECTION
744 LBS/FT CROSS DIRECTION
TENSILE STRENGTH WET (ASTM D 4595) = 672 LBS/FT MACHINE DIRECTION
648 LBS/FT CROSS DIRECTION
ELONGATION FAILURE WET (ASTM D 4595) = 30% MACHINE DIRECTION
28% CROSS DIRECTION
OPEN AREA = 65%
RECOMMENDED SHEAR STRESS = 3LBS/SQ.FT.
RECOMMENDED FLOW = 8FT/S
RECOMMENDED SLOPE </= 1:1
MINIMUM TWINE COUNT PER FOOT = 15X14 SLOPE APPLICATION ISOMETRIC VIEWRECORD DR A W I N G S ON
L
Y
RECORD DRAWINGS ONLYAS-BUILT GENERAL NOTES:
1. ONLY THOSE ITEMS SHOWN ON THIS SHEET THAT ARE RED IN COLOR ARE AS-BUILT
VERIFIED. ALL OTHER INFORMATION ON THIS SHEET WAS TAKEN FROM THE
APPROVED DESIGN DRAWINGS AND SHOULD NOT BE TAKEN AS AS-BUILT
INFORMATION, BUT RATHER FOR GRAPHICAL PRESENTATION ONLY.
ZSTREAM ASBGRAPHIC SCALE
0 5 10 20
1 inch = 10 ft.
UT TO BIG BRANCH
C5.00
UT TO BIG BRANCH
HLE18020-P1
1"=10' / 1"=4'
STA. 0+00 THRU STA. 2+30
AS-BUILT BANKFULL
EXISTING GROUND
(TYP.)
TYPICAL RIFFLE
TYPICAL POOL
SITE LEGEND
X:\Projects\HLE\HLE-18020\Storm\Stream Relocation\As-builts\Current Drawings\HLE18020-P1.dwg, 5/26/2021 11:32:57 AM, Garcia, KelliCLIENT REVISIONS
PROJECT NO.HLE-18020
FILENAME
DATE 05.27.2021
The John R. McAdams Company, Inc.
2905 Meridian Parkway
Durham, NC 27713
phone 919. 361. 5000
fax 919. 361. 2269
license number: C-0293, C-187
www.mcadamsco.com
PLAN INFORMATION
HALLE BUILDING GROUP
56 HUNTER STREET, SUITE 110
APEX, NORTH CAROLINA 27502
PHONE: 919. 387. 1885
RECORD DRAWINGS
OLDE TOWNE - PHASE 1 SUBDIVISION
STREAM RELOCATION
RECORD DRAWINGS
RALEIGH, NORTH CAROLINA
CHECKED BY
DRAWN BY
SCALE
KEG
RAS
PROPOSED GROUND
(TYP.)
LOG SILL #2
TOP OF HEADER LOG = 194.41
BOTTOM OF FOOTER LOG = 192.41
12" DIAMETER LOGS
PLAN AND PROFILE
LOG SILL #2
POOL CONTROL POINT
LOG SILL #1
INSTALLED WITHIN CONSTRUCTED CHANNEL WALL.
SEE DETAIL ON SHEET C5.03
*CONTRACTOR TO PROTECT ALL TREES SHOWN ON THIS PLAN AND NOT CLEARLY SPECIFIED TO BE REMOVED. ANY GRADING ACTIVITIES SHALL WORK AROUND SHOWN TREES TO REMAIN.
RIFFLE SECTION
(TYP.)
AS-BUILT GENERAL NOTES:
1. ONLY THOSE ITEMS SHOWN ON THIS SHEET THAT ARE RED IN COLOR ARE AS-BUILT
VERIFIED. ALL OTHER INFORMATION ON THIS SHEET WAS TAKEN FROM THE
APPROVED DESIGN DRAWINGS AND SHOULD NOT BE TAKEN AS AS-BUILT
INFORMATION, BUT RATHER FOR GRAPHICAL PRESENTATION ONLY.RECORD DR A W I N G S ON
L
Y
RECORD DRAWINGS ONLYAS-BUILT PROFILE
AS-BUILT SURVEYED
GROUND (TYP.)
CROSS SECTION #1
SURVEY LOCATION
(RIFFLE)
ALIGNMENT
ADJUSTMENT FROM
AS-BUILT STATION
1+30 TO 2+00 DUE TO
FIELD CONDITIONS
LOG SILL #2
TOP OF HEADER LOG = 194.22
POOL SECTION (TYP.)
RIFFLE SECTION (TYP.)
NOTE: AS-BUILT PROFILE STATION SHOWN DIFFERS FROM DESIGN STATIONING DUE TO
FIELD CHANGE IN CENTERLINE ALIGNMENT BETWEEN AS-BUILT STATION 1+30 TO 2+00
TREE LEGEND
ZSTREAM ASB
PROPOSED GROUND
(TYP.)
GRAPHIC SCALE
0 5 10 20
1 inch = 10 ft.
C5.01
UT TO BIG BRANCH
HLE18020-P1
1"=10' / 1"=4'
STA. 2+00 THRU STA. 3+78MATCH LINE - SEE SHEET 5.00EXISTING GROUND
(TYP.)
SITE LEGEND
X:\Projects\HLE\HLE-18020\Storm\Stream Relocation\As-builts\Current Drawings\HLE18020-P1.dwg, 5/26/2021 11:35:59 AM, Garcia, KelliCLIENT REVISIONS
PROJECT NO.HLE-18020
FILENAME
DATE 05.27.2021
The John R. McAdams Company, Inc.
2905 Meridian Parkway
Durham, NC 27713
phone 919. 361. 5000
fax 919. 361. 2269
license number: C-0293, C-187
www.mcadamsco.com
PLAN INFORMATION
HALLE BUILDING GROUP
56 HUNTER STREET, SUITE 110
APEX, NORTH CAROLINA 27502
PHONE: 919. 387. 1885
RECORD DRAWINGS
OLDE TOWNE - PHASE 1 SUBDIVISION
STREAM RELOCATION
RECORD DRAWINGS
RALEIGH, NORTH CAROLINA
CHECKED BY
DRAWN BY
SCALE
KEG
RAS
LOG SILL #3
TOP OF HEADER LOG = 188.55
BOTTOM OF FOOTER LOG = 186.55
12" DIAMETER LOGS
PLAN AND PROFILE
LOG SILL #3
POOL CONTROL POINT
RIFFLE TO BE LINED WITH NCDOT
CLASS 'B' RIPRAP OR RIVER
COBBLE OF EQUIVALENT SIZE. TOP
OF STONE SHALL MATCH
PROPOSED GRADE.
*CONTRACTOR TO PROTECT ALL TREES SHOWN ON THIS PLAN AND NOT CLEARLY SPECIFIED TO BE REMOVED. ANY GRADING ACTIVITIES SHALL WORK AROUND SHOWN TREES TO REMAIN.
TYPICAL RIFFLE
TYPICAL POOL
UT TO BIG BRANCHAS-BUILT GENERAL NOTES:
1. ONLY THOSE ITEMS SHOWN ON THIS SHEET THAT ARE RED IN COLOR ARE AS-BUILT
VERIFIED. ALL OTHER INFORMATION ON THIS SHEET WAS TAKEN FROM THE
APPROVED DESIGN DRAWINGS AND SHOULD NOT BE TAKEN AS AS-BUILT
INFORMATION, BUT RATHER FOR GRAPHICAL PRESENTATION ONLY.RECORD DR A W I N G S ON
L
Y
RECORD DRAWINGS ONLYAS-BUILT PROFILE
AS-BUILT BANKFULL
SURVEYED GROUND
(TYP.)
CROSS SECTION #2
SURVEY LOCATION
(POOL)
ALIGNMENT
ADJUSTMENT FROM
AS-BUILT STATION
1+30 TO 2+00 DUE TO
FIELD CONDITIONS
ADDED RIFFLE STONE FROM
APPROXIMATELY STATION 3+47 TO 3+56
IN CHANNEL BOTTOM WITH
APPROXIMATE d50 = 8".
TOP OF STONE MATCHES CHANNEL
BOTTOM GRADE.
LOG SILL #3
TOP OF HEADER LOG = 188.63
POOL SECTION (TYP.)COBLE LINED RIFFLE SECTION
TO BE CONSTRUCTED AT THE
TIME OF SCM CONSTRUCTION
NOTE: AS-BUILT PROFILE STATION SHOWN DIFFERS FROM DESIGN STATIONING DUE TO
FIELD CHANGE IN CENTERLINE ALIGNMENT BETWEEN AS-BUILT STATION 1+30 TO 2+00
TREE LEGEND
C8.00
HLE18020-D1
RAS
KEG
N.T.S.
STREAMDETAILS
CLIENT
REVISIONS
PROJECT NO.HLE-18020
FILENAME
CHECKED BY
DRAWN BY
SCALE
DATE 05. 27. 2021
X:\Projects\HLE\HLE-18020\Storm\Stream Relocation\As-builts\Current Drawings\HLE18020-D1.dwg, 5/26/2021 11:22:07 AM, Garcia, KelliThe John R. McAdams Company, Inc.
2905 Meridian Parkway
Durham, NC 27713
phone 919. 361. 5000
fax 919. 361. 2269
license number: C-0293
www.mcadamsco.com
OLDE TOWNE - PHASE 1 SUBDIVISIONSTREAM RELOCATIONRECORD DRAWINGSRALEIGH, NORTH CAROLINASHEET
PLAN INFORMATION
HALLE BUILDING GROUP
56 HUNTER STREET, SUITE 110
APEX, NORTH CAROLINA 27502
PHONE: 919. 387. 1885
RECORD DRAWINGS
NOTES:
1.AREAS NOTED AS LIVE STAKES WITHIN THE PLANTING ZONE SHALL BE PLANTED WITH RIVER BIRCH (BETULA NIGRA).
2.ONE LIVE STAKE SPECIES PER LIVE STAKE AREA. ALTERNATE SPECIES PER LIVE STAKE AREA.
3.ALL LIVE STAKES SHALL BE DORMANT AT TIME OF ACQUISITION AND PLANTING.
4.LIVE STAKES SHALL BE 1/2-2” IN DIAMETER. LIVE STAKES SHALL ALSO BE 2 - 4 FEET IN LENGTH.
5.DURING PREPARATION, THE BASAL ENDS OF THE LIVE STAKES SHALL BE CLEANLY CUT AT AN ANGLE TO FACILITATE EASY INSERTION INTO THE SOIL, WHILE THE TOPS SHALL BE CUT SQUARE OR BLUNT FOR TAMPING. ALL LIMBS SHALL BE REMOVED FROM THE SIDES OF THE LIVE CUTTING PRIOR TO INSTALLATION.
6.CUTTINGS FOR LIVE STAKES SHALL BE HARVESTED IN A MANNER SUCH THAT THEY ARE CUT, IMMEDIATELY PUT INTO WATER TO BE SOAKED FOR 10 DAYS, AND THEN PLANTED IMMEDIATELY AFTER THE 10 DAYS ARE COMPLETED. CUTTINGS SHALL REMAIN WET UNTIL THEY ARE PLANTED. OUTSIDE STORAGE
LOCATIONS SHOULD BE CONTINUALLY SHADED AND PROTECTED FROM WIND AND DIRECT SUNLIGHT.
7.LIVE STAKES SHALL BE TAMPED AT AN ANGLE INTO THE GROUND SURFACE WITH A DEAD BLOW HAMMER, WITH BUDS ORIENTED IN AN UPWARD DIRECTION. STAKES SHOULD BE TAMPED UNTIL APPROXIMATELY 3/4 OF THE STAKE LENGTH IS WITHIN THE GROUND. ANY STAKES THAT ARE SPLIT OR DAMAGED
DURING INSTALLATION SHALL BE REMOVED AND REPLACED.
8.THE AREA AROUND EACH LIVE STAKE SHALL BE COMPACTED BY FOOT AFTER THE LIVE STAKE HAS BEEN INSTALLED.
9.ONE TO TWO INCHES SHALL BE CUT CLEANLY OFF OF THE TOP OF EACH LIVE STAKE (WITH LOPPERS) AT AN ANGLE OF APPROXIMATELY 15 DEGREES FOLLOWING INSTALLATION.
LIVE STAKE DETAIL
N.T.S.
GENERAL NOTES:
1.A LOG SILL MAY BE USED ALONE OR IN COMBINATION WITH A CONSTRUCTED RIFFLE.
2.AN ELEVATION CONTROL POINT SHALL BE DESIGNATED AT THE CENTER OF THE SILL TO ESTABLISH PART OF THE PROFILE. POOL ELEVATION CONTROL POINTS OR EXCAVATION TO A SPECIFIED MAXIMUM POOL DEPTH SHALL BE DESIGNATED TO ESTABLISH
THE REMAINING PROFILE. SURVEY OF CONTROL POINTS SHALL BE REQUIRED TO ESTABLISH ACCURATE INSTALLATION WITHIN THE TOLERANCE SPECIFIED BY THE DESIGNER.
3.NO PART OF THE SILL SHALL BE PLACED ABOVE THE ELEVATION OF THE STREAM BED.
4.REFER TO THE PLAN-PROFILE FOUND ON SHEETS C5.00 AND C5.01 FOR THE STATION LOCATIONS AND CONTROL POINT ELEVATIONS OF EACH LOG SILL SPECIFIED FOR THE PROJECT.
5.LOGS SHALL BE OF A LENGTH AND DIAMETER SPECIFIED BY THE DESIGNER AND BE ROT-RESISTANT, RELATIVELY STRAIGHT HARDWOOD, RECENTLY HARVESTED. THE LENGTH OF THE SILL EMBEDDED INTO EACH BANK SHALL EQUAL OR EXCEED THE
DIMENSIONS SHOWN IN SECTION B'-B' OF THIS DETAIL.
6.A SINGLE LOG MAY BE USED IN LIEU OF A HEADER/FOOTER LOG COMBINATION.
7.FILTER FABRIC OF A TYPE AND SIZE SPECIFIED BY THE DESIGNER SHALL BE USED TO SEAL THE GAPS BETWEEN THE LOG(S) AND THE STREAM BED, UNDER THE COARSE BACKFILL MATERIAL. THE FABRIC SHALL BE NAILED TO THE ENTIRE LENGTH HEADER LOG
USING A GALVANIZED NAIL WITH A PLASTIC CAP. THE SIZE AND GAGE OF NAIL AND NAIL SPACING SHALL BE SPECIFIED BY THE DESIGNER. THERE SHALL BE NO FILTER FABRIC VISIBLE IN THE FINISHED WORK; EDGES SHALL BE FOLDED, TUCKED, OR TRIMMED
AS NEEDED.
8.COARSE BACKFILL OF THE LOG SILL SHALL BE OF A TYPE, SIZE, AND GRADATION AS SPECIFIED BY THE DESIGNER. COARSE BACKFILL SHALL BE PLACED TO A THICKNESS EQUAL TO THE DEPTH OF THE HEADER (AND ANY FOOTER) LOGS AND SHALL EXTEND
UPSTREAM FROM THE SILL A DISTANCE SPECIFIED BY THE DESIGNER.
IN-STREAM LOG SILL DETAIL
CONSTRUCTION GUIDELINES:
1.STREAM SHALL BE DIVERTED AWAY FROM THE WORK AREA AND THE SITE SHALL BE DEWATERED.
2.OVER-EXCAVATE STREAM BED TO A DEPTH EQUAL TO THE TOTAL THICKNESS AND LENGTH OF THE HEADER (AND FOOTER IF SPECIFIED) LOGS.
3.PLACE FOOTER LOGS, IF SPECIFIED, PERPENDICULAR TO THE PROPOSED CHANNEL WITHIN THE EXCAVATED TRENCH. A LAYER OF BEDDING MATERIAL UNDER THE FOOTER LOG MAY BE SPECIFIED BY THE DESIGNER.
4.INSTALL HEADER LOG ON TOP OF THE FOOTER LOG. HEADER LOG MAY BE SET FORWARD OR BACK FROM FOOTER LOG AS AN OPTION. THE TOP OF THE HEADER LOG SHALL CONFORM TO THE STREAM BED ELEVATION AT THE LOCATION WHICH IT IS PLACED.
5.SECURE LOG(S) WITH ANCHORS AT MAXIMUM SPACING OF 2 FEET ON CENTER. ANCHORS SHALL BE 1
4" DIAMETER MINIMUM REBAR OR DRIFT PIN. ANCHOR MUST HAVE SUFFICIENT LENGTH TO PASS THROUGH BOTH LOGS AND ENTER THE GROUND AT LEAST
6 INCHES.
6.PLACE FILTER FABRIC BEHIND LOG SILL AND ALONG THE BOTTOM OF THE STREAM BED. NAIL FILTER FABRIC TO THE HEADER LOG.
7.PLACE COARSE BACKFILL BEHIND LOG(S) ENSURING THAT ANY VOIDS BETWEEN THE LOGS ARE FILLED.
8.TRIM ANY EXPOSED FILTER FABRIC AROUND THE SILL INSTALLATION. CHECK PROPER FUNCTINO/FLOW PATH BY OBSERVING FLOW OVER STRUCTURE. REPAIR AS NEEDED TO ENSURE PROPER FUNCTION.
9.ENSURE NO LEAKAGE/FLOW UNDER OR AROUND STRUCTURE BY PROPERLY GRADING, SEALING, AND COMPACTING UNDER AND AROUND THE STRUCTURE.
10.EROSION CONTROL BLANKET SHALL BE INSTALLED IN AREAS SHOWN ON THIS DETAIL AND IN COMPLIANCE WITH INSTALLATION INSTRUCTIONS ON THE EROSION CONTROL DETAIL ON SHEET C5.03.
N.T.S.
LOG SILL TOE
GENERAL NOTES:
1.NO PART OF THE SILL SHALL BE PLACED ABOVE THE ELEVATION OF THE STREAM BANK.
2.REFER TO THE PLAN-PROFILE FOUND ON SHEET C5.00 FOR THE STATION LOCATIONS AND ELEVATIONS OF EACH LOG SILL TOE SPECIFIED FOR THE PROJECT.
3.LOGS SHALL BE OF A LENGTH AND DIAMETER SPECIFIED BY THE DESIGNER AND BE ROT-RESISTANT, RELATIVELY STRAIGHT HARDWOOD, RECENTLY HARVESTED. THE LENGTH OF THE SILL EMBEDDED INTO EACH BANK SHALL EQUAL OR EXCEED THE DIMENSIONS SHOWN IN SECTION A'-A' OF THIS DETAIL.
CONSTRUCTION GUIDELINES:
1.STREAM SHALL BE DIVERTED AWAY FROM THE WORK AREA AND THE SITE SHALL BE DEWATERED.
2.OVER-EXCAVATE OLD STREAM BED TO A DEPTH EQUAL TO THE TOTAL THICKNESS AND LENGTH OF THE SPECIFIED LOGS.
3.PLACE LOG(S), PERPENDICULAR TO THE OLD CHANNEL WITHIN THE EXCAVATED TRENCH. A LAYER OF BEDDING MATERIAL UNDER THE FOOTER LOG MAY BE SPECIFIED BY THE DESIGNER.
4.THE TOP OF THE LOG SHALL CONFORM TO THE STREAM BED ELEVATION AT THE LOCATION WHICH IT IS PLACED.
5.SECURE LOG(S) WITH ANCHORS AT MAXIMUM SPACING OF 2 FEET ON CENTER. ANCHORS SHALL BE 1
4" DIAMETER MINIMUM REBAR OR DRIFT PIN. ANCHOR MUST HAVE SUFFICIENT LENGTH TO PASS THROUGH BOTH LOGS AND ENTER THE GROUND AT LEAST 6 INCHES.
6.CHECK PROPER FUNCTION/FLOW PATH BY OBSERVING FLOW PAST STRUCTURE. REPAIR AS NEEDED TO ENSURE PROPER FUNCTION.
7.ENSURE NO LEAKAGE/FLOW UNDER OR AROUND STRUCTURE BY PROPERLY GRADING, SEALING, AND COMPACTING UNDER AND AROUND THE STRUCTURE.
8.EROSION CONTROL BLANKET SHALL BE INSTALLED IN AREAS SHOWN ON THIS DETAIL AND IN COMPLIANCE WITH INSTALLATION INSTRUCTIONS ON THE EROSION CONTROL DETAIL ON SHEET C5.03.RECORD DR A W I N G S ON
L
Y
RECORD DRAWINGS ONLYAS-BUILT GENERAL NOTES:
1. ONLY THOSE ITEMS SHOWN ON THIS SHEET THAT ARE RED IN COLOR ARE AS-BUILT
VERIFIED. ALL OTHER INFORMATION ON THIS SHEET WAS TAKEN FROM THE
APPROVED DESIGN DRAWINGS AND SHOULD NOT BE TAKEN AS AS-BUILT
INFORMATION, BUT RATHER FOR GRAPHICAL PRESENTATION ONLY.
GRAPHIC SCALE
0 10 20 40
1 inch = 20 ft.
L5.00
UT TO BIG BRANCH
HLE18020-P1
1"=20'
SITE LEGEND
X:\Projects\HLE\HLE-18020\Storm\Stream Relocation\As-builts\Current Drawings\HLE18020-P1.dwg, 5/26/2021 11:13:51 AM, Garcia, KelliCLIENT REVISIONS
PROJECT NO.HLE-18020
FILENAME
DATE 05.27.2021
The John R. McAdams Company, Inc.
2905 Meridian Parkway
Durham, NC 27713
phone 919. 361. 5000
fax 919. 361. 2269
license number: C-0293, C-187
www.mcadamsco.com
PLAN INFORMATION
HALLE BUILDING GROUP
56 HUNTER STREET, SUITE 110
APEX, NORTH CAROLINA 27502
PHONE: 919. 387. 1885
RECORD DRAWINGS
OLDE TOWNE - PHASE 1 SUBDIVISION
STREAM RELOCATION
RECORD DRAWINGS
RALEIGH, NORTH CAROLINA
CHECKED BY
DRAWN BY
SCALE
KEG
RAS
TEMPORARY SEEDING SCHEDULE:
TEMPORARY SEEDING SHALL BE APPLIED AS NEEDED DURING CONSTRUCTION TO STABILIZE BARE OR DISTURBED AREAS OF SOIL AND AT
THE COMPLETION OR ALL GRADING AND EARTHWORK ACTIVITIES WITHIN A PARTICULAR AREA OF THE SITE. PERMANENT SEED MAY BE
DISTRIBUTED WITH TEMPORARY SEED UPON THE FINAL APPLICATION OF TEMPORARY SEED.
SEEDING DATE SEEDING MIXTURE APPLICATION RATE
AUG 15 - MAY 1 RYE (GRAIN) 30 LBS/AC
AUG 15 - MAY 1 WHEAT 30 LBS/AC
MAY 1 - AUG 15 GERMAN MILLET 10 LBS/AC
MAY 1 - AUG 15 BROWNTOP MILLET 10 LBS/AC
SEEDING METHODS
1.EVENLY APPLY SEED USING A CYCLONE SEEDER, DRILL, CULTIPACKER SEEDER, OR HYDROSEEDER. THIS MUST BE DONE WITHIN 48
HOURS OF LAND DISTURBING ACTIVITIES.
2.MULCH WITH CLEAN WHEAT STRAW.
3.AFTER SEEDING, APPLY MULCH TO AREAS UNDER HARSH CONDITIONS SUCH AS AREAS THAT HAVE BEEN GRADED, OR THOSE WHICH
WILL RECEIVE CONCENTRATED FLOWS. AREAS CONSIDERED TO BE UNDER HARSH CONDITIONS WILL BE CONSIDERED THE AREAS
GRADED FOR THE WETLAND VALLEY.
4.RESEED AND MULCH AREAS WHERE SEEDLING EMERGENCE IS LESS THAN 80% COVERAGE, OR WHERE EROSION OCCURS, AS SOON
AS POSSIBLE. DO NOT MOW. PROTECT FROM TRAFFIC AS MUCH AS POSSIBLE.
NOTES
1.TEMPORARY ANNUAL SEED SELECTION SHOULD BE BASED ON SEASON OF PROJECT INSTALLATION.
2.A SINGLE SPECIES FOR TEMPORARY COVER IS ACCEPTABLE
3.IN SOME CASES WHERE SEASONS OVERLAP, A MIXTURE OF TWO OR MORE SPECIES MAY BE NECESSARY. HOWEVER, APPLICATION
RATES SHOULD NOT EXCEED THE TOTAL RECOMMENDED RATE PER ACRE.
4.TEMPORARY SEED SHOULD BE MIXED AND APPLIED SIMULTANEOUSLY WITH THE PERMANENT SEED MIX IF OPTIMAL PLANTING
DATES ALLOW.
PERMANENT SEEDING SCHEDULE:
PLANT MATERIAL SELECTION
1.REFER TO TABLE 6.24C BELOW FOR APPROPRIATE SELECTIONS OF NATIVE PERMANENT SEEDS.
2.PERMANENT SEED INCLUSION IN THE MIXTURE SHOULD TOTAL 15 LBS OF PURE LIVE SEED (PLS) PER ACRE DRILLED OR 15-20 LBS
pls/AC BROADCAST APPLIED.
3.AT LEAST 4 SPECIES SHOULD BE SELECTED FOR THE MIXTURE INCLUDING ONE SPECIES FROM EACH TYPE (WARM SEASON, COLD
SEASON, WETLAND). SELECTION OF MORE THAN 4 SPECIES IS RECOMMENDED FOR INCREASING CHANCES OF SUCCESSFUL
VEGETATION ESTABLISHMENT.
4.IF OTHER SPECIES SUCH AS WILDFLOWERS ARE ADDED TO THE MIX, THEY SHOULD NOT BE COUNTED IN THE MINIMUM SEEDING
RATE FOR GRASSES.
SEEDBED PREPARATION
1.DISTURBED SOILS WITHIN RIPARIAN AREAS MUST BE AMENDED TO PROVIDE AN OPTIMUM ENVIRONMENT FOR SEED
GERMINATION AND SEEDLING GROWTH.
2.THE pH OF THE SOIL MUST BE SUCH THAT IT IS NOT TOXIC AND NUTRIENTS ARE AVAILABLE.
3.SOIL ANALYSIS SHOULD BE PERFORMED TO DETERMINE NUTRIENT AND LIME NEEDS OF EACH SITE.
4.APPROPRIATE pH LEVELS ARE BETWEEN 5.5 - 7.
5.RIPARIAN BUFFERS REGULATED FOR NUTRIENT MANAGEMENT MAY BE LIMITED TO A SINGLE APPLICATION OF FERTILIZER.
6.SUITABLE MECHANICAL MEANS SUCH AS DISKING, RAKING, OR HARROWING MUST BE EMPLOYED TO LOOSEN COMPACTED SOIL
PRIOR TO SEEDING.
PLANTING
1.APPLY SEED UNIFORMLY WITH A CYCLONE SEEDER, DROP-TYPE SPREADER, DRILL, OR HYDROSEEDER ON A FIRM, FRIABLE SEEDBED.
2.IN FINE SOILS, SEEDS SHOULD BE DRILLED 0.25 - 0.5 INCHES. IN COARSE SANDY SOILS, SEEDS SHOULD BE PLANTED NO DEEPER THAN
0.75 INCHES.
MULCH
1.MULCH ALL PLANTINGS IMMEDIATELY AFTER SEEDING.
2.IF PLANTING ON STREAM BANKS STEEPER THAN 10% OR AREAS SUBJECT TO FLOODING, A BIODEGRADABLE ROLLED EROSION
CONTROL PRODUCT IS RECOMMENDED TO HOLD SEED AND SOIL IN PLACE.
MAINTENANCE
1.THE RECOMMENDED PERMANENT GRASS SPECIES MAY REQUIRE TWO YEARS FOR ESTABLISHMENT, DEPENDING ON SITE
CONDITIONS.
2.INSPECT SEEDED AREAS FOR FAILURE AND MAKE NECESSARY REPAIRS, SOIL AMENDMENTS, AND RE-SEEDINGS.
3.IF WEEDY EXOTIC SPECIES HAVE TAKEN OVER THE AREAS AFTER THE FIRST GROWING SEASON, THE INVASIVE SPECIES MUST BE
ERADICATED TO ALLOW NATIVE SPECIES TO GROW.
4.MONITOR THE SITE UNTIL LONG-TERM STABILITY HAS BEEN ESTABLISHED.
SEEDBED PREPARATION
1.CHISEL COMPACTED AREAS AND SPREAD TOPSOIL 3-4 INCHES DEEP OVER ADVERSE SOIL CONDITIONS. TOPSOIL SHOULD BE
INCORPORATED INTO THE FINAL GRADING OF THE BASIN SIDE SLOPES AND SHALLOW LAND AND SHALLOW WATER AREAS.
CONTRACTOR SHOULD SCARIFY THE TOP 3-4 INCHES OF THE COMPACTED FILL TO PROMOTE BONDING WITH TOPSOIL.
2.RIP THE ENTIRE AREA TO 6 INCHES DEPTH.
3.REMOVE ALL LOOSE ROCK, ROOTS, AND OTHER OBSTRUCTIONS LEAVING SURFACE REASONABLY SMOOTH AND UNIFORM.
4.PER ONE TIME ONLY, APPLY AGRICULTURAL LIME, FERTILIZER, AND SUPERPHOSPHATE UNIFORMLY AND MIX WITH SOIL.
5.CONTINUE TILLAGE UNTIL A WELL-PULVERIZED, FIRM REASONABLY UNIFORM SEEDBED IS PREPARED 4 TO 6 INCHES DEEP.
6.SEED ON A FRESHLY PREPARED SEEDBED AND COVER.
7.ONCE SEED MIX HAS BEEN APPROPRIATELY APPLIED TO THE AREA, COVER WITH EROSION CONTROL BLANKET IMMEDIATELY (SEE
DETAIL SHEET C9.2).
8.INSPECT ALL SEEDED AREAS AND MAKE NECESSARY REPAIRS OR RESEEDINGS WITHIN THE PLANTING SEASON, IF POSSIBLE. AFTER
PERMANENT COVER IS ESTABLISHED.
9.CONSULT CONSERVATION INSPECTOR ON MAINTENANCE TREATMENT.
PLANTING INSTRUCTIONS
PLANTING TECHNIQUES
A.INSURE THAT ROOTS, ONCE REMOVED FROM POT, ARE STRAIGHTENED AND FACE DOWNWARD.
B.CREATE PLANTING AREA FOR EACH PLANT AND EXCAVATE PIT.
C.PLACE PLANTS IN PIT INSURING ROOTS ARE FACING COMPLETELY DOWNWARD.
D.HEEL IN SOIL AROUND PLANT AND PROCEED TO NEXT PLANTING LOCATION.
E.NEWLY PLANTED PLANTS NEED TO BE FASTENED TO THE SUBSTRATE FOR THE ESTABLISHMENT OF NEW ROOTS.
F.ROOTS SHALL BE SPREAD IN THEIR NORMAL POSITION. ALL BROKEN OR FRAYED ROOTS HALL BE CUT OFF CLEANLY.
G.THE DIAMETER OF THE PITS FOR ALL VEGETATIVE STOCK SHALL BE AT LEAST THREE TIMES THE DIAMETER OF THE ROOT MASS.
PLANT PIT WALL SHALL BE SCARIFIED PRIOR TO PLANT INSTALLATION.
H.SET THE PLANTS UPRIGHT, IN THE CENTER OF THE PIT. THE BOTTOM OF THE ROOT MASS SHOULD BE RESTING ON UNDISTURBED
SOIL.
I.PLACE THE BACKFILL AROUND THE BASE AND SIDES OF THE ROOT MASS, AND WORK EACH LAYER TO SETTLE BACKFILL AND TO
ELIMINATE VOIDS AND AIR POCKETS. WHEN PIT IS APPROXIMATELY 2/3 FULL, WATER THOROUGHLY BEFORE PLACING REMAINDER
OF THE BACKFILL. WATER AGAIN AFTER PLACING FINAL LAYER OF BACKFILL.
J.BROKEN OR DAMAGED PARTS WILL BE CUT BACK TO UNDAMAGED TISSUE, LEAVING AS MUCH GREEN BASAL TISSUE AS POSSIBLE
ABOVE THE ROOTS. IF MORE THAN FIFTY PERCENT (50%) OF THE PLANT IS DAMAGED THEN CONTRACTOR SHALL REPLACE THE
PLANT.
CONTAINER STOCK / BARE ROOT
A.STOCK SHALL HAVE BEEN GROWN IN A CONTAINER LONG ENOUGH FOR THE ROOT SYSTEM TO HAVE DEVELOPED SUFFICIENTLY TO
HOLD ITS SOIL TOGETHER ONCE REMOVED FROM THE CONTAINER.
B.CONTAINER PLANTS WILL NEED TO BE WATERED REGULARLY AND PLACED IN SHADY CONDITIONS UNTIL PLANTING OCCURS.
C.BARE ROOT PLANTS ARE FOR IMMEDIATE PLANTING, OTHERWISE SEE D) BELOW.
D.IF BARE ROOTS SPECIMENS ARE NOT TO BE PLANTED WITHIN FOUR (4) DAYS, TEMPORARY HOLDING OF BARE ROOT SPECIMENS
ARE TO BE COVERED ENTIRELY BY A SUITABLE MEDIUM (ETC. SOIL, SAWDUST, MULCH OR THE LIKE) AND WATERED REGULARLY SO
AS TO NOT DRY OUT.
PLANT LOCATIONS
A.NEW PLANTINGS SHALL BE LOCATED WHERE SHOWN ON PLAN EXCEPT WHERE CHANGES HAVE BEEN MADE IN PROPOSED
CONSTRUCTION.
B.NECESSARY ADJUSTMENTS SHALL BE MADE ONLY AFTER APPROVAL BY THE OWNER OR THE OWNER'S REPRESENTATIVE.
WATER
WATER SHALL BE POTABLE AND SHALL NOT CONTAIN ELEMENTS TOXIC TO PLANT LIFE.
PLANTING PLAN
WETLAND SEED MIX:
RECOMMENDED APPLICATION RATE: 20 TO 25 LBS PER ACRE
RIPARIAN BUFFER SEED MIX:
RECOMMENDED APPLICATION RATE: 20 TO 25 LBS PER ACRE
AS-BUILT GENERAL NOTES:
1. ONLY THOSE ITEMS SHOWN ON THIS SHEET THAT ARE RED IN COLOR ARE AS-BUILT
VERIFIED. ALL OTHER INFORMATION ON THIS SHEET WAS TAKEN FROM THE
APPROVED DESIGN DRAWINGS AND SHOULD NOT BE TAKEN AS AS-BUILT
INFORMATION, BUT RATHER FOR GRAPHICAL PRESENTATION ONLY.RECORD DR A W I N G S ON
L
Y
RECORD DRAWINGS ONLYTREE LEGEND