Loading...
HomeMy WebLinkAbout20130397 Ver 1_401 Application_20130413O�0� W ATE9OG 20130397 Office Use Only Corps action ID no DWQ project no Form Version 14 January 2009 Pre - Construction Notification (PCN) Form A. Applicant Information r 1. Processing 1a. Type(s) of approval sought from the Corps: ❑X Section 404 Permit ❑ Section i0 Permit 1b. Specify Nationwide Permit (NWP) number: 18 or General Permit (GP) number- 1c Has the NWP or GP number been verified by the Corps? ❑X Yes ❑ No 1d. Type(s) of approval sought from the DWQ (check all that apply): Q 401 Water Quality Certification — Regular ❑ Non -404 Jurisdictional General Permit ❑ 401 Water Quality Certification — Express ❑ Riparian Buffer Authorization 1 e Is this notification solely for the record because written approval is not required? For the record only for DWQ 401 Certification• ❑ Yes ❑X No For the record only for Corps Permit. ❑ Yes ❑X No' 1f Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts? If so, attach the acceptance letter from mitigation bank or in -lieu fee program. ❑ Yes ❑X No 1 g Is the project located in any of NC's twenty coastal counties If yes, answer 1 h below ❑X Yes ❑ No 1h. Is the project located within a NC DCM Area of Environmental Concern (AEC)? ❑ Yes Q No 2. Project Information 2a Name of project: 2b. County Beaufort county 2c Nearest municipality / town: Washington, NC 2d. Subdivision name: Riverwalk II 2e. NCDOT only, T I.P. or state project no. 3. Owner Information wig 3a Name(s) on Recorded Deed William Joseph Crocker Jr ARD 3b Deed Book and Page No. 013 3c Responsible Party (for LLC if applicable) D1rA K UAII 3d. Street address 38 Rrverwalk Drive anch 3e City, state, zip Washington, NC 27889 3f. Telephone no 252- 972 -1768 or 252 - 314 -2528 3g Fax no 3h Email address wicrockerir @suddenlink net Page 1 of 10 PCN Form — Version 1 4 January 2009 4. Applicant Information (if different from owner) 4a. Applicant is: ❑ Agent ❑ Other, specify: 4b. Name: 4c. Business name (if applicable): 4d. Street address: 4e. City, state, zip:., 4f. Telephon o ?: �. 4g. Fax no '� 8 4h. Email address: S. AgentlConsultant Information (if applicable) 5a. Name: 5b. Business name (if applicable): 5c. Street address: 5d. City, state, zip: 5e. Telephone no.: 5f. Fax no.: 5g. Email address: Page 2 of 10 B. Project Information and Prior Project History 1. Property Identification 1a Property identification no. (tax PIN or parcel ID): 6603 -47 -5186 lb Site coordinates (in decimal degrees): Latitude-35',4 q /. a s IV Longitude: &7 S 1c Property size .32, acres 2. Surface Waters 2a. Name of nearest body of water to proposed project* Pamlico River 2b Water Quality Classification of nearest receiving water: NSW SB ' 2c. River basin• Tar - Pamlico 3. Project Description 3a Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application Subdivision- Wetland backs up to foundation of house 3b List the total estimated acreage of all existing wetlands on the property: 0.34 Cacr t s 3c List the total estimated linear feet of all existing streams (intermittent and perennial) on the property 3d. Explain the purpose of the proposed project: Fill in wetland area close to house foundation 3e Describe the overall project in detail, including the type of equipment to be used- Fill material, topsoil and sand. Installing silt fence Planting grass seed. Equipment used will be dump truck for hauling fill in material 4. Jurisdictional Determinations 4a Have jurisdictional wetland or stream determinations by the Corps or State been requested or obtained for this property / project (including all prior phases) in the past? X❑ Yes ❑ No ❑ Unknown Comments 4b If the Corps made the jurisdictional determination, what type of determination was made? Preliminary ❑ Final 4c If yes, who delineated the jurisdictional areas? Name (if known)• William Wescott Agency /Consultant Company: Other- 4d. If yes, list the dates of the Corps jurisdictional determinations or State determinations and attach documentation. 5. Project History 5a Have permits or certifications been requested or obtained for this project (including all prior phase`s) in the past? Yes Q No El Unknown 5b If yes, explain in detail according to "help file" instructions 6. Future Project Plans 6a Is this a phased project? ❑ Yes ❑X No 6b If yes, explain Page 3 of 10 PCN Form — Version 1.4 January 2009 C. Proposed Impacts Inventory 1. Impacts Summary 1a. Which sections were completed below for your project (check all that apply): Q Wetlands ❑ Streams — tributaries ❑ Buffers ❑ Open Waters ❑ Pond Construction 2. Wetland Impacts If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted 2a. Wetland impact number Permanent (P) or Temporary 2b. Type of impact 2c. Type of wetland 2d. Forested 2e. Type of jurisdiction Corps (404,10) or DWO (401, other) 2f Area of i impact (acres) W1 P Fill q /You No Corps 004 W2 Choose one Choose one Yes /No W3 Choose one Choose one Yes /No W4 Choose one Choose one Yes /No I W5 Choose one Choose one Yes /No i W6 Choose one Choose one Yes /No 2g. Total Wetland Impacts: 004 2h Comments: 3. Stream Impacts If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this question for all stream sites impacted. 3a. Stream impact number Permanent (P) or Temporary (T) 3b. Type of impact 3c. Stream name 3d. Perennial (PER) or intermittent (INT)? 3e Type of jurisdiction 3f Average stream width (feet) 3g Impact length (linear feet) S1 Choose one S2 Choose one S3 Choose one S4 Choose one S5 Choose one S6 Choose one 3h Total stream and tributary impacts 3i Comments: Page 4 of 10 PCN Form — Version 1 4 January 2009 4. Open Water Impacts If there are proposed impacts to lakes, ponds, estuaries, tributaries, sounds, the Atlantic Ocean, or any other open water of the U S then indivii ually list all open water impacts below 4a 4b 4c 4d 4e. Open water Name of waterbody impact number (if applicable) Type of impact Waterbody Area of impact (acres) Permanent (P) or type Temporary T 01 Choose one Choose 02 Choose one Choose 03 Choose one Choose 04 Choose one Choose 4f. Total open water impacts 4g Comments 5. Pond or Lake Construction If pond or lake construction proposed, the complete the chart below 5a 5b. 5c 5d 5e Pond ID number Proposed use or Wetland Impacts (acres) Stream Impacts (feet) Upland purpose of pond (acres) Flooded Filled Excavated Flooded Filled Excavated P1 Choose one P2 Choose one 5f. Total: 5g Comments 5h Is a dam high hazard permit required* Yes No If yes, permit ID no 51 Expected pond surface area (acres) 5i Size of pond watershed (acres) 5k Method of construction, 6. Buffer Impacts (for DWQ) If project will impact a protected riparian buffer, then complete the chart below If yes, then individually list all buffer impacts below If any impacts require mitigation, then you MUST fill out Section D of this form 6a. Project is in which protected basin? ❑ Neuse Tar - Pamlico Catawba [] Randleman [3 Other 6b 6c 6d 6e. 6f 6g Buffer Impact Reason for impact Stream name Buffer Zone 1 Zone 2 number — mitigation impact impact Permanent (P) or required? (square (square Tem ora T feet feet 61 Yes /No Yes /No B2 63 Yes /No B4 Yes /No B5 Yes /No 66 Yes /No 6h Total Buffer Impacts: � 61 Comments I Page 5 of 10 D. Impact Justification and Mitigation 1. Avoidance and Minimization 1a Specifically describe measures taken to avoid or minimize the proposed impacts in designing project Minimum fill needed to protect foundation 1 b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques silt fence retain wall 2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State 2a Does the project require Compensatory Mitigation for impacts to Waters of the U.S. or Waters of the State ❑ Yes X❑ No 2b. If yes, mitigation is required by (check all that apply), ❑ DWQ ❑ Corps 2c If yes, which mitigation option will be used for this project? ❑ Mitigation bank ❑ Payment to in -lieu fee plogram ❑ Permittee Responsible Mitigation 3. Complete if Using a Mitigation Bank 3a Name of Mitigation Bank, 3b. Credits Purchased (attach receipt and letter) Type Choose one Type Choose one Type Choose one Quantity Quantity* Quantity 3c Comments 4. Complete if Making a Payment to In -lieu Fee Program 4a Approval letter from in -lieu fee program is attached ❑ Yes 4b Stream mitigation requested linear feet 4c If using stream mitigation, stream temperature. Choose one 4d. Buffer mitigation requested (DWQ only)- square feet 4e. Riparian wetland mitigation requested. acres 4f. Non - riparian wetland mitigation requested. acres 4g Coastal (tidal) wetland mitigation requested acres 4h Comments* 5. Complete if Using a Permittee Responsible Mitigation Plan 5a. If using a permittee responsible mitigation plan, provide a description of the proposed mitigation plan Page 6 of 10 PCN Form — Version 1 4 January 2009 6. Buffer Mitigation (State Regulated Riparian Buffer Rules) — required by DWQ 6a. Will the project result in an impact within a protected riparian buffer that requires buffer mitigation? ❑ Yes G 140 6b If yes, then identify the square feet of impact to each zone of the riparian buffer that requires mitigation. Calculate the amount of mitigation required. Zone 6c. Reason for impact 6d. Total impact (square feet) Multiplier r 6e. Required mitigation (square feet) Zone 1 3 (2 for Catawba) Zone 2 1.5 6f. Total buffer mitigation required: 6g If buffer mitigation is required, discuss what type of mitigation is proposed (e.g., payment to private mitigation bank, permittee responsible riparian buffer restoration, payment into an approved in -lieu fee fund). 6h. Comments Page 7 of 10 E. Stormwater Management and Diffuse Flow Plan (required by DWQ) 1. Diffuse Flow Plan la. Does the project include or is it adjacent to protected riparian buffers identified within one of the NC Riparian Buffer Protection Rules? Yes ❑x No 1b. If yes, then is a diffuse flow plan included? If no, explain why. ❑ Yes ❑ No 2. Stormwater Mana ement Plan 2a. What is the overall percent imperviousness of this project? 0 % 2b. Does this project require a Stormwater Management Plan? ❑ Yes No 2c. If this project DOES NOT require a Stormwater Management Plan, explain why: 2d. If this project DOES require a Stormwater Management Plan, then provide a brief, narrative description of the plan: 2e. Who will be responsible for the review of the Stormwater Management Plan? 3. Certified Local Government Stormwater Review 3a. In which local government's jurisdiction is this project? 3b. Which of the following locally - implemented stormwater management programs apply (check all that apply): ❑ Phase II ❑ NSW ❑ USMP ❑ Water Supply Watershed ❑ Other: 3c. Has the approved Stormwater Management Plan with proof of approval been attached? ❑ Yes ❑ No 4. DWQ Stormwater Program Review 4a. Which of the following state - implemented stormwater management programs apply (check all that apply): ®Coastal counties ❑HQW ❑ORW ❑Session Law 2006 -246 [-]Other: 4b. Has the approved Stormwater Management Plan with proof of approval been. attached? ❑ Yes ❑ No 5. DWQ 401 Unit Stormwater Review 5a. Does the Stormwater Management Plan meet the appropriate requirements? ® Yes ❑ No 5b. Have all of the 401 Unit submittal requirements been met? ® Yes ❑ No Page 8 of 10 PCN Form — Version 1.4 January 2009 F. Supplementary Information 1. Environmental Documentation (DWQ Requirement) 1 a. Does the project involve an expenditure of public (federal /state /local) funds or the ❑Yes �TVo use of public (federal /state) land? 1 b. If you answered "yes" to the above, does the project require preparation of an environmental document pursuant to the requirements of the National or State ❑ Yes ❑ No (North Carolina) Environmental Policy Act (NEPA/SEPA)? 1 c. If you answered "yes" to the above, has the document review been finalized by the State Clearing House? (If so, attach a copy of the NEPA or SEPA final approval letter.) ❑ Yes ❑ No Comments. 2. Violations (DWQ Requirement) 2a. Is the site in violation of DWQ Wetland Rules (15A NCAC 2H .0500), Isolated Wetland Rules (15A NCAC 2H 1300), DWQ Surface Water or Wetland Standards, ❑ Yes No or Riparian Buffer Rules (15A NCAC 2B.0200)? 2b. Is this an after - the -fact permit application? ❑ Yes Q No 2c If you answered "yes" to one or both of the above questions, provide an explanation of the violation(s): 3. Cumulative Impacts (DWQ Requirement) 3a Will this project (based on past and reasonably anticipated future impacts) result in C1 Yes ONo additional development, which could impact nearby downstream water quality? 3b. If you answered "yes" to the above, submit a qualitative or quantitative cumulative impact analysis in accordance with the most recent DWQ policy. If you answered "no," provide a short narrative description. 4. Sewage Disposal (DWQ Requirement) 4a. Clearly detail the ultimate treatment methods and disposition (non- discharge or discharge) of wastewater generated from the proposed project, or available capacity of the subject facility. on g,+c saPiic. sys+e ") Page 9 of 10 PCN Form — Version 1.4 January 2009 5. Endangered Species and Designated Critical Habitat (Corps Requirement) 5a. Will this project occur in or near an area with federally protected species or ❑ Yes Q No habitat? 5b. Have you checked with the USFWS concerning Endangered Species Act ❑ Yes ❑X No impacts? 5c. If yes, indicate the USFWS Field Office you have contacted. 5d. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? Subdivision documents did not identify any list species or their habitat. 6. Essential Fish Habitat (Corps Requirement) 6a. Will this project occur in or near an area designated as essential fish habitat? ❑ Yes x❑ No 6b. What data sources did you use to determine whether your site would impact Essential Fish Habitat? No impacts to open water. 7. Historic or Prehistoric Cultural Resources (Corps Requirement) 7a. Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation ❑ Yes x❑ No status (e.g., National Historic Trust designation or properties significant in North Carolina history and archaeology)? 7b. What data sources did you use to determine whether your site would impact historic or archeological resources? Subdivision documents did not identify that it would impact historic or archeological resources. 8. Flood Zone Designation (Corps Requirement) 8a. Will this project occur in a FEMA- designated 100 -year floodplain? ❑X Yes ❑ No 8b. If yes, explain how project meets FEMA requirements: Filling of 0 04 acres of wetlands will not result in Increased flooding on adjacent areas. 8c. What source(s) did you use to make the floodplain determination? FEMA Flood plan map Applicant/Agent's Printed Name A licant/Agent's Signature Date (Agent's signature is valid only if an authorization letter from the applicant is provided.) Page 10 of 10 :[STING IRON PIPE N 06 35 33 W- 12.34' C1 C2 C3 I ST I NG IRON ROD N 80 49 41 E -1 1 , 58' R= 235.15' R= 235.15' R= 250.81' W IRON STAKE A = 7 °39'50" A = 24 °05'16" A = 02 °56'04" 1 POINT SET L= 31.45' L= 98.86' L= 12.85' CORNER BULKHEAD CH= N26 °21'29 "W CH= N42 °13'40 "W CH= N52 °48'17 "W GHT -OF -WAY 31.43' 98,13' 12.84' IER POLE XISTING RAILROAD \ C4 C5 C6 E 0 ?207 °44'40" ZS 300.81' 2 °28'36" A 322 °02'30" ENNEAD UTILITY L= 121.45' L= 65.50' L= 115.72' = TELEPHONE PEDESTAL KNEAD CH= N37 °30'25 "W CH= S25 °29'50 "E CH= S42 °45'23 "E TROL CORNER -- - _______ � 119.98' 65.37' 115,01' RiW S� PERTY LINE T T TO SCALE // -' -� j C7 C8 C9 XISTING PARKER KALON NAIL tP$ f3j3) �, 06 R= 300.81' R= 185.15' R =- 185,15' _ A = 0 29'47 0 = 26 °41 41 0 - 5 03'25' -El5 E P is1i2.54'20 "E / /Pp S L= 2.61' L= 86.26' L= 16.34' 15,89' 77'(707) IS ^ 60, RyF� CH= 554 °01'30 "E CH= S40 °55'26 "E CH= S25 °03'45 BLDG BY OTHERS 10.26' t t. 0 •� �oAR� 1�! 2.60' 85.49' 16.34' ENCROACHES A MAX OF 5.6' S•3Q'' % EDGE OF GRAVEL 21 53' " ",R'w \4,e4i S (WETLAND LINE) 4� N24.2? 40'E „� SS \ F FS 4j I ' 2 C -1 e5.37 & �.�• _ e•, R,. 94 ?' NOTE: THIS MAP SUPERSEDES MAP OF 61 6.44' 39 "w NP o ale �• ,� �• ^ „� " � ?�„ . � ,o 'j'04 d� DIVISION RECOKOED IN PLAT CAB I NE a; .r- ,r ? tL (C5 9 D 9) ` t p D�3 A 'i. ,�„ 9' ? 37 F p� aS1�.�ia1` r3 104 a`+r �`+� '�,�• 9• ,,\ O� •... '0\4 � P WETLANOS - -2 a»`ia'�` O / ,r ,, te 0. iQ v 524\13'54' -19'0 RIVEPWALK DRIV �o�° 2 51,35', '10 PR 50 R/W \ �. _ S79. 01'51 "E / PILINGS 8t• OTHERS /C� �� 3Y ' D -1 PRIVATE �0 �� „_�• 123 42.95' 2 ENCROACH A MAX OF 2.9' P a� / ® 1 + k 554.1 ' 25 "E °�' � - ;;�• 'k- �• 93 Is $B4. m / C 301 53-79 ¢ �y ,r" 46' 53 "E 16 C7 yy'� 0 D1 17 a. O 1 ti0 may"` ,rte .w- 171.48' Is t ,r alir r ,r '�` r n. EIS SWAN POINT �' / M ryo a %� t e do 'k ` �• y. y` 404 y1 ^ \ i1 S5 10' WATERL IN ■. 'ra. "' WETLANDS 4 ,'�`�+� '�`• 3 25 �9 EASEMENTa.a ,r +� �" IPA (4.0477 AC) N A3 i 6 A3,_ 2e �. 21 \. `' 2 : 404 WETLANDS LINE �' '" �.- / o 1)S °3 a3Y o �4a A 7 23 C 9') 6 ? ' 32 a • s ,r " N22' 31 ' 1 9 "W 3 "/ �rE. 3 . 4' p ,rW, At8 y1 O'er D22 109.03' ,r ,r r ac a` - �a1cr olpi 4. R I V E R W A L K / " Wes~ 3 /" ��`� A20 A17oj \a S8 t ' 03' 58 "w �+ i J . ? \ / 35r g, ,rA19 N 23 127.69' ( TOT) LANEs�� A3CL.t'F ,r ,r A16 \�r D24 r r'• ,ra` y.,�` y�,. y� �,r /3 py / A -V.3 A37 Q "` 6`,i ^ 26 a• 50 R / W \ v / -- UPLANDS .� ^ 1 - 1 '�'''i`"54 a'k'�` rJ1t ray �'i` +�'r +�'1c a'ki•'i` � it A, A 0 8 \� D2 ar ,r +ra• +k'„ agar a�cn` y.'n a4'ic ale ale a4 ,3 PRIVATE / ,r ,r cvQ 82 OOHS ,r >A 7 y `� E 1 P E I S+•,r y,�,,r,r,r ^ 5. h4 A41 a, yr,r a. N c0 3„P A 7 5 ' t^ 6.2 '�`'i` ,'i`i`'n a'ri'l` ya'.'r• ,'� as y'i`,+n y'i',+r+r '� N E T L A N D A45 a. 42 ,ter a`;r P O O�In O I 15.1 All NT 409 ry' A4P ,r ` <;� r. B n�r'n t3 A14 AT 6 y0y C A° A4 "` W a�i." Z 1 AZEBO AS A8 '°v. PS 'rte mar ac a �l 8.00' /M / A4 A 0� ,r a. A72 y° t 3601 \ \ 80.86' )y AL 8.44' NPS 569 °'I / 014�0� 4040 ,�. ,�i A10 ^. \ \ s'i` +M4 5.17' °)' 16 36 F WETLANDS A5 h° TiAaDS$kl -ilk -I P 0.72' v / �2, 93 rp ,� �� Az s 5� \ \, RIVERWALK DRIVE PP rl LINE A51 `"•'�'� A- t>� 2 '' • 6.46 6. t 2' - / A6 A5 A56 ;r� �• �• � s +r 1 AC NP NPS (EX 30 PRIVATE R/W GRAVEL ) ps REF : PC E SLIDE °C o 1.93 m' Q� /PEO C1 /^� A61 4 5453_+k2•y °'r 'p OIt, 0 ` \ 38 -5 \ SEE NOTE 4. / WHICH ARE SPECIFIED AS BUILDING LOTS A6,��� „L PAGE PLAT ,AND THAT I(WE) HEREBY SERVED BY INDIVIDUAL SEPTIC TANK REGULATIONS DESCRIBED BY SUBDIVISION ORDIANCE OF BEAUFORT Co / ADOPT THIS PLAN OF SUBDIVISION ry COUNTY. AND THE NUMBER OF LOTS HAS NOT INCREASED AND THE ,�• AS REQUIRED BY THIS ORDINANCE, ESTABLISH THE MINIMUM BUILDING X51 o° ; A65 A64 64a` Wo WETLANDS "' - o �`(2, 01 77 AC °"` �• E I P, ''` `�+0 ` `� RIVER WALK DIVISION / a /0/8478 AC A66 0. M. � '/ Ark-16 co,°, ACC ,� Q `.` n COASTAL � PC E. SL 1 DE 38 -5 BACK REF: PC E. SLIDE 1 -5 p 4 A SHALL BE VALID FOR A PERIOD PRESCRIBED / O ,r �, by �'�'(h ,� �� BY CURRENT RULES AND SUBJECT TO THE ELBERT L. BANKS 4 P / lb / Q xousE A68N2� F A69 a llffiN °' 'r AyA(a� ,r ^ 1 LINE \ DB 1371. PG 504 J / Gj 1 'REM /6} A7 �& ar ^ LAMA P 1 AINDER A7, ,r "'' .r CAMAA 45+r ^ 1 OF WILLIAM K. S / MCLAUGHLIN 251 A73 A72 'r 52.53.00 '` NPS NPS t4NP0S1 ,r �(4Q19 ,.* / OB 911, PG 295 CORB CORE CORBH AMA pAMA 3" END NPS MIS 50.02'00 "E CORE t 35 20. �' 5.69' \ ,° No Al / 141 cb ^^ COR DR ORBH N NP 7) 8 ps 1ETLANDS �O ry • 6' 10.6352 AC ,4 536.14'06 "W t NIS i1 yh / X21 / 7'90' NP 20.00' / PROPERTY OF DEWARD H. & POINT ALONG / THE WATER'S EDGE S32 ?14'07 "W Is y ' LORENE P. SMITH / AREA OF 23.66' NPSN PS CONCERN.EMEAS MEASURED 75' DB 91 1 . PG 290 (MAP) A FROM EDGE OF WATER / A ^^ P 'PERMIT ZONE' N LICp R IP CC(320) / / WILLIAM R. /KENNETH H. N. 67' 53 "E CARPENTER 1 M,9.6', DB�9910 SPG iii' / DB 1515. PG 819 7 " GAZEBO EDGE OF W4 50 0 100 200 '� REVISED 9 -12 -07 (COUNTY HEALTH CERT) I REVISED 9 -13 -07 (SUED APPROVAL CERT) CHIC SCALE- 1" • 100' ^^ REVISED 1 -27 -12 (ACCESS EASEMENT LOTS E AND F. DETAIL) REVISED 2 -20 -12 (ACCESS EASEMENT LOT D. SURVEY CERT) REVISED 1 -25 -13 (REDUCED NUMBER OF LOTS) OWNERSHIP AND D I ED CA T 6. 7. 8. 9. 404 WETLANDS (I 404 WETLANDS ( COASTAL WETLANI UPLANDS 1: 0.01 UPLANDS 2: 0.01 LOT A: 1.6745 LOT B: 1.3189 LOT C: 1.9377 LOT D: 4.1043 . JURISDICTION OF BEAUFORT COUNTY, IMPROVEME S PERMIT. THIS rERTIFICATION DOES NO ONSTITUTE "BLYqKET APPROVAL" OF ALL T 1 E SU 410N. )PROVED•DTB % ATE' 1 -26-12 BE ORT COU Y H T DIRECTOR OWN R(S) 0 DESIGNEE W 0 S ALL BE AN AUTHORIZED AGE F jHEL TE DATE ,ALE: 1" • 100' DATE �'��i /-� 3 V Y T I(• CA Y.I. J4 6 r- o G fc1 q 1 0 V Y V co T co 0 bO3_ q-7- APR 15 2013 ci o pyof 04 � - WA a U BraTMrui► -11 ION BEAUFORT COUNTY HEALTH CERTIFICATION SUBDIVISION APPROVAL CERTIFICATION I 0 N I (WE) CERTIFY THAT I AM (WE ARE) THE OWNER(S) OF THE PROPERTY SHOWN I HEREBY CERTIFY THAT THE SUBDIVISION ENTITLED LOT 6, RIVER WALK DIVISION THIS PLAT CREATES A RECOMBINATION OF AND DESCRIBED HEREON CONSISTS OF EIGHT (8) LOTS, SEVEN (7) OF EXISTING PARCELS OR PORTIONS OF EXISTING WHICH WAS CONVEYED TO ME (US) BY DEED RECORDED IN BOOK SEE WHICH ARE SPECIFIED AS BUILDING LOTS PARCEL Of LANG AND IS NOT SUBJECT TO PAGE PLAT ,AND THAT I(WE) HEREBY SERVED BY INDIVIDUAL SEPTIC TANK REGULATIONS DESCRIBED BY SUBDIVISION ORDIANCE OF BEAUFORT REGISTRY ADOPT THIS PLAN OF SUBDIVISION SYSTEMS EACH BUILDING LOT WAS PROVIDED WITH PROPER APPLICATION, COUNTY. AND THE NUMBER OF LOTS HAS NOT INCREASED AND THE N.C. AS REQUIRED BY THIS ORDINANCE, ESTABLISH THE MINIMUM BUILDING EVALUATION AND IMPROVEMENTS RESULTANTS LOTS ARE EQUAL TO OR EXCEEDS LINES, AND DEDICATE ALL DRAINAGE PERMIT FOR AN INDIVIDUAL SEPTIC TANK THE REOUIREMENTS OF BEAUFORT COUNTY. WAYS AND OTHER OPEN SPACES TO SYSTEM PURSUANT TO THE GENERAL PUBLIC OR PRIVATE USE AS NOTED. STATUTES NORTH CAROLINA AND FURTHER, I (WE) CERTIFY THAT THE A SHALL BE VALID FOR A PERIOD PRESCRIBED LAND AS SHOWN HEREON IS WITHIN BY CURRENT RULES AND SUBJECT TO THE JJ J SUBDIVISION ADMINISTtfATOR DATE THE SUBDIVISION REGULATION THE SET FORTH ON THE JURISDICTION OF BEAUFORT COUNTY, IMPROVEME S PERMIT. THIS rERTIFICATION DOES NO ONSTITUTE "BLYqKET APPROVAL" OF ALL T 1 E SU 410N. )PROVED•DTB % ATE' 1 -26-12 BE ORT COU Y H T DIRECTOR OWN R(S) 0 DESIGNEE W 0 S ALL BE AN AUTHORIZED AGE F jHEL TE DATE ,ALE: 1" • 100' DATE �'��i /-� 3 V Y T I(• CA Y.I. J4 6 r- o G fc1 q 1 0 V Y V co T co 0 bO3_ q-7- APR 15 2013 ci o pyof 04 � - WA a U BraTMrui► -11 v6t