Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
960182_Waste Utilization Plan_20210518 (2)
Emergency Action Plan This plan will be implemented in the event that wastes from your operations are leaking, overflowing, or running off the site. You should NOT wait until wastes reach surface waters or leave your property to consider that you have a problem. You should make every effort to ensure that this does not happen. This plan should be available to all employees at the facility, as accidents, leaks, and breaks can happen at any time. 1) Stop the release of wastes. Depending on the situation, this may or may not be possible. Suggested responses to problems are listed below: a) Lagoon overflow: • add soil to the berm to increase the elevation of the dam • pump wastes to fields at an acceptable rate • stop all additional flow to the lagoon (waterers) • call a pumping contractor • make sure no surface water is entering the lagoon Note: These activities should be started when your lagoon level has exceeded the temporary storage level. b) Runoff from waste application field: • immediately stop waste application • create a temporary diversion or berm to contain the waste on the field • incorporate waste to reduce further runoff c) Leaking from the waste distribution system: • pipes and sprinklers: 3 stop recycle (flushing system) pump © stop irrigation pump © close valves to eliminate further discharge © separate pipes to create an air gap and stop flow • flush system, houses, solids separators: stop recycle (flushing system) pump © stop irrigation pump © make sure no siphon effect has been created © separate pipes to create an air gap and stop flow d) Leakage from base or sidewall of the lagoon. Often these are seepage as opposed to flowing leaks: • dig a small well or ditch to catch all seepage, put in a submersible pump, and pump back into the lagoon • if holes are caused by burrowing animals, trap or remove animals and fill holes and compact with a clay type soil. • other holes may be likewise temporarily plugged with clay soil. Note: For permanent repair measures, lagoon problems require the consultation of an individual experienced in their design and installation. 2) Assess the extent of the spill and note any obvious damages. a) Did the waste reach any surface waters? b) Approximately how much was released and for what duration? c) Any damage noted, such as employee injury, fish kills, or property damage? Contact appropriate agencies. a) During normal business hours, call your DWQ regional office: (919) 946-6481 ; after hours, emergency number: (919) 733-3942. Your phone call should include: your name, facility, telephone number, the details of the incident, the exact location of the facility, and the location or direction of movement of the spill, weather and wind conditions, what corrective measures have been taken, and the seriousness of the situation. b) If the spill leaves the property or enters surface waters, call the local EMS: 731-1413 . c) Instruct EMS to contact the local Health Department: 731-1174 d) Contact CES: 731-1520 local MRCS office: 731-1532 and your integrator: 4) Implement procedures as advised by DWQ and technical assistance agencies to rectify the damage, repair the system, and reassess the waste management plan to keep problems with release of wastes from happening again. 5) Contact contract pumping and/or irrigation equipment companies: a) b) c) 6) Contact dirt moving and/or heavy equipment companies: a) b) c)