HomeMy WebLinkAboutWQ0042524_Application (FTSE)_20210514Shaping the Environment
Realizing the Possibilities
Land Planning
Landscape Architecture
Civil Engineering
Urban Design
200 South Tryon Street, Suite 1400 Charlotte, NC 28202
p+704 376 1555 f+704 376 7851 url+ www.colejeneststone.com
RECEIVED/NCDEQ/DWR
MAY 14 2O 1
WORDS
Date: May 13, 202'MOORESVILLE REGIONAL OFFICE
Reference: 4692 — Brooklyn Village South
Attention: Mr. Corey Basinger
Company: NCDEQ
610 E. Center Avenue, Suite 301
Mooresville, NC 28115
We Are
Transmitting:
Charlotte
Raleigh
TRANSMITTAL
Tel: 704-663-1699
Fax:
4 Herewith El Under Separate Cover
Copies
Dated
Description
2
05/12/21
FTA 04-16 Fast Track Application
1
05/13/21
Application Fee ($480.00)
2
09/29/16
LLC Registration
2
04/19/21
Flow Tracking/Acceptance Form
2
-
USGS Map
2
-
Aerial Map
2
05/12/21
Developer's Operational Agreement
Transmitted Via: ❑ Mail ® Overnight
0 Courier
0 Hand Delivery
❑ Pick -Up
® For Approval El For Your Use 0 As Requested ❑ For Review
Remarks: The attached documents are submitted for approval of a private gravity
sewer extension permit to serve the Brooklyn Village South development
in Charlotte, NC. The proposed mixed -use development will include
multi -family residential, office, retail, hotel and restaurant uses as
itemized in the application.
By:
cc:
R. Todd Fisher, PE
Mr. Marshall Giles, RLA — CJS
Mr. Monte Ritchey — Conformity Corp.
P:\IDIkPROJ\50366\_Ierrespaideeta\2116\Trani®I I lair
Division of Water Re
CEIVED/NCDEO/;
MAY 14 2021
State of North Carolina
Department of Environmental Quality
Division of Water Resources
I,$,9,,QSAC 02T .0300 — FAST TRACK SEWER SYSTEM EXTENSION APPLICATION
b?SVILLE REGIONAL OFFICE FTA 04-16 & SUPPORTING DOCUMENTATION
Application Number:
(to be completed by DWR)
All items must be completed or the application will be returned
I. APPLICANT INFORMATION:
1. Applicant's name: BK Partners, LLC (company, municipality, HOA, utility, etc.)
2. Applicant type: ❑ Individual ® Corporation ❑ General Partnership
❑ Federal ❑ State/County ❑ Municipal
3. Signature authority's name: R. Don Peebles per 15A NCAC 02T .0106(b)
Title: Managing Member
4. Applicant's mailing address: 5937 Collins Avenue
City: Miami State: FL Zip: 33140-
5. Applicant's contact information:
Phone number: (305) 993-5050 Email Address: rdpceo@peeblescorp.com
II. PROJECT INFORMATION:
1. Project name: Brooklyn Village South
2. Application/Project status:
RECEIVED/NCDEQ/DWR
MAY 14 2021
MOORESVILWQROS
LE REGIONAL OFFIC
❑ Privately -Owned Public Utility
❑ Other
® Proposed (New Permit) ❑ Existing Permit/Project
If a modification, provide the existing permit number: WQ00 and issued date:
If new construction but part of a master plan, provide the existing permit number: WQ00
3. County where project is located: Mecklenburg
4. Approximate Coordinates (Decimal Degrees): Latitude: 35.2169° Longitude: -80.8419°
5.
Parcel ID (if applicable): 125-17-101, 125-17-103
(or Parcel ID to closest downstream sewer)
III. CONSULTANT INFORMATION:
1. Professional Engineer: R. Todd Fisher License Number: 025163
Firm: Bolton & Menk, Inc., d.b.a. ColeJenest & Stone
Mailing address: 200 S. Tryon Street, Suite 1400
City: Charlotte State: NC Zip: 28202-
Phone number: (704) 376-1555 Email Address: tfisher@colejeneststone.com
IV. WASTEWATER TREATMENT FACILITY (WWTF) INFORMATION:
1. Facility Name: Sugar Creek WWTP Permit Number: NC0024937
Owner Name: Charlotte Water
V. RECEIVING DOWNSTREAM SEWER INFORMATION (if different than WWTF):
1. Permit Number(s): WQ Downstream (Receiving) Sewer Size: 48 inch
System Wide Collection System Permit Number(s) (if applicable): WQCS
Owner Name(s): Charlotte Water
FORM: FTA 04-16 Page 1 of 5
VI. GENERAL REQUIREMENTS
1. If the Applicant is a Privately -Owned Public Utility, has a Certificate of Public Convenience and Necessity been attached?
❑ Yes ❑No r/N/A
2. If the Applicant is a Developer of lots to be sold, has a Developer's Operational Agreement (FORM: DEV) been attached?
® Yes ❑No ❑N/A
3. If the Applicant is a Home/Property Owners' Association, has an Operational Agreement (FORM: HOA) been attached?
❑ Yes ❑No ®N/A
4. Origin of wastewater: (check all that apply):
❑ Residential Owned
® Residential Leased
❑ School / preschool / day care
® Food and drink facilities
® Businesses / offices / factories
® Retail (stores, centers, malls)
® Retail with food preparation/service
❑ Medical / dental / veterinary facilities
❑ Church
El Nursing Home
5. Nature of wastewater : 100 % Domestic/Commercial % Commercial
% Industrial (See 15A NCAC 02T .0103(20))
>Is there a Pretreatment Program in effect?
6. Has a flow reduction been approved under I5A NCAC 02T .01 14(f)? ❑ Yes
➢ If yes, provide a copy of flow reduction approval letter
7. Summarize wastewater generated by project:
El Car Wash
® Hotel and/or Motels
❑ Swimming Pool /Clubhouse
El Swimming Pool/Filter Backwash
El Other (Explain in Attachment)
❑ Yes ❑ No
® No
Establishment Type (see 02T.0114(f))
Daily Design Flow a,b
No. of Units
Flow
Residential Apartment
135 gal/unit
646
87,210 GPD
Office
25 gal/employee
2,322
58,050 GPD
Retail
100 gal/1000 SF
31,300
3,130 GPD
Hotel
120 gal/room
150
18,000 GPD
Restaurant
40 gal/seat
1,566
62,640 GPD
gal/
GPD
Total
229,030 GPD
a See 15A NCAC 02T .0114(b), (d), (e)(1) and (e)(2) for caveats to wastewater design flow rates (i.e., minimum flow per
dwelling; proposed unknown non-residential development uses; public access facilities located near high public use areas;
and residential property located south or east of the Atlantic Intracoastal Waterway to be used as vacation rentals as defined
in G.S. 42A-4).
b Per 15A NCAC 02T .0114(c), design flow rates for establishments not identified [in table 15A NCAC 02T.01 14] shall be
determined using available flow data, water using fixtures, occupancy or operation patterns, and other measured data.
8. Wastewater generated by project: 229,030 GPD (per 15A NCAC 02T .0114)
➢ Do not include future flows or previously permitted allocations
If permitted flow is zero, indicate why:
❑ Pump Station or Gravity Sewer where flow will be permitted in subsequent permits that connect to this line
❑ Flow has already been allocated in Permit Number:
❑ Rehabilitation or replacement of existing sewer with no new flow expected
El Other (Explain):
FORM: FTA 04-16
Page 2 of 5
VII. GRAVITY SEWER DESIGN CRITERIA (If Applicable) - 02T .0305 & MDC (Gravity Sewers):
1. Summarize gravity sewer to be permitted:
Size (inches)
Length (feet)
Material
8
428
PVC
➢ Section II & III of the MDC for Permitting of Gravity Sewers contains information related to design criteria
➢ Section III contains information related to minimum slopes for gravity sewer(s)
➢ Oversizing lines to meet minimum slope requirement is not allowed and a violation of the MDC
VIII PUMP STATION DESIGN CRITERIA (If Applicable) — 02T .0305 & MDC (Pump Stations/Force Mains):
COMPLETE FOR EACH PUMP STATION INCLUDED IN THIS PROJECT
1. Pump station number or name:
2. Approximate Coordinates (Decimal Degrees): Latitude: . Longitude: -
3. Design flow of the pump station: millions gallons per day (firm capacity)
4. Operational point(s) of the pump(s): gallons per minute at feet total dynamic head (TDH)
5. Summarize the force main to be permitted (for this Pump Station):
Size (inches)
Length (feet)
Material
6. Power reliability in accordance with 15A NCAC 02T .0305(h)(1):
❑ Standby power source or pump with automatic activation and telemetry - 15A NCAC 02T .0305(h)(1)(B)_
➢ Required for all pump stations with an average daily flow greater than or equal to 15,000 gallons per day
➢ Must be permanent to facility
Or if the pump station has an average daily flow less than 15,000 gallons per day:
Cl Portable power source with manual activation, quick -connection receptacle and telemetry - 15A NCAC 02T
.0305(h)(1)(C)
or
❑ Portable pumping unit with plugged emergency pump connection and telemetry - 15A NCAC 02T .0305(h)(1)(C):
➢ It shall be demonstrated to the Division that the portable source is owned or contracted by the applicant (draft agreement)
and is compatible with the station.
➢ If the portable power source or pump is dedicated to multiple pump stations, an evaluation of all the pump stations' storage
capacities and the rotation schedule of the portable power source or pump, including travel timeframes, shall be provided
in the case of a multiple station power outage.
FORM: FTA 04-16 Page 3 of 5
IX. SETBACKS & SEPARATIONS — (02B .0200 & 15A NCAC 02T .0305(f)):
1. Does the project comply with all separations found in 15A NCAC 02T .0305(f) & (g)
➢ 15A NCAC 02T.0305(f) contains minimum separations that shall be provided for sewer systems:
® Yes ❑ No
Setback Parameter*
Separation Required
Storm sewers and other utilities not listed below (vertical)
24 inches
Water mains (vertical -water over sewer including in benched trenches)
18 inches
Water mains (horizontal)
10 feet
Reclaimed water lines (vertical - reclaimed over sewer)
18 inches
Reclaimed water lines (horizontal - reclaimed over sewer)
2 feet
**Any private or public water supply source, including any wells, WS-I waters of Class I or
Class II impounded reservoirs used as a source of drinking water
100 feet
**Waters classified WS (except WS-I or WS-V), B, SA, ORW, HQW, or SB from normal
high water (or tide elevation) and wetlands (see item IX.2)
50 feet
**Any other stream, lake, impoundment, or ground water lowering and surface drainage
ditches
10 feet
Any building foundation
5 feet
Any basement
10 feet
Top slope of embankment or cuts of 2 feet or more vertical height
10 feet
Drainage systems and interceptor drains
5 feet
Any swimming pools
10 feet
Final earth grade (vertical)
36 inches
➢ 15A NCAC 02T.0305(g) contains alternatives where separations in 02T.0305(f) cannot be achieved.
➢ **Stream classifications can be identified using the Division's NC Surface Water Classifications webpage
➢ if noncompliance with 02T.0305(f) or (g), see Section X of this application
2. Does the project comply with separation requirements for wetlands? (50 feet of separation) ❑ Yes ❑ No ® N/A
➢ See the Division's draft separation requirements for situations where separation cannot be meet
➢ No variance is required if the alternative design criteria specified is utilized in design and construction
➢ As built documents should reference the location of areas effected
3. Does the project comply with setbacks found in the river basin rules per 15A NCAC 02B .0200? ❑ Yes ❑ No ® N/A
➢ This would include Trout Buffered Streams per 15A NCAC 2B.0202
4. Does the project require coverage/authorization under a 404 Nationwide or
individual permits or 401 Water Quality Certifications?
➢ Information can be obtained from the 401 & Buffer Permitting Branch
❑ Yes ® No
5. Does project comply with 15A NCAC 02T.0105(c)(6) (additional permits/certifications)? ® Yes ❑ No
Per 15A NCAC 02T.0105(c)(6), directly related environmental permits or certification applications are being prepared, have
been applied for, or have been obtained. Issuance of this permit is contingent on issuance of dependent permits (erosion and
sedimentation control plans, stormwater management plans, etc.).
6. Does this project include any sewer collection lines that are deemed "high -priority?"
Per 15A NCAC 02T.0402, "high -priority sewer" means "any aerial sewer, sewer contacting surface waters, siphon, or sewer
positioned parallel to streambanks that is subject to erosion that undermines or deteriorates the sewer.
❑ Yes ® No ❑ N/A
➢ If yes, include an attachment with details for each line, including type (aerial line, size, material, and location).
High priority lines shall be inspected by the permittee or its representative at least once every six -months and inspections
documented per 15A NCAC 02T.0403(a)(5) or the permitee's individual System -Wide Collection permit.
FORM: FTA 04-16 Page 4 of 5
X. CERTIFICATIONS:
1. Does the submitted system comply with I5A NCAC 02T, the Minimum Design Criteria for the Permitting of Pump Stations
and Force Mains (latest version), and the Gravity Sewer Minimum Design Criteria (latest version) as applicable?
® Yes ❑ No
If No, complete and submit the Variance/Alternative Design Request application (VADC 10-14) and supporting documents for
review. Approval of the request is required prior to submittal of the Fast Track Application and supporting documents.
2. Professional Engineer's Certification:
1, le. Tc ) F. SNNE
(Professional Engineer's name from Application Item II1.1.)
attest that this application for
has been reviewed by me and is accurate, complete and consistent with the information supplied in the plans, specifications,
engineering calculations, and all other supporting documentation to the best of my knowledge. I further attest that to the best
of my knowledge the proposed design has been prepared in accordance with the applicable regulations, Gravity Sewer
Minimum Design Criteria for Gravity Sewers (latest version), and the Minimum Design Criteria for the Fast -Track Permitting
of Pump Stations and Force Mains (latest version). Although other professionals may have developed certain portions of this
submittal package, inclusion of these materials under my signature and seal signifies that I have reviewed this material and
have judged it to be consistent with the proposed design.
NOTE — In accordance with General Statutes 143-215.6A and 143-215.6B, any person who knowingly makes any false
statement, representation, or certification in any application package shall be guilty of a Class 2 misdemeanor, which may
include a fine not to exceed $10,000, as well as civil penalties up to $25,000 per violation.
North Carolina Professional Engineer's seal, signature, and date:
3. Applicant's Certification per 15A NCAC 02T .0106(b):
1 R. Donahue Peebles
owlcom
EAL e w
025'163
e •'•�NGIN�••'
�,„Q• To.p.o..'
�te0%.\2.2�
attest that this application for
(Signature Authority's name & title from Application Item I.3.)
has been reviewed by me and is accurate and complete to the best of my knowledge. I understand that if all required parts of
this application are not completed and that if all required supporting documentation and attachments are not included, this
application package is subject to being returned as incomplete. I understand that any discharge of wastewater from this non -
discharge system to surface waters or the land will result in an immediate enforcement action that may include civil penalties,
injunctive relief, and/or criminal prosecution. I will make no claim against the Division of Water Resources should a condition
of this permit be violated. I also understand that if all required parts of this application package are not completed and that if
all required supporting information and attachments are not included, this application package will be returned to me as
incomplete.
NOTE — In accordance with General Statutes 143-215.6A and 143-215.6B, any person who knowingly makes any false
statement, representation, or certification in any application package shall be guilty of a Class 2 misdemeanor, which may
include a fine not to exceed $1 y 111 as well as civil penalties up to $25,000 per violation.
Signature:
Date: 5/12/21
FORM: FTA 04-16
Page 5 of 5
STATE OF NORTH CAROLINA j ' r
COUNTY OF Mecklenburg Permit No. ►'V G 0` t J 2
DEVELOPER'S OPERATIONAL AGREEMENT
This AGREEMENT made pursuant to G.S. 143-215.1 (dl) and entered into this 12 day of
May, 2021 , by and between the North Carolina Environmental Management
Commission, an agency of the State of North Carolina, hereinafter known as the COMMISSION; and
BK Partners, LLC , a corporation/general partnership registered/licensed to do
business in the State of North Carolina, hereinafter known as the DEVELOPER.
WITNESSETH:
1. The DEVELOPER is the owner of the certain lands lying in Mecklenburg County, upon
which it is erecting and will erect dwelling units and other improvements, said development to be known
as Brooklyn Village South
(hereinafter the Development).
2. The DEVELOPER desires, to construct a wastewater collection system with pumps, wastewater treatment
works, and/or disposal facilities (hereinafter Disposal System) to provide sanitary sewage disposal to serve
the Development on said lands.
3. The DEVELOPER has applied to the COMMISSION for the issuance of a permit pursuant to G.S. 143-
215.1 to construct, maintain, and operate the Disposal System.
4. The DEVELOPER has created or shall create unit ownership in said dwellings units, other improvements
and lands through filing of a Declaration of Unit Ownership (hereinafter Declaration), pursuant to Chapter
47C or 47F of the North Carolina General Statutes.
5. The DEVELOPER has caused to be formed or will cause to be formed at the time of filing of the
Declaration, Brooklyn Village Property Owner's Association (hereinafter
Association), a non-profit corporation organized and existing under and by the virtue of the laws of the State
of North Carolina, for the purpose, among others, of handling the property, affairs and business of the
Development; of operating, maintaining, re -constructing and repairing the common elements of the lands
and improvements subject to unit ownership, including the Disposal System; and of collecting dues and
assessments to provide funds for such operation, maintenance, re -construction andrepair.
6. The COMMISSION desires to assure that the Disposal System of the Development is properly constructed,
maintained and operated in accordance with law and permit provisions in order to protect the quality of the
waters of the State and the public interest therein.
NOW, THEREFORE, in consideration of the promises and the benefits to be derived by each of the parties
hereto, the COMMISSION and DEVELOPER do hereby mutually agree as follows:
1. The DEVELOPER shall construct the Disposal System in accordance with the permit and plans and
specifications hereafter issued and approved by the COMMISSION, and shall thereafter properly operate
and maintain such systems and facilities in accordance with applicable permit provisions andlaw.
2. The DEVELOPER shall not transfer ownership and/or control of the Disposal System to the Association
until construction has been completed in accordance with the permit and approved plans, and the staff of
the Division of Water Resources has inspected and approved of the facilities. In order to change the name
of the permit holder, the DEVELOPER must request that the permit be reissued to the Association. The
request must include a copy of the Association Bylaws andDeclaration.
3. The DEVELOPER shall not transfer, convey, assign or otherwise relinquish or release its responsibility for
the operation and maintenance of its Disposal System until a permit has been reissued to the DEVELOPER's
successor.
E'nDif. TILA/ 1 n v 1 , �n
4. The DEVELOPER shall provide in the Declaration and Association Bylaws that the Disposal System and
appurtenances thereto are part of the common elements and shall thereafter be properly maintained and
operated in conformity with law and the provisions of the permit for construction, operation, repair, and
maintenance of the system and facilities. The Declaration and Bylaws shall identify the entire wastewater
treatment, collection and disposal system as a common element which will receive the highest priority for
expenditures by the Association except for Federal, State, and local taxes and insurance.
5. The DEVELOPER shall provide in the Declaration and Association Bylaws that the Disposal System will
be maintained out of the common expenses. In order to assure that there shall be funds readily available to
repair, maintain or construct the Disposal System, beyond the routine operation and maintenance expenses,
the Declaration and Association Bylaws shall provide that a fund be created out of the common expenses.
Such fund shall be separate from the routine maintenance funds allocated for the facility and shall be part
of the yearly budget.
6. In the event the common expense allocation and separate fund are not adequate for the construction, repair,
and maintenance of the Disposal System, the Declaration and Association Bylaws shall provide for special
assessments to cover such necessary costs. There shall be no limit on the amount of such assessments, and
the Declaration and Bylaws shall provide that such special assessments can be made as necessary at any
time.
7. If a wastewater collection system and wastewater treatment and/or disposal facility provided by any city,
town, village, county, water and sewer authorities, or other unit of government shall hereinafter become
available to serve the Development, the DEVELOPER shall take such action as is necessary to cause the
existing and future wastewater of the Development to be accepted and discharged into said governmental
system, and shall convey or transfer as much of the Disposal System and such necessary easements as the
governmental unit mayrequire as condition of accepting the Development's wastewater.
8. Recognizing that it would be contrary to the public interest and to the public health, safety and welfare for
the Association to enter into voluntary dissolution without having made adequate provision for the continued
proper maintenance, repair and operation of its Disposal System, the DEVELOPER shall provide in the
Association Bylaws that the Association shall not enter into voluntary dissolution without first having
transferred its said system and facilities to some person, corporation or other entity acceptable to and
approved by the COMMISSION by the issuance of apeiniit.
9. The agreements set forth in numbered paragraphs 1, 2, 3, 4, 5, 6, 7, and 8 above shall be conditions of any
permit issued by the COMMISSION to the DEVELOPER for the construction, maintenance, repair and
operation of the Disposal System.
10. A copy of this agreement shall be filed at the Register of Deeds in the County(ies) where the Declaration is
filed and in the offices of the Secretary of State of North Carolina with the Articles of Incorporation of the
Association.
IN WITNESS WHEREOF, this agreement was executed in duplicate originals by the duly authorized
representative of the parties hereto on the day and year written as indicated by each of the parties named below:
FOR THE ENVIRONMENTAL
BK Partners, LLC
MANAGEMENT COMMISSION Nam
S. Daniel Smith (Signature
Director, Division of Water Resources
(Date)
R. Donahue Peebles, Managing Member
Print Name and Title
5/12/21
(Date)
L'(1D A 4 • T>~ A 7 (1'2 10
RECEIVED/NCDEQ/DWR
MAY 14 2021
MOORESVILWQROS
LE REGIONAL OF
State of North Carolina
arintent of the Secretary of State
SOSID: 1546585
Date Filed: 9/29/2016 9:54:00 AM
Elaine F. Marshall
North Carolina Secretary of State
C2016 256 00801
APPLICATION FOR CERTIFICATE OF AUTHORITY
FOR LIMITED LIABILITY COMPANY
Pursuant to §57D-7-03 of the General Statutes of North Carolina. the undersigned limited liability company hereby applies fur a
Certificate of Authority to transact business in the State of North Carolina, and for that purpose submits the following:
I. The n:nne oldie limited liability company is BK Partners, LLC
and if the limited liability comply name is unavailable for use in the State ol'North Carolina, the name the limited
liability company wishes to use is BK Partners (Delaware), LLC
2. The state or country under whose laws the limited liability company was fbrmcd is Delaware
3. Principal otlice information: (Select either a or b.)
a. (X The limited liability company has a principal office.
I'heprincipal office telephone number 212.355.1655
The street address and county of the principal office of the limited liability company is:
Number and Street:
745 Fifth Avenue Suite 1610
New York NY 10151 New York
City: State: 'Lip Code: County
The mailing address, if rlifjerent front the street address. of the principal office of the corporation is:
Number and Street:
City: .... ........._ State: __. Zip Code:County:
b. Q The litnited liability company does nut have a principal office.
4. The name ofthe registered agent in the State of North Carolina is:
Corporation Service Company
5. The street address and county of the registered agent's office in the State of North Carolina is:
Number and Street: 327 Hillsborough Street
City; Raleigh State: NC: Zip Code: 27ti0:1 County: Wake
6. 'Mc North Carolina mailing address, if different front the street address, of the registered agent's office in the State of North
Carolina is:
Number anti Street:
City: _ State: NC Zip Code:_ County:
CORPORATIONS DIVISION P.O. BOX 29622 RALEIGH, NC 27626-0622
(Revised January 2014) tt urat 1.-09)
elaware
The First: State
Page 1
I, JEFFREY W. BULLOCK, SECRETARY OF STATE OF THE STATE OF
DELAWARE, DO HEREBY CERTIFY "BK PARTNERS, LLC" IS DULY FORMED UNDER
THE LAWS OF THE STATE OF DELAWARE AND IS IN GOOD STANDING AND HAS A
LEGAL EXISTENCE SO FAR AS THE RECORDS OF THIS OFFICE SHOW, AS OF
THE NINTH DAY OF SEPTEMBER, A.D. 2016.
AND I DO HEREBY FURTHER CERTIFY THAT THE SAID "BK PARTNERS,
LLC" WAS FORMED ON THE SECOND DAY OF SEPTEMBER, A.D. 2016.
AND I DO HEREBY FURTHER CERTIFY THAT THE ANNUAL FRANCHISE TAXES
HAVE BEEN ASSESSED TO DATE.
6140432 8300
SR# 20165719704
You may verify this certificate online at corp.delaware.gov/authver.shtml
Authentication: 202964703
Date: 09-09-16
CHARLOTTE
April 19, 2021
Mr. Robert Hayes
ColeJenest & Stone, P.A.
200 South Tryon Street
Suite 1400
Charlotte, NC 28202
DECEIVED/NCDEQ/Gi
MAY 14 2021
NIODnESVQLE qVG 0 OF
FICA
SUBJECT: WATER AND SEWER FLOW ACCEPTANCE
BROOKLYN VILLAGE SOUTH
800 STONEWALL STREET, CHARLOTTE, NC 28202
CLTWATER TRACKING# 20211450
After an analysis of the sanitary sewer associated with the proposed design of project, 20211450,
BROOKLYN VILLAGE SOUTH, it was determined that there is sufficient capacity to accommodate
the proposed sewer flow of 229,030 gallons per day (646 units x 135 gpd/unit; 1,566 seats x 40
gpd/seat; 31,300 sfx 100 gpd/1,000 sf; 2,322 emp x 25 gpd/emp; 150 rooms x 120 gpd/room)
at the connection point(s) indicated on the submitted utility plan for transmission to the Sugar Creek
Wastewater Treatment Plant; NPDES permit number NC0024937, for treatment. This acceptance of
flow is based upon the existing capacity of the designated publicly owned treatments works. Please
see attached NCDEQ-FTSE form.
Charlotte Water (CLTWater) agrees to furnish water to the subject project. The water quality to the
subject project is regulated by the State Drinking Water Act Amendments of 1986 and The Water
Supply Management Plan, PWS ID # 0160010 on file with the Public Water Supply Section of
NCDEQ. However, CLTWater cannot guarantee a constant pressure or quality of flow.
The applicant should understand that due to the involvement of other agencies and continuing
growth of the water system, the ability to provide service for future projects cannot be guaranteed
nor reserved. Connection to the CLTWater system is accepted on a first come, first served basis.
The applicant should understand that this letter is not authorization to construct or extend private
water or sewer systems, as the appropriate local or State permits are required prior to construction.
If the appropriate authorization to construct permits are not obtained construction has not started
within two (2) years of issuance of this flow acceptance, and payment for any service connections
have not been received within two (2) years of issuance of this flow acceptance letter, this flow
acceptance approval shall be rescinded, and a new flow acceptance request must be made.
The CAP analysis performed determines available capacity within the existing public gravity sewer
system. The developer is responsible for any additional private or public sewer infrastructure
required to convey flow from the proposed development to the existing public gravity sewer.
If you have any questions, please do not hesitate to contact me at (704) 432-5801.
Sincerely,
G u i,Ct e.rwt o- Awzo-La
Guillermo Anzola
Engineering Assistant
Charlotte Water 5100 Brookshire Blvcl, Charlotte, NC 28216 charlottewater.org
Operated by the City of Charlotte
State of North Carolina
Department of Environmental Quality
Division of Water Resources
Flow Tracking for Sewer Extension Applications
(FTSE 10-18)
Entity Requesting Allocation: ColeJenest & Stone, PA
Project Name for which flow is being requested: Brooklyn Village South (Residential)
More than one FTSE may be required for a single project if the owner of the WWTP is not responsible for all pump
stations along the route of the proposed wastewater flow.
I. Complete this section only if you are the owner of the wastewater treatment plant.
a. WWTP Facility Name: McAlpine Creek, Irwin Creek, Sugar Creek
b. WWTP Facility Permit #: NC0024970, NC0024945, NC0024937
All flows are in MGD
c. WWTP facility's permitted flow 99.00
d. Estimated obligated flow not yet tributary to the WWTP 10.212
e. WWTP facility's actual avg. flow
f. Total flow for this specific request
g. Total actual and obligated flows to the facility
h. Percent of permitted flow used
74.925
0.22903
85.137
86.0%
II. Complete this section for each pump station you are responsible for along the route of this proposed
wastewater flow.
List pump stations located between the project connection point and the WWTP:
(A) (B) (C) (D)=(B+C) (E)=(A-D)
Design Obligated,
Pump Pump Average Approx. Not Yet Total Current
Station Station Firm Daily Flow** Cun-ent Tributary Flow Plus
(Name or Permit Capacity, * (Firm / p f), Avg. Daily Daily Flow, Obligated Available
Number) No. MGD MGD Flow, MGD MGD Flow Capacity***
* The Firm Capacity (design flow) of any pump station is defined as the maximum pumped flow
that can be achieved with the largest pump taken out of service.
** Design Average Daily Flow is the firm capacity of the pump station divided by a peaking factor
(pf) not less than 2.5, per Section 2.02(A)(4)(c) of the Minimum Design Criteria.
*** A Planning Assessment Addendum shall be attached for each pump station located
between the project connection point and the WWTP where the Available Capacity is < 0.
Downstream Facility Name (Sewer): Unknown
Downstream Permit Number: Unknown
Page 1 of 6
FTSE 10-18
PLANNING ASSESSMENT ADDENDUM (PAA)
Submit a planning assessment addendum for each pump station listed in Section II where Available Capacity is <
0.
Pump Station (Name or Number):
Given that:
a. The proportion and amount of Obligated, Not Yet Tributary Daily Flow (C) accounts for
% and MGD of the Available Capacity (E) in Pump Station
; and that
b. The rate of activation of this obligated, not yet tributary capacity is currently approximately
MGD per year; and that
c. A funded Capital Project that will provide the required planned capacity, namely
is in design or under construction with
planned completion in ; and/or
d. The following applies:
Therefore:
Given reasonably expected conditions and planning information, there is sufficient justification to allow
this flow to be permitted, without a significant likelihood of over -allocating capacity in the system
infrastructure.
I understand that this does not relieve the collection system owner from complying with G.S. 143-
215.67(a) which prohibits the introduction of any waste in excess of the capacity of the waste disposal
system.
Signing Official Signature Date
Page 3 of 6
FTSE 10-18
Section II
List the pump station name or number and approximate pump station firm capacity, approximate design average
daily flow (A) approximate current average daily flow (B), and the obligated, not yet tributary flow through the
pump station (C) for each pump station that will be impacted by the proposed sewer extension project. Calculate
the total current flow plus obligated flow (D=B+C) and the available capacity (E=A-D). Include the proposed
flow for this project with other obligated flows that have been approved for the pump station but are not yet
tributary (C).
Firm capacity is the maximum pumped flow that can be achieved with the largest pump out of service as per the
Minimum Design Criteria.
Design Average Daily Flow is the firm capacity of the pump station divided by a peaking factor (pf) of not less
than 2.5.
If the available capacity (E) for any pump station is < 0, then prepare a planning assessment for that pump station
if the system has future specific plans related to capacity that should be considered in the permitting process.
(A) (B)
Design
Firm Average
Pump Station Capacity Daily Flow
(Name or Number) MGD (Firm / pf)
Kaw Creek PS
0.800 0.320
Approx.
Current Avg.
Daily Flow,
MGD
(C) (D)=(B+C) (E)=(A-D)
Obligated,
Not Yet Total Current
Tributary Flow Plus
Daily Flow, Obligated Available
MGD Flow Capacity*
0.252 0.080 0.332 -0.012
Valley Road PS 1.895 0.758 0.472 0.135
0.607
0.151
Page 5 of 6
FTSE 10-18
i0
North'
Pinewood
Cem
Elmwood
Cem
Old
Settlers
Cem
DALTON AVE
cV DI
Polaris 3G Map — Mecklenburg County, North Carolina
700 East Stonewall Street
Date Printed: 5/10/2021 11:10:52 AM
This map or report is prepared for the inventory of real property within Mecklenburg ounty and is compiled from recorded deeds, plats, tax maps, surveys,
planimetric maps, and other public records and data. Users of this map or report are hereby notified that the aforementioned public primary information sources
should be consulted for verification. Mecklenburg County and its mapping contractors assume no legal responsibility for the information contained herein.
CHARLOTTE
April 19, 2021
Mr. Robert Hayes
ColeJenest & Stone, P.A.
200 South Tryon Street
Suite 1400
Charlotte, NC 28202
SUBJECT: WATER AND SEWER FLOW ACCEPTANCE
BROOKLYN VILLAGE SOUTH
800 STONEWALL STREET, CHARLOTTE, NC 28202
CLTWATER TRACKING# 20211450
RECEIVED/NCDEQ/D WR
MAY 14 2Dr:I
MOORESVIUWQROS
.E REGIONAL OFFICE
After an analysis of the sanitary sewer associated with the proposed design of project, 20211450,
BROOKLYN VILLAGE SOUTH, it was determined that there is sufficient capacity to accommodate
the proposed sewer flow of 229,030 gallons per day (646 units x 135 gpd/unit; 1,566 seats x 40
gpd/seat; 31,300 sfx 100 gpd/1,000 sf; 2,322 emp x 25 gpd/emp; 150 rooms x 120 gpd/room)
at the connection point(s) indicated on the submitted utility plan for transmission to the Sugar Creek
Wastewater Treatment Plant; NPDES permit number NC0024937, for treatment. This acceptance of
flow is based upon the existing capacity of the designated publicly owned treatments works. Please
see attached NCDEQ-FTSE form.
Charlotte Water (CLTWater) agrees to furnish water to the subject project. The water quality to the
subject project is regulated by the State Drinking Water Act Amendments of 1986 and The Water
Supply Management Plan, PWS ID # 0160010 on file with the Public Water Supply Section of
NCDEQ. However, CLTWater cannot guarantee a constant pressure or quality of flow.
The applicant should understand that due to the involvement of other agencies and continuing
growth of the water system, the ability to provide service for future projects cannot be guaranteed
nor reserved. Connection to the CLTWater system is accepted on a first come, first served basis.
The applicant should understand that this letter is not authorization to construct or extend private
water or sewer systems, as the appropriate local or State permits are required prior to construction.
If the appropriate authorization to construct permits are not obtained construction has not started
within two (2) years of issuance of this flow acceptance, and payment for any service connections
have not been received within two (2) years of issuance of this flow acceptance letter, this flow
acceptance approval shall be rescinded, and a new flow acceptance request must be made.
The CAP analysis performed determines available capacity within the existing public gravity sewer
system. The developer is responsible for any additional private or public sewer infrastructure
required to convey flow from the proposed development to the existing public gravity sewer.
If you have any questions, please do not hesitate to contact me at (704) 432-5801.
Sincerely,
Gwi Wtrwtro- A .o-La,
Guillermo Anzola
Engineering Assistant
Charlotte Water 5100 Brookshire Blvcl, Charlotte, NC 28216 charlottewater.org
tern Operated by the City of Charlotte
State of North Carolina
Department of Environmental Quality
Division of Water Resources
Flow Tracking for Sewer Extension Applications
(FTSE 10-18)
Entity Requesting Allocation: ColeJenest & Stone, PA
Project Name for which flow is being requested: Brooklyn Village South (Residential)
More than one FTSE may be required for a single project if the owner of the WWTP is not responsible for all pump
stations along the route of the proposed wastewater flow.
Complete this section only if you are the owner of the wastewater treatment plant.
a. WWTP Facility Name: McAlpine Creek, Irwin Creek, Sugar Creek
b. WWTP Facility Permit #: NC0024970, NC0024945, NC0024937
All flows are in MGD
c. WWTP facility's permitted flow 99.00
d. Estimated obligated flow not yet tributary to the WWTP 10.212
e. WWTP facility's actual avg. flow
f. Total flow for this specific request
g. Total actual and obligated flows to the facility
h. Percent of permitted flow used
74.925
0.22903
85.137
86.0%
II. Complete this section for each pump station you are responsible for along the route of this proposed
wastewater flow.
List pump stations located between the project connection point and the WWTP:
(A) (B) (C) (D)=(B+C) (E)=(A-D)
Design Obligated,
Pump Pump Average Approx. Not Yet Total Current
Station Station Firm Daily Flow** Current Tributary Flow Plus
(Name or Permit Capacity, * (Firm / p f), Avg. Daily Daily Flow, Obligated Available
Number) No. MGD MGD Flow, MGD MGD Flow Capacity***
* The Firm Capacity (design flow) of any pump station is defined as the maximum pumped flow
that can be achieved with the largest pump taken out of service.
** Design Average Daily Flow is the firm capacity of the pump station divided by a peaking factor
(pf) not less than 2.5, per Section 2.02(A)(4)(c) of the Minimum Design Criteria.
*** A Planning Assessment Addendum shall be attached for each pump station located
between the project connection point and the WWTP where the Available Capacity is < 0.
Downstream Facility Name (Sewer): Unknown
Downstream Permit Number: Unknown
Page 1 of 6
FTSE 10-18
PLANNING ASSESSMENT ADDENDUM (PAA)
Submit a planning assessment addendum for each pump station listed in Section II where Available Capacity is <
0.
Pump Station (Name or Numbe
Given that:
a. The proportion and amount of Obligated, Not Yet Tributary Daily Flow (C) accounts for
% and MGD of the Available Capacity (E) in Pump Station
; and that
b. The rate of activation of this obligated, not yet tributary capacity is currently approximately
MGD per year; and that
c. A funded Capital Project that will provide the required planned capacity, namely
is in design or under construction with
planned completion in ; and/or
d. The following applies:
Therefore:
Given reasonably expected conditions and planning information, there is sufficient justification to allow
this flow to be permitted, without a significant likelihood of over -allocating capacity in the system
infrastructure.
I understand that this does not relieve the collection system owner from complying with G.S. 143-
215.67(a) which prohibits the introduction of any waste in excess of the capacity of the waste disposal
system.
Signing Official Signature Date
Page 3 of 6
FTSE 10-18
Section II
List the pump station name or number and approximate pump station firm capacity, approximate design average
daily flow (A) approximate current average daily flow (B), and the obligated, not yet tributary flow through the
pump station (C) for each pump station that will be impacted by the proposed sewer extension project. Calculate
the total current flow plus obligated flow (D=B+C) and the available capacity (E=A-D). Include the proposed
flow for this project with other obligated flows that have been approved for the pump station but are not yet
tributary (C).
Finn capacity is the maximum pumped flow that can be achieved with the largest pump out of service as per the
Minimum Design Criteria.
Design Average Daily Flow is the firm capacity of the pump station divided by a peaking factor (pf) of not less
than 2.5.
If the available capacity (E) for any pump station is < 0, then prepare a planning assessment for that pump station
if the system has future specific plans related to capacity that should be considered in the permitting process.
(A) (B)
Design
Firm Average
Pump Station Capacity Daily Flow
(Name or Number) MGD (Firm / pf)
Kaw Creek PS 0.800 0.320
Valley Road PS
1.895 0.758
Approx.
Current Avg.
Daily Flow,
MGD
(C) (D)=(B+C) (E)=(A-D)
Obligated,
Not Yet Total Current
Tributary Flow Plus
Daily Flow, Obligated Available
MGD Flow Capacity*
0.252 0.080 0.332 -0.012
0.472
0.135
0.607 0.151
Page 5 of 6
FTSE 10-18