Loading...
HomeMy WebLinkAbout20210873 Ver 1_Pre-Filing Meeting Request_20210429WR Pre -Filing Meeting Request Form ID#* Regional Office * Reviewer List* 20210873 Version * 1 Mooresville Regional Office - (704) 663-1699 Alan Johnson Pre -Filing Meeting Request submitted 4/29/2021 Contact Name * Contact Email Address* Project Name* S. Paul Petitgout ppetitgout@gmail.com The Falls at Kannapolis - NWP 3 Maintenance - 42-inch pipe at Copes Court Project Owner* True Homes Project County* Rowan Owner Address: Street Address 2649 Brekonridge Centre Drive Address Line 2 City State / Bovine / !Region Monroe NC Fbstal / Zip Code Country 28110 USA Is this a transportation project?* Yes c No Type(s) of approval sought from the DWR: I� 401 Water Quality Certification - I— 401 Water Quality Certification - Regular Express I— Individual Permit I— Modification I— Shoreline Stabilization Does this project have an existing project ID#?* c Yes No Do you know the name of the staff member you would like to request a meeting with? Alan Johnson Please give a brief project description below and include location information.* This project consists of the use of a Nationwide Permit 3 (WQC #4132) for maintenance of an existing culvert. The maintenance activities consist of the repair/replacement of the existing pipe that has been deemed insufficient by the City of Kannapolis. Additionally, the maintenance activities will including the removal of accumulated sediment. The overall development is located near the intersection of Enochville Road and West A Street, within the City of Kannapolis, Rowan County, NC (Parcel ID# 154 076 and others; ±53-acres). The culvert requiring maintenance is a ±42-inch RCP that is located under Copes Court. By digitally signing below, I certify that I have read and understood that per the Federal Clean Water Act Section 401 Certification Rule the following statements: • This form completes the requirement of the Pre -Filing Meeting Request in the Clean Water Act Section 401 Certification Rule. • I understand by signing this form that I cannot submit my application until 30 calendar days after this pre -filing meeting request. • I also understand that DWR is not required to respond or grant the meeting request. Your project's thirty -day clock started upon receipt of this application. You will receive notification regarding meeting location and time if a meeting is necessary. You will receive notification when the thirty -day clock has expired, and you can submit an application. Signature a 5' c�r�l�ggerst Submittal Date 4/29/2021