HomeMy WebLinkAbout20210873 Ver 1_Pre-Filing Meeting Request_20210429WR Pre -Filing Meeting Request Form
ID#*
Regional Office *
Reviewer List*
20210873
Version *
1
Mooresville Regional Office - (704) 663-1699
Alan Johnson
Pre -Filing Meeting Request submitted 4/29/2021
Contact Name *
Contact Email Address*
Project Name*
S. Paul Petitgout
ppetitgout@gmail.com
The Falls at Kannapolis - NWP 3 Maintenance - 42-inch pipe at Copes
Court
Project Owner* True Homes
Project County* Rowan
Owner Address: Street Address
2649 Brekonridge Centre Drive
Address Line 2
City State / Bovine / !Region
Monroe NC
Fbstal / Zip Code Country
28110 USA
Is this a transportation project?* Yes c No
Type(s) of approval sought from the DWR:
I� 401 Water Quality Certification - I— 401 Water Quality Certification -
Regular Express
I— Individual Permit I— Modification
I— Shoreline Stabilization
Does this project have an existing project ID#?*
c Yes No
Do you know the name of the staff member you would like to request a meeting with?
Alan Johnson
Please give a brief project description below and include location information.*
This project consists of the use of a Nationwide Permit 3 (WQC
#4132) for maintenance of an existing culvert. The maintenance
activities consist of the repair/replacement of the existing pipe that
has been deemed insufficient by the City of Kannapolis. Additionally,
the maintenance activities will including the removal of accumulated
sediment.
The overall development is located near the intersection of Enochville
Road and West A Street, within the City of Kannapolis, Rowan
County, NC (Parcel ID# 154 076 and others; ±53-acres).
The culvert requiring maintenance is a ±42-inch RCP that is located
under Copes Court.
By digitally signing below, I certify that I have read and understood that per the Federal Clean Water Act Section
401 Certification Rule the following statements:
• This form completes the requirement of the Pre -Filing Meeting Request in the Clean Water Act Section 401 Certification
Rule.
• I understand by signing this form that I cannot submit my application until 30 calendar days after this pre -filing
meeting request.
• I also understand that DWR is not required to respond or grant the meeting request.
Your project's thirty -day clock started upon receipt of this application. You will receive notification regarding meeting location
and time if a meeting is necessary. You will receive notification when the thirty -day clock has expired, and you can submit an
application.
Signature
a 5' c�r�l�ggerst
Submittal Date 4/29/2021