HomeMy WebLinkAbout20210876 Ver 1_Pre-Filing Meeting Request_20210429DWR Pre -Filing Meeting Request Form
ID#*
Regional Office*
Reviewer List*
20210876
Version *
1
Mooresville Regional Office - (704) 663-1699
Alan Johnson
Pre -Filing Meeting Request submitted 4/29/2021
Contact Name *
Contact Email Address*
Project Name*
Project Owner*
Project County*
Owner Address:
Michael Burkhard
michaelburkhard@att.net
River Land Project
River Land
Mecklenburg
Street Address
20460-3 Chartwell Center Dr.,
Address Line 2
City State / Rovince / Region
Cornelius NC
Fbstal / Zip Code Country
28031 United States
Is this a transportation project?* r Yes (' No
Type(s) of approval sought from the DWR:
fJ 401 Water Quality Certification - I— 401 Water Quality Certification -
Regular Express
I— Individual Permit I— Modification
fJ Shoreline Stabilization
Does this project have an existing project ID#?*
r Yes (' No
Do you know the name of the staff member you would like to request a meeting with?
Alan Johnson
Please give a brief project description below and include location information. *
Property is at the dead end of Turkey Point Dr.
Mecklenburg County Tax Parcel # 03146349
Repair a failed stream crossing installed by PNG about 5 years ago.
The RR was installed incorrectly which blocked the natural flow of the
intermittent stream. Rack lines and the debris created dams up
stream of the crossing which caused a new channel to form thus
completely bypassing the receiving Perennial stream.
The new channel has over time eroded the shore line and created
severe gullies which need to be filled once the stream flow can be re
established.
Need guidance on the permitting process to correct these problems
I can meet any day that is convenient for Alan
Mobile 704.397.6556
By digitally signing below, I certify that I have read and understood that per the Federal Clean Water Act Section
401 Certification Rule the following statements:
• This form completes the requirement of the Pre -Filing Meeting Request in the Clean Water Act Section 401 Certification
Rule.
• I understand by signing this form that I cannot submit my application until 30 calendar days after this pre -filing
meeting request.
• I also understand that DWR is not required to respond or grant the meeting request.
Your project's thirty -day clock started upon receipt of this application. You will receive notification regarding meeting location
and time if a meeting is necessary. You will receive notification when the thirty -day clock has expired, and you can submit an
application.
Signature
Submittal Date 4/29/2021