Loading...
HomeMy WebLinkAboutNCC202114_Notice of Termination_20210525Action History (UTC-05:00) Eastern Time (US & Canada) Submit by Anonymous User 5/25/2021 10:23:53 AM (NOT Submittal) Approve by Morman, Alaina 5/28/2021 5:23:12 PM (NOT Request Review- NCC202114) • The task was assigned to Morman, Alaina. The due date is: May 28, 2021 5:00 PM 5/25/2021 10:23 AM 1 � NORTH CAROLINA Enrlronmenral Quallly Certificate of NCC202114 Coverage (COC) Enter the Certificate of Coverage Nmber No.* 2020 Annual Fee Status 2021 Annual Fee Status OPEN fvby be blank (if not yet billed). Information associated with this permit: Project Name Wegmans/SECU Driveway Address 1810 Fordham Boulevard, Chapel Hill, NC County Orange Latitude 35.9452 Longitude -79.0098 Permittee Listed James R Vannoy & Sons Construction Co., Inc. Legally Responsible Ken Sparks Individual NC Reference No. NCG01-2020-2114 E&SC Plan ID LDP20-0010 Original NOI 25715 Tracking No. Date COC Issued 5/20/2020 Prior Rescission Cate populates only if COCwas already rescinded at tirre of subrrittal. Date Reason for Rescission/Termination Request: Reason for r Project Closed -Out Termination of r Sale (Another Owner/Operator obtained a new COC) Coverage * r Mistake or Invalid Coverage r Other Add ional Mare information about the basis of this request, if needed. Explanation Erosion and Sedimentation Control Site Inspection Report has been updated with correct Project name by Steve Kaltenbach; emailed to tara.mcalister@jrvannoy.com on 5/25/2021 Supporting Upload Supporting DDcurrentation if applicable. Documentation Mast beFDFformt Project Close-out Information: Final Close-out 3/15/2021 Inspection Approval Project Close-out Wegmans SECU driveway 3.15.21 FInal Insp.pdf Approval Mast be FDFfornat Documentation North Carolina General Statute 143-215.66 (1) provides that: 57.12KB Anyperson who knowinglymakes anyfalse statement, representation, or certification in anyapplication, record, report, plan, or other documentfiled or required to be maintained under this Article or a rule implementing this Article; or who knowinglymakes a false statement of a material fact in a rulemaking proceeding or contested case underthis Article; orwho falsifies, tampers with, or knowingly renders inaccurate any recording or monitoring device or method required to be operated or maintained under this Article or rules of the Commission implementing this Article shall be guiltyofa Class 2 misdemeanor which mayinclude a fine notto exceed ten thousand dollars ($10,000). rJ I, as an authorized representative, hereby request rescission of coverage under the NPDES Stormwater Permit for the subject facility. I am familiar with the information contained in this request and to the best of my knowledge and belief such information is true, complete and accurate. *This form must be signed by a responsible corporate officer that owns or operates the construction activity, such as a president, secretary, treasurer, or vice president, or a manager that is authorized in accordance with Part IV, Section B, Item (6) of the NCG010000 General Permit. For more information on signatory requirements, see Part IV, Section B, Item (6) of that permit. Signature C4;4464 Type Name* Ken Sparks Title * Project Manager Organization * James R Vannoy & Sons Construction Co., Inc. Date * 05/25/2021 Email for tara.mcalister@jrvannoy.com Confirmation * Contact Telephone* 8642618458 NOT Certification NOT Certification Form.pdf 78.16KB Form Mast be FDF Format Is this COC Already Ensure this CCChas not been rescinded since subrrittal! Rescinded? Additional Email GCd on Notification BTails (Optional) Original Permittee GCdonWificationBiails Email ken.sparks@jrvannoy.com Original Site Contact CCd on Notificaiton Bmils Email ed.boothe@jrvannoy.com