Loading...
HomeMy WebLinkAbout20130115 Ver 1_More Info Received_20130415Strickland, Bev From: Lucas, Annette Sent: Monday, April 15, 2013 9:35 AM To: Strickland, Bev Cc: Smith, Cherri L Subject: FW: Oakwood North Subdivision Attachments: O &M Oakwood B Executed.pdf; O &M Oakwood A Executed.pdf Please ATF. Thank you! From: David Gastel [ mai Ito: DGASTELCa)landdesign.com] Sent: Monday, April 15, 2013 8:33 AM To: Lucas, Annette Cc: Ross Massey Subject: FW: Oakwood North Subdivision I have attached the O &M agreement. Please let me know if you need anything else. Thanks, ■ LandDesign I Raleigh INC 19 West Hargett Street Suite 602, Raleigh, NC 27601 V: 919.838.9331 F: 919.800.3583 C: 704.351.5227 Email: dgastel(Manddesign.com For 35 years LandDesign has offered award winning urban design, planning, civil engineering and landscape architecture solutions to public and private sector clients across the globe. With four offices across the United States, the LandDesign team effectively brings innovative, buildable, sustainable and ecologically responsible projects to life worldwide. W"'Mraw. The information transmitted in this message is only for the use of the Intended Recipient, for the sole purpose agreed upon with LandDesign, Inc. Recipient agrees to verify the information to ascertain accuracy and completeness for the intended use and to ensure that such information is free of all viruses and other defects prior to use. LandDesign, Inc. accepts no responsibility for loss or damage arising from the use of this information. From: Rhinehalt, Brad [mailto:brhinehaltCa)kbhome.com] Sent: Monday, April 15, 2013 8:32 AM To: David Gastel; Cushing, David Cc: Ross Massey Subject: RE: Oakwood North Subdivision EM Please find attached O & M agreements as executed. I will mail you the originals or give to David if he is meeting with you this week. Eger] Rhi e alt, P Land Manager KB Home Carolinas Division 919-478-7823 919 - 502 -7676 office From: David Gastel [ mai Ito: DGASTELCa)landdesian.com] Sent: Friday, April 12, 2013 11:29 AM To: Cushing, David; Rhinehalt, Brad Cc: Ross Massey Subject: Oakwood North Subdivision David /Brad, I have attached the Operation and Maintenance Manuals for the Level Spreaders. If you can get these signed and notarizes as soon as possible, we can get our approval from DWQ for our riparian buffer impacts. I told them I could get this back to them by Monday. Thanks, David Gastel, PE Associate LandDesign I Raleigh NC 19 West Hargett Street Suite 602, Raleigh, NC 27601 V: 919.838.9331 F: 919.800.3583 C: 704.351.5227 Email: dgastel(Manddesign.com For 35 years LandDesign has offered award winning urban design, planning, civil engineering and landscape architecture solutions to public and private sector clients across the globe. With four offices across the United States, the LandDesign team effectively brings innovative, buildable, sustainable and ecologically responsible projects to life worldwide. Please consider the environment before printing this email The information transmitted in this message is only for the use of the Intended Recipient, for the sole purpose agreed upon with LandDesign, Inc. Recipient agrees to verify the information to ascertain accuracy and completeness for the intended use and to ensure that such information is free of all viruses and other defects prior to use. LandDesign, Inc. accepts no responsibility for loss or damage arising from the use of this information. Consider the environment before printing this email. MY HOME. MY EAPTK®R permit Ntnnber: (to be provided by Dff' j Drainage Area NUMber: Qom' Filter Strip, Restored Riparian Buffer and Level Spreader Operation and Maintenance Agreement I will keep a maintenance record on this BMP. This maintenance record will be kept in a log in a known set location. Any deficient BMP elements noted in the inspection will be corrected, repaired or replaced immediately. These deficiencies can affect the integrity of structures, safety of the public, and the removal efficiency of the BMP. Important maintenance procedures: — Immediately after the filter strip is established, any newly planted vegetation will be watered twice weekly if needed until the plants become established (commoiiiy six weeks). — Once a year, the filter ship will be reseeded to maintain a dense growth of vegetation — Stable groundcover will be maintained in the drainage area to reduce the sediment load to the vegetation. — Two to three times a year, grass filter strips will be mowed and the clippings harvested to promote the growth of thick vegetation with optimum pollutant removal efficiency. Turf grass should not be cut shorter than 3 to 5 inches and may be allowed to grow as tall as 12 inches depending on aesthetic requirements (NIPC,1993). Forested filter ships do not require this type of maintenance. — Once a year, the soil will be aerated if necessary. — Once a year, soil pH will be tested and lime will be added if necessary. After the filter strip is established, it will be inspected quarterly and within 24 hours after every storm event greater than 1.0 inch (or 1.5 :inches if in a Coastal County). Records of operation and maintenance will be kept in a known set location and will be available upon request. Inspection activities shall be performed as follows. Any problems that are found shall be repaired immediately. BMP element: Potential problem: How I will remediate the problem- The entire filter strip Trash/ debris is present. Remove the trash /debris. system The flow splitter device The flow splitter device is Unclog the conveyance and dispose (if applicable) clogged. of any sed meat off -site. The flow splitter device is Make any necessary repairs or damaged. replace if damage is too large for repair, Form SWU40I -Level Spreader, Filter Strip, Restored Riparian Buffer O &M -Rev.3 page I of 3 BMP element: Potential problem: How I will remediate the problem: The Swale and the level The swale is clogged with Remove the sediment and dispose lip sediment. of it off -site. The level Iip is cracked, Repair or replace lip. settled, undercut, eroded or otherwise damaged. There is erosion around the Regrade the soil to create a berm end of the level spreader that that is higher than the level lip, and shows stormwater has then plant a ground cover and bypassed it. water until it is established. Provide lime and a one -time fertilizer application, Trees or shrubs have begun Remove them. to grow on the swale or just downslo e of the level lip. The bypass channel Areas of bare soil and /or Regrade the soil if necessary to erosive gullies have formed. remove the &Lilly, and then reestablish proper erosion control. Turf reinforcement is Study the site to see if a larger damaged or ripap is rollitg bypass channel is needed (enlarge if downhill. necessary). After this, reestablish the erosion control material. The filter strip Grass is too short or too long Maintain grass at a height of if applicable). a roximateI three to six inches. Areas of bare soil and /or Regrade the soil if necessary to erosive gullies have formed. remove the gully, and then plant a ground cover and water until it is established. Provide lime and a one -time fertilizer application. Sediment is building up on Remove the sediment and the filter strip. restabilize the soil with vegetation if necessary. Provide lime and a one- time fertilizer application. Plants are desiccated. Provide additional irrigation and fertilizer as needed. Plants are dead, diseased or Determine the source of the dying. problem: soils, hydrology, disease, etc. Remedy the problem and replace plants. Provide a one -tune fertilizer application. Nuisance vegetation is Remove vegetation by hand if choking out desirable species. possible. If pesticide is used, do not allow it to get into the receiving water. The receiving water Erosion or other signs of Contact the NC Division of Water damage have occurred at the Quality local Regional Office, or the outlet. 401 Oversight Unit at 919- 733 -1786. Form SWU401 -Level Spreader, Filter Strip, Restored Riparian Buffer O &M -Rev.3 Page 2 of 3 Permit Number: (to be provided b3, DTVQ) I acknowledge and agree by my signature below that I am responsible for the performance of the maintenance procedures listed above. I agree to notify DWQ of any problems with the system or prior to any changes to the system or responsible party. Project narne:Qakwood North Subdivision Bh4P clrainage area number:DA -B Print name:Kirby LaForce Title:VP Land Acquisition/Planning Address:4518 S Miami Blvd Suite 180 Durham NC 27703 Phone:919- 768 -7988 Date: Note: Tile legally responsible party should not be a homeowners association unless more than 50% of the lots have been sold and a resident of the subdivision has been named the president. 1, %ohal bOU aI G S , a Notary Public for the State of h tar- 010W.% , County of \NM ly, , do hereby certify that Ki rb j Ldifot C personally appeared before me this x day of V ri , S and acknowledge the due execution of the forgoing filter strip, riparian buffer, and /or level spreader maintenance requirements. Witness my band and official seal, A,��ttEtt�irr DOUG - �4oia4Y Publtc wake county - p /rHC P I��`\\�� SEAL My commission expires i 11 Forin SWU401 -Level Spreader, Filter Strip, Restored Riparian Buffer O &M -Rev.3 Page 3 of 3 Permit Number: (to be provided by DIVA) Drainage Area Number: (,% Filter Strip, Restored Riparian Buffer and Level Spreader Operation and Maintenance Agreement I will keep a maintenance record on this BMP. This maintenance record will be kept in a log in a known set location. Any deficient BMP elements noted hl the inspection will be corrected, repaired or replaced immediately. These deficiencies can affect the integrity of structures, safety of the public, and the removal efficiency of the BMP. Important maintenance procedures: — Immediately after the filter strip is established, any newly planted vegetation will be watered twice weekly if needed until the plants become established (commonly six weeks). — Once a year, the filter strip will be reseeded to maintain a dense growth of vegetation — Stable groundcover will be maintained in the drainage area to reduce the sediment load to the vegetation. -- Two to three times a year, grass filter ships will be mowed and the clippings harvested to promote the growth of thick vegetation with optimum pollutant removal efficiency. Turf grass should not be cut shorter than 3 to 5 inches and may be allowed to grow as tall as 12 inches depending on aesthetic requirements (NIPC,1993). Forested filter strips do not require this type of maintenance. — Once a year, the soil will be aerated if necessary. — Once a year, soil pH will be tested and lime will be added if necessary. After the filter strip is established, it will be inspected quarterly and within 24 hours after every storin event greater than 1.0 inch (or 1.5 inches if in a Coastal County). Records of operation and maintenance will be kept in a known set location and will be available upon request. Inspection activities shall be performed as follows, Any problems that are found shall be repaired immediately. BMP element: Potential problem: How I will remediate the problem: The entire filter strip Trash /debris is present. Remove the trash /debris. system The flow splitter device The flow splitter device is Unclog the conveyance and dispose (if applicable) clogged. of any sediment off -site. The flow splitter device is Make any necessary repairs or damaged, replace if damage is too large for repair. Form SWU401 -Level Spreader, Filter Strip, Restored Riparian Buffer O &M -Rev.3 Page I of 3 BMP element: Potential problem: How I will remediate the problem: The swale and the level The swale is clogged with Remove the sediment and dispose lip sediment. of it off -site. The level lip is cracked, Repair or replace lip. settled, undercut, eroded or otherwise damaged. There is erosion around the Regrade the soil to create a berm end of the level spreader that that is higher than the Ievel lip, and shows stormwater has then plant a ground cover and bypassed it. water until it is established. Provide lime and a one -time fertilizer application. Trees or shrubs have begun Remove them. to grow on the swale or just downslo e of the level lip. The bypass channel Areas of bare soil and /or Regrade the soil if necessary to erosive gullies have formed. remove the gully, and then reestablish proper erosion control. Turf reinforcement is Study the site to see if a larger damaged or ripap is rolling bypass channel is needed (enlarge if downhill. necessary). After this, reestablish the erosion control material. The filter strip Grass is too short or too long Maintain grass at a height of if applicable), approximately three to six inches. Areas of bare soil and /or Regrade the soil if necessary to erosive gullies have formed. remove the gully, and then plant a ground cover and water until it is established. Provide lime and a one -time fertilizer application. Sediment is building up on Remove the sediment and the filter strip. restabilize the soil with vegetation if necessary. Provide lime and a one- time fertilizer application. Plants are desiccated. Provide additional irrigation and fertilizer as needed. Plants are dead, diseased or Determine the source of the dying, problem: soils, hydrology, disease, etc. Remedy the problem and replace plants. Provide a one -time fertilizer application. Nuisance vegetation is Remove vegetation by hand if choking out desirable species. possible. If pesticide is used, do not allow it to get into the receiving water. The receiving water Erosion or other signs of Contact the NC Division of Water damage have occurred at the Quality local Regional Office, or the outlet. 401 Oversight Unit at 919- 733 -1786. Form SWU401 -Level Spreader, Filter Strip, Restored Riparian Buffer O &M -Rev.3 Page 2 of 3 Permit Number: (to be provided by D)YQ) I acknowledge and agree by any signature below that I am responsible for the performance of the maintenance procedures listed above. I agree to notify DWQ of any problems with the system or prior to any changes to the system or responsible party. Project narne:0akwood North Subdivision BMP di-ainage area number: Print name:Kirby LaPorce Title:VP Ac uisition/Plannin Address:4518 S Miami Blvd Suite 180 Durham, NC 27703 Signature: Date: vhz� Note: The legally responsible party should not be a homeowners association unless more than 50% of the lots have been sold and a resident of the subdivision has been named the president. I, . Racyel ba_gglas , a Notary Public for the State of wocm c4aliy , County of WAkC, , do hereby certify that K'% Ir IOU personally appeared before me this _149 day of April , U1 2) , and acknowledge the due execution of the forgoing filter strip, riparian buffer, and /or level spreader maintenance requirements, Witness nay hand and official seal, �\``���111kilII111 .��� �F L DOUG ���i� �i \\e4G ly�/',,i _ Notoly Public Wake county = SEAL My commission expires �Pri � 6- 241" 1 Form SWU401 -Level Spreader, Filter Strip, Restored Riparian Buffer O &M -Rev.3 Page 3 of 3