HomeMy WebLinkAbout20130115 Ver 1_More Info Received_20130415Strickland, Bev
From:
Lucas, Annette
Sent:
Monday, April 15, 2013 9:35 AM
To:
Strickland, Bev
Cc:
Smith, Cherri L
Subject:
FW: Oakwood North Subdivision
Attachments:
O &M Oakwood B Executed.pdf; O &M Oakwood A Executed.pdf
Please ATF. Thank you!
From: David Gastel [ mai Ito: DGASTELCa)landdesign.com]
Sent: Monday, April 15, 2013 8:33 AM
To: Lucas, Annette
Cc: Ross Massey
Subject: FW: Oakwood North Subdivision
I have attached the O &M agreement. Please let me know if you need anything else.
Thanks,
■
LandDesign I Raleigh INC
19 West Hargett Street Suite 602, Raleigh, NC 27601
V: 919.838.9331
F: 919.800.3583
C: 704.351.5227
Email: dgastel(Manddesign.com
For 35 years LandDesign has offered award winning urban design, planning, civil engineering and landscape architecture solutions to public and private
sector clients across the globe. With four offices across the United States, the LandDesign team effectively brings innovative, buildable, sustainable and
ecologically responsible projects to life worldwide.
W"'Mraw.
The information transmitted in this message is only for the use of the Intended Recipient, for the sole purpose agreed upon with LandDesign, Inc. Recipient agrees to verify the information
to ascertain accuracy and completeness for the intended use and to ensure that such information is free of all viruses and other defects prior to use. LandDesign, Inc. accepts no
responsibility for loss or damage arising from the use of this information.
From: Rhinehalt, Brad [mailto:brhinehaltCa)kbhome.com]
Sent: Monday, April 15, 2013 8:32 AM
To: David Gastel; Cushing, David
Cc: Ross Massey
Subject: RE: Oakwood North Subdivision
EM
Please find attached O & M agreements as executed. I will mail you the originals or give to David if he is meeting with
you this week.
Eger] Rhi e alt, P
Land Manager
KB Home Carolinas Division
919-478-7823
919 - 502 -7676 office
From: David Gastel [ mai Ito: DGASTELCa)landdesian.com]
Sent: Friday, April 12, 2013 11:29 AM
To: Cushing, David; Rhinehalt, Brad
Cc: Ross Massey
Subject: Oakwood North Subdivision
David /Brad,
I have attached the Operation and Maintenance Manuals for the Level Spreaders. If you can get these signed and
notarizes as soon as possible, we can get our approval from DWQ for our riparian buffer impacts. I told them I could get
this back to them by Monday.
Thanks,
David Gastel, PE
Associate
LandDesign I Raleigh NC
19 West Hargett Street Suite 602, Raleigh, NC 27601
V: 919.838.9331
F: 919.800.3583
C: 704.351.5227
Email: dgastel(Manddesign.com
For 35 years LandDesign has offered award winning urban design, planning, civil engineering and landscape architecture solutions to public and private
sector clients across the globe. With four offices across the United States, the LandDesign team effectively brings innovative, buildable, sustainable and
ecologically responsible projects to life worldwide.
Please consider the environment before printing this email
The information transmitted in this message is only for the use of the Intended Recipient, for the sole purpose agreed upon with LandDesign, Inc. Recipient agrees to verify the information
to ascertain accuracy and completeness for the intended use and to ensure that such information is free of all viruses and other defects prior to use. LandDesign, Inc. accepts no
responsibility for loss or damage arising from the use of this information.
Consider the environment before printing this email.
MY HOME. MY EAPTK®R
permit Ntnnber:
(to be provided by Dff' j
Drainage Area NUMber: Qom'
Filter Strip, Restored Riparian Buffer and Level Spreader
Operation and Maintenance Agreement
I will keep a maintenance record on this BMP. This maintenance record will be kept in a
log in a known set location. Any deficient BMP elements noted in the inspection will be
corrected, repaired or replaced immediately. These deficiencies can affect the integrity
of structures, safety of the public, and the removal efficiency of the BMP.
Important maintenance procedures:
— Immediately after the filter strip is established, any newly planted vegetation
will be watered twice weekly if needed until the plants become established
(commoiiiy six weeks).
— Once a year, the filter ship will be reseeded to maintain a dense growth of
vegetation
— Stable groundcover will be maintained in the drainage area to reduce the
sediment load to the vegetation.
— Two to three times a year, grass filter strips will be mowed and the clippings
harvested to promote the growth of thick vegetation with optimum pollutant
removal efficiency. Turf grass should not be cut shorter than 3 to 5 inches and
may be allowed to grow as tall as 12 inches depending on aesthetic requirements
(NIPC,1993). Forested filter ships do not require this type of maintenance.
— Once a year, the soil will be aerated if necessary.
— Once a year, soil pH will be tested and lime will be added if necessary.
After the filter strip is established, it will be inspected quarterly and within 24 hours
after every storm event greater than 1.0 inch (or 1.5 :inches if in a Coastal County).
Records of operation and maintenance will be kept in a known set location and will be
available upon request.
Inspection activities shall be performed as follows. Any problems that are found shall
be repaired immediately.
BMP element:
Potential problem:
How I will remediate the problem-
The entire filter strip
Trash/ debris is present.
Remove the trash /debris.
system
The flow splitter device
The flow splitter device is
Unclog the conveyance and dispose
(if applicable)
clogged.
of any sed meat off -site.
The flow splitter device is
Make any necessary repairs or
damaged.
replace if damage is too large for
repair,
Form SWU40I -Level Spreader, Filter Strip, Restored Riparian Buffer O &M -Rev.3 page I of 3
BMP element:
Potential problem:
How I will remediate the problem:
The Swale and the level
The swale is clogged with
Remove the sediment and dispose
lip
sediment.
of it off -site.
The level Iip is cracked,
Repair or replace lip.
settled, undercut, eroded or
otherwise damaged.
There is erosion around the
Regrade the soil to create a berm
end of the level spreader that
that is higher than the level lip, and
shows stormwater has
then plant a ground cover and
bypassed it.
water until it is established. Provide
lime and a one -time fertilizer
application,
Trees or shrubs have begun
Remove them.
to grow on the swale or just
downslo e of the level lip.
The bypass channel
Areas of bare soil and /or
Regrade the soil if necessary to
erosive gullies have formed.
remove the &Lilly, and then
reestablish proper erosion control.
Turf reinforcement is
Study the site to see if a larger
damaged or ripap is rollitg
bypass channel is needed (enlarge if
downhill.
necessary). After this, reestablish
the erosion control material.
The filter strip
Grass is too short or too long
Maintain grass at a height of
if applicable).
a roximateI three to six inches.
Areas of bare soil and /or
Regrade the soil if necessary to
erosive gullies have formed.
remove the gully, and then plant a
ground cover and water until it is
established. Provide lime and a
one -time fertilizer application.
Sediment is building up on
Remove the sediment and
the filter strip.
restabilize the soil with vegetation if
necessary. Provide lime and a one-
time fertilizer application.
Plants are desiccated.
Provide additional irrigation and
fertilizer as needed.
Plants are dead, diseased or
Determine the source of the
dying.
problem: soils, hydrology, disease,
etc. Remedy the problem and
replace plants. Provide a one -tune
fertilizer application.
Nuisance vegetation is
Remove vegetation by hand if
choking out desirable species.
possible. If pesticide is used, do not
allow it to get into the receiving
water.
The receiving water
Erosion or other signs of
Contact the NC Division of Water
damage have occurred at the
Quality local Regional Office, or the
outlet.
401 Oversight Unit at 919- 733 -1786.
Form SWU401 -Level Spreader, Filter Strip, Restored Riparian Buffer O &M -Rev.3 Page 2 of 3
Permit Number:
(to be provided b3, DTVQ)
I acknowledge and agree by my signature below that I am responsible for the
performance of the maintenance procedures listed above. I agree to notify DWQ of any
problems with the system or prior to any changes to the system or responsible party.
Project narne:Qakwood North Subdivision
Bh4P clrainage area number:DA -B
Print name:Kirby LaForce
Title:VP Land Acquisition/Planning
Address:4518 S Miami Blvd Suite 180 Durham NC 27703
Phone:919- 768 -7988
Date:
Note: Tile legally responsible party should not be a homeowners association unless more than 50% of
the lots have been sold and a resident of the subdivision has been named the president.
1, %ohal bOU aI G S , a Notary Public for the State of
h tar- 010W.% , County of \NM ly, , do hereby certify that
Ki rb j Ldifot C personally appeared before me this x
day of V ri , S and acknowledge the due execution of the
forgoing filter strip, riparian buffer, and /or level spreader maintenance requirements.
Witness my band and official seal,
A,��ttEtt�irr
DOUG
- �4oia4Y Publtc
wake county -
p /rHC P
I��`\\��
SEAL
My commission expires i 11
Forin SWU401 -Level Spreader, Filter Strip, Restored Riparian Buffer O &M -Rev.3 Page 3 of 3
Permit Number:
(to be provided by DIVA)
Drainage Area Number: (,%
Filter Strip, Restored Riparian Buffer and Level Spreader
Operation and Maintenance Agreement
I will keep a maintenance record on this BMP. This maintenance record will be kept in a
log in a known set location. Any deficient BMP elements noted hl the inspection will be
corrected, repaired or replaced immediately. These deficiencies can affect the integrity
of structures, safety of the public, and the removal efficiency of the BMP.
Important maintenance procedures:
— Immediately after the filter strip is established, any newly planted vegetation
will be watered twice weekly if needed until the plants become established
(commonly six weeks).
— Once a year, the filter strip will be reseeded to maintain a dense growth of
vegetation
— Stable groundcover will be maintained in the drainage area to reduce the
sediment load to the vegetation.
-- Two to three times a year, grass filter ships will be mowed and the clippings
harvested to promote the growth of thick vegetation with optimum pollutant
removal efficiency. Turf grass should not be cut shorter than 3 to 5 inches and
may be allowed to grow as tall as 12 inches depending on aesthetic requirements
(NIPC,1993). Forested filter strips do not require this type of maintenance.
— Once a year, the soil will be aerated if necessary.
— Once a year, soil pH will be tested and lime will be added if necessary.
After the filter strip is established, it will be inspected quarterly and within 24 hours
after every storin event greater than 1.0 inch (or 1.5 inches if in a Coastal County).
Records of operation and maintenance will be kept in a known set location and will be
available upon request.
Inspection activities shall be performed as follows, Any problems that are found shall
be repaired immediately.
BMP element:
Potential problem:
How I will remediate the problem:
The entire filter strip
Trash /debris is present.
Remove the trash /debris.
system
The flow splitter device
The flow splitter device is
Unclog the conveyance and dispose
(if applicable)
clogged.
of any sediment off -site.
The flow splitter device is
Make any necessary repairs or
damaged,
replace if damage is too large for
repair.
Form SWU401 -Level Spreader, Filter Strip, Restored Riparian Buffer O &M -Rev.3 Page I of 3
BMP element:
Potential problem:
How I will remediate the problem:
The swale and the level
The swale is clogged with
Remove the sediment and dispose
lip
sediment.
of it off -site.
The level lip is cracked,
Repair or replace lip.
settled, undercut, eroded or
otherwise damaged.
There is erosion around the
Regrade the soil to create a berm
end of the level spreader that
that is higher than the Ievel lip, and
shows stormwater has
then plant a ground cover and
bypassed it.
water until it is established. Provide
lime and a one -time fertilizer
application.
Trees or shrubs have begun
Remove them.
to grow on the swale or just
downslo e of the level lip.
The bypass channel
Areas of bare soil and /or
Regrade the soil if necessary to
erosive gullies have formed.
remove the gully, and then
reestablish proper erosion control.
Turf reinforcement is
Study the site to see if a larger
damaged or ripap is rolling
bypass channel is needed (enlarge if
downhill.
necessary). After this, reestablish
the erosion control material.
The filter strip
Grass is too short or too long
Maintain grass at a height of
if applicable),
approximately three to six inches.
Areas of bare soil and /or
Regrade the soil if necessary to
erosive gullies have formed.
remove the gully, and then plant a
ground cover and water until it is
established. Provide lime and a
one -time fertilizer application.
Sediment is building up on
Remove the sediment and
the filter strip.
restabilize the soil with vegetation if
necessary. Provide lime and a one-
time fertilizer application.
Plants are desiccated.
Provide additional irrigation and
fertilizer as needed.
Plants are dead, diseased or
Determine the source of the
dying,
problem: soils, hydrology, disease,
etc. Remedy the problem and
replace plants. Provide a one -time
fertilizer application.
Nuisance vegetation is
Remove vegetation by hand if
choking out desirable species.
possible. If pesticide is used, do not
allow it to get into the receiving
water.
The receiving water
Erosion or other signs of
Contact the NC Division of Water
damage have occurred at the
Quality local Regional Office, or the
outlet.
401 Oversight Unit at 919- 733 -1786.
Form SWU401 -Level Spreader, Filter Strip, Restored Riparian Buffer O &M -Rev.3 Page 2 of 3
Permit Number:
(to be provided by D)YQ)
I acknowledge and agree by any signature below that I am responsible for the
performance of the maintenance procedures listed above. I agree to notify DWQ of any
problems with the system or prior to any changes to the system or responsible party.
Project narne:0akwood North Subdivision
BMP di-ainage area number:
Print name:Kirby LaPorce
Title:VP Ac uisition/Plannin
Address:4518 S Miami Blvd Suite 180 Durham, NC 27703
Signature:
Date: vhz�
Note: The legally responsible party should not be a homeowners association unless more than 50% of
the lots have been sold and a resident of the subdivision has been named the president.
I, . Racyel ba_gglas , a Notary Public for the State of
wocm c4aliy , County of WAkC, , do hereby certify that
K'% Ir IOU personally appeared before me this _149
day of April , U1 2) , and acknowledge the due execution of the
forgoing filter strip, riparian buffer, and /or level spreader maintenance requirements,
Witness nay hand and official seal,
�\``���111kilII111
.��� �F L
DOUG ���i�
�i
\\e4G ly�/',,i
_ Notoly Public
Wake county =
SEAL
My commission expires �Pri � 6- 241" 1
Form SWU401 -Level Spreader, Filter Strip, Restored Riparian Buffer O &M -Rev.3 Page 3 of 3