Loading...
HomeMy WebLinkAboutNCC202761_Notice of Termination_20210526Action History (UTC-05:00) Eastern Time (US & Canada) Subrrit by Anonymous User 5/26/2021 4:13:53 PM (NOT Submittal) Approve by Morman, Alaina 5/28/2021 9:45:50 AM (NOT Request Review- NCC202761) • The task was assigned to Morman, Alaina. The due date is: May 31, 2021 5:00 PM 5/26/2021 4:13 PM 1 � NORTH CAROLINA Enrlronmenral Quallly Certificate of NCC202761 Coverage (COC) Enter the Certificate of Coverage Nmber No.* 2020 Annual Fee Status 2021 Annual Fee Status May be blank (if not yet billed) Information associated with this permit: Project Name Maiden Creek Solar Project - Overhead Line Address Bowbunting Club Road, Maiden, NC County Catawba Latitude 35.6120 Longitude -81.1850 Permittee Listed M. A. Mortenson Company Legally Responsible Tom Schmall Individual NC Reference No. NCG01-2020-2761 E&SC Plan ID CATAW-2020-013 Original NOI 27648 Tracking No. Date COC Issued 6/30/2020 Prior Rescission Cate populates only if COCwas already rescinded at tirre of subrrittal. Date Reason for Rescission/Termination Request: Reason for r Project Closed -Out Termination of r Sale (Another Owner/Operator obtained a new COC) Coverage * U Mistake or Invalid Coverage r Other Ad d i o n a I Nbre information about the basis of this request, if needed. Explanation Supporting Upload Supporting Dxurrentation if applicable. Documentation Mist beFDFformat Project Close-out Information: Final Close-out 5/19/2021 Inspection Approval Project Close-out CATAW-2020-013_5.19.2021.pdf 59.12KB Approval Mist be FDFforrrat Documentation North Carolina General Statute 143-215.66 (1) provides that: Anyperson who knowinglymakes any false statement, representation, or certification in anyapplication, record, report, plan, or other documentfiled or required to be maintained under this Article or a rule implementing this Article; or who knowingly makes a false statement of a material fact in a rulemaking proceeding or contested case underthis Article; or who falsifies, tampers with, or knowingly renders inaccurate any recording or monitoring deice or method required to be operated or maintained under this Article or rules ofthe Commission implementing this Article shall be guiltyofa Class 2 misdemeanor which mayinclude a fine not to exceed ten thousand dollars ($10,000). rJ I, as an authorized representative, hereby request rescission of coverage under the NPDES Stormwater Permit for the subject facility. I am familiar with the information contained in this request and to the best of my knowledge and belief such information is true, complete and accurate. *This form must be signed by a responsible corporate officer that owns or operates the construction activity, such as a president, secretary, treasurer, or vice president, or a manager that is authorized in accordance with Part IV, Section B, Item (6) of the NCG010000 General Permit. For more information on signatory requirements, see Part IV, Section B, Item (6) of that permit. Signature Type Name* Katlyn Beebout Title * Associate Environmental Specialist Organization* M. A. Mortenson Company Date * 05/26/2021 Email for katlyn.beebout@mortenson.com Confirmation * Contact Telephone* 5078293848 NOT Certification 2025.05.26 - NCG01 Notice of Termination - Maiden Form 42.06KB Creek Solar Project-Overhead.pdf Mist be FDF Format Is this COC Already Ensure this CCChas not been rescinded since subrrittal! Rescinded? Additional Email CCd on Notification Erails (Optional) Original Permittee CCd on Wification Bmils Email tom.schmall@mortenson.com Original Site Contact CCd on Notificaiton Errails Email nick.berzins@mortenson.com