HomeMy WebLinkAbout20210975 Ver 1_Meeting Request Review_20210527 tie R•.'.
DWR Pre-Filing Meeting Request Form
NORTH CAROLINA
EnYlmnal2nlrtl Qua fay
ID#* 20210975 Version* 1
Regional Office* Wilmington Regional Office-(910)796-7215
Reviewer List* Robert Patterson
Pre-Filing Meeting Request submitted 5/27/2021
.........................................................................................................................................................................................................................................................................................................................................................................................................................................................
Contact Name* Gordon Cashin
Contact Email Address* gcashin@ncdot.gov
Project Name* Widening of NC 211 fro Aberdeen to Raeford,TIP R-5709
Project Owner* NCDOT
Project County* Hoke
Owner Address: Street Address
1020 Birch Ridge Road
Address Line 2
City State/Rovince/Region
Raleigh NC
Fbstal/Zip Code Country
27610 United States
Is this a transportation project?* r Yes r No
Type(s)of approval sought from the DWR:
rJ 401 Water Quality Certification- I— 401 Water Quality Certification-
Regular Express
I— Individual Permit I— Modification
r- Shoreline Stabilization
Does this project have an existing project ID#?*
r Yes r No
Do you know the name of the staff member you would like to request a meeting with?
no meeting is requested
Please give a brief project description below and include location information.*
NC 211 widening to Multilanes, From US 15-501 in Aberdeen to SR 1244
(West Palmer Street)/SR 1311
(Mockingbird Hill Road) in Raeford, Moore and Hooke Brunswick
Counties.401 Application is pending.
Please attach the documentation you would like to have the meeting about.
pdf only
By digitally signing below, I certify that I have read and understood that per the Federal Clean Water Act Section
401 Certification Rule the following statements:
• This form completes the requirement of the Pre-Filing Meeting Request in the Clean Water Act Section 401 Certification
Rule.
. I understand by signing this form that I cannot submit my application until 30 calendar days after this pre-filing
meeting request.
. I also understand that DWR is not required to respond or grant the meeting request.
Your project's thirty-day clock started upon receipt of this application. You will receive notification regarding meeting location
and time if a meeting is necessary. You will receive notification when the thirty-day clock has expired,and you can submit an
application.
Signature
-e,fzezvor.azdeieW
Submittal Date 5/27/2021
Reviewer Meeting Request Decision
.........................................................................................................................................................................................................................................................................................................................................................................................................................................................
Is a meeting required or is there more info needed?*
r Yes (' No
If rrnre inforn- tion is needed,please add conrrents for the enail notification below.