Loading...
HomeMy WebLinkAbout20210346 Ver 1_Meeting Request form 2_15_2021 3_50_57 PM_20210526DWR Pre-Fil ing Meeting Req u est Form Contact Name * Contact Email Addre ss * Proje ct Owne r * Proje ct Name * Proje ct County * Owne r Addre ss:* Is this a transportation proje ct?* Type (s) of approv al sought from the DWR: Doe s this proje ct hav e an e xisting proje ct ID#?* Do you know the name of the staff me mbe r you would like to re que st a me e ting with? Ple ase giv e a brie f proje ct de scription be low.* Please give a couple of dates you are available for a meeting. Ple ase attach the docume ntation you would like to hav e the me e ting about. Steve Trowell sjtrowell@ncdot,gov North Carolina Department of Transportation US 264 Shoulder Stabilization and Guardrail Repair Hyde City Edenton State / Province / Region North Carolina Postal / Zip Code 27932 Country US Street Address 113 Airport drive Suite 100 Address Line 2 Yes No 401 Water Quality Certification - Regular 401 Water Quality Certification - Express Individual Permit Modification Shoreline Stabilization Yes No Garcy Ward Purpose of project is to repair shoulder slope and stabilize with class B granite riprap. The wooden post supporting the existing guardrail have rotted and also need replacing. The project is located on US 264 east of Engelhard near the airport in Hyde County, North Carolina. The road shoulder at this location for a distance of 250' needs repair and stabilization. The adjacent surface water is a large drainage canal that drains to the drainage pump on 5th avenue canal. Signature * Submittal Date Topo HWY 264 Shoulder Repair and Stabilization Engelhard - Hyde.pdf 1.15MB pdf only By digitally signing below, I certify that I have read and understood that per the Federal Clean Water Act Section 401 Certification Rule the following statements: This form completes the requirement of the Pre-Filing Meeting Request in the Clean Water Act Section 401 Certification Rule. I understand by signing this form that I cannot submit my application until 30 calendar days after this pre-filing meeting request. I also understand that DWR is not required to respond or grant the meeting request. Your project’s thirty-day clock started upon receipt of this application.You will receive notification regarding meeting location and time if a meeting is necessary.You will receive notification when the thirty-day clock has expired, and you can submit an application. 2/15/2021