Loading...
HomeMy WebLinkAbout20210863 Ver 1_Pre-Filing Meeting Information_20210524DWR Pre-Fil ing Meeting Req u est Form Contact Name * Contact Email Addre ss * Proje ct Owne r * Proje ct Name * Proje ct County * Owne r Addre ss:* Is this a transportation proje ct?* Type (s) of approv al sought from the DWR: Doe s this proje ct hav e an e xisting proje ct ID#?* Do you know the name of the staff me mbe r you would like to re que st a me e ting with? Ple ase giv e a brie f proje ct de scription be low and include location information.* Please give a couple of dates you are available for a meeting. Ple ase attach the docume ntation you would like to hav e the me e ting about. Laura J. Meyer laura.meyer@woodplc.com CSX Real Property, Inc. CSXT Bridge at MP 305.5 over Big Swamp #3 Robeson City Jacksonville State / Province / Region Florida Postal / Zip Code 32202 Country USA Street Address 500 Water Street Address Line 2 Yes No 401 Water Quality Certification - Regular 401 Water Quality Certification - Express Individual Permit Modification Shoreline Stabilization Yes No A jurisdictional forested wetland occurs along both sides of the railraod tracks at milepost (MP) 305.5 on the CSXT railway. The forested wetland at the bridge crossing is characterized as a Bottomland Hardwood Forest. The wetlands within the footprint of the project encompass a non-forested portion of the Bottomland Hardwood Forest, as they are in the maintained ROW of the railway. 5/23/2021 Signature * Submittal Date PCN-Butters_04.23.2021.pdf 23.86MB pdf only By digitally signing below, I certify that I have read and understood that per the Federal Clean Water Act Section 401 Certification Rule the following statements: · This form completes the requirement of the Pre-Filing Meeting Request in the Clean Water Act Section 401 Certification Rule. · I understand by signing this form that I cannot submit my application until 30 calendar days after this pre-filing meeting request. · I also understand that DWR is not required to respond or grant the meeting request. Your project’s thirty-day clock started upon receipt of this application.  You will receive notification regarding meeting location and time if a meeting is necessary.  You will receive notification when the thirty-day clock has expired, and you can submit an application. 4/23/2021