HomeMy WebLinkAbout20201779 Ver 1_More Info Received_20210514CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to Report Spam. <mailto:report.spam@nc.gov>
Good afternoon Lyle,
We have provided responses to your concerns/questions below in bold and have provided referenced attachments for your review.
1. As stated in the PCN the road impact at Impact Area “C” is necessary to provide access to the future school site. As such, the present layout of roadway infrastructure at Impact Area
“C” for the proposed project does not depict logical termini leading to the potential for further/future jurisdictional impacts associated with additional impacts for construction of
the future school site, therefore the Corps is unable to determine whether the activity authorized under the nationwide permit will result in more than minimal individual or cumulative
adverse environmental effects. Please provide further information on the potential for adverse cumulative effects due to the stub road and the future school site. A retaining wall has
been added adjacent to the road access to the future school site and wetland impact C has been omitted from the site plan. Please see attached updated Overall Impact Area Map-Sheet
E1 and updated ePCN application.
2. As shown on the Overall Subdivision Layout C2.00 (attached) there is planned future development adjacent to South Salem Street. Can you provide information to support the independent
utility of the proposed development and the future development? According to the attached Preliminary Layout Plan C2.00 found on the Apex Development GIS map additional multifamily development
is proposed. Is the proposed future development to be completed by a different entity? Per the applicant Stephen Dorn of Lennar, “the planned future development adjacent to South Salem
Street will be a separate applicant. Furthermore, the future development will have separate access points off Salem Street per the PUD referenced. Lastly, these future developments
will not share any amenities with the Lennar development.” We’d also like to add that per the Spangler Delineation the areas adjacent to South Salem Street are uplands, see attached
“Poe Wetland Map 1.9.20”.
Attachments:
Depot 499 Overall Impact Area Map-Sheet E1
Updated ePCN application
Updated Impact Map set
Poe Wetland Map 1.9.20
Please let us know if you have any additional questions or need further information to continue your review of this permit application.
Thank you,
CAMDEN BRUNICK
Environmental Consultant
Soil & Environmental Consultants, PA
North Quarter Office Park
8412 Falls of Neuse Road, Suite 104
Raleigh, NC 27615
(919)846-5900 (office)
From: Phillips, George L CIV USARMY CESAW (USA) <George.L.Phillips@usace.army.mil>
Sent: Thursday, May 13, 2021 1:25 PM
To: Deborah Shirley <dshirley@sandec.com>
Cc: Goss, Stephanie <stephanie.goss@ncdenr.gov>; Trone, Rick V <rick.trone@ncdenr.gov>
Subject: Depot 499 / Apex / Wake County / SAW-2020-00034 / NWP 29 / Request for Additional Information
Ms. Shirley,
I have reviewed the above referenced project and need the following comments/questions addressed in order to proceed with the evaluation of the project.
1. As stated in the PCN the road impact at Impact Area “C” is necessary to provide access to the future school site. As such, the present layout of roadway infrastructure at Impact Area
“C” for the proposed project does not depict logical termini leading to the potential for further/future jurisdictional impacts associated with additional impacts for construction of
the future school site, therefore the Corps is unable to determine whether the activity authorized under the nationwide permit will result in more than minimal individual or cumulative
adverse environmental effects. Please provide further information on the potential for adverse cumulative effects due to the stub road and the future school site.
2. As shown on the Overall Subdivision Layout C2.00 (attached) there is planned future development adjacent to South Salem Street. Can you provide information to support the independent
utility of the proposed development and the future development? According to the attached Preliminary Layout Plan C2.00 found on the Apex Development GIS map additional multifamily development
is proposed. Is the proposed future development to be completed by a different entity?
Please let me know if you have any questions/concern.
Lyle Phillips
Regulatory Specialist
US Army Corps of Engineers
CE-SAW-RG-R
3331 Heritage Trade Drive, Suite 105
Wake Forest, North Carolina 27587
Phone: (919) 554-4884, Ext. 25.
Fax: (919) 562-0421
Email: George.L.Phillips@usace.army.mil <mailto:George.L.Phillips@usace.army.mil>
We would appreciate your feedback on how we are performing our duties. Our automated Customer Service Survey is located at https://regulatory.ops.usace.army.mil/customer-service-survey/
<https://urldefense.com/v3/__https://regulatory.ops.usace.army.mil/customer-service-survey/__;!!HYmSToo!P7zsziwSc5NbKYuSTRMLQC5vVbg6tn1IcBaS1J60vg8j1sMWflkvimpMeBZi42DuBBx4qA$> .
Thank you for taking the time to visit this site and complete the survey.
4338 Bland Road Raleigh, NC 27609919-875-4288
Poe Wetlands and Streams6401 Apex Barbecue Road and 1216, 1300 & 1330 S Salem Street Apex, North Carolina
January 2020
Poe Wetland Map
map source:Wake County GIS
«0 260 520 780 1,040130
Feet
Legend
Pot. Jurisdictional Streams
Approximate Property Boundary
Pot. Jurisdictional Non-Wetlands (Ponds)
Potentially Jurisdictional Wetlands
WE
P4
WC
WB
SB
SC
WF
SD
WA
P1
P2
SA
P3
SA
Pond in
Upland / Not
Jurisdictional
(AJD)jWD
X:\Projects\LEN\LEN-19090\04-Production\Engineering\Exhibits\Wetland, Stream, and Buffer Impact Maps\LEN19090-E1.dwg, 5/14/2021 8:59:45 AM, Sarmadi, Sommon
DEPOT 499
WETLAND, STREAM, AND BUFFER IMPACT MAPS
0 APEX BARBECUE ROAD
APEX, NORTH CAROLINA, 27502
PROJECT NO.LEN-19090
FILENAME
CHECKED BY
DRAWN BY
SCALE
DATE 12. 29. 2020
The John R. McAdams Company, Inc.
2905 Meridian Parkway
Durham, NC 27713
phone 919. 361. 5000
fax 919. 361. 2269
license number: C-0293, C-187
www.mcadamsco.com
PLAN INFORMATION
1" = 400'
NC GRID (NAD83)
200
GRAPHIC SCALE
4000 800
1 inch = 400 ft.
OVERALL IMPACT AREA MAP - SHEET E1
LEN19090-E2
SSSEE INSET "A"INSET "A"
TOTAL:
PERMANENT- NO PERMANENT LOSS WETLAND IMPACT AREA =10,640 SF (0.24 AC)
TEMPORARY WETLAND IMPACT AREA =203 SF (0.00 AC)
PERMANENT STREAM CHANNEL IMPACT = 845 SF (.02 AC, 182 LF)
TEMPORARY STREAM CHANNEL IMPACT =555 SF (.01 AC, 127 LF)
PERMANENT (NO-LOSS) STREAM CHANNEL IMPACT = 328 SF (.01 AC, 77 LF)
TOTAL ZONE 1 BUFFER IMPACT AREA = 19,394 SF (.45 AC)
TOTAL ZONE 2 BUFFER IMPACT AREA = 10,098 SF (.23 AC)
TOTAL ZONE 3 APEX BUFFER IMPACT AREA = 39,461 SF (.91 AC)
Pre-Construction Notification (PCN) Form
For Nationwide Permits and Regional General Permits
(along with corresponding Water Quality Certifications)
October 26, 2020 Ver 3.3
Please note: fields marked with a red asterisk * below are required. You will not be able to submit the form until all mandatory questions are answered.
Also, if at any point you wish to print a copy of the E-PCN, all you need to do is right-click on the document and you can print a copy of the form.
Below is a link to the online help file.
https://edocs.deq.nc.gov/WaterResources/0/edoc/624704/PCN%20Help%20File%202018-1-30.pdf
County (or Countie s) where the proje ct is locate d:*
Is this a NCDM S Proje ct *
Is this project a public transportation project?*
1a. Type (s) of approv al sought from the Corps:*
Has this PCN pre v iously be e n submitte d?*
1b. What type (s) of pe rmit(s) do you wish to se e k authorization?*
This form may be used to initiate the standard/individual permit process with the Corps. Please contact your Corps representative concerning submittals for standard permits. All required items that
are not provided in the E-PCN can be added to the miscellaneous upload area located at the bottom of this form.
1c. Has the NWP or GP numbe r be e n v e rifie d by the Corps?*
Nationwide Pe rmit (NWP) Numbe r:
NWP Numbe rs (for multiple NWPS):
1d. Type (s) of approv al sought from the DWR:*
Pre-Filing Meeting Information
A. Processing Information
Wake
Yes No
Click Yes, only if NCDMS is the applicant or co-applicant.
Yes No
This is any publicly funded by municipal,state or federal funds road, rail, airport transportation project.
Section 404 Permit (wetlands, streams and waters, Clean Water Act)
Section 10 Permit (navigable waters, tidal waters, Rivers and Harbors Act)
Yes
No
Nationwide Permit (NWP)
Regional General Permit (RGP)
Standard (IP)
Yes No
29 - Residential Developments
NWP 58- Utility Line Activities for Water and Other Substances
List all NW numbers you are applying for not on the drop dow n list.
check all that apply
401 Water Quality Certification - Regular 401 Water Quality Certification - Express
Non-404 Jurisdictional General Permit Riparian Buffer Authorization
Individual Permit
Before submitting this form please ensure you have submitted the Pre-Filing Meeting Request Form as we will not be able to accept your application without this important first step. The Pre-Filing
Meeting Request Form is used in accordance with 40 C.F.R. Section 121.4(a) “At least 30 days prior to submitting a certification request, the project proponent shall request a pre-filing meeting with the
certifying agency” and in accordance with 40 C.F.R. Section 121.5(b)(7), and (c)(5) all certification requests shall include documentation that a pre-filing meeting request was submitted to the certifying
authority at least 30 days prior to submitting the certification request. Click he re to read more information on when this form is needed prior to application submission or he re to view the form.
ID#Ve rsion
20201779 Version 1
1e . Is this notification sole ly for the re cord be cause writte n approv al is not re quire d?
*
For the re cord only for DWR 401 Ce rtification:
For the re cord only for Corps Pe rmit:
1f. Is this an afte r-the -fact pe rmit application?*
1g. Is payme nt into a mitigation bank or in-lie u fe e program propose d for mitigation of impacts?
Acce ptance Le tte r Attachme nt
1h. Is the proje ct locate d in any of NC's twe nty coastal countie s?*
1j. Is the proje ct locate d in a de signate d trout wate rshe d?*
Link to trout information: http://www.saw.usace.army.mil/Missions/Regulatory-Permit-Program/Agency-Coordination/Trout.aspx
1a. Who is the Primary Contact?*
1b. Primary Contact Email:*
1c. Primary Contact Phone :*
1d. Who is applying for the pe rmit?*
1e . Is the re an Age nt/Consultant for this proje ct?*
2. Owner Information
Pre -fling M e e ting or Re que st Date *
Attach docume ntation of Pre -Filing M e e ting Re que st he re :*
11/18/2020
DWR Pre-Filing Meeting Request Form.pdf 51.99KB
Yes No
Yes No
Yes No
If so, attach the acceptance letter from mitigation bank or in-lieu fee program.
Yes No
Click the upload button or drag and drop files here to attach document
Depot 499 - Wetland SOA 04-02-2021.pdf 171.27KB
FILE TYPE MUST BE PDF
Yes No
Yes No
B. Applicant Information
Deborah Shirley
dshirley@sandec.com
(xxx)xxx-xxxx
(919)846-5900
Owner Applicant (other than owner)
(Check all that apply)
Yes No
2a. Name (s) on re corde d de e d:*
2b. De e d book and page no.:
2c. Re sponsible party:
2d. Addre ss *
2e . Te le phone Numbe r:*
2f. Fax Numbe r:
2g. Email Addre ss:*
Daryl and Jeanne Poe
DB: 010509 DP: 02106
(for Corporations)
City
Apex
State / Province / Region
NC
Postal / Zip Code
27502-7772
Country
USA
Street Address
6401 Apex Barbecue Road
Address Line 2
(xxx)xxx-xxxx
(919)224-9922
(xxx)xxx-xxxx
3. Applicant Information (if different from owner)
Stephen.Dorn@lennar.com
2a. Name (s) on re corde d de e d:*
2b. De e d book and page no.:
2c. Re sponsible party:
2d. Addre ss *
2e . Te le phone Numbe r:*
2f. Fax Numbe r:
2g. Email Addre ss:*
Harp-Barr LLC, Memphis and Maddox LLC
DB: 018244 DP: 02083
(for Corporations)
Daryl Lee Poe & William Douglas Poe
City
Apex
State / Province / Region
NC
Postal / Zip Code
27502-7243
Country
USA
Street Address
1216 S Salem Street
Address Line 2
(xxx)xxx-xxxx
(919)224-9922
(xxx)xxx-xxxx
Stephen.Dorn@lennar.com
2a. Name (s) on re corde d de e d:*
2b. De e d book and page no.:
2c. Re sponsible party:
2d. Addre ss *
2e . Te le phone Numbe r:*
2f. Fax Numbe r:
2g. Email Addre ss:*
William Douglas Poe & Jean S Poe
DB: 009827; DP: 01855
(for Corporations)
City
Apex
State / Province / Region
NC
Postal / Zip Code
27502
Country
USA
Street Address
1216 S Salem Street
Address Line 2
(xxx)xxx-xxxx
(919)224-9922
(xxx)xxx-xxxx
Stephen.Dorn@lennar.com
3a. Name :*
3b. Business Name :
3c. Addre ss *
Stephen Dorn
(if applicable)
Lennar Corporation-Raleigh Division
City
Morrisville
State / Province / Region
NC
Postal / Zip Code
27560
Country
USA
Street Address
1100 Perimeter Park Drive, Suite 112
Address Line 2
4. Agent/Consultant (if applicable)
1a. Name of proje ct:*
1b. Subdivision name :
1c. Ne are st municipality / town:*
2a. Prope rty Identification Numbe r:2b. Prope rty size :
2c. Proje ct Addre ss
2d. Site coordinate s in de cimal de gre e s
Please collect site coordinates in decimal degrees. Use between 4-6 digits (unless you are using a survey-grade GPS device) after the decimal place as appropriate, based on how the location was
determined. (For example, most mobile phones with GPS provide locational precision in decimal degrees to map coordinates to 5 or 6 digits after the decimal place.)
Latitude :*Longitude :*
3d. Te le phone Numbe r:*
3e . Fax Numbe r:
3f. Email Addre ss:*
(919)224-9922
(xxx)xxx-xxxx (xxx)xxx-xxxx
Stephen.Dorn@lennar.com
4a. Name :*
4b. Business Name :
4c. Addre ss *
4d. Te le phone Numbe r:*4e . Fax Numbe r:
4f. Email Addre ss:*
Age nt Authorization Le tter *
Deborah Shirley
(if applicable)
Soil & Environmental Consultants, PA
City
Raleigh
State / Province / Region
NC
Postal / Zip Code
27615
Country
USA
Street Address
8412 Falls of Neuse Road, Suite 104
Address Line 2
(919)846-5900
(xxx)xxx-xxxx
(919)846-9467
(xxx)xxx-xxxx
dshirley@sandec.com
Please provide the Agent Authorization Letter if you are submitting this document.
SEC Agent Authorization Form Applicant.pdf 344.28KB
FILE TYPE MUST BE PDF
C. Project I nformation and Prior Project History
1. Project Information
Depot 499
(if appropriate)
Apex
2. Project Identification
(tax PIN or parcel ID)
0731676714, 0731662438 & 0731766588
(in acres)
+/- 150 acres, +/- 2 offsite acres
City
Apex
State / Province / Region
NC
Postal / Zip Code
27502
Country
USA
Street Address
1330 S. Salem Street
Address Line 2
35.721692
ex: 34.208504
-78.876016
-77.796371
3. Surface Waters
3a. Name of the ne are st body of wate r to propose d proje ct:*
3b. Wate r Re source s Classification of ne are st re ce iv ing wate r:*
Surface Water Lookup
3c. What riv e r basin(s) is your proje ct locate d in?*
3d. Ple ase prov ide the 12-digit HUC in which the proje ct is locate d.*
River Basin Lookup
4. Project Description and History
4a. De scribe the e xisting conditions on the site and the ge ne ral land use in the v icinity of the proje ct at the time of this application:*
4b. Hav e Corps pe rmits or DWR ce rtifications be e n obtained for this project (including all prior phase s) in the past?*
4d. Attach an 8 1/2 X 11 e xce rpt from the most re ce nt v e rsion of the USGS topographic map indicating the location of the proje ct site . (for DWR)
4e . Attach an 8 1/2 X 11 e xce rpt from the most re ce nt v e rsion of the publishe d County NRCS Soil Surv e y map de picting the proje ct site . (for DWR)
4f. List the total e stimate d acre age of all e xisting we tlands on the prope rty:
4g. List the total e stimate d line ar fe e t of all e xisting stre ams on the prope rty:
4h. Explain the purpose of the propose d proje ct:*
4i. De scribe the ov e rall proje ct in de tail, including indirect impacts and the type of e quipme nt to be use d:*
4j. Ple ase upload proje ct drawings for the propose d proje ct.
5. Jurisdictional Determinations
5a. Hav e the we tlands or streams be e n de line ate d on the prope rty or propose d impact are as?*
Comme nts:
5b. If the Corps made a jurisdictional de te rmination, what type of de te rmination was made ?*
Corps AID Numbe r:
UT to Beaver Creek
WS-IV;NSW
Cape Fear
030300020609
Onsite (Residential Area):
Existing conditions onsite consists primarily of wooded and agricultural land with some rural residential structures located adjacent to South Salem St. There is one (1) perennial stream
feature (SA), three (3) intermittent stream features (SB-SD), six (6) wetland features (WA-WF), and four (4) ponds (P1-P4) located on the property. Pond 2 was determined to be in
upland and considered non-jurisdictional. Apex Barbecue Road bounds the property to the north while South Salem Street bounds the property to the east. General land use in the
vicinity of the project is primarily wooded/agricultural land as well as residential developments.
Offsite (Utility Area):
Existing conditions consists primarily of heavily forested land. There is two (2) perennial stream features (SA & Offsite SC), two (2) intermittent stream features (Offsite SB & Offsite SI),
three (3) wetland features (Offsite W1, Offsite W4 & Offsite W8), and one (1) pond feature (Offsite Pond 6) located on the property. Please see attached "Poe Property - Detailed
Sketch Offsite 2020" for exact locations of features.
Yes No Unknown
Click the upload button or drag and drop files here to attach document
USGS + offsite.pdf 6.93MB
File type must be pdf
Click the upload button or drag and drop files here to attach document
SS + offsite.pdf 3.6MB
File type must be pdf
Approximately 2.77 ac onsite and approximately 0.17 ac offsite
(intermittent and perennial)
Approximately 6,020 LF onsite and approximately 1,550 LF offsite
The purpose of this project is to construct a multi-family residential development and its necessary infrastructure.
The overall project consists of the construction of a multi-family residential development to include but not limited to roadway infrastructure, onsite and offsite utilities, residential
structures, amenity center, greenway, and Stormwater Control Measures (SCM). Specifically, there are two (2) utility crossings that impact streams and wetlands, two (2) road crossings
that impact a stream and a wetland, and three (3) greenway crossings that impact streams and wetlands. Equipment typically used for construction and earthwork such as backhoes,
bulldozers, excavators, graders, pavers etc. will be utilized for this project.
Click the upload button or drag and drop files here to attach document
Overall Existing Conditions and Subdivision Layout.pdf 6.25MB
Depot 499 Impact Map Set.pdf 6.11MB
File type must be pdf
Yes No Unknown
Preliminary Approved Not Verified Unknown N/A
5c. If 5a is ye s, who de line ate d the jurisdictional are as?
Name (if known):
Age ncy/Consultant Company:
Othe r:
5d. List the date s of the Corp jurisdiction de te rmination or State de te rmination if a de te rmination was made by the Corps or DWR.
5d1. Jurisdictional de te rmination upload
6. Future Project Plans
6a. Is this a phase d proje ct?*
7b. If ye s, e xplain.
Are any othe r NWP(s), re gional ge ne ral pe rmit(s), or indiv idual pe rmits(s) use d, or intende d to be use d, to authorize any part of the propose d project or re lated activ ity? This
include s othe r se parate and distant crossing for line ar proje cts that re quire De partme nt of the Army authorization but don’t re quire pre -construction notification.
1. Impacts Summary
1a. Whe re are the impacts associate d with your proje ct? (che ck all that apply):
2. Wetland Impacts
If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted.
"W." will be use d in the table be low to re pre se nt the word "wetland".
2a. Site #*(?)2a1 Reason *(?)2b. Impact type *(?)2c. Type of W.*2d. W. name *2e . Fore ste d *2f. Type of
Jurisdicition *(?)
2g. Impact
are a *
2g. Total Te mporary We tland Impact
2g. Total Pe rmane nt We tland Impact
2g. Total We tland Impact
2h. Comme nts:
3. Stream Impacts
If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this question for all stream sites impacted.
"S." will be used in the table below to represent the word "stream".
Example: SAW-2017-99999
SAW-2020-00034
Maria Polizzi
Spangler Environmental, Inc.
USACE: Site visit and field determination made on January 3, 2020 and updated site visit delineation map received on January 10, 2020 by Lyle Phillips. Town of Apex: Site visit and
buffer determination made on January 12, 2017 by Mike Deaton (Apex 17-004). ***NOTE: Preliminary JD not issued to date. Preliminary JD checked at C.5b to prompt this data box at
C.5d.***
Click the upload button or drag and drop files here to attach document
Poe Determination Delineation Concurrence SAW202000034_Spangler.pdf 107.23KB
Buffer Call - Poe Property.pdf 6.09MB
S&EC_Poe Property - Detailed Sketch Offsite 2020.pdf 2.41MB
File type must be PDF
Yes No
This project is broken out into six (6) construction phases. See attached "Overall Subdivision Layout C2.00" for phasing diagram.
It is my understanding that there are no intended future phases beyond the property boundaries shown that will require a NWP, Regional General Permit or Individual Permit.
D. Proposed Impacts Inventory
Wetlands Streams-tributaries Buffers
Open Waters Pond Construction
Impact C Road Fill/Grading P Headwater Forest WA Yes Both 0.006
(acres)
Impact F Utility Crossing
(Permanent-no
permanent loss)
P Bottomland Hardwood Forest Offsite W1 Yes Both 0.244
(acres)
Impact G Greenway Crossing
(construction access)
T Bottomland Hardwood Forest WB Yes Both 0.005
(acres)
0.005
0.250
0.255
Total permanent wetland impacts = 264 SF (0.006 ac); Total permanent-no permanent loss wetland impacts = 10,640 SF (0.244 ac); Total temporary
wetland impact = 203 SF (0.005 ac).
3a. Reason for impact *(?)3b.Impact type *3c. Type of impact *3d. S. name *3e . Stre am Type *
(?)
3f. Type of
Jurisdiction *
3g. S. width *3h. Impact
le ngth *
S1
S2
S3
S4
S5
S6
S7
** All Perennial or Intermittent streams must be verified by DWR or delegated local government.
3i. Total jurisdictional ditch impact in square fe e t:
3i. Total pe rmane nt stre am impacts:
3i. Total te mporary stre am impacts:
3i. Total stre am and ditch impacts:
3j. Comme nts:
1. Avoidance and Minimization
1a. Spe cifically de scribe me asure s take n to av oid or minimize the propose d impacts in de signing the proje ct:*
1b. Spe cifically de scribe me asure s take n to av oid or minimize the propose d impacts through construction te chnique s:*
Impact B-Road Crossing Permanent Culvert Stream A Perennial Both 5
Average (feet)
182
(linear feet)
Impact B-Road Crossing -
Riprap Pad (Permanent-no
Permanent Loss)
Permanent Other Stream A Perennial Both 4
Average (feet)
77
(linear feet)
Impact B-Road Crossing
(temporary construction
access)
Temporary Other Stream A Perennial Both 3
Average (feet)
40
(linear feet)
Impact E-Utility Crossing
(temporary construction
access)
Temporary Other Offsite Stream I Intermittent Both 7
Average (feet)
31
(linear feet)
Impact F-Utility Crossing
(temporary construction
access)
Temporary Other Offsite Stream B Intermittent Both 4
Average (feet)
20
(linear feet)
Impact H-Greenway Crossing
(temorary construction
access)
Temporary Other Stream C Intermittent Both 3
Average (feet)
18
(linear feet)
Impact I-Greenway Crossing
(temporary construction
access)
Temporary Other Stream A Perennial Both 4
Average (feet)
18
(linear feet)
0
259
127
386
Total permanent loss stream = 182 LF/845 SF (0.019 ac); Total permanent-no permanent loss stream = 40 LF/328 SF (0.007 ac); Total temporary
stream = 127 LF/555 SF (0.012 ac).
E. Impact Justification and Mitigation
S&EC completed a wetland and stream delineation for the entire property in order to identify natural resources so that impacts could be avoided &
minimized to the maximum extent practicable. Proposed impacts include two (2) road crossings, two (2) utility crossings, and three (3) greenway
crossings. Impact Area B is proposed road crossing. Proposed impacts include permanent (i.e. culvert & headwalls), permanent-no permanent loss
(i.e. dissipator pad) and temporary (i.e. construction access) stream impacts. This road crossing is necessary to provide access to the property from
the existing stub road to the north and it will also provide an additional point of ingress/egress required by the Town of Apex for the proposed
development. Stream impacts have been minimized by utilizing cast-in-place head walls and cast-in-place retaining walls at the crossing, and by
utilizing a riprap dissipator that will reduce flow velocities and minimize stream degradation. Additionally, two (2) 42” RCP pipes are proposed to be
buried by 1’ to allow for aquatic life passage. And finally, a temporary diversion ditch, coffer dams, and check dam will be utilized during construction to
divert stream flows and minimize the release of sediments during construction activities. Impact Area C is proposed road fill. Proposed impacts include
permanent wetland impacts. This road impact is necessary to provide access to the future school site. Impacts have been minimized by utilizing 2:1
slopes. Compensatory mitigation at a 2:1 ratio is proposed to offset wetland losses. Impact Area E is a proposed offsite sanitary sewer crossing.
Proposed impacts include temporary stream impacts. This impact is necessary to connect to the existing “utility sleeve” under Highway 540 and
existing sanitary sewer to the west of Highway 540. Impacts have been minimized by crossing the stream at a near perpendicular angle. Impact Area F
is a proposed offsite sanitary sewer crossing. Proposed impacts include temporary stream and permanent-no permanent loss wetland impacts. This
impact is necessary to connect to the existing utility stub and manhole to the east of Kelly Road, west of Highway 540. Stream impacts have been
minimized by crossing the stream at a near perpendicular angle. Wetland impacts could not be minimized, the property owner would not grant an
easement for the sewer outside of the Zone 3 Town of Apex buffers. The utility easement width was minimized where feasible to reduce wetland
impacts. This easement will be a permanently maintained easement and wetland mitigation is proposed at a 1:1 ratio to offsite the wetland “change of
function”. Impact Area G is a proposed greenway crossing. Proposed impact include temporary wetland impacts to construct a boardwalk. This impact
is necessary to provide safe pedestrian connectivity on the western side of the development. Impacts have been minimized by utilizing a boardwalk
over the wetlands, therefore avoiding permanent wetland loss. Impact Areas H & I are proposed greenway crossings. Proposed impacts include
temporary stream impacts to construct a boardwalk in the two different locations. These impacts are necessary to provide safe pedestrian connectivity
from the residential lots in the northeast to the Amenity Center. Impacts have been minimized by utilizing a boardwalk over the streams, therefore
avoiding permanent stream loss. Previous Impact Area A was a sanitary sewer crossing. This impact was omitted and designed within the road
infrastructure. Previous Impact D was wetland fill. This impact was omitted. All temporary stream impacts will be brought back to pre-construction
stream bed elevations and the stream banks will be stabilized. All temporary wetland impacts will be brought back to pre-construction contours and the
existing adjacent wetland source will assist in the restoration of the wetland vegetation.
2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State
2a. Doe s the proje ct re quire Compe nsatory M itigation for impacts to Wate rs of the U.S. or Wate rs of the State ?
2c. If ye s, mitigation is re quire d by (che ck all that apply):
2d. If ye s, which mitigation option(s) will be use d for this proje ct?
3. Complete if Using a Mitigation Bank
3a. Name of M itigation Bank:
3b. Cre dits Purchase d/Requeste d (attach re ce ipt and le tte r)
Type :Quantity:
Attach Re ce ipt and/or le tter
3c. Comme nts
NC Stream Temperature Classification Maps can be found under the Mitigation Concepts tab on the Wilmington District's RIBITS website.
6. Buffer mitigation (State Regulated Riparian Buffer Rules) - required by DWR
6a. Will the proje ct re sult in an impact within a prote cte d riparian buffe r that re quire s buffe r mitigation? If ye s, you must fill out this e ntire form - ple ase contact DWR for more
information.
*** Recent changes to the stormwater rules have required updates to this section .***
1. Diffuse Flow Plan
1a. Doe s the proje ct include or is it adjace nt to prote cte d riparian buffers ide ntifie d within one of the NC Riparian Buffe r Prote ction Rule s?
1b. All buffer impacts and high ground impacts re quire diffuse flow or othe r form of stormwate r treatme nt. If the proje ct is subje ct to a state imple me nte d riparian buffe r prote ction
program, include a plan that fully docume nts how diffuse flow will be maintaine d.
All Stormwate r Control M e asure s (SCM )s must be de signe d in accordance with the NC Stormwate r De sign M anual. Associate d supple me nt forms and othe r docume ntation shall be
prov ide d.
What type of SCM are you prov iding?
For a list of options to meet the diffuse flow requirements, click here.
Diffuse Flow Docume ntation
2. Stormw ater Management Plan
2a. Is this a NCDOT proje ct subje ct to compliance with NCDOT’s Indiv idual NPDES pe rmit NCS000250?*
In order to minimize impacts, diversion ditches, coffer dams, and check dams will be utilized at stream crossings, as well as other typical erosion and
sediment control measures such as silt fencing and sediment basins will be utilized throughout the site during construction activities.
Yes No
DWR Corps
Mitigation bank Payment to in-lieu fee
program
Permittee Responsible
Mitigation
Cane Creek Umbrella Mitigation Bank, specifically from the Bethel Branch Site
Riparian wetland 0.26
Click the upload button or drag and drop files here to attach document
FILE TYPE MUST BE PDF
S&EC reviewed the NCDWR Approved Mitigation Banks in NC list, there were four (4) banks listed within the 03030002 HUC that had riparian wetland
credits available. All four (4) were contacted, three (3) had credits available. Attached is a Statement of Availability letter from Wildlands Holdings.
Permanent wetland loss impact = 0.006 acres; 0.006 @ 2:1 mitigation ratio = 0.012 acres, Permanent-no permanent wetland loss = 0.244 acres; 0.244
@ 1:1 mitigation ratio = 0.244 acres, Total = 0.012 acres + 0.244 acres = 0.256 acres.
Yes No
F. Stormwater M anagement and Diffuse Flow Plan (required by DWR)
Yes No
Level Spreader
Vegetated Conveyance (lower SHWT)
Wetland Swale (higher SHWT)
Other SCM that removes minimum 30% nitrogen
Proposed project will not create concentrated stormwater flow through the buffer
(check all that apply)
Click the upload button or drag and drop files here to attach document
7.05-Post-Development Drainage Area Map 24x36.pdf 4.58MB
File type must be PDF
2b. Doe s this proje ct me e t the re quire me nts for low de nsity proje cts as de fine d in 15A NCAC 02H .1003(2)?*
To look up low density requirement click here 15A NCAC 02H .1003(2).
2c. Doe s this proje ct hav e a stormwate r manage me nt plan (SM P) re v ie we d and approv e d unde r a state stormwate r program or state-approv e d local gov e rnme nt stormwate r
program?*
2d. Which of the following stormwate r manage me nt program(s) apply (che ck all that apply):*
Local Gov e rnme nt Stormwate r Programs *
Ple ase ide ntify which local gov e rnme nt stormwate r program you are using.*
Comme nts:
1. Environmental Documentation
1a. Doe s the proje ct inv olv e an e xpe nditure of public (fe de ral/state /local) funds or the use of public (fe de ral/state ) land?*
2. Violations (DWR Requirement)
2a. Is the site in v iolation of DWR Wate r Quality Ce rtification Rule s (15A NCAC 2H .0500), Isolate d We tland Rule s (15A NCAC 2H .1300), or DWR Surface Wate r or We tland Standards or
Riparian Buffe r Rule s (15A NCAC 2B .0200)?*
3. Cumulative Impacts (DWR Requirement)
3a. Will this proje ct (base d on past and re asonably anticipate d future impacts) re sult in additional de v e lopme nt, which could impact ne arby downstre am wate r quality?*
3b. If you answe re d “no,” prov ide a short narrativ e de scription.
4. Sewage Disposal (DWR Requirement)
4a. Is se wage disposal re quire d by DWR for this proje ct?*
4b. De scribe , in de tail, the tre atme nt me thods and dispositions (non-discharge or discharge ) of waste wate r ge ne rate d from the propose d proje ct. If the waste wate r will be treate d
at a tre atment plant, list the capacity av ailable at that plant.
5. Endangered Species and Designated Critical Habitat (Corps Requirement)
5a. Will this proje ct occur in or ne ar an are a with fe de rally prote cte d spe cie s or habitat?*
5b. Hav e you che cke d with the USFWS conce rning Endange re d Spe cie s Act impacts?*
5c. If ye s, indicate the USFWS Fie ld Office you hav e contacte d.
Yes No
Yes No
Yes No
N/A - project disturbs < 1 acre
Hint: projects that have vested rights, exemptions, or grandfathering from state or locally implemented stormw ater programs or projects that satisfy state or locally-implemented stormw ater programs through use of community in-lieu programs should answ er no
to this question.
Local Government State
If you have a local government approval please include the SMP on their overall impact map.
Phase II NSW
USMP Water Supply
Town of Apex
G. Supplementary Information
Yes No
Yes No
Yes No
We have reviewed the “Draft Internal Policy, Cumulative impacts and the 401 Water Quality Certification and Isolated Wetlands Programs” document
prepared by the NC Division of Water Quality on April 10, 2004, version 2.1. The draft states that many private developments are unlikely to cause
cumulative impacts, including projects such as urban in-fill, most residential subdivisions and small commercial developments as well as agricultural
and silvicultural operations. The Depot 499 project is a residential development. Additionally, the project is located within the Town of Apex ETJ,
therefore the adjacent properties that have potential for development will have the following regulations to protect downstream waters: 1) the Water
Supply, Watershed Protection Program which limits development densities as well as requires protective riparian buffers; 2) the Jordan Watershed
Riparian Buffer Protection regulations, these regulations require limited development within the riparian buffer area in addition to “diffuse flow”
requirements, which could require Best Management Practices that control nitrogen if diffuse flow cannot be achieved; and 3) the Phase II NPDES
Stormwater Permit Program, this program includes permitting requirements for Municipal Separate Storm Sewer Systems (MS4s) in addition to post-
construction stormwater management requirements. We anticipate that the DWR will advise us if any additional information is needed.
Yes No N/A
Non-discharge wastewater will be generated and treated at Western Wake Regional Water Reclamation Facility which has a total capacity of 18.0
MGD.
Yes No
Yes No
5d. Is anothe r Fe de ral age ncy inv olv e d?*
5e . Is this a DOT proje ct locate d within Div ision's 1-8?*
5f. Will you cut any tre e s in orde r to conduct the work in wate rs of the U.S.?*
5g. Doe s this proje ct inv olv e bridge mainte nance or re mov al?*
Link to the NLEB SLOPES document: http://saw-reg.usace.army.mil/NLEB/1-30-17-signed_NLEB-SLOPES&apps.pdf
5h. Doe s this proje ct inv olv e the construction/installation of a wind turbine (s)?**
5i. Doe s this proje ct inv olv e (1) blasting, and/or (2) othe r pe rcussiv e activitie s that will be conducte d by machine s, such as jackhamme rs, me chanize d pile driv e rs, e tc.?*
5j. What data source s did you use to de te rmine whe the r your site would impact Endange re d Spe cie s or De signate d Critical Habitat?*
Consultation Docume ntation Upload
6. Essential Fish Habitat (Corps Requirement)
6a. Will this proje ct occur in or ne ar an are a de signate d as an Esse ntial Fish Habitat?*
6b. What data source s did you use to de te rmine whe the r your site would impact an Esse ntial Fish Habitat?*
7. Historic or Prehistoric Cultural Resources (Corps Requirement)
Link to the State Historic Preservation Office Historic Properties Map (does not include archaeological data: http://gis.ncdcr.gov/hpoweb/
7a. Will this proje ct occur in or ne ar an are a that the state , fe de ral or tribal gov e rnme nts hav e de signate d as hav ing historic or cultural pre se rv ation status (e .g., National Historic
Trust de signation or prope rtie s significant in North Carolina history and archae ology)?*
7b. What data source s did you use to de te rmine whe the r your site would impact historic or arche ological re source s?*
7c. Historic or Pre historic Information Upload
8. Flood Zone Designation (Corps Requirement)
Link to the FEM A Floodplain M aps: https://msc.fema.gov/portal/search
8a. Will this proje ct occur in a FEM A-designate d 100-ye ar floodplain?*
8c. What source (s) did you use to make the floodplain de te rmination?*
Raleigh
Yes No Unknown
Yes No
Yes No
Yes No
Yes No
Yes No
S&EC completed a Threatened & Endangered Species Report, to include a Self-Certification letter through the US Fish & Wildlife Service (USFWS), a
query through the NC Natural Heritage Program database, and an official Species List through the iPac. A formal request was sent to the USFWS on
January 21, 2021. S&EC received response from USFWS on February 4, 2021 that they concurred with the determinations made by S&EC that the
proposed actions is not likely to adversely affect a portion of the federally-listed endangered or threatened species, their formally designated critical
habitat, or species currently proposed for listing under the Endangered Species Act (ESA) with the exception of that surveys should be conducted for
Michaux's sumac during the appropriate survey window. Please see attached S&EC Threatened & Endangered Species report and correspondence
from USFWS.
Click the upload button or drag and drop files here to attach document
S&EC Depot 499 T&E Report Signed.pdf 10.15MB
RE DUE DATE FEBRUARY 11 2021 Fw Depot 499 T&E Submittal.pdf 176.36KB
File type must be PDF
Yes No
The NOAA Habitat Conservation/Habitat Protection: National Marine Fish Service; Essential Fish Habitat Mapper website was referenced. No Essential
Fish Habitat was identified near the project.
Yes No
The NC State Historic Preservation Office HPOWEB GIS Service interactive map was referenced on February 12, 2021, four listings or study list
entries were identified within the property boundaries (WA8306, WA0845, WA8307, and WA1056). These listings were all determined ineligible in
2020 per the ER 20-0601 letter from NC Department of Natural and Cultural Resources, State Historic Preservation Office (SHPO). Please see
attached correspondence from the North Carolina Department of Natural and Cultural Resources, SHPO ER 20-0601
Click the upload button or drag and drop files here to attach document
NCDNCR_SHPO_ER 20-0601.pdf 107.12KB
File must be PDF
Yes No
NC Flood Risk Information System Floodplain Mapping Program and confirmation from the project engineer.
M iscellaneous
Comme nts
M isce llane ous attachme nts not pre v iously re que ste d.
*
· The project proponent hereby certifies that all information contained herein is true, accurate, and complete to the best of my knowledge and belief’; and
· The project proponent hereby requests that the certifying authority review and take action on this CWA 401 certification request within the applicable reasonable period of time.
· I have given true, accurate, and complete information on this form;
· I agree that submission of this PCN form is a “transaction” subject to Chapter 66, Article 40 of the NC General Statutes (the “Uniform Electronic Transactions Act”);
· I agree to conduct this transaction by electronic means pursuant to Chapter 66, Article 40 of the NC General Statutes (the “Uniform Electronic Transactions Act”);
· I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature; AND
· I intend to electronically sign and submit the PCN form.
Full Name :*
Signature *
Date
Click the upload button or drag and drop files here to attach document
File must be PDF or KMZ
Signature
By checking the box and signing below, I certify that:
Deborah E. Shirley
4/14/2021
X:\Projects\LEN\LEN-19090\04-Production\Engineering\Exhibits\Wetland, Stream, and Buffer Impact Maps\LEN19090-E2.dwg, 4/5/2021 12:26:53 PM, Sarmadi, Sommon
DEPOT 499
WETLAND, STREAM, AND BUFFER IMPACT MAPS
0 APEX BARBECUE ROAD
APEX, NORTH CAROLINA, 27502
PROJECT NO.LEN-19090
FILENAME
CHECKED BY
DRAWN BY
SCALE
DATE 12. 29. 2020
The John R. McAdams Company, Inc.
2905 Meridian Parkway
Durham, NC 27713
phone 919. 361. 5000
fax 919. 361. 2269
license number: C-0293, C-187
www.mcadamsco.com
PLAN INFORMATION
LEN19090-E2
SS
1" = 40'
NC GRID (NAD83)
GRAPHIC SCALE
0 20 40 80
1 inch = 40 ft.
IMPACT AREA MAP - AREA B
LEGEND
X:\Projects\LEN\LEN-19090\04-Production\Engineering\Exhibits\Wetland, Stream, and Buffer Impact Maps\LEN19090-E2.dwg, 3/19/2021 7:42:55 AM, Sarmadi, Sommon
DEPOT 499
WETLAND, STREAM, AND BUFFER IMPACT MAPS
0 APEX BARBECUE ROAD
APEX, NORTH CAROLINA, 27502
PROJECT NO.LEN-19090
FILENAME
CHECKED BY
DRAWN BY
SCALE
DATE 12. 29. 2020
The John R. McAdams Company, Inc.
2905 Meridian Parkway
Durham, NC 27713
phone 919. 361. 5000
fax 919. 361. 2269
license number: C-0293, C-187
www.mcadamsco.com
PLAN INFORMATION
LEN19090-E2
SS
1" = 40'
NC GRID (NAD83)
GRAPHIC SCALE
0 20 40 80
1 inch = 40 ft.
IMPACT AREA MAP - AREA E
LEGEND
EXIST
INGNC-540(VARIABLE
W
IDTH
PUBL
IC
R/W)
X:\Projects\LEN\LEN-19090\04-Production\Engineering\Exhibits\Wetland, Stream, and Buffer Impact Maps\LEN19090-E2.dwg, 3/19/2021 7:44:36 AM, Sarmadi, Sommon
DEPOT 499
WETLAND, STREAM, AND BUFFER IMPACT MAPS
0 APEX BARBECUE ROAD
APEX, NORTH CAROLINA, 27502
PROJECT NO.LEN-19090
FILENAME
CHECKED BY
DRAWN BY
SCALE
DATE 12. 29. 2020
The John R. McAdams Company, Inc.
2905 Meridian Parkway
Durham, NC 27713
phone 919. 361. 5000
fax 919. 361. 2269
license number: C-0293, C-187
www.mcadamsco.com
PLAN INFORMATION
LEN19090-E2
SS
1" = 60'
NC GRID (NAD83)
GRAPHIC SCALE
0 30 60 120
1 inch = 60 ft.
IMPACT AREA MAP - AREA F
LEGEND
EXIST
INGNC-540(VARIABLE
W
IDTH
PUBL
IC
R/W)
X:\Projects\LEN\LEN-19090\04-Production\Engineering\Exhibits\Wetland, Stream, and Buffer Impact Maps\LEN19090-E2.dwg, 4/5/2021 12:29:21 PM, Sarmadi, Sommon
DEPOT 499
WETLAND, STREAM, AND BUFFER IMPACT MAPS
0 APEX BARBECUE ROAD
APEX, NORTH CAROLINA, 27502
PROJECT NO.LEN-19090
FILENAME
CHECKED BY
DRAWN BY
SCALE
DATE 12. 29. 2020
The John R. McAdams Company, Inc.
2905 Meridian Parkway
Durham, NC 27713
phone 919. 361. 5000
fax 919. 361. 2269
license number: C-0293, C-187
www.mcadamsco.com
PLAN INFORMATION
LEN19090-E2
SS
1" = 40'
NC GRID (NAD83)
GRAPHIC SCALE
0 20 40 80
1 inch = 40 ft.
IMPACT AREA MAP - AREA G
LEGEND
X:\Projects\LEN\LEN-19090\04-Production\Engineering\Exhibits\Wetland, Stream, and Buffer Impact Maps\LEN19090-E2.dwg, 4/5/2021 1:30:47 PM, Sarmadi, Sommon
DEPOT 499
WETLAND, STREAM, AND BUFFER IMPACT MAPS
0 APEX BARBECUE ROAD
APEX, NORTH CAROLINA, 27502
PROJECT NO.LEN-19090
FILENAME
CHECKED BY
DRAWN BY
SCALE
DATE 12. 29. 2020
The John R. McAdams Company, Inc.
2905 Meridian Parkway
Durham, NC 27713
phone 919. 361. 5000
fax 919. 361. 2269
license number: C-0293, C-187
www.mcadamsco.com
PLAN INFORMATION
LEN19090-E2
SS
1" = 40'
NC GRID (NAD83)
GRAPHIC SCALE
0 20 40 80
1 inch = 40 ft.
IMPACT AREA MAP - AREA H
LEGEND
X:\Projects\LEN\LEN-19090\04-Production\Engineering\Exhibits\Wetland, Stream, and Buffer Impact Maps\LEN19090-E2.dwg, 4/5/2021 1:32:21 PM, Sarmadi, Sommon
DEPOT 499
WETLAND, STREAM, AND BUFFER IMPACT MAPS
0 APEX BARBECUE ROAD
APEX, NORTH CAROLINA, 27502
PROJECT NO.LEN-19090
FILENAME
CHECKED BY
DRAWN BY
SCALE
DATE 12. 29. 2020
The John R. McAdams Company, Inc.
2905 Meridian Parkway
Durham, NC 27713
phone 919. 361. 5000
fax 919. 361. 2269
license number: C-0293, C-187
www.mcadamsco.com
PLAN INFORMATION
LEN19090-E2
SS
1" = 40'
NC GRID (NAD83)
GRAPHIC SCALE
0 20 40 80
1 inch = 40 ft.
IMPACT AREA MAP - AREA I
LEGEND
RIVER CROSSING-ASPEN RIVER LANE
X:\Projects\LEN\LEN-19090\04-Production\Engineering\Exhibits\Wetland, Stream, and Buffer Impact Maps\LEN19090-E3.dwg, 3/19/2021 8:04:18 AM, Sarmadi, Sommon
DEPOT 499
WETLAND, STREAM, AND BUFFER IMPACT MAPS
0 APEX BARBECUE ROAD
APEX, NORTH CAROLINA, 27502
PROJECT NO.LEN-19090
FILENAME
CHECKED BY
DRAWN BY
SCALE
DATE 12. 29. 2020
The John R. McAdams Company, Inc.
2905 Meridian Parkway
Durham, NC 27713
phone 919. 361. 5000
fax 919. 361. 2269
license number: C-0293, C-187
www.mcadamsco.com
PLAN INFORMATION
LEN18050-E3
SS
1" = 40'
NC GRID (NAD83)
GRAPHIC SCALE
0 20 40 80
1 inch = 40 ft.
AREA B - CULVERT CROSS SECTION
CULVERT 1
IMPACT AREA 'B'
ASPEN RIVER LANE
SS CROSSING- IMPACT E
X:\Projects\LEN\LEN-19090\04-Production\Engineering\Exhibits\Wetland, Stream, and Buffer Impact Maps\LEN19090-E3.dwg, 3/19/2021 8:08:26 AM, Sarmadi, Sommon
DEPOT 499
WETLAND, STREAM, AND BUFFER IMPACT MAPS
0 APEX BARBECUE ROAD
APEX, NORTH CAROLINA, 27502
PROJECT NO.LEN-19090
FILENAME
CHECKED BY
DRAWN BY
SCALE
DATE 12. 29. 2020
The John R. McAdams Company, Inc.
2905 Meridian Parkway
Durham, NC 27713
phone 919. 361. 5000
fax 919. 361. 2269
license number: C-0293, C-187
www.mcadamsco.com
PLAN INFORMATION
LEN18050-E3
SS
1" = 40'
NC GRID (NAD83)
GRAPHIC SCALE
0 20 40 80
1 inch = 40 ft.
AREA E - SS CROSSING
SANITARY SEWER CROSSING
IMPACT AREA 'E'
SS CROSSING-IMPACT F
X:\Projects\LEN\LEN-19090\04-Production\Engineering\Exhibits\Wetland, Stream, and Buffer Impact Maps\LEN19090-E3.dwg, 4/5/2021 4:13:52 PM, Sarmadi, Sommon
DEPOT 499
WETLAND, STREAM, AND BUFFER IMPACT MAPS
0 APEX BARBECUE ROAD
APEX, NORTH CAROLINA, 27502
PROJECT NO.LEN-19090
FILENAME
CHECKED BY
DRAWN BY
SCALE
DATE 12. 29. 2020
The John R. McAdams Company, Inc.
2905 Meridian Parkway
Durham, NC 27713
phone 919. 361. 5000
fax 919. 361. 2269
license number: C-0293, C-187
www.mcadamsco.com
PLAN INFORMATION
LEN18050-E3
SS
1" = 40'
NC GRID (NAD83)
GRAPHIC SCALE
0 20 40 80
1 inch = 40 ft.
AREA F - SS CROSSING
SANITARY SEWER CROSSING
IMPACT AREA 'F'
AREA G-GREENWAY CROSSING
X:\Projects\LEN\LEN-19090\04-Production\Engineering\Exhibits\Wetland, Stream, and Buffer Impact Maps\LEN19090-E3.dwg, 4/5/2021 1:35:38 PM, Sarmadi, Sommon
DEPOT 499
WETLAND, STREAM, AND BUFFER IMPACT MAPS
0 APEX BARBECUE ROAD
APEX, NORTH CAROLINA, 27502
PROJECT NO.LEN-19090
FILENAME
CHECKED BY
DRAWN BY
SCALE
DATE 12. 29. 2020
The John R. McAdams Company, Inc.
2905 Meridian Parkway
Durham, NC 27713
phone 919. 361. 5000
fax 919. 361. 2269
license number: C-0293, C-187
www.mcadamsco.com
PLAN INFORMATION
LEN18050-E3
SS
1" = 40'
NC GRID (NAD83)
GRAPHIC SCALE
0 20 40 80
1 inch = 40 ft.
AREA G - GREENWAY CROSSING
GREENWAY CROSSING
IMPACT AREA 'G'
GREENWAY CROSSING AREA H
X:\Projects\LEN\LEN-19090\04-Production\Engineering\Exhibits\Wetland, Stream, and Buffer Impact Maps\LEN19090-E3.dwg, 4/5/2021 1:37:00 PM, Sarmadi, Sommon
DEPOT 499
WETLAND, STREAM, AND BUFFER IMPACT MAPS
0 APEX BARBECUE ROAD
APEX, NORTH CAROLINA, 27502
PROJECT NO.LEN-19090
FILENAME
CHECKED BY
DRAWN BY
SCALE
DATE 12. 29. 2020
The John R. McAdams Company, Inc.
2905 Meridian Parkway
Durham, NC 27713
phone 919. 361. 5000
fax 919. 361. 2269
license number: C-0293, C-187
www.mcadamsco.com
PLAN INFORMATION
LEN18050-E3
SS
1" = 40'
NC GRID (NAD83)
GRAPHIC SCALE
0 20 40 80
1 inch = 40 ft.
AREA H - GREENWAY CROSSING
GREENWAY CROSSING
IMPACT AREA 'H'
GREENWAY CROSSING AREA I
X:\Projects\LEN\LEN-19090\04-Production\Engineering\Exhibits\Wetland, Stream, and Buffer Impact Maps\LEN19090-E3.dwg, 4/5/2021 1:38:15 PM, Sarmadi, Sommon
DEPOT 499
WETLAND, STREAM, AND BUFFER IMPACT MAPS
0 APEX BARBECUE ROAD
APEX, NORTH CAROLINA, 27502
PROJECT NO.LEN-19090
FILENAME
CHECKED BY
DRAWN BY
SCALE
DATE 12. 29. 2020
The John R. McAdams Company, Inc.
2905 Meridian Parkway
Durham, NC 27713
phone 919. 361. 5000
fax 919. 361. 2269
license number: C-0293, C-187
www.mcadamsco.com
PLAN INFORMATION
LEN18050-E3
SS
1" = 40'
NC GRID (NAD83)
GRAPHIC SCALE
0 20 40 80
1 inch = 40 ft.
AREA I - GREENWAY CROSSING
GREENWAY CROSSING
IMPACT AREA 'I'
X:\Projects\LEN\LEN-19090\04-Production\Engineering\Exhibits\Wetland, Stream, and Buffer Impact Maps\LEN19090-E4.dwg, 3/19/2021 8:01:26 AM, Sarmadi, Sommon
DEPOT 499
WETLAND, STREAM, AND BUFFER IMPACT MAPS
0 APEX BARBECUE ROAD
APEX, NORTH CAROLINA, 27502
PROJECT NO.LEN-19090
FILENAME
CHECKED BY
DRAWN BY
SCALE
DATE 12. 29. 2020
The John R. McAdams Company, Inc.
2905 Meridian Parkway
Durham, NC 27713
phone 919. 361. 5000
fax 919. 361. 2269
license number: C-0293, C-187
www.mcadamsco.com
PLAN INFORMATION
LEN-19090-E4
SS
1" = 40'
NC GRID (NAD83)
GRAPHIC SCALE
0 20 40 80
1 inch = 40 ft.
AREA B - Stream Diversion