HomeMy WebLinkAboutNCC213205_ESC Approval Submitted_20210527David Weekly, PE
Division Manager
CHARLOTTE.
Land Development
December 17, 2019
LETTER OF APPROVAL REVISED
Simfield Residential Development, LLC
Attn: Jon Grabowski
518 Griffith Rd
Charlotte, NC 28217
RE:
Project Name: Simfield Valley
Permit 1D: LDGP-2019-00263
Denuded Acreage: 6
County: Mecklenburg
Submitted By: Red Bridge New Homes, LLC
Dear Mr. Grabowski:
This office has reviewed the subject erosion and sedimentation control plan. We find the plan to be
acceptable and hereby issue this Letter of Approval. This plan approval shall expire three (3) years
following the date of approval, if no preconstruction meeting and land -disturbing activity has been
undertaken, as is requiredby Title 15A NCAC 413.0129 and Section 17-35(b) of the City of Charlotte Code
of Ordinances. Acceptance and approval of this plan is also conditioned upon your compliance with
Federal, State, and local water quality laws, regulations, and rules.
As of April 12019 all new construction activities are required to complete and submit an electronic
Notice of Intent O form requesting a Certificate of Coverage COC under NCG01000
Construction Stormwater General Permit. This form MUST be submitted prior to the
commencement of any land disturbing activity on the above -named proiect. The NOl form may be
accessed at deg.nc.gov/NCG01. Please direct questions about the NOI form to Annette Lucas at
annette.lucas(ia ncdenr.ov or Paul Clark at paul_clark(acdenr.gov.
After you submit a complete and correct NOT Form, a COC will be emailed to you within tbree business
days. Initially, DEMLR will not charge a fee for coverage under the NCGO 1permit. However, on or atler
Simfield Valley
December 17, 2019
Page 2 of 2
May 1, 2019, a $100 fee will be charged annually. This fee is to be sent to the DEMLR Stormwater Central
Office staff in Raleigh.
Upon receiving this approval, it is the responsibility of the Financially Responsible Party, their agent, or
the owner to request a pre -construction meeting by completing the Pre -Construction Meeting Request Form
found at h ://develo ment.charmeek.or 1. Please provide at least 48 hours advance notice for the prc-
construction meeting so that City Staff may coordinate and schedule the appropriate personnel. No land
disturbance of any kind, including any demolition, is allowed prior to the pre -construction meeting
Title 15A NCAC 4B .0118(a) and the NCGO 1 permit require that the following documentation be kept on
file at the job site:
1. The approved E&SC plan as well as any approved deviation
2. The NCGO 1 permit and the COC, once it is received
3. Records of inspections made during the previous 30 days.
Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection to insure
compliance with the approved plan.
The City of Charlotte's Sedimentation Pollution Control Program is performance -oriented, requiring
protection of existing natural resources and adjoining properties. If, following the commencement of this
project, it is determined that the erosion and sedimentation control plan is inadequate to meet the
requirements of the City of Charlotte Code of Ordinances and the Sedimentation Pollution Control Act of
1973 (G.S. 113A-51 through 66), this office may require revisions to the plan and implementation of the
revisions to insure compliance with the Act and Local Code.
Acceptance and approval of this plan is conditioned upon your compliance with Federal, State, and County
water quality laws, regulations, and rules. This approval does not supersede any other permit or approval.
Approval of this plan is based in part on the accuracy of the information provided in the Financial
Responsibility Form, which you provided. You are requested to file an amended form if there is any change
in the information included on the form.
Your cooperation is appreciated.
Sincerely,
GL41W�
James Wilson, CPESC
Charlotte Land Development Division