Loading...
HomeMy WebLinkAbout20130223 Ver 1_Application_20130412 (3)l�� �, WETLAND PERMIT IMPACT SUMMARY WETLAND IMPACTS SURFACE WATER IMPACTS Site No, Station (RomffoJ Structure Size I Type Permanent Fill In Wetlands (acJ Temp, Fill In Wetlands (acJ Excavation in Wetlands (acJ Mechanized Clearing in Wetlands (acJ Hand Clearing in Wetlands (acJ Permanent SW impacts (acJ Temp, SW impacts (acJ Existing Channel Impacts Permanent (11J Existing Channel Impacts Temp. �ftJ Natural Stream Design I [11J 1 L. 283 +36 T0286 +34 48" RCP 0.10 ON 0.03 U1 385 13 •L•286 +11T0286 +22 BankStabllizallon 11 2 L 287 +09 TO 287 +21 30° RCP 0,01 0.01 13 14 •L• 287 +00 TO 287 +30 Bank Stabilizalion 11 •L• 287 +11 TO 287 +17 Bank SlabilizalioR 32 3 L. 296 +40 T0297 +18 36" RCP 0,03 0.01 345 20 -L- 296 +44T0296 +52 BankSlabilizalion 10 3A •L• 296 +82 T0297 +00 Roadway 0.01 30 4 L. 312 +90 TO 31341 1 @ 10' x 7' RCBC 0.06 0 01 331 46 •L• 312 +95 TO 313 +13 Bank Stabilization 30 5 L. 314 +67 TO 321 +11 1 @ 10' x 6' RCBC 0,10 0.01 688 40 •L• 314 +72 TO 315 +05 Bank Stabilization 37 5A •L• 320 +86 TO 321 +95 Roadway 0,01 90 -L- 320 +78 TO 321 +04 Bank Stabilization 25 6 -L- 323 +60 TO 324 +44 0,04 0.01 60 15 7 •L• 345 +01 TO 345 +88 30" RCP 0.01 0,03 0,01 227 10 •L• 345 +74 TO 345 +85 Bank Slabilizalion 11 7A •L• 345 +02 TO 345 +49 Roadway 0.01 57 8 L 358 +77 TO 360 +29 54" RCP 0.05 0,01 412 20 L 359 +46T0359 +57 BankSlabilizalion 13 9 L 380 +47 TO 382 +86 Bridge 0,02 0.40 10 L 387 +31 T0387 +46 BankSlabilizalion 0.01 16 11 L 389 +65T0398 +04 Bridge 01 1.44 12 L. 399 +62 TO 408 +51 Bridge & Roadway 2.57 0.36 0.96 13 •L• 407 +72 TO 415 +79 Haia(dous Spill Basins, afidge, Roadway & 66" RCP 124 0.34 0,64 1.58 U3 0.01 204 20 •L• 409 +67 TO 409 +73 Bank Stabilization 12 •L• 410 +77 TO 410 +89 Bank Stabilization 12 - L- 41148T0411 +42 BankSlabilizalion 36 -L- 414 +83T0415 +16 BankSlabilizalion 22 14 •L•419 +09T0420 +79 Bridge 0.11 TOTALS; 1,03 0.34 123 4.38 0,42 0,09 3120 198 Notes, Permanent Welland Impacls from bridge conshclion = 0.11 acres Temporary Wohmd Impacls from work bridge construction = 0.14 acres See Sheet — ___ of — for a defailod breakdown of the proposed bridge consfmclion impacts.