Loading...
HomeMy WebLinkAbout20110512_Merger Process Documentation_20130415DocuSign Envelope ID: 1 F1 19E97-C2A7-4485-BF03-D73CD4986AB4 NEPA /404 MERGER TEAM MEETING AGREEMENT Concurrence Point No. 2A: Hydraulic Structures and Alignments Federal Aid Project Number: NA State Project Number: WBS Element 35494.1.1 TIP Project Number: R -2511 TIP Description: US 17, North of NC 171 to Multi -lanes South of Williamston, Beaufort and Martin Counties Hvdraulic Structures and Locations Site No. Crossing Existing/Recommended Structure 1 Tributary to Latham Creek Retain and extend existing 1 @ 48" RCP and 1 @ 6'x4' RCBC with 2 @ 60" RCP 2 Gum Swamp /Latham Creek Replace existing 22 foot bridge with 1 @ 31' -5" x 7' -3" aluminum box culvert 3 Jacks Swamp Retain and extend existing 1 @ 8'x 3' RCBC 4 Tributary to Smithwick Creek Retain and extend existing 2 @ 8'x 6' RCBC RCP - Reinforced Concrete Pipe. RCBC- Reinforced Concrete Box Culvert. The Project Team concurred on this date of April 09, 2013 with the structures to be carried forward for the proposed project as indicated above. Agency , Name Date wi 11 i am J. Bi ddl eco e(tiilb; J, bi�kkUKII, 4/11/2013 B1fiF8001064D42G.. Gary Jordan y g � J( � 4/9/2013 F " Ronald Lucas r� �Y 4/11/2013 I dbFFA56i385D44�_ David wainwright 1 ° I9 "Id by 4 9 2013 �D '),a U')­; '_'r -g-d by: Travis W. Wilson w a 4/10/2013 N4629i- F96E@46?.. Fritz Rohde . -�gP� 4/10/2013 EPA Pag y 4/11/2013 �� i --- Kevin Hart s'g °Idly: 4/11/2013 V, hvf Joseph Miller —e y 4/9/2013 �, ©G A ✓i.