Loading...
HomeMy WebLinkAboutNC0032077_2020 PAR checksheet_20210319Regional Pretreatment Annual Report (PAR) Review Is the PAR on time? Does it have two copies? Did they send an v other submissions with it? Included? ADEQUATE? POTW noted Corrections? Narrative r YES ❑ NO ❑ NA r YES ❑ NO ❑ NA PPS Form r YES ❑ NO /1 YES ❑ NO SNCR r YES ❑ NO 0 YES ❑ NO IDSF r YES ❑ NO 0 YES ❑ NO Allocation Table /1 YES ❑ NO r YES ❑ NO Compliance Schedules ❑ YES ❑ NO II NA ❑ YES ❑ NO NA Public Notice ❑ YES ❑ NO NA ❑ YES ❑ NO NA Program Information 0 YES ❑ NO YES ❑ NO ❑ YES 0 NO Historical SNC 0 YES ❑ NO ❑ NA YES ❑ NO ❑ NA ❑ YES A NO ❑ NA Regional Office: Washington POTW: Contentnea Metropolitan Sewerage District NPDES Permit No. NC0032077 Report Period:1/1/2020 to 12/31/2020 ® Full ❑ Modified For modified programs evaluate shaded items only. A Narrative is required for a modified program only if there are SIUs in SNC. If No, check recommendation below: 1. Have at least 90% of SIU permits been issued within 180 days of expiration? (See Allocation Table). ❑ Yes ❑ No Not req'd ❑ NOD ❑ NOV ❑ QNCR ❑ NCP ❑ Civil Penalty Assessment 2. Were at least 80% of SIUs inspected? (See PPS Form) Yes ❑ No ❑ Not req'd ❑ NOD ❑ NOV ❑ QNCR ❑ NCP ❑ Civil Penalty Assessment 3. Has effective enforcement been taken against industries in SNC, including those causing pass -through or interference? (See Narrative and SNCR Form) ❑ Yes ❑ No /1 NA ❑ NOD ❑ NOV ❑ QNCR ❑ NCP ❑ Civil Penalty Assessment 4. Does public notice cover all SIUs in SNC? ❑ Yes ❑ No A NA ❑ NOD ❑ NOV ❑ QNCR ❑ NCP ❑ Civil Penalty Assessment Note: Exceptions should be explained in the comment section below: Reviewed By:, 5idg5frci Date: 3/19/2021 Regional Pretreatment Annual Report Review CMSD PAR 202016