HomeMy WebLinkAbout20061804 Ver 5_Stormwater Info_20130404Soil & Environmental Consultants, PA 11010 Raven Ridge Road • Raleigh, North Carolina 27614 • Phone: (919) 846 -5900 • Fax: (919) 846 -9467 www.SandEC.com April 4, 2013 S &EC Project # 6658.P6 N.C. Division of Water Quality WEBSCAPE Unit Attn: Karen Higgins /Annette Lucas 512 N. Salisbury Street -9th floor Raleigh, NC 27603 Re: The Village at Flowers Plantation Stormwater Management Plan -POD 9 (Phase 1) DWQ Project #20061804, Ver.3 /Certification No. 3766 Johnston County, NC To Mrs. Higgins /Lucas: On behalf of Mrs. Rebecca Flowers, please find the attached Stormwater Management Plan for POD 9 (Phase 1). Please note that the bioretention cell for POD NW -8 was increased to accommodate POD 9. According to the Individual 401 Water Quality Certification Approval Certification No. 3766, Condition No. 9, "a final, written stormwater management plan for each phase of this project shall be submitted to the DWQ 401 Oversight/Express Permitting Unit for review and approval'. Therefore, please see attached Stormwater Management Plan for your review and anticipated Approval. Please contact me at DEdwards(CD-SandEC.com or (919) 846- 5900 if you have any questions. Sincerely, Soil & Environmental Consultants, PA Deborah Edwards Environmental Specialist Attachments: 1) Flowers Plantation Pod NW-8 and POD 9 Sitework Calculations 2) NW -8 and 9 Runoff Map 3) Signed and notarized Operations & Maintenance Agreement 4) Overall POD map (east side of Buffalo Rd.) 5) POD 9 PHI Overall Site Plan 6) POD 9 PHI Master Grading Plan 7) POD 9 PHI Erosion & Sediment Control Plan 8) POD 9 PHI Bioretention Details 9) POD 9 HP1 E &S Details 1 & 2 Flowers Plantation Pod NW 8 and Pod 9 Bmioretentmion Owner /Developer: Rebecca Flowers 4880 NC 42 East Clayton, NC 27520 Phone: (800) 343 -0659 Am ==EBL STOCKS ENGINEERING P.A. 1100 Eastern avenue Phone: 252.459.8196 PO Box 1108 Fax: 252.459.8197 Nashville, NC 27856 Mobile: 252.903.6891 Email: mstocks @stocksengineedng.com 1 1 YR: 5.76 cfs I The current property is open field and/or forested. The post condition will utilize a Bioretention cell for both nutrient reduction and peak flow reduction. The proposed site will utilize a Bioretention cell to obtain an 85% TSS reduction. Stocks Engineering, P.A. 1100 Eastern Avewe PO Box 1108 Nashville, NC 27856 Project: Flowers - Pod 9 Date: March 20, 2013 Page: I of 3 Post - Develonment Post - Develonment 5 la 1.55 0.65 7.4 7.46 5 lb 0.13 0.92 7.4 0.89 5 IC 0.21 0.88 7.4 1.37 5 Id 1.85 0.65 7.4 8.90 5 le 3.09 0.67 7.4 15.32 3.09 0.67 8.4 17.39 - I Total 6.83 - 7.64 33.93 Post - Develonment Runoff Computations 10 -Year Storm 25 -Year Storm 5 la 1.55 0.65 8.4 8.46 5 lb 0.13 0.92 8.4 1.00 5 IC 0.21 0.88 8.4 1.55 5 Id 1.85 0.65 8.4 10.10 5 le 3.09 0.67 8.4 17.39 - Total 6.83 - I 8.4 j 38.51 Runoff Computations 10 -Year Storm 25 -Year Storm Channel Report Hydreflow Express by Intellsolve Swale 3 to 4 - Bare Soil Triangular = 17.39 Side Slopes (z:1) = 8.00, 8.00 Total Depth (ft) = 1.50 Invert Elev (ft) = 297.50 Slope ( %) = 0.50 N Value = 0.020 Calculations = 0.99 Compute by: Known Q Known Q (cfs) = 17.39 Elev (ft) Section 300.00 299.50 299.00 298.50 298.00 P!Y4-11l 297.00 Friday, Mar 22 2013 Highlighted Depth (ft) = 0.86 Q (cfs) = 17.39 Area (sgft) = 5.92 Velocity (ft/s) = 2.94 Wetted Perim (ft) = 13.87 Crit Depth, Yc (ft) = 0.79 Top Width (ft) = 13.76 EGL (ft) = 0.99 7p� Depth (ft) 2.50 2.00 1.50 1.00 0.50 0.00 I 5 10 15 20 25 30 Reach (ft) 35 Channel Report Hydraflow Express by Intelimlve Swale 3 to 4 - Vegetated Triangular = 17.39 Side Slopes (z:1) = 8.00, 8.00 Total Depth (ft) = 1.50 Invert Elev (ft) = 297.50 Slope ( %) = 0.50 N Value = 0.035 Calculations = 1.12 Compute by: Known Q Known Q (cfs) = 17.39 Elev, 300.00 299.50 299.00 298.50 298.00 297.50 297.00 'ft) Section v 5 10 15 20 Reach (ft) Friday, Mar 22 2013 Highlighted Depth (ft) = 1.06 Q (cfs) = 17.39 Area (sgft) = 8.99 Velocity (f fs) = 1.93 Wetted Perim (ft) = 17.09 Crit Depth, Yc (ft) = 0.79 Top Width (ft) = 16.96 EGL (ft) = 1.12 25 30 35 Depth (ft) 2.50 2.00 1.50 1.00 0.50 0.00 -0.50 Hvdrafiow Plan View outran 4 9 6 5 2 Project File: New.stm No. Lines: 6 03 -22 -2013 woraftw strnm SOMM zoos Storm Sewer Summary Report Page 1 Line Line ID Flow Line Line Invert invert Line HGL HGL Minor HGL Dns No. rate sirs length EL Dn EL Up slope down up loss Junct line (Cts) (in) (ft) (ft) (ft) N (ft) (ft) (ft) (ft) No. 1 FES1 to CB2 33.94 30 C 38.0 290.00 293.80 10.000 291.95 295.75 1.33 295.75 End 2 C82 to D12A 15.32 24 C 90.0 293.90 294.35 0.500 296.44' 296.85" 0.37 297.22 1 3 CB2 to CB3 9.72 18 c 104.0 293.90 295.46 1.500 298.34' 297.23' 0.24 297.47 1 4 CB3 to C84 9.72 18 c 302.0 295.68 313.20 5.801 297.47 314.39 n1a 314.39 j 3 5 CB4 to CB5 0.89 15 c 20.0 313.30 313.50 1 000 315.03` 315.04" 0.01 315.04 4 6 CB4 to CB6 7.46 15 c 53.0 313.30 314.36 2.000 314.47 315.45 We 315.45 j 4 Project File: New.stm Number of lines: 6 Run Date: 03-22 -2013 NOTES: c = cir; e = ellip. b = box; Known Qs only ; 'Surcharged (HGL above crown). ; j - Line contains hyd. jump. Hydranoor Storm Sewers 2005 Hydraulic Grade Line Computations Page i Line Size Q Downstream Len Upstream Check JL Minor coeff loss Invert HO L Depth Area Vel Vet EGL Sf Invert HGL Depth Area Vol Vol EGL Sf Ave Enrgy Slav elev head elev elev Slav head elev Sf loss (in) (cfs) (ft) (it) (ft) (sgft) (ftls) (ft) (ft) (° %) (ft) (ft) (ft) (ft) ($4ff) (ftf$) (ft) (ft) (!'o) (%) (ft) (K) (ft) 1 30 33.94 290.00 291.95 1.95 4.10 8.27 1.06 293.01 0.757 38.0 293.80 295.75 1.95" 4.10 8.27 1.06 296.81 0.757 0.757 n/a 1.25 1.33 2 24 15.32 293.90 296.44 2.00 3.14 4.88 0.37 296.81 0.459 90.0 294.35 296.85 2.00 3.14 4.88 0.37 297.22 0.459 0.459 0.413 1.00 0.37 3 18 9.72 293.90 296.34 1.50 1.77 5.50 0.47 296.81 0.857 104 295.46 297.23 1.50 1.77 5.50 0.47 297.70 0.857 0.857 0.891 0.50 0.24 4 18 9.72 295.68 297.47 1.50 1.77 5.50 0.47 297.94 0.857 302 313.20 314.391 1.19" 1.50 6.47 0.65 315.04 0.912 0.864 n/a 1.50 n/a 5 15 0.89 313.30 315.03 1.25 1.23 0.73 0.01 315.04 0.019 20.0 313.50 315.04 1.25 1.23 0.73 0.01 315.04 0.019 0.019 0.004 1.00 0.01 6 15 7.46 313.30 314.47 1.17 1.14 6.26 0.61 315.08 1.154 53.0 314.36 315.45 J 1.09" 1.14 6.57 0.67 316.12 1.214 1.184 n/a 1.00 0.67 Project File: New.stm Number of lines: 6 Run Date: 03-22 -2013 Notes: ; " Critical depth.; J -Line contains hyd. jump. Hydmflow scam sewers 2005 Storm Sewer Profile Elev. (ft) 311.00 306.00 301.00 K *11I#1 291.00 286.00 0 Proj. file: New.stm N � C i') ) D J 10 20 30 40 i 311.00 306.00 301.00 296.00 291.00 286.00 50 60 70 80 90 100 110 120 130 Reach (ft) Hydraflow Storm Sewers 2005 PIP O 9 �cD i �D M a. W z Ili�llll��lll11111111111111 III�IIIIIIIIIIIIIIIIIIIII ,,. 11111111111111111111111 IIIIII�IIIIIIIIIIIIIIII�� IIIIIII�!1►11111111111II IIIIII ��IIIIIIIIIIIIIII -1111111111!1111111111111 IIIIIIIIIIII�1!IIIIIIIIII ... PIP O 9 �cD i �D M a. W z Cfnrm Cowor Prnfilo Elev. (ft) 326.00 1 323.00 1 320.00 1 317.00 1 314.00 I 311.00 0 s n c c O Proj. file: New.stm 10 20 30 40 50 60 70 60 Reach (ft) 326.00 1 323.00 1 320.00 1 317.00 1 314.00 1 311.00 I 90 100 riyamnow Sloan sewers cuuo Permit Number fto be provided by DINO) OFWATFq WDENR a < STORMWATER MANAGEMENT PERMIT APPLICATION FORM 401 CERTIFICATION APPLICATION FORM BIORETENTION CELL SUPPLEMENT This form must be hTled out printed and submilled. The Required Items Checklist (Part Ill) must be printed, filled out and submitted along wlfh all of the required information. Project name Contact name Phone number Date Drainage area number II. DESIGN INFORMATION Site Characteristics Flowers Plantation - Pod NW 81 Kevin Vamell 252.459.8196 March 22, 2013 1 Drainage area 628,994 ft2 Impervious area 268,250 ft2 Percent impervious 42.6% % Design rainfall depth 1.0 inch Peak Flow Calculations Is pre/post control of the 1 -yr, 24-hr peak flow required? Y (Y or N) 1 -yr, 24-hr runoff depth 3 in 1 -yr, 24-hr intensity 0.12 in/hr Pre - development 1-yr. 24-hr peak flow 5.760 ft'/sec Post - development 1 -yr, 24-hr peak flow 1.640 ft, /SeC Pre/Post 1 -yr, 24-hr peak Control -4.120 ft' /sec Storage Volume: Non -SA Waters Minimum volume required 22,539.0 ft' Volume provided 22,920.0 ft OK Storage Volume: SA Waters 1.5' runoff volume fe Pre-development 1 -yr, 24-hr runoff ft' Post-development 1 -yr, 24-hr runoff ft' Minimum volume required 0 ft' Volume provided ft' Cell Dimensions Ponding depth of water 12 Inches OK Ponding depth of water 1.00 it Surface area of the top of the bioretention cell 22,920.0 ft2 OK Length: ft Width' ft -or- Radius ft Media and Soils Summary Drawdown time, ponded volume 6 hr OK Drawdown time, to 24 Inches below surface 18 hr OK Drawdown time, total: 24 hr 1" to say: Soil permeability 0.10 in/hr Insufficient. Increase infiltration rate or include underdrains. Planting media soil.• Soil permeability 2.00 inner OK Soil composition % Sand (by volume) 86% OK % Fines (by volume) 10% OK % Organic (by volume) 4% OK Total: 100% Phosphorus Index (P- Index) of media 30 (unitless) OK Form SW401- sloretention -Rev.8 June 25, 2010 Pena I and II. Design Summary, Page 1 of 2 Permit Number. (to be pravided by DING Basin Elevations Temporary pod elevation 291.00 fmsl Type of bioretention cell (answer ffr to only one of the two following questions): Is this a grassed cell? Y (Y or N) OK Is this a cell with treeslshrubs? N (Y or N) Planting elevation (top of the mulch or grass sod layer) 290 Bnsl Depth of mulch inches Bottom of the planting media soil 288 fmsl Planting media depth 2 ft Depth of washed sand below planting media soil 0.33 ft Are underdrains being Installed? Y (Y or N) How many dean out pipes are being installed? 23 OK What factor of safety is used for sizing the underdrains? (See BMP Manual Section 12.3.6) 2 OK Additional distance between the bottom of the planting media and the bottom of the cell to account for underdrains 1 ft Bottom of the cell required 286.67 fmsl SHWT elevation P84 fmsl Distance from bottom to SHWT 2.67 ft OK Irel emal Water Storage Zone (IWS) Does the design include IWS N (Y or N) Elevation of the top of the upturned elbow fmsl Separation of IWS and Surface 290 it Planting Plan Number of tree species 0 Number of shrub species Number of herbaceous groundcover species Additional Information Does volume in excess of the design volume bypass the bioretention cell? Y (Y or N) OK Does volume to excess of the design volume flow evenly distributed through a vegetated filter? N (Y or N) Excess volume must pass through filter. What is the length of the vegetated filter? ft Does the design use a level spreader to evenly distribute flow? N (Y or N) Show how flow is evenly distributed. Is the BMP located at least 30 feet from surface waters (50 feet ff SA waters)? Is the BMP localed at least 100 feet from water supply wells? Are the vegetated side slopes equal to or less than 3:1? Is the BMP located in a proposed drainage easement with access to a public Right of Way (ROW)? Intel velocity (from treatment system) Is the area surrounding the cell likely to undergo development in the future? Y (Y or N) OK Y (Y or N) OK Y (Y or N) OK Y (Y or N) OK 0.22 ft/sec OK N (Y or N) OK Are the slopes draining to the bioretention cell greater than 20%? N (Y or N) OK Is the drainage area permanently stamized? Y (Y or N) OK Pretreatment Used (Indicate Type Used with an IR in the shaded ceM Gravel and grass (Winches gravel followed by 3.5 ft of grass) Grassed Swale OK Forebay X Other Form SW401- Bloretentlon -Rev.e June 25, 2010 Parts I and 0. Design Summery, Page 2 of 2 .�yJ'����'r -r - ;`s°�.•u- 2�Q;.`'wy- �. --i�� z -�a �=' .', ir�'�"' •e�� .^ �. i,' `'''^`".'�,�_'S?;r`s��.�'"'.`; - u4 til;�..a'. - ...a.-- t+�.:,ccE --� _ ,: +,,,..;'.��i,..� +sz.;:��'�ed�Es`,""- y - -'�i� Fig•. -r�„x�"r?�%yx u�--:� .-cr.__ r� =:%ices Please indicate the page or plan sheet numbers where the supporting documentation can be found. An Incomplete submittal package Will result In o request for additional information. This will delay final review and approval of the project. Initial in the space provided to Indicate the following design requirements have been met. If the applicant has designated an agent, the agent may initial below. Na requirement has riot been met, attach Justification. Page! Plan Inidals Sleet No. 1. Plans (1' - 50 or larger) of the entire site showing: - Design at ultimate build -out, - Off-site drainage (d applicable), - Delineated drainage basins (include Rational C coeificlent per basin), - Coil dimensions, - Pretreatment system, - Hgh flow bypass system, - Maintenance access, - Recorded drainage easement and public right of way (ROW), - Clean out pipe locations, - Overflow device, and - Boundaries of drainage easement. 2. Plan details (1' = 30' or larger) for the biorelention cell showing: - Cell dimensions . Pretreatment system, - High flow bypass system, - Maintenance access, - Recorded drainage easement and public right of way (ROW), - Design at ultimate build -out, - Off-she drainage (If aWleable), - Clean out pipe locations, - Overflow device, and - Boundaries of drainage easement. - Indicate the P -Index between 10 and 30 Section view of the biorelention cell (1' = W or larger) showing: - Side slopes, 3:1 or lower - Underdrain system (if applicable), and - Biorelention cell layers (ground level and slope, pre - treatment, ponding depth, mulch depth, fig media depth, washed sand, filter fabric (or choking stone if applicable), #57 stone, underdrains (if applicable), SHWT level(s), and overflow structure) 4. A soils report that is based upon an actual field investigation, soil borings, and 'mfiltration tests. The results of the soils report must be verified In the field by DWO, by completing & submitting the soils investigation request form. County sail maps are not an acceptable source of soils information. Ail elevations shall be in feet mean sea level (trnsl). Results of soils tests of both the planting soil and the In situ soil must include: - Soil permeability, - Soil composition (% sand, % fines, % organic), and - Pandex. 5. A detailed planting plan (1' = ZY or larger) prepared by a qualified individual showing: • A variety of suitable species, - Sizes, spacing and locations of plantings, - Total quantity of each type of plant specified, - A planting detain - The source nursery for the plants, and - Fertilizer and watering requirements to establish vegetation. 6. A construction sequence that shows how the bioretentlon cell will be protected from sediment until the entire drainage area is stabilized. 7. The supporting calatlations (including underdrain calculations, if applicable). 8. A copy of the signed and notarized inspection and maintenance (I&M) agreement. 9. A copy of the deed restriction. Form SW401- 81oretendmi -Rev.7 Part III, Page 1 of 1 :NF-- DEvet.opMrAT G,e.+sS �orE 1> C< 1. q/ .4 C- k 6 C Z.s3 AC- x N.44 t*c- �osr t PAPE¢,01 o0os (40. ( (o A L )c 28 Ac X Co 1 � % 1 `f • � � H-C. C-dz 77 )"d -34 f WSJ 51 jtj 35n -4- sh .o = S°)Z h - 0 * b' o-+. °" o = ,sue h' T rb6'8Z07 =Jd5 -z'6o .is oSZ 18022 -L,7-7 7-:YA ,►s 005 "'Z b I = .4S SS �r :4L 5-,6 4L i6 `s hZ .0 °71 ��o) s•o Soo • o IQ lox ss,l °ys• o _ S 110 'o L4 5 �� SS • 1 � b �^x Z9 a � �� bra<a -�rrn Watershed Model Schematic 1 - Pre- Development D Project: Pre vs Post Calcs.gpw Hydraflow Hydrographe by Intellsolve vg.22 2 - Post Development 3 - Outflow w Friday, Mar 22, 2013 Hydrograph Return Period Recap Hydraflow Hydrographs by InteUsolve v9.22 Hyd. Hydrograph Inflow Peak Outflow (cfs) Hydrograph No. type Hyd(s) description (origin) 1 Yr 2 -Yr 3-Yr 5-Yr 10-Yr 25-Yr 50-Yr 100 Yr 1 SCS Runoff — 5.758 — — -- -- — Pre - Development 2 SCS Runoff 26.30 -- - -- -- --- -- — Post Development 3 Reservoir 2 1.643 --- ---- -- -- — — Outflow Proj. file: Pre vs Post Calcs.gpw Friday, Mar 22, 2013 Hydrograph Summary Report HydrefiowHydrographsbylntellsolvev9 .22 Hyd. No. Hydrograph type (origin) Peak flow (cfe) Time interval (min) Time to peak (min) Hyd. volume (cuff) Inflow We) Maximum elevation (ft) Total strge used (tuft) Hydrograph description 1 SCS Runoff 5.758 2 718 16,368 — — — Pre- Development 2 SCS Runoff 26.30 2 718 52,632 — --- — Post Development 3 Reservoir 1.643 2 776 30,752 2 291.09 27,349 Outflow Pre vs Post Cales.gpw Retum Period: 1 Year Friday, Mar 22, 2013 4 Hydrograph Report Hydraflow Horographs by Intelisohre v9.22 Hyd. No. 1 Hyd. volume = Pre - Development Curve number = Hydrograph type = SCS Runoff Storm frequency = 1 yrs Time interval = 2 min Drainage area = 14.440 ac Basin Slope = 10.0% Tc method = KIRPICH Total precip. = 3.00 in Storm duration = 24 hrs Friday, Mar 22, 2013 Peak discharge = 5.758 cfs Time to peak = 718 min Hyd. volume = 16,368 cult Curve number = 60 Hydraulic length = 1000 ft Time of conc. (Tc) = 3.86 min Distribution = Type II Shape factor = 484 Pre - Development Q (cfs) Hyd. No. 1 —1 Year Q (Cfs) 6.00 5.00 4.00 3.00 2.00 1.00 000 6.00 5.00 4.00 3.00 2.00 1.00 0 00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 1 Time (min) Hydrograph Report Hydraflow Hydrographs by Intelisolve v9.22 Hyd. No. 2 Hyd. volume = Post Development Curve number = Hydrograph type = SCS Runoff Storm frequency = 1 yrs Time interval = 2 min Drainage area = 14.440 ac Basin Slope = 10.0% Tc method = KIRPICH Total precip. = 3.00 in Storm duration = 24 hrs 5 Friday, Mar 22, 2013 Peak discharge = 26.30 cfs Time to peak = 718 min Hyd. volume = 52,632 cuft Curve number = 77 Hydraulic length = 1000 ft Time of conc. (Tc) = 3.86 min Distribution = Type II Shape factor = 484 Post Development Q WS) Post No. 2 --1 Year Q (� 28.00 24.00 20.00 16.00 12.00 8.00 4.00 0 00 28.00 24.00 20.00 16.00 12.00 8.00 4.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) � - Hyd No. 2 6 Hydrograph Report Hydraflow Hydrographs by hrteiisoive v9.22 28.00 Friday, Mar 22, 2013 Hyd. No. 3 Outflow 24.00 24.00 Hydrograph type = Reservoir Peak discharge = 1.643 cfs Storm frequency = 1 yrs Time to peak = 776 min Time interval = 2 min Hyd. volume = 30,752 tuft Inflow hyd. No. = 2 -Post Development Max. Elevation = 291.09 ft Reservoir name = Bioretention Max. Storage = 27,349 cuft Storage Indication method used. . =iT-M Q (Cfs) Hyd. No. 3 —1 Year Q WS) 28.00 28.00 24.00 24.00 20.00 20.00 16.00 16.00 12.00 12.00 8.00 8.00 4.00 4.00 0.00 0.00 0 240 480 720 960 1200 1440 1680 1920 Time (min) -- Hyd No. 3 — Hyd No. 2 Il"1 EEIT Total storage used = 27,349 cult Pond Report 7 Hydraflow Hydrographs by Intellsolve v9.22 Friday, Mar 22, 2013 Pond No. 1 - Bioretention Pond Data Contours - User -defined contour areas. Average end area method used for volume calculation. Begining Elevation = 290.00 It Stage I Storage Table Stage (ft) Elevation (ft) Contour area (sqft) Incr. Storage (cult) Total storage (cuff) 0.00 290.00 22,920 0 0 1.75 291.75 27,072 43,743 43,743 Culvert I Orifice Structures [A] [B] [C] [PrfRel Rise (in) = 24.00 0.00 0.00 0.00 Span (in) = 24.00 0.00 0.00 0.00 No. Barrels = 1 0 0 0 Invert El. (ft) = 287.00 0.00 0.00 0.00 Length (ft) = 54.00 0.00 0.00 0.00 Slope (%) = 15.00 0.00 0.00 n/a N -Value = .013 .013 .013 We Orifice Coeff. - 0.60 0.60 0.60 0.60 Multi -Stage = n/a No No No Stage (ft) 2.00 1.80 1.60 1.40 1.20 1.00 0.80 0.60 0.40 0.20 000 Weir Structures [A] [B] [CI ID] Crest Len (ft) = 14.00 0.00 0.00 0.00 Crest El. (ft) = 291.00 000 0.00 0.00 Weir Coeff. - 3.33 3.33 3.33 3.33 Weir Type = Riser - - -- Mull -Stage = Yes No No No Exfll.(Inlhr) = 0.000 (by Contour) TW Elev. (ft) = 0.00 Note CiukvdfOrff ce oufflum ale a11aWW under IrM (!a) and outlet (oc) Wf1W. weir fi m deed for Office cor d6ons (ic) and submergence (9) Stage I Discharge Elev (ft) 292.00 291.80 291.80 291.40 291.20 291.00 290.80 290.60 290.40 290.20 290.00 0.00 3.00 6.00 9.00 12.00 15.00 18.00 21.00 24.00 27.00 30.00 Total Discharge (cfs) R :?Go 9 'J Skimmer Sediment Basin Worksheet (Drainage Area Must be Less Than 10 Acres) Area Disturbed = /• �o Acres Runoff Area - / . 90 Acres Qio =C x I x A =. _�Wx 7.4 x q. q Z cfs Basin Volume Calculation: Volume of Sediment = • 10 Ac.) x (1800 cf sed. /year) x (1 year) cf Assume 3 foot of basin depth, therefore area of the pit /`10 Square Feet Try ( Z$ wide) x ( !9'8 long) x ( 3 foot deep) Sediment Basin Surface Area Calculation: Surface Area (SF) = Qto x 325 sf /cfs -R� x 325 sf /cfs sf Surface Area — 6/� Use ( wide) x ( long) x ( foot deep) Sediment Basin Surface Area — Weir Design and Velocity Check: Q10 = cfs; Q = CLH3r2; H = [Q/CL]m _ [ (2.68)( /o )]2'3 0.32 feet Velocity Check 4 ( 9Z )/( /o ) (0.32) _ /• 5' 1 fps, OK ✓ JAc-,, E Skimmer Orifice Desion n _ �— oEaaf- + —ose.Y ��foq � _ I O/ rom mw waoa fmaoao use. wotm stmaQe volum (11131 Figure 2 Skimmer orifice diameter as a function of the basin volume and basin dewatering time. Basin Volume (From Worksheet: 8 7 2 Basin Dewatering Time (1 -3 Days): 3 Skimmer Orifice Diameter (From Chart): I �� rr,�s F>4.0 g' 4w Skimmer Sediment Basin Worksheet (Drainage Area Must be Less Than 10 Acres) Area Disturbed ?S Acres Runoff Area — Z. `r$ Acres Q10 =CxIxA = .319x7`(x Z.98 = 7.7 7- cfs Basin Volume Calculation: Volume of Sediment = ( Z-99 Ac.) x (1800 cf sed./year) x (1 year) ✓c (a `I cf Assume 3 foot of basin depth, therefore area of the pit I 788 Square Feet Try (_ 4 wide) x ( 7 Z long) x ( 3 foot deep) Sediment Basin Surface Area Calculation: Surface Area (SF) = Q10 x 325 sf /cfs = 7.7 Z x 325 sf /cfs sf Z� 5�2 1 Surface Area — oL Use ( wide) x ( long) x ( foot deep) Sediment Basin Surface Area — Weir Desian and Velocity Check: Qio = 7.7 2- cfs; Q = CLH3n; H = [Q /CL]2r3 _ [ 7.72. / (2.68)( 15 )]2j3 ©.33 feet Velocity Check 4 ( 7 77- )/( 16- ) ( 0 . 33 ) _ • 94, fps, OK ✓ 7fil✓ g$pVy6 a „}5 C II N Skimmer Orifice Design WO IMW tm000 tam unw. wOtN Simapa volufne (W3) Figure 2. Skimmer orifice diameter as a function of the basin volume and basin dewatering time. Basin Volume (From Worksheet: Basin Dewatering Time (1 -3 Days): 3 Skimmer Orifice Diameter (From Chart): Skimmer Sediment Basin Worksheet (Drainage Area Mast be Less Than 10 Acres) Area Disturbed = !6.34, Acres Runoff Area - g• AP Acres Qjo =CXIXA = .35"x7.&{x = 2-1. Co SS cfs Basin Volume Calculation: Volume of Sediment = ( S•34 Ac.) x (1800 cf sed. /year) x (1 year) = 15, 048 cf Assume 3 foot of basin depth, therefore area of the pit S o /co Square Feet Try ( 6ro wide) x ( I Zo long) x ( 3 foot deep) Sediment Basin Surface Area Calculation: Surface Area (SF) = Qjo x 325 sf /cfs Z . x 325 sf /cfs = 7 034) sf = 7 Zoo '*"' Z o 3(o Surface Area — v IL Use ( wide) x ( long) x ( foot deep) Sediment Basin Surface Area — Weir Design and Velocity Check: Q10 = Z • & T- cfs; Q = CLH312; H = [Q /CL]23 _ [ ZJ• (2.68)( 7.5- )]2'3 = D r¢A feet Velocity Check 4 ( 21.45)/( 0.41a ) ( 25" ) _ • 80 fps, OK J5L✓ n Cr 1 N Skimmer Orifice Design 1010 tOCUO 100010 1'C00.D GwIn Wator stotage VON" (tt•31 Figure 2 Skimmer orifice diameter as a function of the basin volume and basin dewatertng time. Basin Volume (From Worksheet: Basin Dewatering Time (1 -3 Days): 2 t, &00 3 Skimmer Orifice Diameter (From Chart): Z � Stocks Engineering, P.A. 1100 Eastern Avenue PO Box 1108 NashM% NC 27858 Project: Flowers -Pod 9 Date: March 25, 2013 Page:1 of 1 Post- Develooment Runoff Computations TEMPORARY DIVERSION CALCS. 10•Year Storm Channel Report Hydraffow Express by IntelisoNe Temporary Diversion la - Bare Soil Triangular = 3.110 Side Slopes (z:1) = 3.00, 3.00 Total Depth (ft) = 1.00 Invert Elev (ft) = 100.00 Slope ( %) = 0.50 N -Value = 0.020 Calculations = 0.75 Compute by: Known Q Known Q (cfs) = 3.11 Elev (ft) 102.00 101.50 101.00 100.50 100.00 99.50 Monday. Mar 25 2013 Highlighted Depth (ft) = 0.66 Q (cfs) = 3.110 Area (sqft) = 1.31 Velocity (fds) = 2.38 Wetted Perim (ft) = 4.17 Crit Depth, Yc (ft) = 0.59 Top Width (ft) = 3.96 EGL (ft) = 0.75 Section 1 2 3 4 5 6 7 8 Reach (ft) Depth (ft) 2.00 1.50 1.00 0.50 -0.50 Channel Report Hydraflow Express by Intellsolve Monday, Mar 25 2013 Temporary Diversion la - Vegetated Triangular Highlighted Side Slopes (z:1) = 3.00, 3.00 Depth (ft) = 0.81 Total Depth (ft) = 1.00 Q (cfs) = 3.110 Area (sgft) = 1.97 Invert Elev (ft) = 100.00 Velocity (ft/s) = 1.58 Slope ( %) = 0.50 Wetted Perim (ft) = 5.12 N -Value = 0.035 Crit Depth, Yc (ft) = 0.59 Top Width (ft) = 4.86 Calculations EGL (ft) = 0.85 Compute by: Known Q Known Q (cfs) = 3.11 Elev (ft) Section 102.00 101.50 101.00 100.50 100.00 99.50 0 1 2 3 4 5 6 7 8 Reach (ft) Depth (ft) 2.00 1.50 1.00 0.50 0.00 -0.50 Channel Report Hydraflow Express by IntelWve Monday, Mar 25 2013 Temporary Diversion lb - Bare Soil Triangular Highlighted Side Slopes (z:1) = 3.00, 3.00 Depth (ft) = 0.40 Total Depth (ft) = 1.00 Q (cfs) = 0.830 Area (sgft) = 0.48 Invert Elev (ft) = 100.00 Velocity (ftfs) = 1.73 Slope ( %) = 0.50 Wetted Pedm (ft) = 2.53 N -Value = 0.020 Cdt Depth, Yc (ft) = 0.35 Top Width (ft) = 2.40 Calculations EGL (ft) = 0.45 Compute by: Known Q Known Q (cfs) = 0.83 Elev (ft) 102.00 --1 101.50 101.00 100.50 100.00 99.50 Section 0 1 2 3 4 5 6 7 8 Reach (ft) Depth (ft) 2.00 1.50 1.00 0.50 0.00 -0.50 Channel Report Hydreflow Express by IntelisoNe Temporary Diversion lb - Vegetated Triangular = 0.830 Side Slopes (z:1) = 3.00, 3.00 Total Depth (ft) = 1.00 Invert Elev (ft) = 100.00 Slope ( %) = 0.50 N Value = 0.035 Calculations = 0.52 Compute by: Known Q Known Q (cfs) = 0.83 Elev (ft) 102.00 = 101.50 101.00 100.50 11116111111 99.50 Monday, Mar 25 2013 Highlighted Depth (ft) = 0.50 Q (cfs) = 0.830 Area (sgft) = 0.75 Velocity (ft/s) = 1.11 Wetted Perim (ft) = 3.16 Crit Depth, Yc (ft) = 0.35 Top Width (ft) = 3.00 EGL (ft) = 0.52 Section 1 2 3 4 5 6 7 Reach (ft) Depth (ft) 2.00 1.50 1.00 0.50 -0.50 Channel Report Hydraflow Express by IntaUsolve Monday, Mar 25 2013 Temporary Diversion Ila - Bare Soil Triangular Highlighted Side Slopes (z:1) = 3.00, 3.00 Depth (ft) = 0.74 Total Depth (ft) = 1.00 Q (cfs) = 4.250 Area (sqft) = 1.64 Invert Elev (ft) = 100.00 Velocity (ft/s) = 2.59 Slope ( %) = 0.50 Wetted Perim (ft) = 4.68 N -Value = 0.020 Crit Depth, Yc (ft) = 0.66 Top Width (ft) = 4.44 Calculations EGL (ft) = 0.84 Compute by: Known Q Known Q (cfs) = 4.25 Elev (ft) 102.00 -, 101.50 101.00 100.50 100.00 99.50 Section 0 1 2 3 4 5 6 7 8 Reach (ft) Depth (ft) 2.00 1.50 1.00 0.50 0.00 -0.50 Channel Report Hydratiow Express by Intelisolve Monday, Mar 25 2013 Temporary Diversion Ila - Vegetated Triangular Highlighted Side Slopes (z:1) = 3.00, 3.00 Depth (ft) = 0.91 Total Depth (ft) = 1.00 Q (cfs) = 4.250 Area (sgft) = 2.48 Invert Elev (ft) = 100.00 Velocity (ft1s) = 1.71 Slope ( %) = 0.50 Wetted Perim (ft) = 5.76 N -Value = 0.035 Grit Depth, Yc (ft) = 0.66 Top Width (ft) = 5.46 Calculations EGL (ft) = 0.96 Compute by: Known Q Known Q (cfs) = 4.25 Elev (ft) Section 102.00 101.50 101.00 100.50 100.00 99.50 0 1 2 3 4 5 6 7 8 Reach (ft) Depth (ft) 2.00 1.50 1.00 0.50 0.00 -0.50 Channel Report Hydraflow Express by IntelisoNe Monday, Mar 25 2013 Temporary Diversion llb - Bare Soil Triangular Highlighted Side Slopes (z:1) = 3.00, 3.00 Depth (ft) = 0.57 Total Depth (ft) = 1.00 Q (cfs) = 2.050 Area (sqft) = 0.97 Invert Elev (ft) = 100.00 Velocity (ft/s) = 2.10 Slope ( %) = 0.50 Wetted Perim (ft) = 3.60 N Value = 0.020 Crit Depth, Yc (ft) = 0.50 Top Width (ft) = 3.42 Calculations EGL (ft) = 0.64 Compute by: Known Q Known Q (cfs) = 2.05 Elev (ft) 102.00 = 101.50 101.00 100.50 100.00 99.50 Section 0 1 2 3 4 5 6 7 8 Reach (ft) Depth (ft) 2.00 1.50 1.00 0.50 0.00 -0.50 Channel Report Hydraflow Express by Intelisolve Temporary Diversion Ilb - Vegetated Triangular = 2.050 Side Slopes (z:1) = 3.00, 3.00 Total Depth (ft) = 1.00 Invert Elev (ft) = 100.00 Slope ( %) = 0.50 fd Value = 0.035 Calculations = 0.73 Compute by: Known Q Known Q (cfs) = 2.05 Section Monday, Mar 25 2013 Highlighted Depth (ft) = 0.70 Q (cfs) = 2.050 Area (sgft) = 1.47 Velocity (fUs) = 1.39 Wetted Perim (ft) = 4.43 Crit Depth, Yc (ft) = 0.50 Top Width (ft) = 4.20 EGL (ft) = 0.73 101.50 101.00 100.50 100.00 99.50 0 1 2 3 4 5 8 7 8 Reach (ft) Depth (ft) 2.00 1.50 1.00 0.50 9114111 -0.50 Channel Report Hydraflow Express by Intellsolve Monday, Mar 25 2013 Temporary Diversion Ilia - Bare Soil Triangular Highlighted Side Slopes (z:1) = 3.00, 3.00 Depth (ft) = 1.03 Total Depth (ft) = 1.50 Q (cfs) = 10.31 Area (sgft) = 3.18 Invert Elev (ft) = 100.00 Velocity (ft/s) = 3.24 Slope ( %) = 0.50 Wetted Perim (ft) = 6.51 N Value = 0.020 Crit Depth, Yc (ft) = 0.95 Top Width (ft) = 6.18 Calculations EGL (ft) = 1.19 Compute by: Known Q Known Q (cfs) = 10.31 Elev (ft) Section 102.00 101.50 101.00 100.50 100.00 99.50 I 1 2 3 4 5 6 Reach (ft) 7 8 9 10 11 Depth (ft) 2.00 1.50 1.00 0.50 0.00 WAIV6l Channel Report Hydrallow Express by IMelisolve Temporary Diversion Ilia - Vegetated Triangular = 10.31 Side Slopes (z:1) = 3.00, 3.00 Total Depth (ft) = 1.50 Invert Elev (ft) = 100.00 Slope ( %) = 0.50 N Value = 0.035 Calculations = 1.34 Compute by: Known Q Known Q (cfs) = 10.31 Elev (ft) Section 102.00 101.50 101.00 100.50 100.00 99.50 Monday, Mar 25 2013 Highlighted Depth (ft) = 1.27 Q (cfs) = 10.31 Area (sqft) = 4.84 Velocity (ft/s) = 2.13 Wetted Perim (ft) = 8.03 Crit Depth, Yc (ft) = 0.95 Top Width (ft) = 7.62 EGL (ft) = 1.34 Depth (ft) 2.00 1 2 3 4 5 6 7 Reach (ft) 8 9 10 11 EN-111 STS 0.50 M l am-fal .o 0 . y CL w r V r y O 1 N Cr) N C cn O C Z w LIU Cl w N I �j EC.'f � FLo l�fL2S OU i L-E-r 'flPrT77EL7► Dk-� Usk F1CrtJe� °.Q(�� kwr� zs 7.8'i -� s c cip, • I � Mtn1. �cG. U-145-- C4., 65 6 D'J m)u?► -I J=�U1� Z2 " IN ��PTrI . Use 1F1 G Ve:E� S.o(V a g.fjowm 1? t..P w *05F CLP %5 . F-tP F--ii- ova MIBFI 1� 1. " ►►J V Tr-f . 8 6ROS of ION G'b � b air a C14 Permit Number: (to be provided by DWQ) Drainage Area Number: Bioretention Operation and Maintenance Agreement I will keep a maintenance record on this BMP. This maintenance record will be kept in a log in a known set location. Any deficient BMP elements noted in the inspection will be corrected, repaired or replaced immediately. These deficiencies can affect the integrity of structures, safety of the public, and the removal efficiency of the BMP. Important operation and maintenance procedures: - Immediately after the bioretention cell is established, the plants will be watered twice weekly if needed until the plants become established (commonly six weeks). - Snow, mulch or any other material will NEVER be piled on the surface of the bioretention cell. - Heavy equipment will NEVER be driven over the bioretention cell. - Special care will be taken to prevent sediment from entering the bioretention cell. - Once a year, a soil test of the soil media will be conducted. After the bioretention cell is established, I will inspect it once a month and within 24 hours after every storm event greater than 1.0 inches (or 1.5 inches if in a Coastal County). Records of operation and maintenance will be kept in a known set location and will be available upon request. Inspection activities shall be performed as follows. Any problems that are found shall be repaired immediately. BMP element: Potential problems- How I will remediate the roblem: The entire BMP Trash debris is present. Remove the trash debris. The perimeter of the Areas of bare soil and /or Regrade the soil if necessary to bioretention cell erosive gullies have formed. remove the gully, and then plant a ground cover and water until it is established. Provide lime and a one -time fertilizer application. The inlet device: pipe, The pipe is clogged (if Unclog the pipe. Dispose of the stone verge or swale applicable). sediment off -site. The pipe is cracked or Replace the pipe. otherwise damaged (if a livable ). Erosion is occurring in the Regrade the swale if necessary to swale (if applicable). smooth it over and provide erosion control devices such as reinforced turf matting or riprap to avoid future problems with erosion. Stone verge is clogged or Remove sediment and clogged covered in sediment (if stone and replace with clean stone. applicable). Form SW401- Bioretention O&M -Rev.3 Page 1 of 4 BMW element: Potential problems: How I will remediate the problem: The pretreatment area Flow is bypassing Regrade if necessary to route all pretreatment area and /or flow to the pretreatment area. gullies have formed. Restabilize the area after grading. Sediment has accumulated to Search for the source of the a depth greater than three sediment and remedy the problem if inches. possible. Remove the sediment and restabilize the pretreatment area. Erosion has occurred. Provide additional erosion protection such as reinforced turf matting or riprap if needed to prevent future erosion problems. Weeds are present. Remove the weeds, preferably by hand. The bioretention cell: Best professional practices Prune according to best professional vegetation show that pruning is needed practices. to maintain optimal plant health. Plants are dead, diseased or Determine the source of the dying. problem: soils, hydrology, disease, etc. Remedy the problem and replace plants. Provide a one -time fertilizer application to establish the ground cover if a soil test indicates it is necessary. Tree stakes/ wires are present Remove tree stake /wires (which six months after planting. can kill the tree if not removed). The bioretention cell: Mulch is breaking down or Spot mulch if there are only random soils and mulch has floated away. void areas. Replace whole mulch layer if necessary. Remove the remaining much and replace with triple shredded hard wood mulch at a maximum depth of three inches. Soils and/or mulch are Determine the extent of the clogging clogged with sediment. - remove and replace either just the top layers or the entire media as needed. Dispose of the spoil in an appropriate off -site location. Use triple shredded hard wood mulch at a maximum depth of three inches. Search for the source of the sediment and remedy the problem if possible. An annual soil test shows that Dolomitic lime shall be applied as pH has dropped or heavy recommended per the soil test and metals have accumulated in toxic soils shall be removed, the soil media. disposed of properly and replaced with new planting media. Form SW401- Bioretention O&M -Rev.3 Page 2 of 4 BW element: Potential problems. How I will remediate the problerm The underdrain system Clogging has occurred. Wash out the underdrain system. if applicable) The drop inlet Clogging has occurred. Clean out the drop inlet. Dispose of the sediment off -site. The drop inlet is damaged Repair or replace the drop inlet. The receiving water Erosion or other signs of Contact the NC Division of Water damage have occurred at the Quality 401 Oversight Unit at 919 - outlet. 733 -1786. Form SW401- Bioretention O &M -Rev.3 Page 3 of 4 Permit Number: (to be provided by DWQ) I acknowledge and agree by my signature below that I am responsible for the performance of the maintenance procedures listed above. I agree to notify DWQ of any problems with the system or prior to any changes to the system or responsible party. Project name:Flowers Plantation Pod NW 8 BMP drainage area number:NA Print name:Rebecca Flowers Title:Owner / Developer Address:4880 NC 42 East Clanton- NC 27520 SS3 - 3 —JO W [%F/ZEK�J D. Note: The legally responsible party should not be a homeowners association unless more than 50% of the lots have been sold and a resident of the subdivision has been named the president. I, T. Mc cka j ct,%� , a Notary Public for the State of County of A's N , do hereby certify that IZ a b.� c�a l o w arc ;S personally appeared before me this —Lv� day of vl6ft 7013 , and acknowledge the due execution of the forgoing bioretention maintenance requirements. Witness my hand and official seal, I Noma mcit;J Votary PuWlc E.a.� Co., It C. 514� SEAL My commission expires S- Z Z015- Form SW401- Bioretention I &M -Rev. 2 Page 4 of 4 G tl E* \• \ \ ,, \ •\ \ \ ;, ! d r � 1 Y / -0! CURVE TABLE CURVE LENGTH RADIUS DELTA I TANGENT CHORD DIRECTION CHORD LENGTH C1 180.35 400.00 25'49'57" 91.73 S12 45'40 "E 178.82 C2 137.59 400.00 19.42'3 " 1 69.48 N0941'57 "W 136.91 C3 77.47 255.00 17'2426" 1 59.04 N28'15'2eW 77.17 ° �• J ��� �� � y �� i ! t it ! \ ! ! CONCRETE TO BE CLASS AA `--- -- \•° / •.� �' @$` ,. j i } t 1 ! It AIR ENTRAINED LOW SLUMP Qom � r /� °•\ � / ;�y � /J/ 1 ! i2,9g � I t \\ t ' ! \ 4600 P.S.I. it 61 2 �' a"v t%'� �1"�' / / / r 'r' r r ''r� / /, -. ,`•.� � � J �.I•'' ..v'� t !\ bj \\ 7 1 \ \ .' ••4 • .• f ;� '- •�.t „ �1 �'�, / /j // / ° r °°�• ,,jy� r.- °r\ �pf:r !rr/ 10,55 /S.F. ! i \\ p \t tt \, \ 1 42 hQND�'t NG .r•-- / / J I j /! r ,,. �• /, r �, / � 5� •: ; .::,;r. � � .�• �, ✓ / ��.• "" l \ ! \ \ -� STANDARD LL CURB ?" " r // e! j f J // // ° / 1s r ✓'' N a g W .. -' �� '' " \ / �w \\ ; t \ \\ NOT TO SCALE ` r ERCY FLOWERS / ;. ri.: NG h2 S7oRE / . J i I , '38 2t Am r'r w POND t ! \ \ \ J ! r „•- / / / / J / \1 D y ,,s -..M- � ,�s . .•/,.,,,.. ✓ ' ?,.,::.�y, . a� + _ --N � ♦ 9,72 2 6 Ac Of NOT TO SCALE Us ti \ \\ rn �$ ,�►P- All \ w `` It 00 S.F. t / o •,. s" dC \ o, \ ! \ It 723 S.F. \ 1 \ / I i / / / / / / / / / / / / / / e +,,, ..,• .-- ^ - - -- -~` �, r r ,�..- _` _` _ --• ! / /�• / �,,, . � r !, �,,.. �,�syi. 1. :�4? �;;�., AO R� \, 2 AC. � !\ ! \ / / / / / / / / f �• r .r' / / / r � . .... ..... .... '"� '� �" '' r / r / � / r / ! 3, :. �+: �. a � r .r r ' = r ° ! -� . \!\ t ! \ \\ • / ! / / / / / / / r 1 / ,� r �„ ._ .......... / � r r .�' / j . 00 .,r -�` �"�• `� !\ \ t i \ \ .18 A,w:. ry tai+ r / o+./ 01 ! J .- "G �; \ \ i \\ it i ! / f / / / / /. / r / / / / / �, �,, ......., ,,,� / I / d= / \� / 9 r �'' r r � t!t � •` 9,Q2i .F. \ \ \ '•.. \ \ \ // 11 j /I !/ / / / / / / � •� �... f e' ,, / / °�-'" ...� Q ° s �'•'' •'''` \ m It t \ \ \ / / / r / / / / / � j r t �•'� / / r '' �` ` •....._...... -' / / / / / / 1 ` 1 � 16 F: ' "R y` { ". '' q9••� \ •� p` \ i ! \ \ low 9,720 F ♦ _ \ '§ i t \\ \ \\ o. ! i [ ! ! i I 1 t { / / / Lys,, ti :: ; :.:..�,: -,.::. �:..:::� :..... :.::. �•,,,,..- -''""� � _,,., ,.- r \ \ \i \ \\ t { ( I ! i y I t 1 t ! t J 1 / f / J 1y � � t -: P•"';;.��''�' °;� : ,�ca S ��N_: '- '� '" • „- -~'' 1 \ \ \ \ \ \ l / t ! t J t aye �N �aJA �o : -:�- ..:.;.:... •:... ?: -. .....:::� o;, \ �,,.� 1� � \ \\\ low- psa�,6L� aoa ? :-%`�° o: _• r n 1 1 1 \\ \p. of„rr IN, \ \, ~.r•~ � ' • � - $- °3 �� � � 9.73 S.F. .__..._. -- . -. f \ °' ' t t t \ \ \ ! \ \ \ ,fir: ,,. ♦ ~�,.- �. ,,,_ ,� -.� _ �. `, r__,,,..._�'= •� ,� �, ♦ �' •a.. ` \ \ O .....:••i � C, N. ! It tl \ \ \ \\ \ \ \ \ \ \ � `.,\ '`��. ` .i -�•., � �- _,.... -, �--° °� `;• ;.. ` � '`• •,. „� ♦ � .., � � "' -. „° \ ♦ � \ \ \ N .. ,:_ o ,7 s.F I \ ! i tilt �•. •� '� 1 \ \ -, .` • -- .,:�,/ ,. ` :.`.'�-- .,.. ,,r _ - �' .` -- ..,, .,•..,,, `.• � �- •.. \ \ \ \ \ \ � ` ¢moo : °,e, n � c' �. --'� I t 1 t 1i \\ i \r -•.. - ..._...,,, ~` •� „+. -�• �... •4. ~ 1` �.. `� ,` R J. •�" S to � r •.." f t \\ \ \ \\ ',, '\ \ '` \ \ \ \ `` \ ` '' �,. �/ / � ` .,` -.. _- _...._ _„_ .,�'1 -. ` -.. -. � `' ..•• ... ,,,,, ` �• �, .,� 1' ••.. ,1 '' •., •�, � � � •� \ \ \ \ \ � o \ �, ° •�' '�1°' ,ms's -� { t 1 c$'' i 11 \\ \J \ \ \ \ \ \ \ \ \ N, `` .,,` y . �f•" .`` •°^,• " --- -- �... " �" ^- _ '� �. „` `` •-. ` ".• .,` •`� .•, ` 1 1 ..,` ♦ �• .� ♦ ^" .�.. ,� " \° \6s .\ �' 'T `Lfl ; \ w: ` f 9,763 \ \ \ f _ >. -� ° ,/` ._ _ - - - - - _ _ - _ _ - , - ` ♦ `♦ ` - ®,` >, L\ `� \ \ \ \ 8,26 1': cs 1 v •- _1 -� �, .,•• �,... -- - - =�J._ .... _ ♦ -• •.•, \ \ ` ♦ �. ` 1-..., .,.s� .,. ?'`' -.�.o ,,� \ •, \ � , \ \ 0.19 �. \ .:- �„ ..• -' •-�� ! V 3'cri t \ \ _ _ - _ _ _ _ -- _ ° 1., \ *� �� oo' �ar`M" \ _i i 1 R., 9,77 F i 1\ 1 1 ;� \ l \ __..._;'.�.� \ \ ♦ .... =� r'- �....•• --- � ._ ---- -• -- _ ...... - .,_. •_,. •.... �. �. �\ \• `. \ •`` '� \ �' 1� 17.80 S. ' l ! 8 0, 0:22 c. \ - ....- .-. - - -- -- - \\ `\ \ \ \ \ \ \ \ c, . ! \ 10.1 c. • 1 � \ gyp' � ' �, �, �'"� / ¢''1 \ l ..�, •.... _ - -° \ \ \ 05 \ c "� l \ \ \ \ ! 0.1 S ,::C. t .I0 fl : d> / C, �� \ ` � 1- ..,. _.. � - .,`� .........• -- --' '" �, - -_- -r- "" "` - ,.... -,. Y` 1i �°• �•, `� \ \ \ \ `- .=^�.' `\` • y\ \\ 1 1 \ �i \ ! � `ti.� 1 \ �1 1 t JQ d ,,� , :,.1�04�'� ..�1iN� �� p r' ,,, r�' r ,A�`*'61� t ) /?0 1 -. \ .,, � ,.- \ � i\ \ \ . � •. t it \ 1 is s, .�ycwA..::oS :;i;�• 'G; -.` -- t \ ! ' \ �, r ..- -' � �..._ ..,.. _......_ .... -- -- ~ �' � \ •� .... '� `\ t 1! \ \ \ '�'! � \ ` . S\ i � J 2y 5 30 68108 0 9,794 \ tl t t t i \ {}% -• _ - \ 2 / /r `�.3�.� \ I i 0.1 AC. \ J '►U jZ /'' 2fl� .:s :i �r' 'Al I 1 Ul r -,.-\ - -• 1 i • / / / a� n::: � fir• -- -. / 1 1 ss o W 1 \ � d C w \ .•�' ^+.. r '•~' ._,,...r• _. -� •� \. / JJJrr• � �.'^.i ��.... ,,,,,.r. f + .:: '� .:' �' f f ' ti1:- � '.'•o I 1 f� .� c r� / t ' r7s / t© �o.. Ar~iJ . S ,a t \ l0 S.F. ` .o i!' 1r'' .r'9`' \\ • \• �\ ~ `�'�-- •- .._..__..._..- -•''�_ . ---- -� ,\ t \\ /i��i � % /f�i /ij /I � 1 l t l ! / f f/. tt ! 5 i_� ®ss;°� spec fl,Z�.•,,.:::: J ,� ® 1� s J 1 1 1 j � ' ',,.r� ::. � p 1 1 \\ 1\ t t \ - -. - �' _ ♦ _ �I /i / /�/ r f ! t 1 J f 7s. ' w :: , :50� ,. ,, ; /.ea? , &VV. �c d f \ -� j� J " ff 1 l I / ..l� $ :.� / �o� ; L J o m \ \ - - ri �Jr i 1 i I I I d l I J 1 / ,' r ,•.: �o�E / o �► { 1 $ c. r _.• t 3 \ 1 1 t„ t �. 1+ 1' -1 � t -- - _ _ - -- - \ \� -`^ _'�j�? ./� t i ! 1 \ 1 t\ \ 1 I 1 1 ` / -tN #'- \ d i ! l 4 __ 1t I t t \ \ \ \ \ 1 1 J:.S ,,..::15;:; �'%....- ;:•. Q'r 1 J ! ! o u+ \ �, S.F. tt{I \ \ \ \ \ \ \ \ 1 1 1 ,:'�. ' I \ Y 1 >\ I o. 0.17 Ac. l "' - .... '- -- - -. _.`��` " •• -- _, .� .= -•- /ice II / • tilt t \ � \ \ \ `°� 1 \ \ \ ! l t i ..:.,,, ,,,~ . /,-;; A d di I \ cn d \ \ \ \ \ i t { Imo.::::.' ;:`' :: , . \ / i S, i s ! ! r -- -- \ \ \ \ 1 t t ; .:•.: ;:.:.. \ t cr ! U, 32 1 \I 1 1 1 1 \ . _ _ _ _ _ - _ .:- - , �.•��, // e 1 / -- i` \ \ \ \ \ t t t { ° f:: ;; ,::.'.,t.:.., ; ;� / / Y i d \ CC ©. w. t.� d t 1 -'- { \ 1 -- L 1 \ ° _ . _ _ .✓ %r . ♦�^c� `�-- l / �\ 1 t a J 1 y \3� t I 5 �r -1 1 1038 .F \\ t ! - _•• ...- �•� �. _ (\ � \ \ } i t �l';��;�:_!'' �':�.::,: ,: / ` \ l 8 1 t t � l �t ! I ! \ t \ ..- -1' `� '.._,- 5ti t ! �o�o� t ♦ ` . _ , -- - - °.r i1.- .♦`_,�- ,�"'" b J .�e.,\ \ \ \ \\ t I 1 t { , ;, a..s�:`; `\ \ 6 6 SIF. \ t 1 i 16 t j _ \ l 10,740 S l } 1+ I o .► 1 s ! , \ .k'' y tt, \ 1 .. y �,. ` r'".' �, .,.a"� �' •9..'°r� .r_.S••� •^ _'.' \ \ \ •.. r \ \\ t i i I 7,2 S.F. t i\ i. j 0.2 AC. N � ,. ._- -..-•' '?"__ �.,•„� \ irJ I I { i y t t .."".". -•--� .7 AC. S , __ - �y"ri �' ". ""' ,1: i l ' 1 t t \ .� t � N :. � .,,• fit' JURISDICTIONAL WETLAN , S ti r r �. y �� /11 (I i j ! 1 i 1 \ t ` \ \\ 1 ° t 1 \�ZO' Ly� ° �„ f t 8' is c. rl O °1 `, `'° ism- ,, E� \ l! c�► \ t AREA - 5867 S.F. '" �� ! \t t t i ! 1 -- ~' t �x ,�a 20 sasSL i ° ., fLgSi. j -T f t t 35 y t ? 1 li -..�- - 1 ! ! / ( l f t apN R�I 33 \ \\ !!! t \\ t\ �eNCa PA-.5t$ I i Y ! 17. 5.13 l c�\2 1 1! \ �:; t i \ \! 1J 2 it . t \ �) } { } -_ -_ -� -r ♦ //� i I 1 t! \ t\ \ \ \ \ , . , } ` ; ! 1 / IN \ t t t t t i \ i S��`\ \~ \\ \ . 97 S.F. 25, 1 /4r 12 2" SF9.5A COMPACTED SUBGRADE - PREPARE i IN ACCORDANCE WITH GEOTECHNICAL REPORT. ALL CURB CROSS SECTION SCALE: 1" = 10' -0" GENERAL NOTES- (LOCAL JURISDICTION) 1. Any discrepancies In layout should be brought to the Engineer's attention prior to construction. 2. Written dimensions supercede scaled dimension. All dimensions are edge of pavement or face of curb, unless noted otherwise. 3. All materials, Installation, testing and Inspection of water and sewer utilities to meet current Johnston County standards. 4. All streets noted as "PUBLIC" shall meet NCDOT minimum standards for subdivision streets. All other shall meet the criteria shown. 5. All lots to be served by public water and public sewer. 6 A 10' t €li d i d r ad maintenance easement is reserved W ty, ra nage an o along and adjacent to all street right of ways. 7. Flared end sections are to be used on both Inlet and /or outlet ends of storm sewer unless otherwise noted. S. Fire hydrants are to be Installed as shown on plans. 9. Maintain minimum 3' cover for all water pipe. 10. Waterline pipe shall be C -900 class 200 PVC unless otherwise noted and Installed a minimum of 4' off edge of pavement, 11. Corporation stops shall be rated a minimum of 300 PSI. 12, Where Waterline Crosses: A. Sanitary Sewer: Waterline shall cross above and maintain 2' vertical separation or 10' of horizontal separation. If this separation cannot maintain or if waterline passes below sewer line then both waterline and sewer line shall be class 50 ductile iron pipe for a minimum of 10' each side of crossing. B. Storm Sewer: Where waterline crosses above maintain 1' vertical separation. If this separation cannot be maintained or where waterline and /or sanitary sewer crosses below storm sewer, waterline and /or sanitary sewer shall be class 50 ductile iron pipe for minimum of 10' each side of crossing. 13. All gravity sewer line is SDR 35 PVC except as follows: All sewer line less than 3' deep or greater than 14' deep shall be minimum class 50 ductile iron. 14. Each prime contractor performing excavations or underground work shall be responsible for the location of any existing utilities in the area of their work. Notify the utility locator service (1- 800 - 632 -4949) at least 48 hours prior to commencing construction In order that existing utilities in the area may be flagged and staked. Contractor shall use all care necessary when working in areas [known or suspected to contain underground utilities, including hand digging. 15. The contractor Is responsible for relocating any existing utilities that conflict with the proposed construction. In addition, the contractor is responsible for repair and replacement of any utilities, curb and gutter, pavement, etc. that may be damaged during construction, . Damaged Items shall be repaired to at least the quality of the original workmanship. The contractor shall field verify depth of existing utilities and relocate If proposed grading causes utility cover to be less than minimum required. 16. All temporary erosion control measures shall be Inspected after each rain event and necessary repairs shall be done as required. 17. Each lot shall have a 4" sewer service at the center of the lot and a 3/4" water service located 3' from the property line. 18. Water services are to be "ganged" where possible. Where "ganged" service crosses under the road, the line must be 11". All service pipe under roads shall be sleeved. 19. Waterline to be pressure tested at minimum 175 psi. 20. Ductile iron pipe sanitary sewer must be Interior coated with Sewper Coat or Protecto 401, per Johnston County requirements. 21. Contractor to test sewer & water line according to Aqua North Carolina's 2012 standards. 22. Contractor shall Install stub outs for sanitary sewer which shall have a depth of no greater than 6' below the finished grade at the termination of the lateral. The location shall be marked by a 4" PVC turn -up at „the and of the lateral. Contractor will mark all sewer services with an S in the face of the curb. BEFORE YOU DIG CALL TOLL FREE 1-800- 800 632 4949 NORTH CAROLINA ONE -CALL CENTER surLSL,ona: emp�d Eli t ! \ \ �" \ \ \.24 Ac. r ° J / \ y t `\ 10.4 }8 S.F1 W A311 t \ \ 0.24 Ac. ``� Q� "� ol \ \\ \ \ h", ` `� /t \ ®\ . \ �/ f ! y t ! \ \ \ / \ i \ ww \ \ \ \ �►\ f i 1 515 F. \ \ v r.x.9= r3 14\ \ \ \ \ \ :,1 \ \ \ r\ \ \ w:: 5 1 °UFE7 y o. 4 A \ r r -' 1 \ s I + 1 \ y J \ 9 \647 S.% \ \ \\ \ 1 \ e` / t ! \ \ `; 1. ;. ! o. • 6 J \ 1 \ 0. 2 Ac.\ \ \ .A- _� y \ \ \ \,. e \ \ \ t \ ` , s / J \ ! \ \ \ \ \ \ ! �`♦\ \ \ ' •I1 \ \ t \ u 1 -' -* � °° I ..,:,e'%;/' 17,108 `` f!, / / ! j �` '� \ \ \ / \ yr -°'' \ \Vr \ie/� \\ \ \t •\ 9 AC C: >�4 rr 000 A- i ` ..r // / / 1 JJ \\ •€ ?�1``'�..t�\ ^�`0'• \ \ \ \ ` °.4 \\ f < ' \� \\ 11\ \\ tl\ \ t \ reFER ' a A� ,.°j' ( V_ / ♦ 1'\- 5 \ \ \ \ 9, 78 S� \ \ ° -t dF / J ! \ \ ! 04 w \ \ 1 t ! ! \ r 0 $ ! yqO , r / J t \ \15 \ \ � \ � 1 ! �t(� '� \ c, \ 4.�� A�- 1 1 1 loo, �a V3� STOP 8,303 S.F. \ \ l \ t t`i / + `' \ \t \ ! t 1 t 1 ! Y SIG OAR AC. \ 1 42 5 tK_\ ,o t t ! \ 1 WAiFkt VALVE) `=`�JP ,� • i 's� � \ t t t ! \ t (�• �. .� "��� aQz•'''i . %`""' •t�¢ �`'� f \ \ 1 ! i \ t i CQNTRACTOR TO VERi �o-0 ,. t ^ ! r -t- -� 7 t ! t ! \ \.)' OF E; X. STUB TI DEPTH !J� C J l 2s.5� / THE NE WITH 45 . .,• rs3,z .. -l. l t �-31--- _ \ � .� •,/ .- ! \ \l 1 S \ \� \ , °j `\- / ADJUSr VALVE i ,• _ - - _. \ 11 t J_� `� t j iYATCH� RO. sfW� / a�i r/i 1{ ° ( ! ! JJ`•�\\ \` l 1 SCALE: 1 " = 50' 6 50 100 125 150 � ®t�t�t, e'rrrrsr® = SEAL 13843 " � ® ® ® °d a_lr�f148 ►`,'� %+Wt4 In II in 0 X M N N 'N 0 V I � N O o � v ', r ,o CO • ,, UJ UJ LU U Z 00 i r ,. If A 0• !,,s ON14131 081 • � \ � \ t '~- •\" � �`., _ : \ �- - �� •m°' \\ \t i j 1 j { - /'ill Ii l i i\ t �\ i GRADING NOTES: LENldAR CRITERIA) \ t . v ,, Qti� y� ! {,, I tt tt t �` I\ A . j 1 t 1. With regards to slopes on all Homesites: ,� f /�', / cf �'j 1 1 1:•� I 1 t 1 1 a. All slopes in the community shall be graded to the Engineering Plans. 1M5 1 �a / Ac . i \ I t b. Slopes shall not contain any organics, spoils, or other unsuitable material, 1 1 \ i and shall have proper footing. c. All slopes shall be "walked in" by dozer. d. All slopes shall b® properly stabilized with vegetative ground cover. 5� ,- - -- f %��:: • �� / / / �'g I { \ 1 1 i 1 2. Homesite shall be graded to a uniform slope from Right of Way to the front building setback It as measured from top of curb at center of ham ®alts Ile - " - / .� ' '� 12 �'• ,�^ j 1 \ I tit and shall be not less than 6" above top of curb, to not more than 18" / 1 \ t 1 i \ above curb. �� ® �', h •• 30 5' F. 1 3. The Minimum Building Envelope (area Inside the building setbacks) of each \ t\ \ \ \t homesite plus the required slopes must be completely cleared and grubbed, .. -..1 Kc 42 // /i✓ ref,t �3r �� 4. Building pads shall be compacted to 95% standard proctor begirding across POND , / / 1 i / ;� ✓ -- / \ the entire width of the Minimum Building Envelope from a point 5 In front of the Minimum Building Envelope and extending to a point 10 feet behind _ ERCY FLOWERS / / 1 t j 312 C , . '39 g gg /1/ {�, t \ \ 9 P g P � STORE the rear Minimum Building Envelope. V1G 42 �: ��'� ?sl AC. g"i� -" ✓ / j \ 1 O~ j. / J ® �q- .-' 1 i i 1 \ 5. On all "Fill" "Partial Partial Fill ar Homesites, the contractor shall provide owner with 31g a soil engineer's letter certifying (a) that the Building Pad of the homesite has - __..:' ✓._ -- /-� /' •,,' 1 / 1 / / \/ "' /--' ,,,,.: ' �' ": �' ..... •- \ 1 t t i 4t \ been compacted to 95 °° standard proctor, and (b) the Building Pad of the 9, 72& °�°' SKETCH --' -- --.• � / � _ ..- --� t J � t\ � ... 3'�� -: � `• ag 1 t t t t t homesite as a load bearing capacity of at least 3.000 p.s.f. OCA �. B ,-' ,, -- — ` -- _ _ / / / / ' � J J J J � t t r�1A d� gg' ♦ / �, ; . '!; �, +� M ?1`X� t t tt t \ "Cut" / i " / c, p ` e \ tt \ \ 6. On all Cut or "Partial Cut Homesites, the contractor shall provide owner with HOT TO SCALE - . -- - -- _ r / / .. - 1 j / ® •- / /' :;,;,; ' .- '" �'t t 1 \ a soil engineer's letter certifying (a) that the Building Pad of the homesite has J / I / t / / . / / ♦ / / '` � ` ' r � ` � J / ♦ I J f 5 �'g s .; : � . g0 ' \ �c, t\ t t t \t\ a load bearin capacity of at least 3 000 s.f. / r / / ., j 1 / U /e 1 t 9 P Y P• ,. r �• 00 s.F. ;�.� 1'�, .,•. ©. \ t 1 1 7. All lots shall be graded so that there is no standing water after a rain event. .10 aF. ,,i ® \ it \ 1 t\ S. The building pad shall be loacted at the front building line of the Homesite, % u / / / ��` y \ 2 \ i \t \ t l \\ 9. The building pad shall be constructed with a 2% side to side slope established b { \\ t \ to adequately shed surface water, and a 2% front to rear slope established to / ! ! / / / / / / / / / �. ,, / .•.. -- •'�' .• / ..� j g / t / .- •'' Ap cr _'� t �.. _ _....• 23 s.F. t \ 1 \ •�•: � . q Y ° P / ! ! / / / / // // // I / / /' / ° - - - - --- ' _ _ _ _ - / / / t / ✓ ~- i �- 19• / ao \ C. �` -A it t i \\ adequately shed surface water. 1 t / / ♦ ♦ / / ! / .01 ,, _ t ca fiN si';: o ry / / % / / t / / / / / •- / ,� ......- ,,,. / •- i 317 • \ / � S.F. I ''� "4it0, Ac. : r `fin: W ` t t t lei \Y / J t ♦ / / / / / / / / / J t / • ♦! / / � J / // // / // ✓ �,, / / / �. 1 \ \ 26 A.. ,R : .'.'va, �„�� ✓ .,,,.. \ \ o \ 11 t \\ ` �t: J ! t r / / 1 j / / t -' ♦ / / \ 1 j °,' �a °' _ g•1;9`',,.. -•.. , 1 1 t \ '.�.. �� 9,720 1 j / // / 1 j 1 1 1 JI 1 1 i // / / 3 � - ° o vii -� ••" �: p � \ i tt \\ l l j j // J/ I i 1 I 1 1 t 1 1 / fj t/ j v ��A�`}� e•i m ?�:.- •:.:`' ":����",1��,.�idh o .-2 �, -e l- i\ t\ \ \ \ \ \ \\ { 1 1 { // y { f t 1 \\ t\ i 1 j 1 t $ 3•�. o$ ° p� �! e � • =ga ..p`��,� �;;':� >-..... ��.::'; \ .- \'' �''1a �+ i \It \\ t 1 \ ( t1 �.� � a �;�. w- a ,1 ' �. �-,, ...a°�•3 �3. \ \ •�, \i t .t`1 \\ 1 { t t / 1 { t \ °t \ \ { t ,�,,FtU Ua �t�.. �g5.✓„ �- a� > �' 'in =' .-'• ..._.. :: -° i \ 0 -1 \ t t, t \ 1 / 1 { t i 1 \ \ \ � 1 ! t \ J p L°t� °� - ,. :..: `? ` �� >.:.:: � _ ,�, °; •� C�' �. � � \ 1 1 \t t 1 \t t t s 9, 4 � 1 t \t i \ I / \ i\ \\ `\ \\ \\\ � �:____ ��_..�- .___..-- .- - --= •�.�` �.\ % -� ,� �,•� �'`•.\ \ \\ \1 �� ®-' I \\\ it \l\ t`\ t t tt \ 1 + / Il \ \ \ \ \ `\ ,...- ^''"-- �- \ � `� -.. � `"• -.. _... --'~'' ~-.� � \ �•; ~~ � .`' � .." \ \ \ . a ✓ .- t'' �, -- �' � \ 1 a� t i t t � \t t i 1 f t \ \ \ -- '.'' -\ ., ` \� - ` -. - r.- -'-•:. `,• .. _..- -. \ � . \ \ "`. `` -''` � -„'� .��" -bit. 3a 1 1 cs t 1 1 t11t \ � t t t t \ \ .-.' ` . --- '"` -- -. _ -� c \ •. \ \ �� �': ° 2a - -- \ t tit 1 e f ! \ .ti V �1 � tt t t \ \ \ \ \ \ \ \ -•<•• _...,,, `` '' -- ` ,�.!- ` _• ..-- -.. _ .� `• -.. ,,,, -- .�. ,\ `` �.• .,., � '` •. ,` \ � �. \ �'\ \ \ \ :.� : � � I 3 �- I r tit\ \\ 7"— — W ✓ ✓ u`? tt \ ( \ \ \ \\ It 9,763 F t \t\ \ t t\ t Ds \ >/.- %` ! - - �— — --�` \ ,fig j`l \ �c \ \ \ o +F!S.: ✓ 04e' t t\ AS \ �. \ -•'1' =;. /" ^' -- -- ......._ _,,. `• ••.� �- \ \ �' \. �" ,1 t \ 3 4 \ \ 6� S., \ , 'p:.. 'r � t -- —.- -- _— _. —.... -- — "— —~ ~ ~' ` T , I 1 �ti � ` �.,,•,,r ..- r- ~�:......... _... — J `• ,...,... _ ._. �. _ _ �. _. � •.,. ,,,, ,,,,, `' -. ` \ \ \\ \ \ � �\, g \ \ ' t ,` 'b �,',� \ 7. BO�ci .1 \ �� j 1 1�$ � a3a � ;t��e�''.. � I ✓ ,,,. •�' ' fJ.•"'' -®„1 t \ t \ t \;.• =,;` ' ;� ``�-- -_.... __. -- - -�__ -- '- _ `'`.. `~ \\ \\ \\ 6 --'c 4 ;\ 1 �\ \ 1 \\ i 1 0 C. \ `. �. -., — _...... _...._ --•r �. — _ ._, -- ._ .-. �. •.,. ,_� -.. \ s. \ �*�\ 302•' t � '•• � t \ t,:� °; ':;.''' S� �• ,/ ��p .r::. � ..- t 1 1 1 \ +, 7 Rio i { 1 \ °d� t' ,. /;:' � �E'' ✓ sg c :�t ; =::.�' s*crN: � :. W ga • \ 1 1 t •' \ \ ., •- ,� .�. -- '` — �. `_' _... — .._..._. _ �' �" �" -. -. `" \ \ \ \ 3Q1• \ t \ � \ t t 1. E 6 _ _ .,� , •,:.:', ; 319• `~ \ '' ..- _ 1 "''` ,•. .. \ \ \ \ j \ ....,• t ,BOO S. � t I tl. ,,& �� -..:� :g;..; . x �±' .....:, r'g. q 30 � t 40.1$ c. \ i { gYjf ' / `4 / �. ;J�a':; ::..',N..; 2 9,794 ' \ \ �'` � \ _,,, �" "" -- — —'" .... '" .,.. -- .-, _ .. _ _` _'. ... % �• ,� 1` ••� .. � �\ti \ \�\ l 1 t �\ ,yq 30 ^° ` � t �p9. � w � ,,`1�r"�' �a � `� \ `, \ ' '� .,,- ..... ° ,.... •"' " � ,� �•, �\\ \ \��•�� -... Os '. \ J ` •"" .r''� gg••:.r?:.. 121 t .,,. -"' -j'/ 4jt a •:'t' � � . ia` �' � t t 1 t \ -... ,,,,.,. _,,, — ,,,� ,.... �"' ..++ �` _ ...,., � '^.. _' ••'. 1 \ \ ��'.` ..f \ \+�'�`,r`•.\\"�..+..,••,,. ; � • 0.1 t7. dgfi t e µl . /� 14•'.::, -,.. 1 f7 . , �r ..W \ 1 1 t \ / f Jr�i %.'�\ ��1 7 -r f. 0 r �• / ,y $6g,0a :� th. :::: -' /'fir Q t: O .- �''•9Q t �j1 1 . \ \ ~ "'• �. _ ... ".. .•- ''" ...• -'" " '.., '` \ \ \ � Jr'•�''I \ \\ ..=� ® _ •' , \ `' -•••• ...,. _ `" �. -- -.r •- -- -- ..._ \ �,- �°^°• �„ 111 ! /IJtr ^•-- - - h .. 1 / . c, � �,�, :�.:.:::' �!"' �I 0 r_ iii �a � a`..3 -- t t o i _ -- ,.�'r/p' t ®2 / �cygfo;!7 •mss''. ?.' �i(5J C t I 0 S.F. iP'`' \ t t `` '^ r ." -' - \ \ � !i�- J � -= -•�- `' j $ l 1 3a a' j '/�;:: '" g g i � -o a ,,, .�-•,/ t I A 1J \ 0 ll ..: ' 1'.�• 1 .19 4c. '� \ .•,, _.. --• - -- -- . _ - - t \ f /r,r /%ii /i /i i f j / / 1 ! •,5,�g'ga � o � '�.:�, . �20� 131 i\ t 1 \ '\ .. `,_.......... __ -•-`" _ `� \ \..�J��i/ ;c� . -••�.z tier ;;'�v >�'-�� .N�o...�' i, �!� \ -- -- -- - - - _ --- \ 1 \ �� // r/ / / ; k j--� �a \ l - �" _" ' \ \ �' -- -- �l / %''��i { t t ! 1 I ( j I ! / � • ,:;;. :' '.. :.: .:: k . � .:��: . ,,,,. I 6�,•� , j =� c � j � j \ .. ..- 4,0• N` �' , r� -••. ..- ._.. -- -- - r �. -..� It �„ i i t t t 1 .-. , ::N � �'" f '' :'' / � 1 ` �n `�: ! j ��.; t -•z � .. � : ,::' ;; . �r / �..-i \ t 1 .,,` -- ^- �. ..� .r — �. -...`. •-. \ "' .•" tt2 1 '�t:,. ::� n r ° \ 1 O '� R7 1 � ' ,'' t r ','O �JF'i' \ N t 1 t 34, .,,`\ _ ... -•- _... _.._ - \ \ �.._ .-. / � ..- -- _.. "" -- _ _. � --�- -. - /iii � /II � _ _ t \ � °,° ' . •::.:::: ,: � t J :i t I I 0.37 A . ,v a .. { . ,' _ _ _ _ _ _ / / /IL t !1 _ 4 it \ \ \ t t 3 ; . ri t d� J \ J ;? S. , ' j \ W i /ii II %/,1 �1t1 •; \ \ \ \\ \ \ \ t t t t ► / �, ! \ 1 1 ` 7�I I �,1 a t .. �c �' �' 1 32 t t t ^- — - - -_ _ / / /// � \, { 10,385 tt 1 t 1 / 1• .. Q i \ � _ _ 4 03 ,.. t 1 \ 1 t •/ I \ 2 `. t C? \ 3 1 \ 3 \ t 'n s s 1 '►s•• 0 t 1 11 _� .... -`• _... r- - �•'• -• .._. � �� ..- •,,...� \ \\ �.... � �.,. 'yet. \ \ ,. /Qq, ,7$ .F u11' .:. my ..,►- -- ,� \ \ l \\ \\ 1 i I 1 ► t t 7 F. I it \ ` 1 { { 0.2 1 1 1 1 -�_ . t t i I I\ �' 1 s ti o0 ..._ ::,: � --.•'- -�' �-��= `' � �i�ll t I I I I 4 1 t �...+ o t 7 Ac. { t , 1� �`:' { :' a \ I 1 3� ' J ^� ... �:'v►': + t 32Q. 1 JURISDICTIONAL WETLAN AREA = 5867 S,F� l i t 2\0 t `; ►�� • i t 1 ^i `111 I �l 1 ► { 19 Ac. t al l i i `'• °;s � ��- w .: 33 t t 1 t \ SAO _ `.:`;' �, t115 a - \ i -- -r2s 70'r - 329�fl IS I / Ac. j t-1 17t. , 5�1 13' :� `: --w t ti � � � N fag �,1 1 i _ � � - � f ,_,_ �.. _ •••�� � t c i \ .� - -t. �3Za•2a �►- - .._ -• - � '"" �22�,1 �p ,.. � { ,,,, .- •'' e- �, ,,.. -C 1g' I \ i J4 1 t �/ �s. °s \ { t / t t ! i 1✓ ✓ 1 t\ \ t I� J 1 1 \\ I $i•i \\ y0, s.2' 1 t \: t —f + 1 t/ 1 \ \ 1 \13 t' , t t 1 \ �, 24 Ac. �,� Q 10,498 s.0 Z , "t � tl t 1 1 \ > \\ \' \\ \ AVID \ \ 0.2k Ac. I k5i N \ �\ 14\ \/ \ 919• �t `� f A. i\ ,ails i ..131 -t�° VI"JAr 3-T \ t 1 \ r 1�; -,A Ilk l ! \ 4j=• ``\°./ \ �`°' t :' 4''s: ►v \ i \ \ 1\ \ t \i of ip t Oct X ON Ac-N I \ \ ® t i a+ \t i t \ t ga 9-'c / 5 STOP \ 8,3 @3 S.F. ( \ { k . \ iN \ t t ti�i V SIG 1 \ 0.11'y Ac. \ \ t tW 4.gtZ1 \ t t t t t \ 6 2S �,� •„•. 1 �► i (EX. WAi'ER VALVE) �' 0n " '� �-~ .,- r Ft sN j t \ -- t v1P, \CONTfiAC'1;Oft 70 VE °' y,.3, J !. / " A- zs. t • 1 t i `i ' �'OO EX STU Ix& 11E TO 5� THl LINE WI�t A 45'. �' 1 --. \`,�I• �� 1 t ��I�'�/'��E _ /�°' I i i t t t t - � t/ \ t \ � �� ,/ '� -'r � tt ,. � �' 1 \ I / /���t \t1 I ` t � \i SCALE: 1 " = 50' 0 50 100 125 150 C x o � N .t N 0 . z w n a C x o � N .t N 0 . z w ' \ ; �; � \ \ 1 1 t ! t 0'A 1 W-6 } I / ' \ 1 \t \ \ \ Notification of Land Resources Sediment and Erosion Control Self Inspect m Program• \ \ \ 1 ! /t i l The Sedimentation Pollution Control Act was amended in 2006 to require persons responsible for land disturbing activities t I t 1� \ \ inspect a project after each phase of the project to make sure that the approved errosion and sedimentation control plan is / J 1 1. \ being followed Rules detailing the documentationof these inspections took effect October 1, 2010. The self inspection t s1 �P ' ! J / \ 1 ! t program is separate from the weekly self monitoring program of the NPO>"S Stormwater Permit for Construction Activities. LQ d' \acs 1 ,! ! t } \ l �\ \\ t \ The focus of the self inspection report Is the installation and maintenance of erosion and sedimentation control measures 1 } obPe ( \ according tot he approved plan. The inspections must be conducted after each phase of the project, continued until �,'`• } ;' '��` / l I \ 1 1 permanent ground cover is established In accordance with NCGS 113A- -54.1 and 15A NCAC 48.0131. The Self inspection Report Form Is ovailable as an Excel spreadsheet from {jilp I/www.&rmrstaicnrue&ago/jeAlmentgUm-new.html. . If you / ;�. •,� , � • � .' / 2 2� ( t1 1 \` \ have any questions or cannot access the farm, please contact NCOENR at 919.791.4200, See Eho Vegetative Practices zr ! {D. r® R � 25 S MER Ac. o� Al=,/6ETKIL ICE AND -1 A S ®SiA ii•iALI, v 1,•'' ' ! ! t t \\ I t \ \ '. / / �' ~' /::i•3:: r 10,55' S.F. ! \ } \ \ . a .. 0. _ r ERCY FLOWERS / f/ ) t / 42 ` STORE ,S tr . ;:•..: 1:. -' ✓ .� ! \ 1 i \ rsa `'. 1 I. / j / I / 2r1 Ac. ':. ✓ ✓ / / \ 0 1 1 i \ \ POND r TION -`' / / , / J / ! 1 f / /\ / --.- ✓ a, ` 9,726 F✓ \ t t t t\ \ \ t d J . t j �i :y �- C. } t t tt \ \ NOT TO SCALE ✓ -- ' - / r - -. , / / / / _ ✓ / I / '' ✓ / / o _� - '1 ^ \ \ \ .1$ f}c. // ''"✓ \ 2 i / 1 ! 1 t / j / I e / ./ / /'' / / I O !\ / ✓ ✓ ✓ ;? _)1,723 S.F. \ ( \\ t 1 \\ ' �! !/ /! j I // /.i r,. ✓f rte/ /•.__._. // J/ \\ /1 ✓�✓ /, .../ / r+0 \ C. ,. � t t \ i / / / f , / ✓ „�. _...... ' ' / (" ✓ ' Ica• `` o \ .,- .' ,,. ✓ \ \ Arm: / v/ \ / / / / / / / / J / / f / .'` / f / is / ✓ O C. Ile S A le 16 XN ps /�s o f :..:::;: \ 9,720 \ \ \I 1\ \\ I ! !`j r I ► I t t ( t 1 ! I t / / \ ! Q ° c:tN= ";`'_; ;'' z C. ( ( I / / t t ! i t t t ( i ! ( 1 / 1 � ♦IE, \,. 12 _; ::; v� <- "' .::.:..:....: ... � ,- I vA � a0 IP.:: < .:::::.:::::.:::::.:_... _ ....; 5�cta.;:-;:. "' -- `-•- � rn \ � \\ \ 1\1 \\ Me :.° „a� �° .•;:: • ! t t \ • l t t t / k i t t 1 \ \ \ \ t i \`i4c�F'P U�+ p� -,Ss -''� : - :� 1,,; ,� � .. .,< w � •- ! f ,.., � t 1 °o � 1 i 1 1 \ 1 9,73 S.F. ` t \ \ t ( \ \ _„___ ••` -- _.-� _•-. ,. `•` :,°° \ a. ✓ , -' ✓ I ! \ ✓ \ -. ,_ >• _. - -- - \ \ :1t . >a I J ! \ 1 1 1 \i\ \vs:E 7 AP: 1 1 \i ! �1 Tam \ \ \ \ • . ' •/ -- 'r "a c: ` \ ` \\ \\ ;:`:Y`''ea, (9,7 S.F i t t h i :.< C. Ij NI �.'"- . ` '' \ \ `, ` .•.:. `' .` w- .,,, ` _`.' `` -• •• ``d�I"�iDzi• `' -- ... \ \ �` � \ \ r J ,�. q °' , ... -' " F � -J' ✓ ' R 1 �r 1 ! 1 \\\ \ 1 / .. `` , ^ ` . \ \ \ o,, \ \ fl G. :. 1 ✓I ✓ .ham ( t a 1 :•a Nk frT- •.,, ,%` -- -.., _ /- .... - _........ _. •- ._....._ -.,., _.. ..,., `. ^.. ,.., „� ,` �.. \ \ •. ` \ ,- �.. \ -,. \ggA \ \ t. •,1 \\ ,....\ .,. w,w:.: t 9,763 .F \, •,'� \ \ \\ \ V�y,� . �• \ \ \ \ \ \ \ 7*:. / _ _ _ ' _ ° -". `` ^ ® \1eq�` \ "�\ i \ t mss:;, tS loop, J `\ \` \ `� ✓__ ` - _ �-=-- _ -_ -- -, .��,. \ \ 5gii8 �: \ \ \ \\ \ \0.19 C. \ \ \ '`.• .1 - ,,.,,.,�- ;.- --- - - - •''.. • _. _..._ ......... _.._ - ._..._. _' ." '^ -- -- _.. ` `' ••. `' • `` r, \ \ `'` �°' -• .._ . t 1"` ,. \ �., \ � *.. 1 It \ t t - _.._ - ..... _... - - _ _... _ \7,$o 0.18 C. \ -.. 11 ~ \ t\ aQ, \ \ r \ 1 1 ;� \ \ t \ 7, _ x@ _ _ 00 t t\ t t i t _ •. ---� :,; "' -• ._.. _...._.. _ -- -- -~ ,,,_ .r --- - _ - _ _ _ _ _ _ _ " ~ \ \ \ \ \ 6s• .•. �, � \ - ...., t \ \ ,� t 1 U.0 a I,,;. t t t 1 d ` . �' \ '` \ .,,, •- ,..' - -- ` _ -• r y . �. - -' `_ ` ._ ._ - _ _._. `'` -• r. '` - ... \ \ \ \ \ ( '"� y t\ \ \ �', ` 7,sbo t t 1 pp �` i 8c, Otb` •,ttP \ \ _ .'' -- -- \ 1 \ 1t \ ✓ / \ \ t 7 800 s. \ \ 11 i 1 it •! ..: �'.:.,': 29 1 i i \ 1 \ 9,77 F \ \ \ \ \ \ _ - - ,.. - ✓ - - . \ \ �i t \ i . \ 1 0.1 s t \ 1 9,794 \\ \ t \ \ `-. ` - " - ✓ " -- ~ .'^'- - _ - -- -. `' \ \ ~'� - ` \` \`� �� \ 11 10 Y \ -�, yr :: j:• ,;; ` V 2� ✓ � O f'` \ ) / ; ;;/::::..;'8 121 , ti`'� -': >. !?' cn t •- t 1 t \, •.., .,., - ....._.._. • •-^' ..., --- "' ..,,, ...- + - \ \ \ �% �� \ 7- .'`^,"`^'. �` _ a `'� / 0.1 AC, t / 0 / tlf i ' .: �• ,,,,, k .::�..a.; p ..+ ; \ t t t '` \ `• , `_ --'' -• -' ._. - \ ` \ . <_ p.' J � //!/ / l!r. -`� =_ .,... � t j :, ' .,j , ; o C J i Q ;:li< `�., o t� ,,,, ,.- , \ 1 0 \ \ -.. -- ,_ -- -• .,,...• Y,- _.._ -- _ \ \ ,,-�'� 1/ I1,1 -_ _ { \ -- t / �-i1: s J w ,s ik .-- �, 1 t o. o s.F. .19 1 c. ` t .- --'" \ \ \ fJ/ / jlj/r/ 1 J ! t J i / "' 0 sD...:•::':':�. k1 -o 1 o Y .. N -s::, ss S. AII \ -- _ - ---- .-- -- - - - \ / /� t e A S } :. r• o •.." ` - _. ~ `' ., .rte,, \\t 1 ! 1 / _:,��? '` a\�` .�, - f / � i \ � ,... -' .- 1 l 1 t ! \ aA t .. / 0 4 ! ! v s.F. O X:. ✓ ! \ /1/ 0.17 Ac. A ..- _.._.... .. ..._ ..., - - -��i // / / ..,.._. " ttl tt \ � \ \ \ \ \ \ : , , .., <,::: f , ;:; •: =:.:5 ,.:.: / \ 1 J 1 �N 1 `� � PS � c,+ } t „• ... ol: w l \ t i t - -- - ..- -- - -.. - - -- -. `'� -,•, -- .ire /.,. 11� r - ...r" i �. \ \ \ \ \ , t f \ 1 3 � ..•• ; �r� Oi" i 32 1 t . _ .._...._ - - ....._._ _ it =� �•�' -• �.-- '- ��' / / /jJ ....• -•• .... t ` t\ °�. \ \ \ \ \ } t •!`�_ � `s �.. � ! t ( o. �<�. tp .� \ 1 \ ....• y .� . \ I 10 3s .F it t t - ✓ / / •\ �`/�� \ /� • . - \ \` \ \ \ \ i { e% ++ 1 \ I t I I ! r 1 _.�.:` I \ ! S c O Sex x3 i fi \ 1T . t rn t ; _ 1 i - ✓ \ I t ✓ J i - .aM.•a'.'. � Gill .1 I 10,710 ~ = - _. ✓ = _ \ _-' �\\ 1 t k 1 7,2 s.F, t t \ t t j m \ { 0.2 Ac. ul< °'-_ .� ✓ -- �. --'' \ it O. I 7 k1 1 t t \ i t -"ter i j I r � .�J _ ✓ ,� �J1i i 1 t t i t i f pk {! " ! f t _ {�. M JURISDICTIONAL - 4 /ETLAN i AREA = 5867 S.'. � 1 t ''- _ °o' � �' t L • \ \1 tt1 IPE�d TER A. 3 I' : Zz" 11 0­1 ori 4-1.1ri 18 ik %4 '& . SE : i - • : r r �- '�►1 t i 1- RAI i + I j3- F. 56'I t ! 5\13' 1 \ L _ '-7 Z5 Q. 6 1 l \t � SKIMMER %A jVI- KIMMER / \ \t \ YS.I I I Ill. 5 4 Y✓ t AC. / ✓ �1 t t � \ \1 1 NOT rO SCALE 2' WIN 6' TIP. O MIRUC17ON SPEi RrA111 e i REMOVE AND PROPERLY DISPOSE OF ALL tREE4 BRUS 1,, $nW.; AND 07HER 0960110NABLE MA 79/X 2 ENSURE THAT THE MINIMUM CONSTRUCTED IOU SECTION MEFDS' ALL DESIGN REQUIREMENTS J. ENSURE THAT 71E TAP OF THE DIKE IS NOT {:OW AT ANY Por THAN THE DEIGN am non PLUS THE SPECIItEID SE7iT•EMENr. 4. PRO 140F SUf ISYT ROOM AROUND DIII TO PERMIT MACHINE REGRADING AND LLLANWr MAINIENANLE: INSPECT 7E1 ORARY DVERSIONS ONL'E A mw AND AFTER for RwAlL IMMwAaY REAIow awwr mw PE ROW ARFA AND REPAIR NE 9090V RIME CAREfUL1Y CHECK QUTTETS AND MAKE FM&Y REPAIRS AS NEEDED. WEN THE AREA PRO00 IS PERMANENTLY STABILIZED. RL•1/OW TIIE RIDGE AND THE 01ANNEL TO BLEND 917H WO 7URAL MAD LEW AND APPROPRIATELY SWIUZE IT. STANDARD METAL POSTS 2` -0" IN GROUND GALVANIZED HARDWARE WARE EXTENDS TO TOP OF BOX RAIN AND JIAKE REPAIRS AS NEEDExI PROVIDE ADEQUATE STORAGE III IME F'OR UNIRVANG DRAINAGE AREA HAS NOW 1 MATERIALS AND ANY VNSTA&F SDK, AND PROPERLY. BRING THE D/SWROEV AREA TO COMPACT f. APPROPRIATELY STABILIZE ALL @ 57 WASHED STONE PLACED TO A HEIGHT OF IZ -18" MINIMUM ABOVE TOP OF BOX EROSION LEGEND SILT FENCE SILT FENCE OUT, LET CONSTRUCTION ENTRANCE ® HARDWAFIE CLOTH ® INLET PROTECTION PS PERMANENT SEEDING OUTLET PROTECTION [3 CONCRETE TRUCK WASH -OUT - M - M TEMPORARY DIVERSION W/EXCELSIOR MATnNG TOTAL AREA DISTURBED _ 8.51 Ac. SKIMMER SEDIMENT BASIN V .6♦ . S \ 46. N .a 1 \ \ �i• \ \ \ .597 S.F. sa ,.::: \ tt 0.24 Ac, tv�" 10.4 8 S.F. .l ! e If t\ \ f \ \ \ 0 34 1 I \ 1 1 J t \,, \ \ 0.24 Ac. \ ry� It q1 \ © \\ \ \ \ f It 10.51s1 S.F. / M \ \ \ \ \ I cV \, ' 1 b.24 7�c. \ \ \`\ t "\ -~ V \9.647\5.F. \\ \ \\ W , ,» ® S %IREST \\ > Q \ ASIA\ WILL\ \ \ � •PNDER q0 S,UCIN t 8E\ EXPANDED \ \ \ \. -a- --� 7 \\ \ \ \, / \ t \ \ ,' / �� • \ \ t \ � 17,108 t1 fy�.,,, \'C• -.. \1 \\ \\ J/ � va �y-''� .64 �,.:� � \ \v`�' / /�c'' \\ \\ \\tj `\ 1\\ . 9 Ac. `cv. O's" 9 78 S�. 0. Aa.\ S / S aP t \ 8,3Q3 S.F. /ji J \ 0.1� Ac. \ 1 k A2 \ t t \ \ t t EX. WATER VIA ONTRACYOR `fib �a t / 40CATION,SI g?"�- ,.-k Ok EX. �j &A E TO g� � 1 E9�i TX> �i -I } t I ?' `�� rl� J � >�� � ,� � t t t .. �♦ t. \ ..raj \ ONSTRU fflPN S LT I` IL �VTRAN E �11 k 0 \t "lip .��•ItSL 11s� °a.'�'�� -' } E� � \\ ' a CON _;_. - 'TRIM IV1 y \ \ at ' f ✓ t t iAI'I CST�''1 Sri' / /��j• �� f� /'" � t \\ ,� i t\ \\`\ , t, SCALE: 1 " 50' 0 50 100 125 150 `'111dBBdddyr ®s SEAL d =• 3-- 20--13 t %J dd B41a,,, sal x 1�a M r4v � c� p: N °z a � • " ,. to CD zz 5 Rif 02 LU Uj mom U Z i �r 00 .. w IL Z TOP DAM 291.75 NOT TO SCALE 4" WF °_ 0ROI :. PONDiNG ,f 4.0 —0 DEPTH � �f" TOP OF 810REIEOM 29aoo jam" NOSRHDROUSiNDEX ,: {,:30;:;;::i':;:;:;; PERFORATED PVC SOCK DRAW Conversion Procedure -- Sediment Basin to Bioretention Area 1. After the site is completely stabilized, contact Stocks Engineering ® 252 - 459 -8196 for verification of completion and stabilizctlon. 2. Contact Thad Valentine of NCDENR —Land Quality Section 0 919 -791 -4200 for approval to remove all temporary erosion contra! measures. 3. Upon approval from NCDEWR —Land Quality Section, begin the conversion of the bloretention area from a temporary sediment trap to a permanent BMP as follows. 4. Construct slit fence around the toe of the Interior side slope of the bloretention area (BA) to protect the BA from sedirnnent contamination during the Conversion Procedure. Leave an opening at the downstream end of the BA just wide enough for construction machinery to enter /exit. 5. Bring the side slopes surrounding the BA to proposed grade. 6. Seed /sod the side slopes ws per specifications. {Contractor is responsible to maintain and protect seed /sod to promote successful establishment during Conversion Procedure. If damage or death to seed /sod occurs, Contractor must replace affected area immediately.} 7. Once seed /sod has been Installed, Contractor shall excavate the bottom of the BA to a depth equal to the greater of tkse following: a. 1 foot below any evideruas of sedimentation upon in situ soils; or, b. 4 feet below the proposed bottom of BA elevation. 8. Excavated material must be disposed of in an approved off —site location. 9. Care must be taken to prevent any sedimentation /re— sedimentation during this process, as contamination of the in stiu soils or the designed soli media will compromise the functionality of the BA. If any sedimentation occurs during this process, Contractor shall remove sediment immediately. 10. Contact Stocks Engineering 0 252 - 459 -8196 to Inspect excavated BA before continuing construction. 11. Upon approval of Stocks Engineering, continue constructing BA per details. Establish appropriate permanent vegetation in EA as soon as possible. 12. Upon completion of BA construction, remove sediment from slit fence and dispose of at on approved off—site location. 13. Contact Stocks Engineering 0 252- 459 -8196 to Inspect completed BA before removing slit fence and placing the BA In ser°wlce. CLASS B RIP RAP UNED FORMA 12" IN DEPTH .......,... 6" 057 STONE v r �411 wl—lw r vw BIORETENTION AREA PROFILE SOCK DRAiN NOT TO SCALE Centipede Sod Notes:: 1. Centipede Sod shall have bean grown in sandy soils with an infiltration rate of 2— inches per hour or greater. 2. Do not deliver more sod t?.-an can be installed in less than 24 hours. 3. Use a knife or sharp edge2' shovel to cut the sod to desired lengths. Do not tear sod. 4. Water sod Immedlatley upon Installation to a depth of 1 inch. Water daily for a period of 2 weeks and then periodically until roots have been established. WASHED SAND GRADE /!!!!!lttPd °IOi r SEAL w 19843 . e ® EL SN ery r N � N 0 U i � N O Z 4 A � r .o ,,, �. , • Q z Z* • M LU Uj LU A: u i [ID cr M i1 Z z U In ery r N � N 0 U i � N O Z 4 A � r .o ,,, �. , • Q z Z* • M LU Uj LU A: u i [ID EROSION AND SEDIMENTATION CONTROL NARRATIVE PROJECT DESCRIPTION The purpose of this project is for construction of streets and utilities for POD -9 (Phase One) 0 Flowers Plantation. The project is owned by The Riverdell Company. The site is currently undeveloped. Approximately 9.51 acres will be disturbed during construction. The maximum fill will be 4--6 feet. The project is scheduled to begin construction in April 2013 with project completion and final stabs iza ion by June 2013. The erosion and sediment control program for this project will include the Installation of a suitable construction entrance, silt fence, outfet protection, inlet protection, and skimmer basins with temporary seeding of the site. ADJACENT PROPERTY The Riverdeli Company owns most land adjacent to the proposed construction area. SOILS The soil at this site is a sandy clay. EROSION AND SEDIMENT CONTROL MEASURES All vegetative and structural erosion and sediment control practices shall be constructed and maintained by the contractor according to these plans and specifications and the minimum standards of the Dept. of Environmental Management, Land Quality Section and Johnston County. The contractor shall also follow any additional requirements cs outlined by the Project Engineer. Structural Practices 1. Vehicle wheels shall be clean when leaving the site to prevent the tracking of mud on paved roads. 2. onstruction Road Stabilization: Construction traffic shall be limited to stabilized areas. At a minimum, a temporary gravel construction entrance shall be provided as shown on this droving. 3. Silt Fence: Silt fences shall be provided where shown and as needed on the site plan. These barriers shall be used to contain sediment. 4. Rip Rap /Gravel Filter Sediment Basins: Construct basin to the shap�e and dimensions shown in the details. The basin is to be placed below the existing ditch flow line by 2' with the berm built above as dimensioned. Management Strategies 1. Perimeter measures are to be installed prior to grubbing or grodin 2. Tall Ditches shall be stabilized immediately following their construc8on. As an alternate, rock check dams may be provided at their outlets and /or the terminal downstream end of disturbance until ground cover is implemented. 3. Stockplie and /or waste areas must be maintained within the limits of the areas protected by the proposed measures and otherwise temporarily seeded If to be left stockpiled over 15 calendar 4. Construction shall be planned so that grading operations can begin <and end as quickly as assible. . Slit Fences shall also be installed prior to or as a first step in construction. 6. The Contractor shall be responsible for the installation and maintenance of all erosion and sediment control practices. Vegetative Ground Cover Immediately following grading, all areas shall receive either permanent or temporary seeding, as applicable, as follows: Site Area Description: Stabilization Time Frame: Stabilization Time Frame Exceptloncs Perimeter dikes, swalee, 7 Days None ditches & slopes. High Quality Water (HQW) 7 Days None Zones. Slope steeper than 3:1 7 Days If slopes ore UY or less In length are not steeper than 2:1, 14 days are d1owed. Slopes 3:1 or flatter. 14 Days 7 Days for stapes greater than 54 fast In length. All other areas with slopes 14 Days None (Except for perimeters and F�Z;N flatter than 4:1 Zones) PERMANENT_ SEEDING SPECIFICATIONS SEEDING MIXTURE SPECIES RATE (LB /ACRE) TALL FESCUE 200 SERICEA LESPEDEZA 30 KOBE LESPEDEZA 10 PENSACOLA BAHIAGRAS 50 SEEDING NOTES 1. FROM SEPT, 1 - MAR. 1, USE UNSCARIFIED SERICEA SEED. 2. ON POORLY DRAINED SITES OMIT SERICEA AND INCREASE KOBE TO 30 LB /ACRE. 3. WHERE A NEAT APPEARANCE IS DESIRED, OMIT SERICEA AND IN GREASE KOBE TO 40 LB /ACRE. NURSE PLANTS BETWEEN APR. 15 AND AUG. 15, ADD 10 LB /ACRE GERMAN MILLET OR 15 LB /ACRE SUDANGRASS. PRIOR TO MAY 1 OR AFTER AUG. 15 ADD 25 LB /ACRE RYE (GRAIN). SEEDING DATES BEST POSSIBLE EARLY SPRING: FEB. 15 -MAR. 20 FEB. 15 -APR. 30 FALL: SEPT. 1 -SEPT. 30 SEPT. 1 -OCT. 31 SOIL AMENDMENTS APPLY LIME AND FERTILIZER ACCORDING TO SOIL TEST, OR APPLY 3,000 -5,000 LB /ACRE SEDANGRASS. PRIOR TO MAY 1 OR AFTER AUG 15, ADD 25 LB /ACRE RYE (GRAIN). MULCH APPLY 4,000 LB /ACRE GRAIN STRAW OR EQUIVALENT COVER OF ANOTHER SUITABLE MULCH. ANCHOR STRAW BY TACKING WITH ASPHALT, NETTING, OR ROVING OR BY CRIMPING WITH A MULCH ANCHORING TOOL. A DISK WITH BLADES SET NEARLY STRAIGHT CAN BE USED AS A MULCH ANCHORING TOOL M&LffENANCE_ IF GROWTH IS LESS THAN FULLY ADEQUATE, REFERTILiZE THE SECOND YEAR. ACCORDING TO SOIL TESTS OR TOPDRESS WITH 500 LB /ACRE 10 -10 -10 FERTILIZER. MOW AS NEEDED `NHEN SERICEA IS OMITTED FROM THE MIXTURE. RESEED, FERTILIZE, AND MULCH DAMAGED AREAS IMMEDIATELY. Maintenance 1. Reseed and mulch bare spots larger than 9 square feet (limited to 5 2. �aintain all seeded areas until uniform stand is acceptable. 3. If growth is not established by final project Inspection, continue spe_,d*dnak nohrdI1etbeea.) stand is acceptable. 4. Correct and repair all undue settling and erosion within 1 year after final Inspection. 5. Remove from the site, all erosion control structures after complete stabilization at end of construction period. 6. Remove silt from sediment pits and from behind check dams when silt is within half depth of the pit or spillway. Dispose of in an area where silt cannot re-enter pit / trap. Calculations The practice utilized for the proposed site did require formal calculations. Calculations have been provided. OWNER RIVERDELL COMPANY 4880 NC 42 EAST Clayton, NC 27520 919.553.3086 (v) CONSTRUCTION SEQUENCE: 1. Obtain erosion control plan approval prior to beginning land disturbance. Retain a copy of the approved erosion control plan and permit on site. Call the NCDENR @ 919 - 791 -4200 to notify the State Inspector of a start date prior to land disturbance. 2. Clear the area needed to construct the proposed construction entrance. 3. Construct the construction entrance as shown on the plans. Maintain the construction entrance daily to ensure that mud and silt will not be tracked onto the paved surface. if mud is tracked onto the road surface, it is to be removed immediately. . 4. Construction entrance location may not vary without prior approval from Engineer and NCDENR. 5. Clear the area needed to access and construct sediment basins. 6. Construct sediment basins. Stabilize immediately. 7. Clear the area needed to construct the perimeter erosion control measures including temporary diversion ditches, silt fence, and rock check dams. Rock check dams downstream of level spreaders, pipes and ditches shall remain in -place until permanent measures are stabilized. 8. Construct the temporary diversion and silt fence. Tie temporary diversions into sediment basins where applicable diversions & basins shall be seeded, mulched, anchored upon installation. 9. Begin clearing, grubbing, and topsoil stripping for roadway rights-of-way. 10. Rough grade all roadways. 11. Construct sanitary sewer system throughout project. 12. Construct the storm sewer system throughout the project. Install inlet protection devices. 13. Construct curb and gutter and CABC on roadway. 14. Seed, straw and tack areas behind the curb and gutter that are graded to their final disposition. 15. Upon stabilization of seeded areas. See C -6 for Sediment Bastin to Bioretention Conversion procedures. 16. Complete the construction of storm sewer pipe. 17. Construct permanent outlet protection devices at pipe outlet. 18. Upon completion of the project, remove silt fence. 19. Seed, straw and tack any remaining exposed areas. INFU STRL PVC END PVC END CAP-•/ PVC TEE mar ro scats PVC ELBOW PVC PIPE i f f HOLES IN UNDERSIDE END VIEW NOT TO SCALE PI VC VENT PE i-• SGHEDUIE 40 PVC PIPE SCHEDULE 40 PVC PIPE �- ORIFICE PLATE FLEJQBLE HIS PVC TEE 0 FRONT VIEW NOT TO SCALE NOT TO SCALE STRUCTURE DEWATERINO ZK FILTER FABRIC SEDIMENT STORAGE ZONE EMERGENCY SPDl.WAY BAFFLES 1' FREEBOARD IEMBANKMENT 6' MIN. INVERT ELEVATION EMERGENCY EMERGENCY SPILLWAY, SPILLWAY CROSS-SECTION VIEW NOT TO SCALE PIPE OUTLET TO FLAT AREA NO WELL - DEFINED CHANNEL PLAN VIEW LDl11S7RUCHON SPEaRCAPONS 1. aeor, grub, and strip the area under the awbankment of all vegetation and root mat Remove all surface soil containing high amounts of organic matter and stocka#e or dispose of it properly. Haut oil 6jec11onabie material to the designated disposal area. Place temporary sediment control measures below basin as needed. I Ensure that Rl materiel for the embankment is free of roots woody vegetation, organic matter, and other objectionable material. Place the R/ in lifts not to exceed 9 incheA and mochiue compact it Over it Ore embankment 6 inches to allow for settlement .1 Shape the basin to the specNed dfinensons. Prevent the skimming device from settling into the mud by excavating a shallow pit under the skimmer or providing a low support under the skimmer of stone or Ibber. 4. Place the barrel (typically 4 -tech Schedule 40 PYC pipe) on a firm, smooth foundation of impwWous soil. Do not use pervious material such as sand, grovel, or crushed stone as backR1 around the pipe. Place the Rl material around the pipe spillway in 4 -inch layers and compact it under and around the pipe to at least the some density as the adjacent embankment :Care must be taken not to raise the pipe from the frmn contact with its foundation when compacting under the pgae hounches Place a minimum depth of 2 feet of compacted backNI over the pipe spillway before crossing it with construction equipment In no case should the pipe conduit be installed by cutting a trench through the dam after the embankment is complete. 5 Assemble the skimmer following the manufacturers ksbvctkx ,% or as desfgned. 6. Lay the assembled skimmer on the bottom of the basin with the flexible joint at the Inlet of the barrel pipe. Attach the flexible joint to the barrel pipe and position the skimmer over the excavated pit or support 8e sure to attach a rope to the skimmer and anchor R to the side of The basin. this winll be used to pull the skimmer to the side for maintenance T. Earthen sp1woys - install the spAlway in undisturbed sail to the greatest extent possible The achievement of planned elevatlons, grade, design width, and entrance and exit channel slopes are critical to the successful operation of the spillway. Me spllway should be lined with laminated plastic or impermeable geotexble fabric The fabric must be wide and long enough to cols° the bottom and sides and extend onto the top of the dam for anchoring in a trench. The edges may be secured with 8-Inch staples or pins The fabric must be ;long enough to extend down the slope and exit onto stable ground Die width of the fabric must be one piece, not pined or splice&, otherwise water can get under fir , fabric. If the length of the fabric is Insufficlent for the entire length of the spillway, multiple sections, spanning the complete width, may be used the upper sevtlon(s) should overtop the lower section(s) so the water cannot flow under the fabric Secure the upper edge and sides of the fabric in a trench with staples or pins 8 Inlets - Discharge water into the basin in a manner to prevent erosion. Use temporary slope drains or diversions with outlet protection to divert` sediment -laden water to the upper end of the pool area to .t nprove basin trop efficiency. 9. Erosion control - Construct the structure .so that the disturbed area is minimized Divert surface water away from bare areas Complete the embankment before the area is cleared Stabktze the emergency spOsay embankment and all other disturbed areas above the crest of the pdacool spillway immediately after construction. 10 install porous baffles as spedfled 1L After all the sediment productng areas Move been permanently stabr7iczed, reprove the structure and all the unstable sediment Smooth the area to blend I& the adpining areas and stabAize properly: MAINUANCE Inspect skimmer sWiment baslns at least wvJdy and after each significant (one -half inch or greater) rainfall event and repair immediately. Remove sediment and restore the basin to its original dimensions i6an sediment accumulates to one -half fhe height of the first baffle; Pull the skimmer to one side so that the sediment underneath it can be excavated &movate the sediment from the entire basin, not just around the skimmer or the fmst cell. Make sure vegetation growing In the bottom of the basin does ncht' hold down the skimmer. Repair the baffles If they are damaged. R&- anchor the baffles if water is flowing undemeath or around them. If the skimmer is dogged with trash and blare Is water In the basin, usually poking on the rope will make the skimmer bob up and down and dislodge the debris and restore Bow. !f this does not work, puw'F<` the skimmer over to the side of the basin and remove the debris Also check the orifice inside the skimmer to see if It is clogged if so, remove the debris if the skimmer arm or barrel pipe Is dogged; the orifice con be removed and the obstruction cleared with a plumber's snake or by flushing with water. He sure and replace the orifice before repasitiomng 6e skimmer. Check the fabric lined spillway for damage Grid make any required repairs with fobdc that spans the full width of the spillway. Check the embankment, spilways, and outlet for erosion damage, and inspect Oe embankment for piping and settlement Make all necessary repoks immediately. Remove ail trash and other debris from the skimmer and pool areas Freezing weather can result in ice forming k, the basin. Some special precautions should be taken io the winter to prevent the skimmer from plugging with ice. GENERAL NOTES: 1. La THE LENGTH OF THE RIP RAP APRON. 2. d = L.5 TIMES THE MAXIMUM STONE DIAMETER BUT NOT LESS THAN 67. 3, IN A WELL- DEFINED CHANNEL EXTEND THE APRON UP THE CHANNEL BANKS TO AN ELEVATION OF 6• ABOVE THE MAXIMUM TAILWATER DEPTH OR TO THE TOP OF THE BANK, WHICHEVER IS LESS. 4. A FILTER BLANKET OR FILTER FABRIC SHOULD BE INSTALLED BETWEEN THE RIP RAP AND SOIL FOUNDATION. 5. FLARED END SECTION IS OPTIONAL. SEE PLANS FOR REQUIREMENT. 6. SEE PLAN AND PROFILES FOR ACTUAL DIMENSIONS. M Maintenance Notes: 1. Do not let any area re;_nained exposed for more than 7 or 14 calendar days according to chart without applying temporary seedling. 2. Maintain all erosion control measures daily and reseed disturbed areas as needed. 3. Inspect all erosion contDrol measures weekly and after each rainfall event. Repair as needed. 4. At the end of each day's storm drainage operation, construct a temporary pipe inlet protection device until the next day's operation, continues. rs i r ■� ;* i SCALE: N.T.S. ?Sr '� � `N • AI , !` 1NI M j S££ EROSION CONTROL PLAN FOR ACTUAL PIT DIMENSIONS SET CLEAN - OUT-•1 STAKE AT 112 PIT VOLUME 1:1 SUPPORT ROPE• Tr! •if1RE TO PREVENT S4=M0 SUPPORT 24" IM I OR Sit FILTER FABRIC NATURAL GROUND A GENERAL NOTES: 1. Clear, grub, and strip the area under the embankment of all vegetation and root mat. Remove all surface soil containing high amounts of organic matter and stockpile. or dispose of it properly. Haul all objectionable material to the designated disposal area. 2. Ensure that fill material for the embankment is free of roots, woody vegetation, organic matter, and other objectionable material. Place the fill in lifts not to exceed 9 inches and machine compact it. Over fill the embankment 6 inches to allow for settlement. 3. Construct the outlet section in the embankment. Protect the connection between the riprap and the soil from piping by using filter fabric or a keyway cutoff trench between the riprap structure and the soil. Place the filter fabric between the riprap and soil. Extend the fabric across the spillway foundation and sides to the top of the dame or Excavate a keyway trench along the centerline of the spillway foundation extending up the sides to the height of the dam. The trench should be at least 2 ft. deep and 2 ft. wide with 1:1 side slopes. 4. Clear the pond area below the elevation of the crest of the spillway to facilitate sediment cieanout. 5. All cut and fill slopes should be 2:1 or flatter. 6. Ensure that the stone (drainage) section of the embankment has a minimum bottom width of 3 ft. and a maximum side slopes of 1:1 that extend to the bottom of the spillway section. 7. Construct the minimum finished stone spillway bottorn width, as shown on the plans, with 2:1 side slopes extending to the top of the over filled embankment. Keep the thickness of the sides of the spillway outlet structure at a minimum of 21 inches. The weir must be level and constructed to grade to assure design capacity. 8. Material used in the stone section should be a well- graded mixture of stone with a d size of 9 inches (class B erosion control stone is recommended) and a maximum stone size of 14 inches., The stone may be machine placed and the smaller stones worked into the voids of the larger stones. The stone should be hard, angular, and highly weather- resistant. 9. Ensure that the stone spillway outlet section extends downstream past the toe of the embankment until stable conditions are reached and outlet velocity is acceptable for the receiving stream. Keep the edges of the stone outlet section flush with the surrounding ground and shape the center to confine the outflow stream (References: Outlet Protection). 10. Direct emergency bypass to natural, stable areas. Locate bypass outlets so that flow will not damage the embankment. 11. Stabilize the embankment and all disturbed areas above the sediment pool and downstream from the trap immediately after construction (References: Surface Stabilization). 12. Show the distance from the top of the spillway to the sediment cleanout level (one -half the design depth) on the plans and mark it in the field. j D -04 )SCALE: N.T.S. €[% lirrrr' SEAL x 19843 Ei � 3 -20 1 if ®iit1`�� 1 in a a U o ar M N 0 c�3 N � c°v ci Z a 14 r ti ti r, 4 • ,t ,. ,• CNI • UJ Imi UJ (; U.- izz 0 w �. 0 Co 1fft r CONSTRUCTION SPECIFICATIONS__ 1. LAY ONE BLOCK ON EACH SIDE OF THE STRUCTURE ON ITS SIDE ON THE BOTTOM ROW TO ALLOW POOL DRAINAGE. THE FOUNDATION SHOULD BE EXCAVATED AT LEAST 2 INCHES BELOW THE CREST OF THE STORM DRAIN. PLACE THE BOTTOM ROW OF THE BLOCK AGAINST THE EDGE OF THE STORM DRAIN FOR LATERAL SUPPORT AND TO AVOID WASHOUTS WHEN OVERFLOW OCCURS. IF NEEDED, GIVE LATERAL SUPPORT TO SUBSEQUENT ROWS BY PLACIAG 2x4 WOOD STUDS THROUGH BLOCK OPENINGS. CAREFULLY FIT HARDWARE CLOTH OR COMPARABLE 2. WIRE MESH WITH 1/2—INCH OPENING OVER ALL BLOCK OPENING TO HOLD GRAVEL IN PLACE. 3. USE WASHED STONE PLACED 2 INCHES BELOW THE TOP OF THE BLOCK ON A 2:1 SLOPE OR FLATTER AND SMOOTH IT TO AN EVEN GRADE. 4. INSTALL 1/4 IN. WIRE MESH HARDWARE CLOTH, AND METAL POSTS THAT ARE 5 FT. TALL. PLACE THE WIRE MESH A MINIMUM OF 3 FT. HIGH, AND THE STONE A MINIMUM OF 1 FT. HIGH. 5. BEFORE COMMENCING CLEARING & GRUBBING OPERATIONS, THE CONTRACTOR SHALL FIELD LOCATE ALL EX. INLETS WITHIN THE OPERATIONS AREA AND INSTALL INLET PROTECTION. (REFERENCE: EROSION AND SEDIMENT CONTROL PLANNING AND DESIGN MANUAL, 6.52) 0 8' MAX. WITH WIRE MAX. WITHOUT WIRE) DEWATERING— cffib 00 `10J 00CF-6 �Ioaorlo t. SEE NOTE 4 :o —2:1 SLOPE, WASHED STONE FILTER r WIRE SCREEN —DPW ERING �- �I� I�u 111 All DROP WIT III I II� H GRATE SCALE: N.T.S. U U L_I TT OP FABRIC TOP AND BOTTOM STRAND EXTENSION TRENCH FABRIC AND NOTES SHALL BE 10 GAUGE MIN. 1. CONSTRUCT THE SEDIMENT BARRIER OF STANDARC STRENGTH OR EXTRA STRENGTH SYNTHETIC FILTER FABRICS. 2. ENSURE THAT THE HEIGHT OF THE SEDIMENT FENCE DOES NOT EXCEED 18" ABOVE THE GROUND SURFACE. 3. INSTALL THE FILTER FABRIC FROM A CONTINUOUS !ROLL CUT TO THE LENGTH OF THE BARRIER TO AVOID JOINTS. WHEA JOINTS ARE NECESSARY, SECURELY FASTEN THE FILTER CLOTH ONLY AT A SUPPORT POST WITH OVERLAP TO THE NEXT POST. 4. SUPPORT STANDARD STRENGTH FILTER FABRIC BY WIRE MESH FASTENED SECURELY TO THE UPSLOPE SIDE OF THE POSTS USING HEAVY. DUTY WIRE STAPLES AT LEAST 1" LONG, OR TIE WIRES. EXTEND THE WIRE MESH SUPPORT TO THE BOTTCk� OF THE TRENCH. 5. WHEN A WIRE MESH SUPPORT FENCE IS USED, SPACE POSTS A MAXIMUM OF 10' APART. SUPPORT POSTS SHOULD BE DRIVEN SECURELY IN TO THE GROUND TO A MINIMUM OF 24 ". 6. EXTRA STRENGTH FILTER FABRIC WITH 6' POST SPACING DOES NOT REQUIRE WIRE MESH SUPPORT FENCE. STAPLE C,R WIRE THE FILTER FABRIC DIRECTLY TO THE POSTS. 7. EXCAVATE A TRENCH APPROXIMATELY 4" WIDE AND 8" DEEP ALONG THE PROPOSED LINE OF POSTS AND UPSLOPE FROM THE BARRIER. 8. BACKFILL THE TRENCH WITH COMPACTED SOIL OR GRAVEL PLACED OVER THE FILTER FABRIC. 9. DO NOT ATTACH THE FILTER FABRIC TO EXISTING TREES. 10. LOCATION OF TEMPORARY SEDIMENT FENCE SHOWI �' ON THE PLANS IS NOT EXACT. CONTRACTOR SHALL FIELD LOCATE TEMP. SEDIMENT FENCE AS CLOSE T0. THE DOWNSLOPE EDGE OF THE LIMITS OF CLEARING & GRUBBING AS SPACE ALLOWS. 0 SCALE: N.T.S. ,1 GENERAL NOTES: 1. CLEAR THE ENTRANCE AND EXIT AREA OF ALL VEGETATION, ROOTS, AND OTHER OBJECTIONABLE MATERIAL. 2. PLACE THE GRAVEL TO THE SPECIFIC GRADE AND DIMENSIONS SHOWN ON THE PLANS, AND SMOOTH IT. 3. PROVIDE DRAINAGE TO CARRY WATER TO SEDIMENT TRAP OR OTHER SUITABLE OUTLET. 4. MAINTAIN THE GRAVEL PAD IN A CONDITION TO PREVENT MUD OR SEDIMENT FROM LEAVING THE CONSTRUCTION SITE. THIS MAY REQUIRE PERIODIC TOPDRESSING W/2 INCH STONE. N� p JUN-16-2006 FRI 09*5 M DIM RRO Appry a peod cevetega of draw mach betere 1081111M t8ft- kr Anchor Wiling or matting In a &Iru,h tre M at upper end of Furs a can tdtannW. C Iltation >8 araamporarlt �. chasunef 11tor. Rots an netting in the doe don of water flow. Do net scratch. 6..90.3 8 TEMPORARY LINER D-05 SCALE: � N.T.S. a r r r r ♦ a . . a r a ♦ a r a r v r r r♦ r r r, ,,,...a ♦ a . . INSERT IXSptAROE �'~ �/ r a r s ✓� �,, . a . r ... –. _ _.. a.....s+I'_�°" E!£NA'EFJtlN$ a . r strG7l�i HOSEi r . . * `Y ®� ♦r. -..#• a /// a r r a . • r r a r r .r_ �� t r r . . r a .�. . r r'`"',►..,,�` a r a I_.•I I M I( �— ^� a r a v r r a v a�� ♦ r `+. . r r I 15 Installation and flee: 1. Place Dewatering Bag on the ground or on a trailer over a relatively level, stabilized area. 2. Insert discharge pipe a minimum of 5ft. inside dewatering bag and secure with a rope wrapped 6 times around the snout over a 6 inch width of the bag. 3. Replace Dewatering Bag when half full of sediment or when the sediment has reduced the flow rate of the pump discharge to an impractical amount. Maintenance and Disposal;; 1. Remove and dispose of accumulated sediment away from waterways or environmentally sensitive areas. Slit open Sediment Bag and remove accumulated sediment GT:spose of bag at an appropriate recycling or solid waste facility. OR, as directed by engineer or inspector. SCALE: N.T.S. N I 2 MIN. fa I5' n?. I TEMPORARY DIVERSION SCALE: N.T.S. 0 � s 12" OF #57 WASHED STONE 4'��i!t1i CROSS SECTION 'ILT FENCE 1' -8" MIN. CLASS B EROSION CONTROL STONE 2:1 FILTER SILT FABRIC SEE PLAN F. • PR i_ 1. CLEAR & GRUB THE AREA AROUND THE SILT FENCE OUTLET AND PROPERLY DISPOSE OF DEBRIS. 2. PLACE GRAVEL TO THE SPECIFIC GRADE AS SHOWN PER THE DETAIL. 3. PROPERLY OVERLAP STONE BEYOND EDGES OF SILT FENCE OPENING. MAINTENANCE 0 INSPECT OUTLETS WEEKLY AND AFTER EACH RAIN EVENT. IMMEDIA TEL Y REMO UE SEDIMENT FROM THE FL OW AREA AND REPAIR AS NEEDED. CAREFULLY CHECK OUTLETS FOR EROSION AND REPAIR IMMEDIA TEL Y. ENSURE THERE IS NO SCOURING APPARENT DOWNSTREAM OF OUTLET. IMMEDIA TEL Y STABILIZE ANY AREAS THAT NEED REPAIR. SILT FENCE • SCALE: N.T.S. Erosion Control Maintenance Plan All erosion and sedimentation control measures shall be inspected weekly and after each runoff — producing rainfall event. Structures that shall be inspected include but are not limited to: Silt Fence and Fabric Inlet Protection Any fabric which collapses, tears, decomposes, or becomes ineffective shall be replaced immediately. - Sediment deposits shall be removed when sediment behind the fence reaches 6 ". Seeding, Fertilizing, and Mulching Seeded areas shall be inspected for failure and necessary repairs and re— seeding shall be made within the some season. Block and Gravel Inlet Protection. Inspect the barrier after each rain, remove sediment as necessary to provide adequate storage volume for subsequent rains. Upon stabilization of drainage area, remove all materials and any unstable soil; either salvage or dispose of properly. Bring disturbed disturbed area to proper grade, then smooth and compact it. Stabilize all bare areas around the inlet. Temporary Diversion Ditches Sediment shall be removed from the flow area immediately after each rainfall. Temporary Gravel Construction Entrance /Exit Maintain the gravel pad in a condition to prevent mud or sediment from leaving the construction site. This may require periodic topdressing with 2 --inch stone. After a rainfall, immediately remove all objectionable materials spilled, washed, or tracked onto roadways. Sediment Basins and Pits Sediment shall be removed from the structure and the structure shall be restored to its original dimensions when 1.0' of sediment has accumulated in the structure. The sediment shall be disposed of off—site and the contaminated part of the gravel shall be replaced. The structure shall be inspected for damage and repaired accordingly. SCALE: N.T.S. FENCE 0 z a 0 N � 0 c3a t ci Z a � i M to ,. ,. ♦ „ to .. in ic UJ UJ UJ 00 q A r. r