HomeMy WebLinkAbout20090940 Ver 1_Certification of Completion_20130401O/LWSP •SELLS
TO:
128 Overhill Drive, Suite 105
Mooresville, NC 28117
T: 704.662.0100
F: 704.662.0101
www.wsosells.com
Wetlands, Buffer, Stormwater — Compliance and
Permitting (Webscape) Unit
1650 Mail Service Center
Raleigh, NC 27699 -1650
919- 807 -6300
LETTER OF TRANSMITTAL
DATE
March 27, 2013
JOB NO.
08$070
PROPOSAL NO.
ATTN:
2
RE-
Dan River Combined Cycle Project — BMP asbuilt
3 -27 -13
1
401 Certification
0 9 - p
WE ARE SENDING YOU ❑x Attached PX Via FedEx _the following items:
V ia Mail
Shop Drawings Prints ❑ Plans ❑ Samples ❑ Specifications
Copy of Letter Change Order
Photographs Control Photographs ❑ Contact Prints ❑ Manuscripts ❑ CD
Diapositives x See Below
COPIES
DATE
NO.
DESCRIPTION
1
3 -26-13
2
BMP — asbuilt drawings
1
3 -27 -13
1
401 Certification
THESE ARE TRANSMITTED as checked below:
For approval Approved as submitted Resubmit
For your use Approved as noted Submit
As requested Return for corrections Return
For review and comment x For your records
Control survey required Analytical aerial triangulation required
See below remarks ri For review and comment
❑ FOR BIDS DUE
REMARKS
COPY TO:
copies for approval
copies for distribution
corrected prints
20 ❑ PRINTS RETURNED AFTER LOAN TO US
SIGNED:
A.
l�CDENR
North Carolina Department of Environment and Natural Resources
Division of Water Quality
Pat McCrory Charles Wakild, P. E. John E. Skvada, III
Governor Director Secretary
DWQ Project No: 09 -0940
Applicant: Duke Energy Carolinas, LLC
County: Rockingham County
Project Name: Dan River Combined Cycle Project
401 Water Quality Certification Issued Date: Modified September 7, 2011
Certificate of Completion
Upon completion of all work approved within the 401 Water Quality Certification or applicable Buffer
Rules, and any subsequent modifications, the applicant is required to return this certificate to the
Webscape Unit, NC DWQ, 1650 Mail Service Center, Raleigh, NC, 27699 -1650. This form may be returned
to DWQ by the applicant, the applicant's authorized agent, or the project engineer. It is not necessary to
send certificates from all of these.
Applicant's Certification
1, . hereby state that, to the best of my abilities, due care and
diligence was used in the observation of the construction such that the construction was observed to be
built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the
approved plans and specifications, and other supporting materials.
Signature: Date:
Agent's Certification
1, . hereby state that, to the best of my abilities, due care and
diligence was used in the observation of the construction such that the constryc ion was observed to be
built within substantial compliance and intent of the 401 Water Quality Certifi JRw84MEKW&2 �
approved plans and specifications, and other supporting materials.
Signature:
Date:
If this project was designed by a Certified Professional
I, Jonathan A. Carter as a duly registered Professional Engineer (i.e., E
Surveyor, etc.) in the State of North Carolina, having been authorized to observe (periodically, weekly, full
time) the construction of the project, for the Permitee hereby state that, to the best of my abilities, due
care and diligence was used in the observation of the construction such that the construction was
observed to be built within substantial compliance and intent of the 401 Water Quality Certification and
Buffer Rules, the
Signature:
ns, and
materials.
-77 -1
L30M916 AL
Wetlands, Suffers, Stomrwater — Compliance and Permitting (Webscape) Unit One
1650 Mail Service Center, Ralegh, North Carolina 27699 -1650 V6.
,� "q 'e `v r NorthCarohna
Location: 512 N. Salisbury St Raleigh, North Carolina 27604 �' ��.K ° Phone: 919 -807 -63001 FAX: 919 -807 -64941 Customer Service:1 -877 -623-6748 .. Q� •••
Internet www.ncwaterquality.org y�'7A
44j48ur, #";It%�o
~ GAS
'A® 1
i
�•r
E
I
s
i
{
3
�1
0
v
U
cn
f
U
rr;
Lf;
Lf
�LJ
r'f
r�
i
vp
r
Q, \,
13 +00
12 +50
12 +00
11 +50
11+00
10 +50
7 t t t r
� f 1
!
� r
I J
t r f
I f t
! j t
!
Or
I � 1
f
tI E
!
l�' I1 I !
I S
I t
I .
1
0 10 20 40
540
(IN FEET)
1 INCH = 20 FEET
530
520
10 +00
I 2'-0"
a r
a
O c• 9
N
�c v
�.
EMERGENCY
DRAIN
BAR SCREEN
TRASH RACK
SEE DETAIL
TOP OF FOREBAY WEIR
TO VEN
GEOTEXTILE EQUIVALENT
MIRAFI 500X.
FOREBAY SPILLWAY SECTION CROSS SECTION
NTs
780`°""— — EXISTING GRADE CONTOUR
— PROPOSED GRADE CONTOUR
.TECHNICAL E .IFIC/�"1r.. ®� t®
1. SUBGRADE FOR DAM TO BE PROOF ROLLED PRIOR TO EARTH FILL
PLACEMENT. ANY SOFT OR PUMPING AREAS ARE TO BE UNDERCUT
AND REPLACED WITH COMPACTED EARTH FILL.
2 COMPACTED EARTH FILL TO HAVE DRY UNIT WEIGHT OF AT LEAST 90
PCF, ALL EARTH FILL TO BE COMPACTED TO MINIMUM OF 95% OF
STD. PROCTOR MAXIMUM DRY DENSITY.
3. EXCAVATED SIDE SLOPES TO BE STABILIZED WITH GRASS COVER IN
ACCORDANCE WITH SEEDING SPECIFICATIONS FROM EROSION &
SEDIMENT CONTROL PLAN.
4. FINAL DAM EMBANKMENT SLOPES TO BE TRACKED AND STABILIZED
WITH GRASS COVER IN ACCORDANCE WITH SEEDING SPECIFICATIONS
FROM EROSION & SEDIMENT CONTROL PLAN.
5. REINFORCED CONCRETE RISER STRUCTURE TO BE 36" DIAMETER.
6. ANTI —SEEP COLLARS FOR DISCHARGE PIPE SHALL HAVE WATERPROOF
CONNECTION TO DISCHARGE PIPE.
7. SHOP DRAWINGS FOR ALL APPURTENANCES (I.E., GATE VALVE,
HANDWHEEL, ETC.) SHALL BE SUBMITTED TO ENGINEER FOR REVIEW
AND APPROVAL.
JOINTS SHALL BE SEALED W
MASTIC CAULK. INSIDE JOR
SHALL BE GROUT
CONCRETE ANCHOR
3.5" 3.5"
"X2» X1 /
4GLE (T',P
?-"0 REEAf
4SH RAyK
1D
2
all
BAR SCREEN TRAzin nAuK
NTS
SECTION A -A
18=1011003 Ok
fifty /I
A, 06
3�Z
PRECAST CONCRETE
RISER SECTIONS
ONCRETE KEYWAY
TOP OF DAM
ON IUNDiSTURBED GROUNDLWAY .
PROVIDE EROSION CONTROL
MATTING EQUIVALENT TO NORTH
AMERICAN GREEN SC -150,
EMERGENCY SPILLWAY CROSS SECTION
NTs
BY DATE
O
\
�
EX. GROUND
L
p
5
JAC
3/11/13
N
4
JAC
9/22/11
REVISED PER NCDENR COMMENTS
3
JAC
6/29/11
100
2
�i
�
o
1
H:
L
r•
PROJECT#: 086070 DATE: 09/14109
DRAWN BY: JAC CHECKED BY: DEB
�-
SHEET
JOI
ff 10
■
DNR(�C- DE- C- OO.EC -26
M
P►.
R
V:1 INCF
4 FEET
L
N®
N
L.
TRASH
RACK
V
C
.�
O
®®
O
CL
ANTI-VORTEX
PLATE
36
DIA.
L
Liz
,-
O
o
CO
CRETE RISER
•9+
W
HAND
WHEEL WITH
C
10.00'
(MIN.)
5.00'
530.74
SPILLWAY -8-
' `� LOCI
3NG DEVICE
>
.L
1
(N
00' 533.84
1N.} TOP OF 'DAM 538.60
i�
.E
L
(5 MIN.)
SPILLWAY 5N.50
CO
532.77
532.62
TOP OR RI
.
SER - w.4'
100 —YR
STORM PEAK
—
Of
532.44
5 —Y TOR P AK —
531.69
TR _
fZ 1— R STORM PEAK —
_
3
,
1
FOREBAY
T OL - - 5z6-5�
1
� _
3 10'. M
N.� �1
2
_PERM
VEGETATED
SHELF
Q4
530.59
3
523.0
10
00' MIN. 1
�(MJN.) VEG
TED SHELF
524.05
`
MAIN POND
90.4 3
1% (MIN.)
30" RCP
521.76
1 4sr INV. rAele
0
1.5'
\
/
PROP. GROU14DO
80
ANCHOR
WITH CONCRETE AND
RIP
Rj
P APRON
BAR SCREM TRASH RAeje
5.00'
\L 13'Wxi
Lx15'T \J
CONCRETE;
ANTISEEP COLLAR
5.5'x5.5'x1'
CONCRETE ANCROiR
N
O
N
O
LC?
0')
N
e
cfl
d
O
d
d
c6
M
(6
M
d
N
M
c6
N
Imo
N
: J
17
N
r�
O
N
Ln
Ln
li}
L(�
117
l�
Ln
Ln
Lo
L`7
0
Lt?
Lo
13 +00
12 +50
12 +00
11 +50
11+00
10 +50
7 t t t r
� f 1
!
� r
I J
t r f
I f t
! j t
!
Or
I � 1
f
tI E
!
l�' I1 I !
I S
I t
I .
1
0 10 20 40
540
(IN FEET)
1 INCH = 20 FEET
530
520
10 +00
I 2'-0"
a r
a
O c• 9
N
�c v
�.
EMERGENCY
DRAIN
BAR SCREEN
TRASH RACK
SEE DETAIL
TOP OF FOREBAY WEIR
TO VEN
GEOTEXTILE EQUIVALENT
MIRAFI 500X.
FOREBAY SPILLWAY SECTION CROSS SECTION
NTs
780`°""— — EXISTING GRADE CONTOUR
— PROPOSED GRADE CONTOUR
.TECHNICAL E .IFIC/�"1r.. ®� t®
1. SUBGRADE FOR DAM TO BE PROOF ROLLED PRIOR TO EARTH FILL
PLACEMENT. ANY SOFT OR PUMPING AREAS ARE TO BE UNDERCUT
AND REPLACED WITH COMPACTED EARTH FILL.
2 COMPACTED EARTH FILL TO HAVE DRY UNIT WEIGHT OF AT LEAST 90
PCF, ALL EARTH FILL TO BE COMPACTED TO MINIMUM OF 95% OF
STD. PROCTOR MAXIMUM DRY DENSITY.
3. EXCAVATED SIDE SLOPES TO BE STABILIZED WITH GRASS COVER IN
ACCORDANCE WITH SEEDING SPECIFICATIONS FROM EROSION &
SEDIMENT CONTROL PLAN.
4. FINAL DAM EMBANKMENT SLOPES TO BE TRACKED AND STABILIZED
WITH GRASS COVER IN ACCORDANCE WITH SEEDING SPECIFICATIONS
FROM EROSION & SEDIMENT CONTROL PLAN.
5. REINFORCED CONCRETE RISER STRUCTURE TO BE 36" DIAMETER.
6. ANTI —SEEP COLLARS FOR DISCHARGE PIPE SHALL HAVE WATERPROOF
CONNECTION TO DISCHARGE PIPE.
7. SHOP DRAWINGS FOR ALL APPURTENANCES (I.E., GATE VALVE,
HANDWHEEL, ETC.) SHALL BE SUBMITTED TO ENGINEER FOR REVIEW
AND APPROVAL.
JOINTS SHALL BE SEALED W
MASTIC CAULK. INSIDE JOR
SHALL BE GROUT
CONCRETE ANCHOR
3.5" 3.5"
"X2» X1 /
4GLE (T',P
?-"0 REEAf
4SH RAyK
1D
2
all
BAR SCREEN TRAzin nAuK
NTS
SECTION A -A
18=1011003 Ok
fifty /I
A, 06
3�Z
PRECAST CONCRETE
RISER SECTIONS
ONCRETE KEYWAY
TOP OF DAM
ON IUNDiSTURBED GROUNDLWAY .
PROVIDE EROSION CONTROL
MATTING EQUIVALENT TO NORTH
AMERICAN GREEN SC -150,
EMERGENCY SPILLWAY CROSS SECTION
NTs
4l���e�a�aasas><vs$aA�p
oa. eg . CA,, j agog
p0. AB�"�eg,] T"7,Bg9a.
4 �
m
0— a ®'o
4_00194
NC License # F-0891
BY DATE
O
�
O
L
p
5
JAC
3/11/13
N
4
JAC
9/22/11
REVISED PER NCDENR COMMENTS
3
JAC
6/29/11
100
2
�i
�
o
1
JAC
L
r•
PROJECT#: 086070 DATE: 09/14109
DRAWN BY: JAC CHECKED BY: DEB
IAN
•
SHEET
JOI
ff 10
■
DNR(�C- DE- C- OO.EC -26
M
P►.
R
r-
V_
L
N®
N
L.
d
V
C
.�
O
®®
O
CL
L
Liz
O
o
•9+
W
C
0�
t0
N
L
>
.L
i�
.E
L
CO
4l���e�a�aasas><vs$aA�p
oa. eg . CA,, j agog
p0. AB�"�eg,] T"7,Bg9a.
4 �
m
0— a ®'o
4_00194
NC License # F-0891
V./
Z
J
o
Q �U
(j �z
i- o
cow
w
W
w
W
M
NO
BY DATE
REVISION
5
JAC
3/11/13
ASBUILT
4
JAC
9/22/11
REVISED PER NCDENR COMMENTS
3
JAC
6/29/11
•
2
�i
11/04/09
REVISED PER NCDENR
1
JAC
0/20/09
ADDED VERTICAL SCALE
PROJECT#: 086070 DATE: 09/14109
DRAWN BY: JAC CHECKED BY: DEB
IAN
•
SHEET
JOI
ff 10
■
DNR(�C- DE- C- OO.EC -26
V./
Z
J
o
Q �U
(j �z
i- o
cow
w
W
w
W
M
NO
BY DATE
REVISION
5
JAC
3/11/13
ASBUILT
4
JAC
9/22/11
REVISED PER NCDENR COMMENTS
3
JAC
6/29/11
REPLACED SIORETEN110N AREA #1
WITN WET DETENTION POND #1
2
JAC
11/04/09
REVISED PER NCDENR
1
JAC
0/20/09
ADDED VERTICAL SCALE
PROJECT#: 086070 DATE: 09/14109
DRAWN BY: JAC CHECKED BY: DEB
TITLE
WET DETENTION POND #1
PLAN & PROFILE
SHEET
JOI
ff 10
■
DNR(�C- DE- C- OO.EC -26
k
I!
i?
I
0
0
0
a
M
i
v
zL.l
VICINITY MAP
CALL ULOCO 1). CONTRACTOR IS FULLY RESPONSIBLE FOR CONTACT: JG
BEFORE YOU DIG APPROPRIATE PARTIES AND ASSURING THAT EXIST4N"3 UTILITIES
ARE LOCATED PRIOR TO BEGINNING CONSTRUCTION.
2). CONTRACTOR IS RESPONSIBLE FOR PLACING BARRICADES USING
FLAGMEN, ETC., AS NECESSARY TO INSURE SAFETY TO THE
PUBLIC.
3). ALL PAVEMENT CUTS, CONCRETE OR ASPHALT, ARE TO BE
REPLACED ACCORDING TO STANDARDS OF THE NORTH CAROLINA
DEPARTMENT OF TRANSPORTATION.
1- 800 -6TY DAMAGE AGE )• 9
AVOID UTILITY DAM SHORING WILL BE ACCORDING TO OSHA TRENCHING STANDARDS
PART 1926 SUBPART P, OR AS AMENDED.
0 10 20 40
(IN FEET)
1 INCH = 20 FEET
�l
\ \ 1
\
\ \ i
\ �1
` t
♦
w 1 1
TO SCALE
1 \ \
i \
w wwt \\ t \
www t \ f \\
t
t
Big
1 F �
1 � 4
F t
� t t
1 S ( 1
11 FT EMERG j GY
SPIL AY \�
PERMANENT
DRAINAGt
', << EASEMENT
1 t
i
t
t ♦
1♦ � � 1
t t
t t
t / 1
t t
t t
t i
F t11
t
t
i \ \
\
\
780
— EXISTING GRADE CONTOUR
— PROPOSED GRADE CONTOUR
w♦ tr
i
00
Go
F
} t x
r ,
J
ff� It I
i
~ N rr /V
t
r Oa
J j J
I !
3 J t
f 00 �Q VVV
t
,.
D ♦
♦
♦
t 1 , i
E
O
W
e•
309iS
a, e4j
aXej.t3
NC License ## F -0891
W
Z
O
4>
O
bu
r
0
S
Cv
dF+
�
1
z
0
z
—j
3/11/13
�i
O
AC
Zr1
i■
�+
TITLE
WET DETENTION POND #2
PLAN
SHEET
Cm7m 3A
Dl'R ®C- DE- C- OO,EC -28
O;e
ni
1�-
w
06
t0
r
r
uj
L.
Op
ct
4—
04
Z
0
C
a■■
Z
Q?
V
A�
•
>
N
0
CL
#r
Q
co
Adfthl
tp..
Lo
`ii
O
C
r
ch
cc
Q}
b.
low
L
,n
r
309iS
a, e4j
aXej.t3
NC License ## F -0891
W
Z
S
1
z
0
z
—j
3/11/13
ASBUILT
•
AC
Zr1
REVISED TOP OF DAM ELEV.
020
TITLE
WET DETENTION POND #2
PLAN
SHEET
Cm7m 3A
Dl'R ®C- DE- C- OO,EC -28
O;e
COW
r
w
06
>
ct
0
Z
0
U
—j
J
C/)
Q
Z
M �N
W
N �
UZ
U(1)
�-
�(40a
co �
�
U
Z
w
W
NO
BY DATE REVISION
2
JAC
3/11/13
ASBUILT
1
AC
0/20/06
REVISED TOP OF DAM ELEV.
PROJECT * 08 -6070 DATE: 09/14109
DRAWN BY: JAC CHECKED BY: DEB
TITLE
WET DETENTION POND #2
PLAN
SHEET
Cm7m 3A
Dl'R ®C- DE- C- OO,EC -28
0
U)
0111.
�L
QC
C
d
it
LLWAY
ON Ll lSTURBEO GROUND.
PRO' 1DE EROSION CONTROL
MAT7NG EQUIVALENT TO NORTH
AMEFiCAN GREEN SC -150.
EMERGENCY SPILLWAY CROSS SECTION
NTS
BAR SCREEN
TRASH RACK
SEE DETAIL
DRAIN PIPE ANCHOR
NTS
BAR SCREEN TRASH RACK
NTS
Z
d
C
i
i
PERMANENT
•
ct
MAIN
RISER
SPILLWAY
TOP OF FOREBAY WEIR
I WEIR
CONCRETE
CONCRETE
HbIIQAL
EMERGENCY
JAC
�
d
DRAINAGE
IMPERVIOUS
6'
RISER SIZE
BARREL
BARREL
INVERT
INVERT
�
tV
=DAMA55945
POOL
ORIFICE 1
ORIFICE 1
ORIFICE 2
ORIF`CE 2
BOTTOM
ANTI -V
RTEX PLATE
TOP DAM
ELEV.
/x 12' 12' 3 \\
\ //%
5
PRECAST CONCRETE
1,
SUBGRADE FOR DAM TO BE PROOF ROLLED PRIOR TO EARTH FILL
_780 - EXISTING GRADE CONTOUR
v
CA
%
/ \\ \ / / % / \\ ; /��
\
RISER SECTIONS
UPSTREAM
PLACEMENT. ANY SOFT OR PUMPING AREAS ARE TO BE UNDERCUT
i
HAN
WHEEL WITH TRASH RACK
d'
WAY -536:99-
�,
\
INV.ELEV.
ELEV.
AND REPLACED WITH COMPACTED EARTH FILL
X33.07
` L
ING DEVICE
(MIN.)
535.88
/1;//
\� \ \\
JOINTS
MASTIC
SHALL BE SEALED WITH
CAULK. INSIDE JOINTS
5'
2
COMPACTED EARTH FILL TO HAVE DRY UNIT WEIGHT OF AT LEAST 90
- PROPOSED GRADE CONTOUR
` TOP OR RI
CONCR
R - 5x35:58
RISER
48"
104.0 F'
► --^"'"
SHALL BE GROUTED.
100- YR STORM PEA
PCF. ALL EARTH FILL TO BE COMPACTED TO MINIMUM
24,906 SF
536.25 .,
535.56
00
(2) 10" 0
\ \\ \ y NWE
\`\\ :
/
525.00
535.50
536.00
STD. PROCTOR MAXIMUM DRY DENSITY.
f - LIMITS OF DISTRUBANCE
K- S88.i
�
12 LF
GRASS
\\ / � /j
WET DETENTION POND
\
�
f
\\ \\ \ \
/ /y / /
\ � \ /� / ���
A A
3.
EXCAVATED SIDE SLOPES TO BE STABILIZED WITH GRASS COVER IN
\ T
OP OF WELL #2
(2) 10-0
CONCRETE ANCHOR
ACCORDANCE WITH SEEDING SPECIFICATIONS FROM EROSION &
Tai TD1 - TEMPORARY DIVERSION DITCH
r
U
\
CONCRETE KEYWAY
SEDIMENT CONTROL PLAN.
532.86 W/
rRASH RACK
""
Z
E
CLASS B RIP RAP OVER WOVEN
'- - " -
4.
FINAL DAM EMBANKMENT SLOPES TO BE TRACKED AND STABILIZED
- TEMPORARY POROUS BAFFLES
1-YR STORM PEA
U
GEOT =XTILE EQUIVALENT TO
WITH GRASS COVER IN ACCORDANCE WITH SEEDING SPECIFICATIONS
MIRAF- 500X.
3
FROM EROSION &SEDIMENT CONTROL PLAN.
61.34 - TEMPORARY SILT FENCE
®
C
SECTION A -A
5.
REINFORCED CONCRETE RISER STRUCTURE TO BE PREFABRICATED 5
O
N
/
10
FT. x 5 FT. INTERIOR DIMENSIONS.
FOREBAY SPILLWAY SECTION CROSS SECTION
PERMANENT POOL
530.74
1
6
DISCHARGE PIPE SHALL HAVE WATERPROOF
`
lam
L
NTS
RISEN
DETAIL
CONNECTION 0 DISCHARGE PIPE.
r - - - - ^ -' -
-- _"
FOREBAY
O
3
2.5
O - .539;39
525.23
�• `
a
156
t
NTS
IN POND
530.74
5 4
�-
!!
7.
SHOP DRAWINGS FOR ALL APPURTENANCES (I.E., GATE VALVE,
HANDWHEEL, ETC.) SHALL BE SUBMITTED TO ENGINEER FOR REVIEW
0.0' MIN.
CL
2'-0"
-0
7777-
2
AND APPROVAL.
90.90
TOP OF DAM
„X1/4
VEG
TATED SHELF
N
\\ :
2X2
8.
12" CLAY LINER TO BE RECOMPACTED CLAYEY SOIL MATERIAL. THE
---
(�
>
15 (MIN.)
\
ANGLE TYP.
LINER SHALL HAVE A MAXIMUM INFILTRATION RATE OF 0.01 IN /HR.
i"
�'
�` / \\ ✓\ / / / /\ \
%j` //\ i
p ®
CLAY SHALL BE PLACED IN 2 LIFTS WITH DEEP PENETRATING
\
Q
\��
•
1/2 "0 REBAR
SHEEPSFOOT ROLLER (CAT 815 OR EQUAL) TO MINIMUM COMPACTION
3,
EMERGENCY
' DRAIN
TRASH RACK
OF 98% STANDARD PROCTOR MAXIMUM DRY DENSITY.
522,27
E
EXISTrN
.... / \\ / \l
•
2
•
':tN S± 1 °00
\
12 INCH THICK
CLAY LINER
HANDWHEEL STEM WITH
ADEQUATE SUPPORTS
PROPOSED
GROUND C9q
0
(SEE NOTES
THIS SHEET)
00
8'° DIP EMERGENCTY DRAIN
1100'
RIP RAP APRON
\ / \ \/\\ / \/ \/ \ \ / \i \ \ / \ / \ \\ \ \ / \ / \\ \ \/\�. /.,
'.
D D 2D
BAR SCREEN TRASH RACK
29'W x 26'L x 2'T
\ \
GATE VA
LLWAY
ON Ll lSTURBEO GROUND.
PRO' 1DE EROSION CONTROL
MAT7NG EQUIVALENT TO NORTH
AMEFiCAN GREEN SC -150.
EMERGENCY SPILLWAY CROSS SECTION
NTS
BAR SCREEN
TRASH RACK
SEE DETAIL
DRAIN PIPE ANCHOR
NTS
BAR SCREEN TRASH RACK
NTS
14 +50
14 +00
13 +50
13 +00
12 +50
12 +00
11 +50
11911161
Z
C
i
i
PERMANENT
•
ct
MAIN
RISER
SPILLWAY
ASSUILT
I WEIR
CONCRETE
CONCRETE
EMERGENCY
EMERGENCY
JAC
0/20/09
BASIN
DRAINAGE
IMPERVIOUS
IMPERVIOUS
RISER SIZE
BARREL
BARREL
INVERT
INVERT
BARREL
CTO
=DAMA55945
POOL
ORIFICE 1
ORIFICE 1
ORIFICE 2
ORIF`CE 2
BOTTOM
ANTI -V
RTEX PLATE
TOP DAM
ELEV.
ANCHOR
ANTI -SEEP
SPILLWAY
SPILLWAY
SA /DA
AREA
AREA
%
(INSIDE)
\
LENGTH
UPSTREAM
Q
i
HAN
WHEEL WITH TRASH RACK
10.00' SP
WAY -536:99-
INV. ELEV.
\
INV.ELEV.
ELEV.
ELEV.
X33.07
` L
ING DEVICE
(MIN.)
535.88
LENGTH
\
\
RATIO
TYPE
/
12.42' /
Spumy e.55..88-
` TOP OR RI
CONCR
R - 5x35:58
RISER
48"
104.0 F'
► --^"'"
523.00
100- YR STORM PEA
536.62
- - 586.54 (5' MIN. /
24,906 SF
536.25 .,
535.56
530.50
(2) 10" 0
5312.10
525.00
535.50
536.00
_
SZ -R STORM PE
K- S88.i
7'x7'x1'
12 LF
GRASS
2.75
WET DETENTION POND
\
534.94
f
\ T
OP OF WELL #2
(2) 10-0
532.30
- "55'2Ae
i
VEGET
.00'
D SHELF
/
\
ELEV. 532.00
532.86 W/
rRASH RACK
.�
1-YR STORM PEA
3
T \
/
10
PERMANENT POOL
530.74
1
`
r - - - - ^ -' -
-- _"
FOREBAY
1r
3
2.5
O - .539;39
525.23
�• `
156
t
1 M
IN POND
530.74
5 4
r, \
!!
(MIN.)
0.0' MIN.
7777-
90.90
VEG
TATED SHELF
---
(�
15 (MIN.)
36p RCP
x
\
3,
522,27
EXISTrN
GROUND
2
•
':tN S± 1 °00
\
12 INCH THICK
CLAY LINER
HANDWHEEL STEM WITH
ADEQUATE SUPPORTS
PROPOSED
GROUND C9q
(SEE NOTES
THIS SHEET)
8'° DIP EMERGENCTY DRAIN
1100'
RIP RAP APRON
BAR SCREEN TRASH RACK
29'W x 26'L x 2'T
GATE VA
ANTISEEF
COLLAR
WATER I
LEV. = 519.30
6' x 6'
1'
CONCRETE ANCHOR
p0
t+)
O0
N
O
r`
r`
r
UJ
W
-
p
U)
d
r7
d
U)
M
N
0)
N
0)
N
O
t+)
to
M
M
to
QO
M
tn
O
It
In
m
M
U)
M
Lo
Lo
t
!M
0)
IN
1�
04
Lo
Lo
Lo
Lo
14 +50
14 +00
13 +50
13 +00
12 +50
12 +00
11 +50
11911161
BMP SCHEDULE
1U +bU
550
540
530
520
10 +00
CA
w
Su
Eygg�� ®�9F
a �CA
• �i
6�8 7
tJ tT' :.
< W
30916 •
Q
d��F�It88 699/tIvo r►
NC License # F -0891
W
Z
C
PERMANENT
PERMANENT
•
ct
MAIN
RISER
SPILLWAY
ASSUILT
I WEIR
CONCRETE
CONCRETE
EMERGENCY
EMERGENCY
JAC
0/20/09
BASIN
DRAINAGE
IMPERVIOUS
IMPERVIOUS
RISER SIZE
BARREL
BARREL
INVERT
INVERT
BARREL
DRAIN
POOL
POOL
ORIFICE 1
ORIFICE 1
ORIFICE 2
ORIF`CE 2
BOTTOM
CREST
CREST
TOP DAM
ELEV.
ANCHOR
ANTI -SEEP
SPILLWAY
SPILLWAY
SA /DA
AREA
AREA
%
(INSIDE)
DIAMETER
LENGTH
UPSTREAM
DOWNSTREAM
SLOPE
SIZE
SURFACE
VOLUME
SIZE
INV. ELEV.
SIZE
INV.ELEV.
ELEV.
ELEV.
ELEV.
ELEV.
FOREBAY
SIZE
COLLAR
LENGTH
SURFACE
RATIO
TYPE
POND -2
18.15ac
9.16ac
50.4
5'x5'
48"
104.0 F'
524.80
523.00
1.73%
8" DIP
24,906 SF
86,832 CF
2.5" DIA.
530.50
(2) 10" 0
5312.10
525.00
535.50
536.00
538.00
533.00
8'x8'x1'
7'x7'x1'
12 LF
GRASS
2.75
WET DETENTION POND
BMP SCHEDULE
1U +bU
550
540
530
520
10 +00
CA
w
Su
Eygg�� ®�9F
a �CA
• �i
6�8 7
tJ tT' :.
< W
30916 •
Q
d��F�It88 699/tIvo r►
NC License # F -0891
W
Z
C
•
ct
3
W
z<
ASSUILT
z
0
_j
REVISED PER NCDENR
00
JAC
0/20/09
ADDED VERTICAL SCALE. REVISED
TOP OF DAM ELEV.
PROJECT#: 08070 DATE: 09/14/09
DRAWN BY: JAC CHECKED BY' DEB
0
!7>
0
:
ww
oz
>
z
t
0
Z
0
V
.J
Q
2
N
CD O ��
t!3 N
V �Z
Ca �
c_
co
w
Z
W
NO. BY DATE REVISION
3
JAC
3/11/13
ASSUILT
2
JAC
11/04/09
REVISED PER NCDENR
1
JAC
0/20/09
ADDED VERTICAL SCALE. REVISED
TOP OF DAM ELEV.
PROJECT#: 08070 DATE: 09/14/09
DRAWN BY: JAC CHECKED BY' DEB
TITLE
WET DETENTION POND #2
PROFILE & DETAILS
SHEET
umt724
DNROC- DE- C- 00,EC -29
;S
`. n,,
.A® '
i
i
i
i
3
11.
0
U
N
h
I
M,
d•
L:
�'jii
rr
.^rr
r •�
d
d
�. � a w w a r w ♦ m ,. i w w m w w aj � • a ... ' t � ...,, ,,... --
d } J \
4�k PY
i tt
CIE
13 +00
12 +50
12 +00
11+50
11+00
10 +50
i E
t f �
i t i
t � f
� E f
,t
t
t � f
f +--t
f i f
1
I�
1
f E
` t 1
4 t
t
III E
t t
I t
3 ,
C
0 10 20 40
540 1 11
(IN FEET)
1 INCH = 20 FEET
530
520
2'-0"
V 4 b • • 9
EMERGENCY
• ° 4 DRAIN
i
CV
c
BAR SCREEN
TRASH RACK
SEE DETAIL
TOP OF FOREBAY WEIR
vWEN
GEOTEXTILE EQUIVALENT TO
MIRAFI 50OX.
FOREBAY SPILLWAY SECTION CROSS SECTION
PITS
?80- —" - EXISTING GRADE CONTOUR
- PROPOSED GRADE CONTOUR
TECHNICAL . PECIEMAI
1. SUBGRADE FOR DAM TO BE PROOF ROLLED PRIOR TO EARTH FILL
PLACEMENT. ANY SOFT OR PUMPING AREAS ARE TO BE UNDERCUT
AND REPLACED WITH COMPACTED EARTH FILL.
2 COMPACTED EARTH FILL TO HAVE DRY UNIT WEIGHT OF AT LEAST 90
PCF. ALL EARTH FILL TO BE COMPACTED TO MINIMUM OF 95% OF
STD. PROCTOR MAXIMUM DRY DENSITY.
3. EXCAVATED SIDE SLOPES TO BE STABILIZED WITH GRASS COVER IN
ACCORDANCE WITH SEEDING SPECIFICATIONS FROM EROSION &
SEDIMENT CONTROL PLAN.
4. FINAL DAM EMBANKMENT SLOPES TO BE TRACKED AND STABILIZED
WITH GRASS COVER IN ACCORDANCE WITH SEEDING SPECIFICATIONS
FROM EROSION & SEDIMENT CONTROL PLAN.
5. REINFORCED CONCRETE RISER, STRUCTURE TO BE 36° DIAMETER.
6. ANTI -SEEP COLLARS FOR DISCHARGE PIPE SHALL HAVE WATERPROOF
CONNECTION TO DISCHARGE PIPE.
7. SHOP DRAWINGS FOR ALL APPURTENANCES (I.E., GATE VALVE,
HANDWHEEL, ETC.) SHALL BE SUBMITTED TO ENGINEER FOR REVIEW
AND APPROVAL.
JOINTS SHALL BE SEALED W
MASTIC CAULK. INSIDE JOR
SHALL BE GROUT
CONCRETE ANCHOR
a Q
SE4 3 ,
B e
3�2
3.5° 3.5"
" 2 X1 /4
>LE (T,
0 REE.AI
;H RAC's
E
SECTION A -A
0 MAIN i"l
PRECAST CONCRETE
RISER SECTIONS
ONCRETE KEYWAY
TOP OF DAM
J. I I WAY
DI
ON ^UNSTURBED GROUND.
PROVIDE EROSION CONTROL
MATTING EQUIVALENT TO NORTH
AMERICAN GREEN SC -150.
EMERGENCY SPILLWAY CROSS SECTION
Tugs
Z
0
I
•q,
EX. GROUND CAD OL
5
CL
3/11/13
00
4
Cq
8/22/11
REVISED PER NCDE NR COMMENTS
3
JAC
6/29/1,
<
t�►
oz
(jo
11/04/09
REVISED PER NCDENR
3
O
0/20/09
ADDED VERTICAL SCALE
PROJECT#: OM070 DATE: 09/14/09
DRAWN BY: JAC CHECKED BY: DEB
H:
SHEET
L;�7 ■ 1
DMOC- DE- C- OO.EC -26
0
�z
ww
. t:
ltY
r-
V:1 INCF
00
4 FEET
0
04
Z
0
U
w
,
C)
w
a�
8
TRASH
RACK
_N
O
•—
o
a
cc
AN11-VOIt7EX
PLATE
36
DIA.
O
o
V1
CCl4CRE7E
RISER
C
cl)
HAND
NHEEL WITH
!—
p
ppp-
10.00'
(MIN.)
5.00'
5
SPILLWAY 3 +88-
>
`1 LOCKING
DEVICE
1 (.OIY
{
IN.)
533.84
TOP OF DAM 330.88
00
T_
(5 MIN.)
SPILLWAY 5228.68 -
\
532.
532.62
TOP OR RI
ER - 3ii�39
100 -YR
STORM A
-
0- STOF i P AK
-
532.44
5 -YR TOR P AK -
531.69
t\
_ tI _
1 -YR STORM, PEAK -
3
,
FOREBAY
_
SZ P RMA NT POOL - - 526.8
FVEGETATEC
3 10'. M
N.`' .
, 1
2
_
.
SHE LF
1
4Q
L5"
530.59
- 326:89
3
523.0
1'
10
00' MIN. 1
�(Mft)
VEGETATED
SHELF
524.05
\
MAIN POND
90.43
1X (MIN.)
LF
RCP
\ 521.76
INV. 51&10
0
V\
PROP. GROUI
4D ® rqL
8" DIP EMERGENCTY DRAIN
1
WITH CONCRETE ANCHOR AND
RIP
R
APRON
13AR SCREEN TRASH-BACK
5.00'
CLASS A
13'Wx1
Lxi5 "T \J
CONCRETE
-
ANTISEEP COLLAR
5.5'x54'x1'
CONCRETE ANCHOR
(10
N
07
l0
0)
N
QD
C0
cj
O
e►
�}
d
00
M
cD
M
et
tr?
N
r_0
M
05
N
h
N
Lr)
C 1
M
N
(�
.—
O
N
io
to
Lo
to
to
to
TIT
L.r 3
ul
tf?
ul
13 +00
12 +50
12 +00
11+50
11+00
10 +50
i E
t f �
i t i
t � f
� E f
,t
t
t � f
f +--t
f i f
1
I�
1
f E
` t 1
4 t
t
III E
t t
I t
3 ,
C
0 10 20 40
540 1 11
(IN FEET)
1 INCH = 20 FEET
530
520
2'-0"
V 4 b • • 9
EMERGENCY
• ° 4 DRAIN
i
CV
c
BAR SCREEN
TRASH RACK
SEE DETAIL
TOP OF FOREBAY WEIR
vWEN
GEOTEXTILE EQUIVALENT TO
MIRAFI 50OX.
FOREBAY SPILLWAY SECTION CROSS SECTION
PITS
?80- —" - EXISTING GRADE CONTOUR
- PROPOSED GRADE CONTOUR
TECHNICAL . PECIEMAI
1. SUBGRADE FOR DAM TO BE PROOF ROLLED PRIOR TO EARTH FILL
PLACEMENT. ANY SOFT OR PUMPING AREAS ARE TO BE UNDERCUT
AND REPLACED WITH COMPACTED EARTH FILL.
2 COMPACTED EARTH FILL TO HAVE DRY UNIT WEIGHT OF AT LEAST 90
PCF. ALL EARTH FILL TO BE COMPACTED TO MINIMUM OF 95% OF
STD. PROCTOR MAXIMUM DRY DENSITY.
3. EXCAVATED SIDE SLOPES TO BE STABILIZED WITH GRASS COVER IN
ACCORDANCE WITH SEEDING SPECIFICATIONS FROM EROSION &
SEDIMENT CONTROL PLAN.
4. FINAL DAM EMBANKMENT SLOPES TO BE TRACKED AND STABILIZED
WITH GRASS COVER IN ACCORDANCE WITH SEEDING SPECIFICATIONS
FROM EROSION & SEDIMENT CONTROL PLAN.
5. REINFORCED CONCRETE RISER, STRUCTURE TO BE 36° DIAMETER.
6. ANTI -SEEP COLLARS FOR DISCHARGE PIPE SHALL HAVE WATERPROOF
CONNECTION TO DISCHARGE PIPE.
7. SHOP DRAWINGS FOR ALL APPURTENANCES (I.E., GATE VALVE,
HANDWHEEL, ETC.) SHALL BE SUBMITTED TO ENGINEER FOR REVIEW
AND APPROVAL.
JOINTS SHALL BE SEALED W
MASTIC CAULK. INSIDE JOR
SHALL BE GROUT
CONCRETE ANCHOR
a Q
SE4 3 ,
B e
3�2
3.5° 3.5"
" 2 X1 /4
>LE (T,
0 REE.AI
;H RAC's
E
SECTION A -A
0 MAIN i"l
PRECAST CONCRETE
RISER SECTIONS
ONCRETE KEYWAY
TOP OF DAM
J. I I WAY
DI
ON ^UNSTURBED GROUND.
PROVIDE EROSION CONTROL
MATTING EQUIVALENT TO NORTH
AMERICAN GREEN SC -150.
EMERGENCY SPILLWAY CROSS SECTION
Tugs
$C`
e .a
30916 � z�
gwp qjY�, 35y{f Ay{aAq o a a
NC License # F -0891
W
Z
0
•q,
5
CL
3/11/13
00
4
Cq
8/22/11
REVISED PER NCDE NR COMMENTS
3
JAC
6/29/1,
<
t�►
oz
(jo
11/04/09
REVISED PER NCDENR
3
O
0/20/09
ADDED VERTICAL SCALE
PROJECT#: OM070 DATE: 09/14/09
DRAWN BY: JAC CHECKED BY: DEB
0
SHEET
L;�7 ■ 1
DMOC- DE- C- OO.EC -26
0
�z
ww
. t:
ltY
r-
�
00
0
04
Z
0
U
w
,
C)
w
a�
8
C
.�
_N
O
•—
o
a
cc
lwhm
O
o
V1
C
cl)
!—
p
ppp-
L
>
00
T_
$C`
e .a
30916 � z�
gwp qjY�, 35y{f Ay{aAq o a a
NC License # F -0891
W
Z
•q,
5
CL
3/11/13
00
4
JAC
8/22/11
REVISED PER NCDE NR COMMENTS
3
JAC
6/29/1,
<
2
oz
(jo
11/04/09
REVISED PER NCDENR
1
JAC
0/20/09
ADDED VERTICAL SCALE
PROJECT#: OM070 DATE: 09/14/09
DRAWN BY: JAC CHECKED BY: DEB
0
SHEET
L;�7 ■ 1
DMOC- DE- C- OO.EC -26
0
�z
ww
. t:
>
z
0
Z
0
<
w
,
C)
w
J
v/
Q
z
_j
0 w. o
Z
j5 m
i' o
0 N�
r�o �
W
W
w
NO BY DATE REVISION
5
AC
3/11/13
AwulLT
4
JAC
8/22/11
REVISED PER NCDE NR COMMENTS
3
JAC
6/29/1,
REPLACED SIORETEN71ON AREA 11
WETH WET DETENTION POND 0
2
JAC
11/04/09
REVISED PER NCDENR
1
JAC
0/20/09
ADDED VERTICAL SCALE
PROJECT#: OM070 DATE: 09/14/09
DRAWN BY: JAC CHECKED BY: DEB
TITLE
WET DETENTION POND #1
PLAN & PROFILE
SHEET
L;�7 ■ 1
DMOC- DE- C- OO.EC -26
i
I
i
j
I
0
Q
to
M
v
iI
VICINITY MAP
CALL ULOCO 1). CONTRACTOR IS FULLY RESPONSIBLE FOR CONTACTING
BEFORE YOU DIG APPROPRIATE PARTIES AND ASSURING THAT EXISTING UTILITIES
ARE LOCATED PRIOR TO BEGINNING CONSTRUCTICk4.
2). CONTRACTOR IS RESPONSIBLE FOR PLACING BARRICADES USING
FLAGMEN, ETC., AS NECESSARY TO INSURE SAFE;Y TO THE
PUBLIC.
3). ALL PAVEMENT CUTS, CONCRETE OR ASPHALT, A=E TO BE
REPLACED ACCORDING TO STANDARDS OF THE NORTH CAROLINA
DEPARTMENT OF TRANSPORTATION.
1 -800- 632 -4949 )•
AVOID UTILITY DAMAGE 4 SHORING WILL BE ACCORDING TO OSHA TRENCHING STANDARDS
PART 1926 SUBPART P, OR AS AMENDED.
0 10 20 40
(IN FEET)
1 INCH = 20 FEET
LEQEND
780 - - - -- — EXISTING GRADE CONTOUR
\ — PROPOSED GRADE CONTOUR
\ ! 0
t
_
Aj
t t
TO SCALE
rj
\\ ? t
t
/1
— t i
'\ t t low / I
� t
e \\ ki
l 1 t t � ++ t � t+ • � \
t i
t t i j t
112 FT EMERG CY
tt i t SPIL AY , \?
j1 \
PERMANENT
DRAINAGt
kk ++ EASEMENT
J + tk t i
? k
—
k t `
1 1: k
Row
so
\
j\
t \
\
\
1\
Ali
\ ♦ \ \ t r X
/ ••� T ~�\ fib, -.. -' °° F F} l ,,rf � ,J !!' / r// /. // /// t
7
' �a t! / r � \� \ ♦ / \,-.\ � \ \,^ °` ,.� `` �' _ f•"' f � `t \\ Jf, rt it � F F'� • 1F ! r j'/ 1 k
fra;' � i / � /, ` \ ^, � ° ' � 1 •�, ".•,`^ s -^."' ? 1 J ` t i F Ir r i t +
it
,�' � % / \{ � \',.,` \ \� .. ~1~k\ `.,\ ' \ r' •" \\ . ltt \\ Ir � i 1 fr Ir ! Jf �✓f III � c \t
v t 1`
Xk
~� `� ^" ® � �• �`"'ti \ `�`'"•.•,. _ — ._- ...,...,.,`^ ._ J /Ji ._'^ `.e \\ � .""'^' -- � Jrr Frr t Ft Ir F 7 Fr Il m 1 \\
\
t � /
!f J
i
J oo �r
\ F
f
iF
r
i 000
F s
a.. JJ jr r
CA
lf\t
�-
N\\
D\
! J 1
\ 1
\ 1
\ i
t
t F
i f
/ F
r t F r
r F 7 1
it
i
t
l
y,
CA
6�
N) R
e a
hI
daaeuaoos
d t �ly7
NC License # F -0891
NO
BY
O
4)
O
T-
�
tV
t�
2
JAC
�
O
1 1
JAC
0/20/09
REVISED TOP OF DAM ELEV.
PROJECT k 08.6070 DATE: 09/14109
DRAWN BY: JAC CHECKED BY: DEB
TITLE
WET DETENTION POND #2
PLAN
SHEET
UmT3
DNROC- DE- C- 001C -28
P
iw
00
w-t
C4
C
U
•®•
Z
ca
60
C
•t j
co
0
Mrr
+M
O
Tis
I
•F+
r
p
o
CL
N
C
C0
N
O
v—
CA
6�
N) R
e a
hI
daaeuaoos
d t �ly7
NC License # F -0891
NO
BY
DATE REVISION
2
JAC
3/11/13
ASBUILT
1 1
JAC
0/20/09
REVISED TOP OF DAM ELEV.
PROJECT k 08.6070 DATE: 09/14109
DRAWN BY: JAC CHECKED BY: DEB
TITLE
WET DETENTION POND #2
PLAN
SHEET
UmT3
DNROC- DE- C- 001C -28
U
N
b
�m.
0
;;,I
TOP OF FOREBAY WEIR
�. , .. VEN
GEO-EXTILE QU
EIVALENT TO
MIRA=€ 500X.
FOREBAY SPILLWAY SECTION CROSS SECTION
NTS
TOP OF DAM
C
It
tr
.. , . 3 EO
LWAY
ON ' N ISTURB GROUND.
PRC611DE EROSION CONTROL
MA! kk1NG EQUIVALENT TO NORTH
AMERICAN GREEN SC -150.
EMERGENCY SPILLWAY CROSS SECTION
NTS
1
n
JOINTS SHALL BE SEALED %
MAST'. =C CAULK. INSIDE JOR
SHALL BE GROUT
CONCRETE ANCHOR
RISER DETAIL
NTS
2- 1
1 a n EMERGENCY
® DRAIN
N
• < • v
P
y v '
BAR SCREEN
TRASH RACK
SEE DETAIL
DRAIN PIPE ANCHOR
NTS
6" 6"
SECTION A -A
2 "X2 "X1/4"
ANGLE (TYP
1/2"0 REBAI
TRASH RACK
2D
PRECAST CONCRETE
RISER SECTIONS
DNCRETE KEYWAY
BAR SCREEN TRASH RACK
NTS
TECHNICAL
SPECIFICATIONS:
LEGENa
1.
SUBGRADE FOR DAM TO BE PROOF ROLLED PRIOR TO EARTH FILL
780 - EXISTING GRADE CONTOUR
PLACEMENT. ANY SOFT OR PUMPING AREAS ARE TO BE UNDERCUT
>m
AND REPLACED WITH COMPACTED EARTH FILL.
PERMANENT
PERMANENT
�
- PROPOSED GRADE CONTOUR
2
COMPACTED EARTH FILL TO HAVE DRY UNIT WEIGHT OF AT LEAST 90
MAIN
RISER
PCF. ALL EARTH FILL TO BE COMPACTED TO MINIMUM OF 95% OF
ASBUILT
WEIR
STD. PROCTOR MAXIMUM DRY DENSITY.
ol IN 11 ma IN NJ al to ffm 0 - LIMITS OF DISTRUBANCE
3.
EXCAVATED SIDE SLOPES TO BE STABILIZED WITH GRASS COVER IN
AC
:5;
ACCORDANCE WITH SEEDING SPECIFICATIONS FROM EROSION &
�� lU'1 - TEMPORARY DIVERSION DITCH
IMPERVIOUS
SEDIMENT CONTROL PLAN.
RISER SIZE
4.
FINAL DAM EMBANKMENT SLOPES TO BE TRACKED AND STABILIZED
- TEMPORARY POROUS BAFFLES
INVERT
WITH GRASS COVER IN ACCORDANCE WITH SEEDING SPECIFICATIONS
DRAIN
POOL
FROM EROSION & SEDIMENT CONTROL PLAN.
- TEMPORARY SILT FENCE
5.
REINFORCED CONCRETE RISER STRUCTURE TO BE PREFABRICATED 5
ORI:.ICE 2
BOTTOM
FT. x 5 FT. INTERIOR DIMENSIONS.
CREST
6.
ANTI -SEEP COLLARS FOR DISCHARGE PIPE SHALL HAVE WATERPROOF
ANCHOR
ANTI -SEEP
CONNECTION TO DISCHARGE PIPE.
SPILLWAY
7.
SHOP DRAWINGS FOR ALL APPURTENANCES (I.E., GATE VALVE,
ANTI-VC
RTEX PLATE
HANDWHEEL, ETC.) SHALL BE SUBMITTED TO ENGINEER FOR REVIEW
Q 2
AND APPROVAL.
LENGTH
8.
12" CLAY LINER TO BE RECOMPACTED CLAYEY SOIL MATERIAL. THE
SLOPE
SIZE
LINER SHALL HAVE A MAXIMUM INFILTRATION RATE OF 0.01 IN /HR.
VOLUME
SIZE
CLAY SHALL BE PLACED IN 2 LIFTS WITH DEEP PENETRATING
\
INV. ELEV.
SHEEPSFOOT ROLLER (CAT 815 OR EQUAL) TO MINIMUM COMPACTION
Q
i /
OF 98% STANDARD PROCTOR MAXIMUM DRY DENSITY.
WHEEL WITH TRASH RA
14 +50
14 +00
wtojilll
13 +00
12 +50
12 +00
11+50
11+00
Z
0
1
>m
PERMANENT
PERMANENT
�
o
ct
MAIN
RISER
SPILLWAY
ASBUILT
WEIR
CONCRETE
CONCRETE
EMERGENCY
EMERGENCY
AC
:5;
BASIN
DRAINAGE
IMPERVIOUS
IMPERVIOUS
RISER SIZE
BARREL
BARREL
INVERT
INVERT
BARREL
DRAIN
POOL
POOL
ORIFICE 1
ORIFICE I
ORIFICE 2
ORI:.ICE 2
BOTTOM
CREST
CREST
CTOP
OF DAM 9 s
ANCHOR
ANTI -SEEP
SPILLWAY
SPILLWAY
SA /DA
ANTI-VC
RTEX PLATE
AREA
INSIDE
DIAMETER
LENGTH
UPSTREAM
DOWNSTREAM
SLOPE
SIZE
SURFACE
VOLUME
SIZE
INV. ELEV.
\
INV. ELEV.
ELEV.
Q
i /
` �. HAN
WHEEL WITH TRASH RA
K SPILLWAY
10.00'
- 5.36:@6-
LENGTH
\
RATIO
TYPE
POND -2
18.15ac
� LO
`
ING DEVICE
(MIN.)
535.88
104.0 F7
\\
523.00
1.73%
/
12.42' /
533.07
SPILLWAY, - r3
\OP OR RISER
- 335:58 CONCR
RISER
(2) 10" 0
5,32.10
. -- -"""
535.50
100- YR STORM PEA
536.62
- (5 MIN.) /
533.00
536.25
535.56
12 LF
GRASS
2.75
WET DETENTION POND
CL
-
0- R PEAK
-
(a
�
C
534.94
CO
}
's.,
\
P OF WELL #2
1�
-
-
(2) 10-0
532.30 `�
- -552le-
1
VEGETATED
/
��
-
\
ELEV. 532.00
532.86 W/
ASH RACK
Co
N
/
1- STORM PEA
_
"
"
JSHELF
10
P AN P O
- 530.74
FOREBAY
1r
3
2.5
0� - .5.3838
IX
�1 MIN
POND
530.74
5 4
I
\
II_
(MIN.)
"""""_
0.00' MIN.
;
I -+
90.90
VEG
ATED SHIELF
-1 I-
1X (MIN.)"
RCP
-------
X
it i I
'
3.27
522.27
EXISTIN3
GROUND
:-N =1;; 1.00'
Y v'
C12 NCH THIC
CLAY LINER
HANDWHEEL STEM WITH
ADEQUATE SUPPORTS
PRO
4SED GRC�JND C
EE NOTES
THIS SHEET)
8" DIP EMERGENCTY GRAIN
8.00`
RIP RAP APRON
BAR SCREEN TRASH RACK
29'W x 26'L x 2'T
GATE VANLE
WATER
LEV. = 519.30
sNXS6
COLLAR
CONCRETE ANCHOR
00
t�
M
00
to
rn
N
rn
of
O
t•")
00
Q
CD
a;
O
r
O
d
t
to
O
C+
d
d
to
d
to
M
to
N
to
N
to
N
to
to
to
M
to
M
t
It
to
M
to
U
14 +50
14 +00
wtojilll
13 +00
12 +50
12 +00
11+50
11+00
10 +5U
550
540
530
520
10 +00
>>��1111IiP
GA
° S : ✓�
w
m
yo
n
J
Z
0
1
>m
PERMANENT
PERMANENT
�
o
ct
MAIN
RISER
SPILLWAY
ASBUILT
WEIR
CONCRETE
CONCRETE
EMERGENCY
EMERGENCY
AC
:5;
BASIN
DRAINAGE
IMPERVIOUS
IMPERVIOUS
RISER SIZE
BARREL
BARREL
INVERT
INVERT
BARREL
DRAIN
POOL
POOL
ORIFICE 1
ORIFICE I
ORIFICE 2
ORI:.ICE 2
BOTTOM
CREST
CREST
TOP DAM
ELEV.
ANCHOR
ANTI -SEEP
SPILLWAY
SPILLWAY
SA /DA
AREA
AREA
INSIDE
DIAMETER
LENGTH
UPSTREAM
DOWNSTREAM
SLOPE
SIZE
SURFACE
VOLUME
SIZE
INV. ELEV.
SIZE
INV. ELEV.
ELEV.
ELEV.
ELEV.
ELEV.
FOREBAY
SIZE
COLLAR
LENGTH
SURFACE
RATIO
TYPE
POND -2
18.15ac
9.16ac
50.4
5'x5'
48"
104.0 F7
524.80
523.00
1.73%
8" DIP
24,906 SF
86,832 CF
2.5" DIA.
530.50
(2) 10" 0
5,32.10
525.00
535.50
536.00
538.00
533.00
8'x8'x1'
7'x7'xl'
12 LF
GRASS
2.75
WET DETENTION POND
10 +5U
550
540
530
520
10 +00
>>��1111IiP
GA
° S : ✓�
w
m
yo
n
J
� @s�8d5B9fr}9pyg�
c
w
}}
>� .i46 4� �
IriN�'s�aoao o e
NC License # F• -0891
W
Z
0
1
>m
0
�
o
ct
3
CV
z<
ASBUILT
•e•+
Co
11/04/09
�
Co
00
AC
:5;
ADDED VERTICAL SCALE. REVISED
TOP OF DAM ELEV.
=
L
O
ha
SHEET
r®
s
DNROC- DE- C- 001C -29
f
C)
z
,<
N1
!`
w
oz$
V_
n-
00
y
N
Z
0
=
U
C'
Z
E
8
O
e®
O
w
Rai
2
3
.2
L
�
4
O
r-•
CL
(a
�
C
CO
}
's.,
1�
O
Co
N
� @s�8d5B9fr}9pyg�
c
w
}}
>� .i46 4� �
IriN�'s�aoao o e
NC License # F• -0891
W
Z
1
>m
0
o
ct
3
W
z<
ASBUILT
2
0_j
11/04/09
�
Co
00
AC
:5;
ADDED VERTICAL SCALE. REVISED
TOP OF DAM ELEV.
()
020
SHEET
r®
s
DNROC- DE- C- 001C -29
f
C)
z
,<
C
w
oz$
>
z
0
Z
0
.1
C'
J
0
J
0 6N
ON
�N
U 1r Z
ca �
>" o
CO
co
�U
Lit
W
NO. BY DATE REVISION
3
JAC
3/11/13
ASBUILT
2
JAC
11/04/09
REVISED PER NCDENR
1
AC
0/20/09
ADDED VERTICAL SCALE. REVISED
TOP OF DAM ELEV.
PROJECT #: 086070 DATE: 09/14/09
DRAWN BY: JAC CHECKED BY: DEB
TITLE
WET DETENTION POND #2
PROFILE & DETAILS
SHEET
r®
s
DNROC- DE- C- 001C -29