Loading...
HomeMy WebLinkAbout20081579 Ver 1_401 Application_20130413DEPARTMENT OF THE ARMY WILMINGTON DISTRICT, CORPS OF ENGINEERS 69 DARLINGTON AVENUE _ WILMINGTON, NORTH CAROLINA 28403 -1343 REPLY TO ATTENTION OF Environmental Resource Section APR d 1 2013 Ms. Karen Higgins NC Division of Water Quality 1650 Mail Service Center Raleigh, North Carolina 27699 -1650 Dear Ms. Karen Higgins: D $- 157 q V3 n. � -9-E-D Fort Bragg proposes a road expansion project within the Patriots Point (Old Ammunition Supply Point) area. The proposed project consists of expansion of an existing perimeter road to a four lane road. The road expansion is needed to accommodate the increased traffic flow associated with the proposed build -out of the Patriots Point area. A previous Nationwide Permit (NWP) 14 (SAW- 2008 - 00067) was issued 8 July 2009 by Mr. Richard Spencer of the Wilmington Regulatory Field Office for the impacts associated with construction of the existing two lane perimeter road. Impacts associated with that permit have been made and mitigation has been completed with payment into the N.C. Ecosystem Enhancement Program. Since the proposed road expansion is a linear transportation project, authorization is being pursued under the Corps Regulatory Nationwide Permit No. 14 and N.C. Division of Water Quality General Certification # 3886. A Pre - Construction Notification (PCN) with figures that further describe the project is enclosed, and a check for the application fee of $240. Thank you for your attention to this matter. Should you have any questions, please contact Ms. Teresa Bullard of my Environmental Resources section at telephone number 910 - 251 -4725. Sincerely, Philip M. Payonk Chief, Environmental Resource Section APR 2013 � HR _ Wq s4rTy r lea _h,'�i• Office Use Only Corps action ID no DWQ project no. Form Version 1.4 January 2009 Page 1 of 10 PCN Form — Version 1 4 January 2009 U Pre - Construction Notification (PCN) Form A. Applicant Information 1. Processing la Type(s) of approval sought from the Corps: ❑X Section 404 Permit ❑ Section 10 Permit 1 b. Specify Nationwide Permit (NWP) number: 14 or General Permit (GP) number. 1 c. Has the NWP or GP number been verified by the Corps? ❑X Yes ❑ No 1 d. Type(s) of approval sought from the DWQ (check all that apply) - ❑X 401 Water Quality Certification — Regular ❑ Non -404 Jurisdictional General Permit ❑ 401 Water Quality Certification — Express ❑ Riparian Buffer Authorization 1 e Is this notification solely for the record because written approval is not required? For the record only for DWQ 401 Certification: ❑ Yes ❑X No For the record only for Corps Permit: ❑ Yes X❑ No 1f. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts? If so, attach the acceptance letter from mitigation bank or in -lieu fee program. ❑X Yes ❑ No 1 g. Is the project located in any of NC's twenty coastal counties. If yes, answer 1 h below. ❑ Yes ❑ No 1 h. Is the project located within a NC DCM Area of Environmental Concern (AEC)? ❑Yes Q No 2. Project Information 2a. Name of project: PN 69287: Patriot Point Roadways 2b. County: Cumberland County 2c. Nearest municipality / town: Fort Bragg t t_, 2d. Subdivision name: N/A 2e. NCDOT only, T.I.P. or state project no. N/A I APR 3 2013 3. Owner Information 3a. Name(s) on Recorded Deed: UU Department of the Army, United States of America `�d� n at .ALITM 3b Deed Book and Page No. N/A 3c. Responsible Party (for LLC if applicable): Mr Gregory Bean, Directorate of Public Works 3d. Street address: Directorate of Public Works (IMBG- PW /Ms. Stump), 2175 Reilly Rd, Stop A 3e City, state, zip: Fort Bragg, NC 28310 -5000 3f. Telephone no.: 910- 396 -4009 3g. Fax no.: 910- 432 -6908 3h. Email address: Gregory.g.bean civ @mail mil Page 1 of 10 PCN Form — Version 1 4 January 2009 U 4. Applicant Information (if different from owner) 4a Applicant is. ❑ Agent ❑ Other, specify. 4b Name 4c. Business name (if applicable): 4d. Street address: 4e. City, state, zip: 4f. Telephone no.: 4g.' Fax no.. 4h Email address: 5. Agent/Consultant Information (if applicable) 5a. Name: Teresa R. Bullard 5b. Business name (if applicable): Environmental Resources Section, Wilmington District, U. S. Army Corps of Engineers 5c. Street address: 69 Darlington Ave. 5d. City, state, zip: Wilmington, NC 28403 5e. Telephone no.: 910 - 251 -4725 5f. Fax no.: 910 -251 -4744 5g. Email address: teresa.r.bullard @usace.army.mil Page 2 of 10 B. Project Information and Prior Project History 1. Property Identification 1a Property identification no. (tax PIN or parcel ID) Project located within Fort Bragg Military Base 1b. Site coordinates (in decimal degrees): Latitude: 35.0766 Longitude: - 79.035936 1 c. Property size. 70 acres 2. Surface Waters 2a. Name of nearest body of water to proposed project: Unnamed tributary to Bones Creek 2b. Water Quality Classification of nearest receiving water: C 2c. River basin: Cape Fear 3. Project Description 3a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application: The project area currently contains an existing two lane roadway and side slopes The project area consist of a previously developed area (Old Ammunition Supply Point) being re purposed with upgraded buildings and additional buildings and some undeveloped forested area. 3b. List the total estimated acreage of all existing wetlands on the property: 0.1749 3c. List the total estimated linear feet of all existing streams (intermittent and perennial) on the property: 140 3d. Explain the purpose of the proposed project: The purpose of this design -build protect is to expand an existing roadway from two lane to four lane to accommodate a higher traffic flow to the area. 3e. Describe the overall project in detail, including the type of equipment to be used: Equipment used for this protect might include heavy earth moving machinery such as dump trucks, front end loader, graders, pavers, and rollers. 4. Jurisdictional Determinations 4a. Have jurisdictional wetland or stream determinations by the Corps or State been requested or obtained for this property / project (including all prior phases) in the past? ❑X Yes ❑ No ❑ Unknown Comments: SAW- 2008 -00067 4b. If the Corps made the jurisdictional determination, what type of determination was made? ❑ Preliminary ❑X Final 4c. If yes, who delineated the jurisdictional areas? Name (If known): Richard Spencer (Wilmington District Reg Office) Agency /Consultant Company: Other: 4d. If yes, list the dates of the Corps jurisdictional determinations or State determinations and attach documentation. USACE Wilmington Regulatory approval February 3, 2009. See Attached 5. Project History 5a. Have permits or certifications been requested or obtained for this project (including all prior phases) in the past? ❑X Yes ❑ No ❑ Unknown 5b - -If yes, explain -in detail ng accordi to "help file'- instructions: — - A NWP 14 and associated WQC was previously issued for the original two lane road. 6. Future Project Plans 6a. Is this a phased project? ❑ Yes ❑X No 6b. If yes, explain. Page 3 of 10 PCN Form — Version 1 4 January 2009 C. Proposed Impacts Inventory 1. Impacts Summary 1 a. Which sections were completed below for your project (check all that apply). ❑X Wetlands X❑ Streams —tributaries ❑ Buffers ❑ Open Waters ❑ Pond Construction 2. Wetland Impacts If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted. 2a. Wetland impact number Permanent (P) or Temporary T 2b. Type of impact 2c. Type of wetland 2d. Forested 2e Type of jurisdiction Corps (404,10) or DWQ (401, other) 2f. Area of impact (acres) W1 P Fill Headwater Wetland No Corps 0.1033 W2 P Fill Headwater Wetland No Corps 00108 W3 P Fill Headwater Wetland No Corps 0.0218 W4 P Fill Headwater Wetland No Corps 0.0149 W5 P Fill Headwater Wetland No Corps 00241 W6 - Choose one Choose one Yes /No 2g. Total Wetland Impacts: 0.1749 2h. Comments' 3. Stream Impacts If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this question for all stream sites impacted. 3a. Stream impact number Permanent (P) or Temporary (T) 3b. Type of impact 3c. Stream name 3d. Perennial (PER) or intermittent (INT)? 3e. Type of jurisdiction 3f. Average stream width 3g. Impact length (linear feet) ) S1 P Culvert UT to Bones Creek PER Corps 4 60 S2 P Culvert UT to Bones Creek PER Corps 4 30 S3 P Culvert UT to Bones Creek PER Corps 4 50 S4 Choose one S5 Choose one S6 Choose one 3h. Total stream and tributary impacts 140 3i. Comments: Page 4 of 10 PCN Form — Version 1.4 January 2009 D. Impact Justification and Mitigation 1. Avoidance and Minimization 1a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing project. The project plan is to expand the existing road from two lanes to four lanes. Staying within the existing footprint avoids impacts that could be associated with choosing a new road alignment Impacts to the streams and wetlands were avoided if possible, but in some areas headwater features were minimally impacted lb Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques. Stream crossings will be properly culverted to maintain flow connection The construction of the road will utilize existing road alignment Proper sediment and erosion control measures such as silt fence, rock check dams and other appropriate stream protection will be utilized to avoid erosion and sedimentation into streams. Since this is a design -build project the exact S &EC measures will be detailed in the Land Quality Permit at a later date after an exact project design is submitted. 2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State 2a. Does the project require Compensatory Mitigation for impacts to Waters of the U.S. or Waters of the State? ❑X Yes ❑ No 2b. If yes, mitigation is required by (check all that apply): ❑X DWQ ❑X Corps 2c. If yes, which mitigation option will be used for this project? ❑ Mitigation bank ❑ Payment to in -lieu fee program ❑ Permittee Responsible Mitigation 3. Complete if Using a Mitigation Bank 3a. Name of Mitigation Bank: EEP 3b. Credits Purchased (attach receipt and letter) Type: Riparian wetland Type: Stream Type: Choose one Quantity: 0.50 AC Quantity: 140 LF Quantity: 3c. Comments: Payment or wetland credits and stream credits will e debited to the Jumping Run Mitigation site on Fort Bragg 4. Complete if Making a Payment to In -lieu Fee Program 4a. Approval letter from in -lieu fee program is attached. ❑X Yes 4b. Stream mitigation requested: 140 linear feet 4c. If using stream mitigation, stream temperature, warm 4d Buffer mitigation requested (DWQ only): square feet 4e. Riparian wetland mitigation requested: 0.5 acres 4f. Non - riparian wetland mitigation requested: acres 4g Coastal (tidal) wetland mitigation requested: acres 4h Comments: Jumping Run Creek Site will be used. 5. Complete if Using a Permittee Responsible Mitigation Plan 5a If using a permittee responsible mitigation plan, provide a description of the proposed mitigation plan. Page 6 of 10 PCN Form — Version 1 4 January 2009 4. Open Water Impacts If there are proposed impacts to lakes, ponds, estuaries, tributaries, sounds, the Atlantic Ocean, or any other open water of the U.S. then indivii ually list all open water impacts below. 4a Open water impact number Permanent (P) or Temporary T 4b. Name of waterbody (if applicable) 4c. Type of impact 4d Waterbody type 4e. Area of impact (acres) 01 Choose one Choose 02 Choose one Choose 03 Choose one Choose 04 Choose one Choose 4f Total open water impacts 4g Comments: No impacts to open water. 5. Pond or Lake Construction If pond or lake construction proposed, the complete the chart below. 5a. Pond ID number 5b. Proposed use or purpose of pond 5c Wetland Impacts (acres) 5d. Stream Impacts (feet) 5e. Upland (acres) Flooded Filled Excavated Flooded Filled Excavated P1 Choose one P2 Choose one 5f. Total: 5g. Comments: 5h. Is a dam high hazard permit required? ❑ Yes ❑ No If yes, permit ID no: 5i. Expected pond surface area (acres): 5j. Size of pond watershed (acres): 5k. Method of construction: 6. Buffer Impacts (for DWQ) If project will impact a protected riparian buffer, then complete the chart below. If yes, then individually list all buffer impacts below. If any impacts require mitigation, then you MUST fill out Section D of this form. 6a. Project is in which protected basin? ❑ Neuse ❑ Tar - Pamlico ❑ Catawba ❑ Randleman ❑ Other: 6b. Buffer Impact number — Permanent (P) or Temporary T 6c. Reason for impact 6d Stream name 6e. Buffer mitigation required? 6f. Zone 1 impact (square feet ) 6g. Zone 2 impact (square feet B1 Yes /No B2 Yes /No B3 Yes /No B4 Yes /No B5 Yes /No B6 Yes /No 6h. Total Buffer Impacts: 6i Comments. Page 5 of 10 6. Buffer Mitigation (State Regulated Riparian Buffer Rules) — required by DWQ 6a. Will the project result in an impact within a protected riparian buffer that requires Yes X No buffer mitigation? 6b. If yes, then identify the square feet of impact to each zone of the riparian buffer that requires mitigation. Calculate the amount of mitigation required. 6c. 6d. 6e. Zone Reason for impact Total impact Multiplier Required mitigation (square feet) (square feet) Zone 1 3 (2 for Catawba) Zone 2 1.5 6f. Total buffer mitigation required: 6g. If buffer mitigation is required, discuss what type of mitigation is proposed (e.g., payment to private mitigation bank, permittee responsible riparian buffer restoration, payment into an approved in -lieu fee fund). 6h. Comments: Page 7 of 10 E. Stormwater Management and Diffuse Flow Plan (required by DWQ) 1. Diffuse Flow Plan la Does the project include or is it adjacent to protected riparian buffers identified ❑ Yes ❑X No within one of the NC Riparian Buffer Protection Rules? 1 b. If yes, then is a diffuse flow plan included? If no, explain why. The project is outside of any protected buffer areas ❑ Yes ❑ No 2. Stormwater Management Plan 2a. What is the overall percent Imperviousness of this project? % 2b. Does this project require a Stormwater Management Plan? ❑ Yes ❑Q No 2c. If this project DOES NOT require a Stormwater Management Plan, explain why. This project is a design -build project. The contractor will be required to obtain the stormwater permit for the roads portion of construction associated with PN 69287 Patriot Point Roadways. 2d. If this project DOES require a Stormwater Management Plan, then provide a brief, narrative description of the plan: 2e. Who will be responsible for the review of the Stormwater Management Plan? 3. Certified Local Government Stormwater Review 3a. In which local government's jurisdiction is this project? N/A ❑ Phase II 3b Which of the following locally - implemented stormwater management programs ❑ NSW apply (check all that apply): ❑ USMP ❑ Water Supply Watershed ❑ Other: 3c Has the approved Stormwater Management Plan with proof of approval been ❑ Yes ❑ No attached? 4. DWQ Stormwater Program Review ❑Coastal counties ❑HQW 4a. Which of the following state - implemented stormwater management programs apply ❑ORW (check all that apply): ❑Session Law 2006 -246 ❑Other: 4b. Has the approved Stormwater Management Plan with proof of approval been ❑ Yes ❑ No attached? 5. DWQ 401 Unit Stormwater Review 5a. Does the Stormwater Management Plan meet the appropriate requirements? ❑ Yes No 5b. Have all of the 401 Unit submittal requirements been met? ❑ Yes No Page 8 of 10 PCN Form — Version 1 4 January 2009 F. Supplementary Information 1. Environmental Documentation (DWQ Requirement) 1 a. Does the project involve an expenditure of public (federal /state /local) funds or the X❑ Yes ❑ No use of public (federal /state) land? 1 b. If you answered "yes" to the above, does the project require preparation of an environmental document pursuant to the requirements of the National or State 0 Yes ❑ No (North Carolina) Environmental Policy Act (NEPA /SEPA)? 1c. If you answered "yes" to the above, has the document review been finalized by the State Clearing House? (If so, attach a copy of the NEPA or SEPA final approval ❑ Yes ❑X No letter.) The NEPA document will be completed by Fort Bragg DPW Environmental Management Branch staff. Comments: 2. Violations (DWQ Requirement) 2a. Is the site in violation of DWQ Wetland Rules (15A NCAC 2H .0500), Isolated Wetland Rules (15A NCAC 2H .1300), DWQ Surface Water or Wetland Standards, ❑Yes ❑X No or Riparian Buffer Rules (15A NCAC 2B .0200)? 2b. Is this an after - the -fact permit application? ❑Yes ❑X No 2c. If you answered "yes" to one or both of the above questions, provide an explanation of the violation(s): 3. Cumulative Impacts (DWQ Requirement) 3a. Will this project (based on past and reasonably anticipated future impacts) result in E] Yes ❑X No additional development, which could impact nearby downstream water quality? 3b. If you answered "yes" to the above, submit a qualitative or quantitative cumulative impact analysis in accordance with the most recent DWQ policy. If you answered "no," provide a short narrative description. 4. Sewage Disposal (DWQ Requirement) 4a. Clearly detail the ultimate treatment methods and disposition (non- discharge or discharge) of wastewater generated from the proposed project, or available capacity of the subject facility. The road improvements will not be a source of wastewater Page 9 of 10 PCN Form — Version 1.4 January 2009 5. Endangered Species and Designated Critical Habitat (Corps Requirement) 5a. Will this project occur in or near an area with federally protected species or habitat? es Y Q No 5b. Have you checked with the USFWS concerning Endangered Species Act impacts? es Y Q No 5c. If yes, indicate the USFWS Field Office you have contacted. 5d. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? 6. Essential Fish Habitat (Corps Requirement) 6a. Will this project occur in or near an area designated as essential fish habitat? ❑Yes Q No 6b. What data sources did you use to determine whether your site would impact Essential Fish Habitat? 7. Historic or Prehistoric Cultural Resources (Corps Requirement) 7a. Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation status (e.g., National Historic Trust designation or properties significant in North Carolina history and archaeology)? Yes ❑X No 7b. What data sources did you use to determine whether.your site would impact historic or archeological resources? Data provided by the Cultural Resources Program, Fort Bragg Directorate of Public Works. 8. Flood Zone Designation (Corps Requirement) 8a. Will this project occur in a FEMA- designated 100 -year floodplain? ❑ Yes ❑X No 8b. If yes, explain how project meets FEMA requirements: 8c. What source(s) did you use to make the floodplain determination? > e-0- -" Applicant/Agent's Printed Name March 27, 2013 Date Applicant/Agent's Signature (Agent's signature is valid only if an authorization letter from the applicant is provided.) Page 10 of 10 Erich Hoffman Ft. Bragg 545 Thunderbolt Road Fort Bragg, NC 28307 Project. PN 69287 Patriot Point Roadways Expiration of Acceptance: August 5, 2013 County: Cumberland The purpose of this letter is to notify you that the North Carolina Ecosystem Enhancement Program (NCEEP) is willing to accept payment for compensatory mitigation for impacts associated with the above referenced project as indicated in the table below. Please note that this decision does not assure that participation in the NCEEP will be approved by the permit issuing agencies as mitigation for project impacts. It is the responsibility of the applicant to contact these agencies to determine if payment to the NCEEP will be approved. You must also comply with all other state, federal or local government permits. regulations or authorizations associated with the proposed activity including SL 2009 -337: An Act to Promote the Use of Compensatory Mitigation Banks as amended by S.L. 201 1 -343. This acceptance is valid for six months from the date of this letter and is not transferable. If we have not received a copy of the issued 404 Permit /401 Certification /LAMA permit within this time frame, this acceptance will expire. It is the applicant's responsibility to send copies of the permits to NCEEP. Once NCEEP receives a copy of the permits) an invoice will be issued based Oil the required mitigation in that permit and payment must be made prior to conducting the authorized work. The amount of the In- Lieu Fee to be paid to NCEEP by an applicant is calculated based upon the Fee Schedule and policies listed at www.nceep.net. Based on the information supplied by you in your request to use the NCEEP, the impacts that may require compensatory mitigation are summarized in the following table. The amount of mitigation required for this impact is determined by permitting agencies. EEP will debit the Jumping Run Creek mitigation site to satisfy the mitigation requirement associated with this impact Upon receipt of payment. EEP will take responsibility for providing the compensatory mitigation. The mitigation will be performed in accordance with the N.C. Department of Environment and Natural Resources' Ecosystem Enhancement Program In -Lieu Fee Instrument dated July 28, 2010. Thank you for your interest in the NCEEP. If you have any questions or need additional information, please contact Kelly Williams at (9 19) 707 -8915. Sincerely, bill- Slianne Klimek Acting Director cc: Karen Higgins, NCDWQ Wetlands /401 Unit Ronnie Smith, USACE- Wilmington Teresa Bullard, agent File k"tov9... E ... Pvote"1 0" State WX RCDENR North Carolina Ecosystem Enhancement Program, 1652 Mail Service Center, Raleigh, NC 27699 -1652 / 919 - 919 - 707 -8976 / www.nceep.net River Basin CU Location Stream (feet) Wetlands (acres) Buffer I (Sq. Ft.) Buffer II (Sq. Ft.) Cold Cool Warm Riparian I Non - Riparian Coastal Marsh j Impact Cape Fear 03030004 0 0 140 0.175 0 0 0 0 Upon receipt of payment. EEP will take responsibility for providing the compensatory mitigation. The mitigation will be performed in accordance with the N.C. Department of Environment and Natural Resources' Ecosystem Enhancement Program In -Lieu Fee Instrument dated July 28, 2010. Thank you for your interest in the NCEEP. If you have any questions or need additional information, please contact Kelly Williams at (9 19) 707 -8915. Sincerely, bill- Slianne Klimek Acting Director cc: Karen Higgins, NCDWQ Wetlands /401 Unit Ronnie Smith, USACE- Wilmington Teresa Bullard, agent File k"tov9... E ... Pvote"1 0" State WX RCDENR North Carolina Ecosystem Enhancement Program, 1652 Mail Service Center, Raleigh, NC 27699 -1652 / 919 - 919 - 707 -8976 / www.nceep.net �rIT OF Sr�res of • CESAW -RG (1145b) DEPARTMENT OF THE ARMY WILMINGTON DISTRICT, CORPS OF ENGINEERS P.O. BOX 1890 WILMINGTON. NORTH CAROLINA 28402 -1890 8 July 2009 MEMORANDUM FOR Garrison Commander, Attn: Gregory G. Bean, Director of Public Works, Fort Bragg, North Carolina 28310 SUBJECT: Action ID SAW 2008 - 00067, Fort Bragg /Ammunition Supply Point /108"' ADA. 1. Reference: Application for Nationwide Permit Verification, 15 June 2009, Gregory G. Bean, Director of Public Works, Fort Bragg. 2. On 19 June 2009, a Pre - construction Notification (PCN) was received for nationwide permit verification on the above - referenced project. After review of the submitted PCN, I find the notification to be complete, and I have evaluated the proposed work for possible authorization under Nationwide Permit (NWP) # 14. 3. Road Crossing # 1 is located at an unnamed tributary to Bones Creek and Road Crossing #2 is located within the headwaters wetland adjacent to another unnamed tributary to Bones Creek at the existing Pope Ammunition Supply Point in Cumberland County, North Carolina. 4. The following is a description of the authorized work and activities: a. Road Crossing #1 — requires the widening of the existing perimeter road footprint as shown on the submitted plans. The existing culvert will be extended 57 feet on the west side and 30 feet on the east side of the roadway. A ten foot construction strip will be mechanically cleared at the base of the fill slope on both sides of the perimeter road. Utility lines will be located under the constructed road fill. Total impacts to jurisdictional areas resulting from this crossing will be 87 linear feet of warm water stream channel and 0.11 acre of bottom land hardwood wetland impact. b. Road Crossing #2 — requires the construction of a segmented block retaining wall for the widening of the existing perimeter road and the mechanical clearing of a ten foot construction strip at the base of the segmented block retaining wall. Utility lines will be located under the constructed road fill. Total impacts to jurisdictional areas resulting from this crossing will be 0.01 acre of bottomland hardwood wetland impact. CESAW -RG (1145b) SUBJECT: Action ID SAW 2008 - 00067, Fort Bragg /Ammunition Supply Point /108`h ADA. 5. Your work, as described above, is hereby authorized by Department of the Army_ Nationwide Permit Number 14 (Enclosure 1) provided the completed work is not altered, is maintained, and additional work has not been started without proper authorization. Any violation of the Nationwide Permit General Conditions or the following special conditions or deviation from your submitted plans may subject you to a stop work order, a restoration order and /or appropriate legal action. 6. This verification will remain valid until the expiration date identified below unless the nationwide authorization is modified, suspended or revoked. If, prior to the expiration date identified below, the nationwide permit authorization is reissued and/or modified, this verification will remain valid until the expiration date identified below, provided it complies with all requirements of the modified nationwide permit. If the nationwide permit authorization expires or is suspended, revoked, or is modified, such that the activity would no longer comply with the terms and conditions of the nationwide permit, activities which have commenced (i.e., are under construction) or are under contract to commence in reliance upon the nationwide permit, will remain authorized provided the activity is completed within twelve months of the date of the nationwide permit's expiration, modification or revocation, unless discretionary authority has been exercised on a case -by -case basis to modify, suspend or revoke the authorization. 7. The following are the Nationwide Permit Special Conditions: a. The applicant shall notify the Wilmington Regulatory Office that construction has commenced on the authorized work. b. All areas that have been previously disturbed that are outside of the authorized work shall be restored to the original grade and stabilized with a Fort Bragg DPW approved ground cover (Straw or Tack). The restored area will be seeded with an approved Fort Bragg DPW wetland seed mix. C. Sediment and erosion control measures shall be in place and maintained during construction in the authorized work areas. d. All stream work shall be conducted in the dry. Stream flow will be either pumped around or diverted by use of diversion structures. De- watering of the construction area shall be accomplished by use of silt bags or settling basins located in upland areas. All connections and hose lines shall be inspected for proper coupling fit and leaks before the commencement of the daily work. Used silt bags shall be changed out in accordance with manufacture's specifications -2- CESAW -RG (1145b) SUBJECT: Action ID SAW 2008 - 00067, Fort Bragg /Ammunition Supply Point /108`h ADA. and not allowed to overcharge and release sediment to the surface waters and /or wetlands. All temporary structures shall be removed in their entirety at the completion of work. If sandbags are used, they shall be placed and removed by hand to avoid rupturing the bags during placement or removal. e. Compensatory mitigation for the unavoidable impacts to 0.12 acres of Bottomland hardwood forested riparian wetlands and 87 linear feet of warm water stream channel associated with the proposed project shall be mitigated by Fort Bragg with payment to the North Carolina Ecosystem Enhancement Program ( NCEEP) in the amount determined by the NCEEP, sufficient to perform the restoration of 87 linear feet of warm water stream and 0.24 acres of riparian wetlands in the Cape Fear River Basin, Cataloging Unit 03030004. Construction within jurisdictional areas on the property shall begin only after the permittee has made full payment to the NCEEP and provided a copy of the payment documentation to the Corps, and the NCEEP has provided written confirmation to the Corps that it agrees to accept responsibility for the mitigation work required, in compliance with the MOU between the North Carolina Department of Environment and Natural Resources and the United States Army Corps of Engineers, Wilmington District, dated November 4, 1998. f. The permittee shall comply with the conditions specified in the water quality certification issued by the North Carolina Division of Water Quality and additional conditions indentified in their letter dated 25 June 2009. g. Upon completion of the authorized work, sign the compliance certification (Enclosure 2) and return to the Wilmington Regulatory Office. h. Failure to institute and carry out the details of the special conditions above and all nationwide permit general and regional conditions will result in a directive to cease all ongoing and permitted work within waters of the United States, including wetlands, associated with the permitted project, or such other remedies and /or fines as the U.S. Army Corps of Engineers District Commander or his authorized representatives may seek. 8. This Department of the Army verification does not relieve you of the responsibility to obtain any other required Federal, State or local approvals /permits. 9. This verification will remain valid until 8 July 2012. -3- CESAW -RG (1145b) SUBJECT: Action ID SAW 2008 - 00067, Fort Bragg /Ammunition Supply Point /108th ADA. 10. If you have any questions regarding this authorization or any of the conditions of the NWP, please contact me at (910) 251 -4172. Encls RICHARD K. SPENCER Military Projects Regulatory Project Manager CF: Mr. Ken Averitte Division of Water Quality North Carolina Department of Environment, and Natural Resources 225 Green Street, Suite 714 Fayetteville, North Carolina 28301 -5043 Mr. Ian McMillan Division of Water Quality North Carolina Department of Environment, and Natural Resources 2321 Crabtree Boulevard, Suite 250 Raleigh, North Carolina 27609 -2260 Ms. Kelly Williams North Carolina Ecosystem Enhancement Program In -Lieu Fee Program Coordinator 1652 Mail Service Center Raleigh, NC 27699 -1652 N 0 W ��I N U U] o Lo InJ-i U H G T/V V 0— W U z W LL Ili m I `o \ o � � LL U, �I l - 1 ` 1 � \ ° F LU O Ci w N CQ w °_ LL a t soz W W r¢w o rmd �- o�u 2 �' WW K e� ul //'L o m U oZ m J L ° m W F to Q mom o o EL LO H Z Z (~) W H \ I •. !.....I U zr J D 0- Q \ I I wcr ,Z r,= �a LL¢ v 1� ooz \\ w U w W Iw-¢ WU0 O 0 3 0Z� e'y za Zz ` w w OCn \ WF-o \ 3 0 0 \ LL co in \ \ Jo= \ CA o W \ 3 ' 7 t . `/J 19 m z W z U w w� L U LO u / LL � O W W LLJ W \ LU \ r, N C) J CFO Q C) 0 U) 0 2 Z Z 000 �L U fn OfU-W a \ 3 J O w N_ Z Z Q � � U Z J W -1 O Q LL Q W U) J U) W U W W F- F- 0 O Z Z W W O O r � # Li +�r * <L r \ I 1 LU Z / W LL C O w N_ Z Z Q � � U Z J W -1 O Q LL Q W U) J U) W U W W F- F- 0 O Z Z W W O O r � # Li +�r * <L r J PROPOSED IMPACT SITE SITE LEGEND BRAGG AD. 'J�I1I JURISDICTIONAL WATERS O PROPOSED IMPACT SITE zoo' a zoo <00• 100' PROPOSED IMPROVEMENTS TO THE PERIMETER ROAD AT THE I08th ADA FORT BRAGG, FAYETTEVILLE, NORTH CAROLINA JURISDICTIONAL WATERS IMPACTS PROJECT VICINITY MAP The Louis Berger Group, Inc FIGURE 1 Raleigh. NC 2 sos surce aoo MAY 2009 �`'- er its. •f t,3 ,, fT4.. r t" - � < tl <-. •} � .� `N j ',fit ': � YfT�� •::d. rt � j r � - 1 ti x y a r � Oda YFRI It .4 . J, �: - . .s J �f - _ _ r 1N . � try � #•�y� .` � S � >f r v D m cT v 0 O v O .N . : _ z L y � __I J 1 •.M,�N. O r P, 0 rt'' • PO � � ``', 0 IIJ �` s �I `, FNS m m In z0 I m O'� •;i -'1,� zTA•�'Y' �'r rT -i'91 2 0 N 00 z i / IS m�� /JJJttt zy z O i4_ _'- �".�'= �•�•� � ���'�'I m 9 �} µla"_ A N C \ � l �� I_ 1 +t _ JI � � FNIA�" O -m•1 Om \t Z ft'1 N ' Tq��'• -- ` - - - -- U A Or� 0o ��S �m As m cO�tnOm z ' r yA_ m O['uIcNzoJ mo �yy yI•I Co�HNmop AZ< Az W o °'p ti v mm -1 o mN H.V. 11r 24 2 O O�L�OV° y E �gimmmZ�2iFmocZi'o °z uxmpoiZ °mn�y��mNmb g w �OST� °Oy O�cm�o Fg °�,��aZgpA D�Zmr oxm Z1m D pp ° A�m nZo T m��oOOO Wp OQgyfmoomoc 0 m�m o° y o� Oan o m O t � m � v ��z�n° v>>KZ � y7�Z t,'tmOo 0 � < �o am K pm yz No�pmm '.�m�pmv O� imtnN yV my � Z- zm {nYoW r z - Oi° ommmm�z AD g 2 F o' mA'aa_ w mZf o zo �[•t p� C op °�m N '�y m mirn �mv ^ p� cmNA ��� Cpmvmt� .t q 8y$ Z?ni O amolmfO�jZ?S!Ama x� t^ m WO p N" � r N HJ 2 �m- p�• ZnO m �m p O+m OO �-.m m �o 2'L.- � - p�0 n �;0 o iz NN LO -Z po� -p aAN° -°= W0Tm o m cmoz �°Oi F K�m o ZX2K, A0 ZOOf°f- Og'° I Oat > o � Z C I A O Ozm S iACFO �c D Ln C o y O °WZm qm c ox A O gC�o n r O m IOTm D D I ( ; " —_ " -1 � -- — 6p�mm a O O !n O V a O ou ti wo a Z n ° mm OZ Z c m n m D � 0 O -Ti C C o a rn r m z u a Z oo osm i �N ;; N -m NON$- 0 >3M! � $m c<io� �=� r Cmtn 21 � mxF A n x s v N in o 0 N °N�"=om `$ $m gt §6= pO°.p eo -p°.p °� £ggAR �j Z -:3 OZO bm Z ;1^5�OR m ra�fm �^o�mm ' -u - _ I n r� u Pz ncv�m '^ x _o N xzo> c n N �^ o m on a -; -., U 0 °yym =rm0g o om om z �A) yi�to"c17N T102� Op o0 0 m Ow z x (< Vlmz Zn O E,,Z �zT �m�^�Q _ r;I _I `,�•- __ -____ pmp s sm>z Z '�W sod g a� �o�c �° � [�mfJ77l mZZi Zz� °pmt mo ; oOO N'vo zAFCZiAmm ;r WAS' oziA r Y\ _ w1 - Zo � rnm W�z O�m P- Ms- C, o mmp �c� W ov ta� W N c mbt E , • -v/ ,:�� �mo; mix mf i myzO�� 250 m mAx- ziyy�n� O �Oy y�ym D59� m2��jJw �ONZ; Rpi MAC, ON O�Zm'DC 8m N t7gmp �ND �mf°.)� Nsv ° ; MAC, Nmy�A � 1 .�1.'�\2 ^T �- �`���• \N i 1� OCO SD AA '9 °� 0O ?y1�m m� 2�y �2pNmO��mm m mom °m "'A� OQ�WO° �m zrn4�p O° OVIm �. O ° Oyn �.z1,t o�g o 2 2 m�rzgN �x - ^5 i mzv z ° zxm0° m ° NO N 2mm tA•�t•�m,'U� o- '21• -__- LL; ```\; �y mgm a g o °2 8m8 5�aaF Om m _ p�� Z$t.tWpm� _ �A �011A� t^COAA s ;vl °�\FOO=o �gg�Wmm om1�.vOOgNbz �S z� ;,� zoZmma2 °u6r�z° v?s'1=> �m =g °ZZO °N go�� a 9zFc zrp °N Ago 'A _ a z 6 c�iovpoz�Nazn oo Zm zrooN o x°m> IZ momm oc>i cic c oOZC�m� o F °SCx N OFOg �p o�ocn rm N ZFm o_ xom m z �1 z 1^r� m c�i15�'20=mZ��mZpA �5WNO >cZ'1XOm Do�ay�Z°o mzN>O���m m�vc���fO�c s� oo�; mm�� u/ -' !/� ����J. -`- •/I \ `•�T� mfg oMOOmmt�'1Srr �m �"y ofm� [�; A �m MoKCm�N�Z z� APc Nm�N DZa� vm Fo ��z?zmZ o0 v o m_z o \\ - _ v° �x ° ;m ncQOZm my N o m �ONocs mmo �C1, / x$ zm iPEIZ9,C)m <CNmP�W^AOC_ eNmN Imo g 1 z zP �{ F g -� 2� ;�0�°WF °v x 11Y p�zm 4; MIA, ��� 0 O� yomzpN gm; m �A° o N� m y zmq o v Z .09 om A m < o m DRAFT SUBMITTAL - NOT FOR CONSTRUCTION DESIGNED BY DATE N PATRIOT POINT ROADWAYS J S ARMY ENGINEER DISTRICT MF m DECEMBER M12 z x FORT BRAGG, NORTH CAROLINA CORPS OF ENGINEERS DwN Br cKD BY SODDITATIDN NO - - Z a m Z m SRC sLM Teo O _ _ m WILMINGTON DISTRICT C m r SUBMITTEDBY CONTRACT NO O m o ° 3 D K HENSON TBD Z m p��` a FILE NAME ■` CATEGORY CODE N A cT VICINITY MAP .A_/Ys clmnac rnw ,n -esM IT EM1GINEERINC ARCHI`cCTURE S¢E D vLOTSCALE vLOT OATE AS SHOWN Z]NOVEMBER 2012 SYMBOL DESCRIPTION DATE 8Y NIN \J D p z /�i' sae --A > 0 qj .a_ - _ __ - - __ - - _ S4:C:_: '',J yy ,��)C` :•�• \;off,. _ - _ :a„/ ,W,,,�V�,�•,, � _' -_ - � -__ -- 1 `r 1 - - rye. _ L�„ _ i, -" — /� .(,(� �, ii is ,� �� .��•,.- , .— T,�:.��/,"--`--'_- -_ _ _i ^C�� , �6, _e _- _ _ _- .. �\ _" I• j I _ �� H I _ ,� r�� ;/n i. '� an, -,n•ev E 'i I � - z- - , - T f I �I I 0, -u o� ,!� ,�i� -_ v_ -t /7 --iTi -■■ �a-;1 i. - - o _ CL-_- _ __ a - c . '°Ii'�I l ' ' ' "Y i���' - i __ — P2 •`f _ °` I _ - __- _ -- .�� c c-J; 7 ' SU D „� �`', -.I �S�IC�`; � � � �-, . ' '��D�� - � - • ' ' i .1i ff � — E � i j /___ IB - lir r ia= �W WO T � 15N692933 F=Y - oI G SOF RIGGIN Z _ ,A cab' j',:•',r :a_' :��,_ -� 03- r 41 1, /� `•�. '.__- /, - - -\'a` — 1 { it I '-, 1 l 1 i'I \ /.. i , ,.l _ __ _ _ _ - - -_ -_ _ _- - _ _- - _ __ - -• I ', / i L.'\ �. Z, ; o _ .yam � �'� -. %,_• ��,������ _ � r _ '� I y,��' „ "�' �� ?'1"111; %,�T/„%z > :,'; ":�r�. _ -``�� - -_ - _-- - •] _- "_ '41 -. -..'" -- � - � /�� -- -� / - � .-' _� _ ,; :.`��� : :� :; .�; c �_ - _ .;.,,, :�.' rya _ _ _ / _- - -: "- .- ��'.;�_ -. _ . ` -I•C: it -'1�7 y`-- i; ! ''i�.'_I�, E `_' _ - IIti; �•�;`"',^=r " """ - __ - - -i.'i 'I ._ � ����'j :% .,%"r- ='_ � i r G7 t D- 4 , 0 J J o m m -1 Z o p D 3 z D m 0 m x 2 co 1 Z O A 2 PATRIOT POINT ROADWAYS m m FORT BRAGG, NORTH CAROLINA Z c: C m D WETLAND IMPACT EXHIBIT m� ��Zm m DRAFT SUBMITTAL - NOT FOR CONSTRUCTION DESIGNED BY DATE U S ARMY ENGINEER DISTRICT DSF 03, DECEMBER 2012 m 0 ° CORPS OF ENGINEERS WILMINGTON DISTRICT JRC SLM TBD SUBMITTEDBY K HENSON CONTRACT NO TBD z FILE NAME O D Z7 2 D 3 m C m O r m z D m z O13 ° I I ° I M X x :z —i m 8� o D D X x z m 0 \ W W (P O D O > -D D � o w Ca Do o z D v { D m p D II U) C7 D r c/) V ID Z7 D m m z ? W N n m !n D _9 D Z � r 00 O w0 00 x X ID*'I D Fri Z O °p p °O °O f'm'I CDC X X (Dj —i = r D m Z �1 C7 Z D L7 ? cf) O O x D ° x C7 m x x U) o 0 0 0 m D X R m 0 m m (n DRAFT SUBMITTAL - NOT FOR CONSTRUCTION DESIGNED BY DATE U S ARMY ENGINEER DISTRICT DSF 03, DECEMBER 2012 m SOLICITATION NO CORPS OF ENGINEERS WILMINGTON DISTRICT JRC SLM TBD SUBMITTEDBY K HENSON CONTRACT NO TBD z FILE NAME O D Co 2 T T 3 m C m O r m z D m z o m I D D D O D O 0 0 m Z O O O D D � D f Ca Do O D v D D II C7 o c/) V ID D ON ? W N N m !n Z � DRAFT SUBMITTAL - NOT FOR CONSTRUCTION O N 3 z D Z A z 0 3z n z w u, SYMBOL DESCRIPTION DATE By ■© DESIGNED BY DATE U S ARMY ENGINEER DISTRICT DSF 03, DECEMBER 2012 own By I CKDSY SOLICITATION NO CORPS OF ENGINEERS WILMINGTON DISTRICT JRC SLM TBD SUBMITTEDBY K HENSON CONTRACT NO TBD I FILE NAME CATEGORY CODE CEMS 1al�szo SIZED PLOT SALE PLOT DATE III \�E=1`I� - �rT =�iJE AS SHVJN 21 NOVEMBER 2012 O N 3 z D Z A z 0 3z n z w u, SYMBOL DESCRIPTION DATE By ■© Im v 2 � I w m C) 11 z m a ti cziarx i T> J 12�2�2 czi2�2�2 cziA � <8 2 � m m 8 o� N 1 N- N 4 zD n N"' A? z ' � °-�'� cn v cn c p S Z z m m o N A D Z z m< c A = D r r Do 3 0 ,Z�j Z O 3 Z z m UC Nz 0 a v z c m ;-0 � ;o o A �f m z a � 0 z r ti N m n m m r'O z Q D 2 m -m+ D m I D $ ID NORTH W N Ci m Z E ;x mO�rz f*t mm zz2r To p 4Dr �C) 3-CN� D <2;9p8T' iZ2 ZOrcO0 r p zmm,p 4� z m -- z -- z *.Z -zmo X§ �mN'{D m m x i x ���pnnn m=mm90 zoo Cvai>m to O� rnDx zA Z �o I -i - -I m m N N m m spc gxr F 'X� F800 DCOzOpD mgr ODrZ c) mx m mol Wo 94 2p; p z w FE ��n ACDO oz 00 � mm��om m Z AoA Z D O� D m m z 0 00 00000 DATE U S ARMY ENGINEER DISTRICT SLIM 03, DECEMBER 2012 OWN BY clm BY SOLICITATION NO CORPS OF ENGINEERS WILMINGTON DISTRICT CC� _I- 0 ; i W c m Om N ZX cm -0 �� c0 wo �� M> D C' Z Nr NO NnI�T10 tV) �pG m p O ENI INr FRING �ARC41iF.CTUR: m��m : �� (/1 min X� Cm 1X �ADx �O 08 -i r O Z� *> ND D n CA c�� z mz Nm�O n o m m �i mD �fanpc ? pommy N N m N v o o m ZZ z � a m a N DO r = -0 m A m co MOOz z pxZZO 0 v c z 0 Z m PATRIOT POINT ROADWAYS Z m FORT BRAGG, NORTH CAROLINA mo mocl —O X�KMI- OmZm A 0 CIVIL SITE PLAN - AREA "A" m _ l l t\ \\ 11 I I i i r °• 1f ` 1 l III I I I l 1 1 I I 1 f I 1 1 I 1 1 I i 1 I -h 1 1 1 m 1 • 1 I I 1 I �1 I I I'� I, I i I! � I If I i i II f� I 1 _ I ' I i NIIIIIIIIIIIIIIIIII rig i 111 i i 1 1'1 II, , 1 ' I� it I IIII I. 11 \; N I'i II , 1 1 1 i ` � 7 �---- �_ - -�-_- - _- _..- -- ------ -- I T J _ =_ � I I II 1� 1 ,i DRAFT SUBMITTAL - NOT FOR CONSTRUCTION �0c 0 m O 0 z N � m %SYMBOL DESCRIPTION I DATE I BV 14 1 u 1 r 1 a DESIGNED By DATE U S ARMY ENGINEER DISTRICT SLIM 03, DECEMBER 2012 OWN BY clm BY SOLICITATION NO CORPS OF ENGINEERS WILMINGTON DISTRICT aac sLAI TBO SUBMITTED BY CONTRACT NO + FILE NAME CATEGORY CODE C =MS 141 -8520 SIZED PLOT SCALE PLOT DATE ENI INr FRING �ARC41iF.CTUR: 22 " %34" AS SHOWN 27 NOVEMBER 2012 �0c 0 m O 0 z N � m %SYMBOL DESCRIPTION I DATE I BV 14 1 u 1 r 1 a x IT! v z z y I w ,2 P I G7 A N O in N rn rn v7 of D Z Z rn z n Z Z Z Z Z Z Z 0?. m m 0 0 O D coil c o O o o o z c z C m M n In x 0-z N m z c 0 O N N n z m F- m "' zz%z " °o�nmzo D o y c zDrn m Arn �� r Z ;u A M r Z7 2 D r x K m r � o _ m N O Z O v c m x X m K o m m K O m A z m - m � m 0 z W N G) m DVIOOf*l��TI ��� -O f�NDm Z <<.Z�lcrnilDmZ1 x�m 3?Cri- D ARzg00'm iczilz Z> -%22 r Z mZ<z��o Xc� ? ;N�z O �T12�2 � -�nC) D m_ 2 Z 5 2 N o m N O q .-i�l `LZ � -4 m -Q Nm�O C O A 2 r x 2 r n DCp�OOD Wzm OD�z -1 OrnDNOmO mOD �mn0 Ommo2�w oz m2Oz �Nf�� FO -<y �NZ0 �mO0 Sao Oz OZ m m = -nom = O m z m { O:q D m m z v n N y ti m Z r 2 III =F! A m a F, 1W NORTH PATRIOT POINT ROADWAYS mZ m FORT BRAGG, NORTH CAROLINA C Im x�03ITD Omzm CTl � n CIVIL SITE PLAN - AREA "B" m DRAFT SUBMITTAL - NOT FOR CONSTRUCTION OES3 ED BY DATE U S ARMY ENGINEER DISTRICT WF 07 DECEMBER 2012 CORPS OF ENGINEERS WILMINGTON DISTRICT DWI BY cKD BY sum SOLICITATION NO TBO SUMITTEO BY SU CONTRACT NO CO FILiNAME 'ADTEESOBRY CODE e Ei6/IS SIZ D PLOT SCALE PLOT DATE NGINEERING ARJiITECf'U �E ° 229i' AS SHOWN 27 NOVEMBER 2012 m m z c� 0 �r n� W cm nv om N zx �z zvcn aD m0� Z i T ` 1 r v rr O z' X v' 00 0195 m � p D m Z rn X � m DB Z� 0 � v m v�Om 1") v c m m t/7 I m O c X-N_i nm DD DO C7 jam X Ul x D Nj2 O OVl �Of/l ND Z� �mDZ z Zm nII N Z O ° ZO O r 0 ri Z -< 62 AO N N TI 1 i E 1 I I O O f m-� D O m mD m 1 i I 1 I- -r- - - - - - -- -- - ---- O m == Z r r (A- my D O N< m O z m m r m mr n I �r =_ � = r Z �x D m Zz W z -i m D Z7 m I '� I' I; -- ---- v x m> -1 -� zz 'II I 1 m a0 r = v ro 0 1 i i O z 0 m mt� Z ; 00 p O I- 1� ' t -- m < X xm L7 1 m 1 v z PATRIOT POINT ROADWAYS mZ m FORT BRAGG, NORTH CAROLINA C Im x�03ITD Omzm CTl � n CIVIL SITE PLAN - AREA "B" m DRAFT SUBMITTAL - NOT FOR CONSTRUCTION O m 0 0 Z x U ti %SYMBOL DESCRIPTION 11 ATE BY OES3 ED BY DATE U S ARMY ENGINEER DISTRICT WF 07 DECEMBER 2012 CORPS OF ENGINEERS WILMINGTON DISTRICT DWI BY cKD BY sum SOLICITATION NO TBO SUMITTEO BY SU CONTRACT NO CO FILiNAME 'ADTEESOBRY CODE e Ei6/IS SIZ D PLOT SCALE PLOT DATE NGINEERING ARJiITECf'U �E ° 229i' AS SHOWN 27 NOVEMBER 2012 O m 0 0 Z x U ti %SYMBOL DESCRIPTION 11 ATE BY 5 z D I DD 1 n 1 0 i •'' I m • O � , m z f-Im N *mmmmmmo n n m m � NO N N N N N N D Z< Z 0 Z �z z�zzzzz °Z -x' mm moo c£ y v 00000 z c z r m 2 w N N Z c G1 O N N O n Z m O ��S5rr77 m ° Z < D 4 r Q, m D 0 M r 2 D r? co > ZoZO�ty zR _ O Z -v m o c o -o mM m s O ;o m c g z m A 0 O 2 W N G) 3N2Z-ADN ? � Z :;w ip 9mm 2 02�O0 O D Z Z Z oz gyp xc� ;N�z O mz r N TT5=r m�o ZOO NNDm m ON DDS �zm %0 m0 mmcz - -I�m m 0 (Am m �mo��oD Fpm 9mDNOm° mom �m00 K n32TW ct mmm°- �Cn?�r0 -�� KNZn �mOy 261 Oz OZ m -IZ >�2 -i O mm l vm m m z °a z m m 0 ril r y �U m m Ia D z z m, m D A O O O O O O OOO sw '�I OvN BY cXO BY SOLICITATION NO CORPS OF ENGINEERS 1 0.0 'Om .o K m 00 Mo W cQ Om N �Z 20mo n- .mil :0 .Z1 0] Z Z; o r rr O N zr Xnv- No N o oo °o NS NS N m g O 9ZE D PLOT SCALE PLOT DATE 2 mm CAA. 61 zm >m Dm v� m m R7 OF NZ 10/10D 1/10 � 2 V1 Z ZO Ovt�>N ZZ �mDZ �O 0:0 O r0 N --�O O ON m .07 Zf �a a�n °vc Ln ? m m zD Z� m° z_ Nm mm am) °mm Z N o p �z z -iD z -zl?m� co D " m 0 X _0 T. m r Do -1 Z g� -1 W > z _ Ao m z r 2-: �mn r- m O mo m m m < Z O° Z x -0 Z v IHI - m 0 zc m Z ° m � Z PATRIOT POINT ROADWAYS Z m FORT BRAGG, NORTH CAROLINA �wcmr. x " D OmzM O A m CIVIL SITE PLAN - AREA ••C•' i i 1 1 I 1 1 I 1 1 I t 1 I 1 RIM. 21 TV iN. NOT fl INV OUT. NOT FI 1 1 I 1 1 ` ♦ INV• 209.1 1 � I 1� I i 1 ti 1 I I 1 I!� w i 1 i h� I I Ii s � I i NI t I 'I I _ 1 �I 1 I I -1 I 1 1 1 I r 1 �CONSTRUCTION AREA ^' I A 211.48' V M' 1?09.70' T' 204 .68' [OU : 90' Y OT FOUND V CJT: 209.98' 1 yNltJ: NOT FOUND 1 1 1 I 1 1 I 1 I / 1 - j:0NSIRUCT;0N AREA - N 1 1 +� I 1 1 I t 1 _I "Y1 1 AREA- - CONSTRUCTION AREA- 1 w� 1 ,w�121 l� ❑ 1 ._J DRAFT SUBMITTAL — NOT FOR CONSTRUCTION 0 IGNEDBY DATE 1 sw '�I OvN BY cXO BY SOLICITATION NO CORPS OF ENGINEERS 1 nc sw1 TED D BY 1 'BD8S20 CATEGORY CODE II =I CEMS ENGINEERING A�RGH11EC NiL 9ZE D PLOT SCALE PLOT DATE 2 "X34" ABSHOWN 27 NOVEMBER 2012 !;I IHI - �j1 £ / O / u�, 1 � � N !j 1 . 1 AI i I _ 1 �I 1 I I -1 I 1 1 1 I r 1 �CONSTRUCTION AREA ^' I A 211.48' V M' 1?09.70' T' 204 .68' [OU : 90' Y OT FOUND V CJT: 209.98' 1 yNltJ: NOT FOUND 1 1 1 I 1 1 I 1 I / 1 - j:0NSIRUCT;0N AREA - N 1 1 +� I 1 1 I t 1 _I "Y1 1 AREA- - CONSTRUCTION AREA- 1 w� 1 ,w�121 l� ❑ 1 ._J DRAFT SUBMITTAL — NOT FOR CONSTRUCTION V7 � � O N A SYMBOL DESCRIPTION I DATE I BY ■v ■ ■ v ■ v 1 N 0 IGNEDBY DATE U S ARMY ENGINEER DISTRICT sw 03 DECEMBER 2012 OvN BY cXO BY SOLICITATION NO CORPS OF ENGINEERS WILMINGTON DISTRICT nc sw1 TED D BY IHENSON FLE NAME 'BD8S20 CATEGORY CODE + CEMS ENGINEERING A�RGH11EC NiL 9ZE D PLOT SCALE PLOT DATE 2 "X34" ABSHOWN 27 NOVEMBER 2012 V7 � � O N A SYMBOL DESCRIPTION I DATE I BY ■v ■ ■ v ■ v 1 N Ix 'o z iw Iti i f m o e m i I m m m N m?� mmmmm 0-ao mo x -t xxxxx O Drn °O N_4 5" L 1 L m -Zi m n � OZ c� Z c� Z O Z O Z z Z� 1A 0 c� r*� D c� c r rn rN�7 m zOZ�3ocnNi O Z Z m ° Z a m< c m;u A; 3= A K r x r W D D ZOZ °v) z ;:u ° c -u m o ;' ov *mz c m K -D mm rn c O m ? m zz W N p m D 1n IT0ITII t0�*rtt�r�?Z1 ��� �<�N D?1 Z '�Vm<GDND X D mm �O�z m �V2rz -tr 3-zim r D ° zo zom9of r � po z� mz� mc� 5Km �m2 -tm?N MOO m mV)=T�2G zg� � c Nmm Z N z� -q m m mAOm 07nCDpm -t r O mOD gm�O �CMZ��tn �mOD�OO oz 0Z m M A om m -< m O q D m m z ° r N m m rMr z a D 2 � D D 2 8600 8 0 980 C3 .ZI m m om 0-0 Z -0ton -0 00 m Om o'A m0 - ;� Z r� r 'm K': 00 <-frZ00 p N O O O (n0 Ha mmDlnG 1 - '�x m D m mm Dm N zm a N x-N-i m m m O_Ix rD �DO N (7 ZFn (n D xWN0 z FA n �p Z z 3Z. O Nz LI))V ° p = ND p� ? VI Z m m D �_ C) Op o 'S ° m ID f o DD O 0 = r p° D O ` m z A m Z° z •1• PATRIOT POINT ROADWAYS m Z m FORT BRAGG, NORTH CAROLINA :� (/)cm-v x —� ;D -'mzm A m R CIVIL SITE PLAN - AEA "H" 1 1 1 J V321V 3NIIH3IVW I II 111 ! 11 1 1 K. V36V 3NIIHZ)IVW l --- - i I i ✓a iI � r I I I' 1 1 i II� j•thE :A I I 1( 1 £l'�£ AN to ! I l ♦ O !Do io I 11 1 I, ♦ II ;o _ 'p im it NI I ,OL'Op f x i I I 1 � II „ I Ir � I � � r I I 1 1 I N I � ♦ l Q ; I I •�I 1 I I I it 1 I 1 r , 1 I?'' NI mI f r I 1 I I ri r �£;•b A 41 II ,50'bZZ NN!, I 11 II 'I Ir 1 00 r I I r r 1 I '00.5tZ 7N1 I' 1 DRAFT SUBMITTAL - NOT FOR CONSTRUCTION O C z SYMBOL DESCRIPTION DATE BY mw mw mF m© DESIGNED BY DATE u S ARMY ENGINEER DISTRICT SLM 03, DECEMBER 2012 DWN Br CKO BY BOLICITATION NO CORPS OF ENGINEERS WILMINGTON DISTRICT JRC Sun TEO SUBMITTED BY CONTRACT NO FILE NAME CATEGORY CODE, Cr S 141 -esz0 SIZED PLOT SCALE PLOT DATE EM1CINEERING LA 22•X34• AS SHOWN 27 NOVEMBER :012 O C z SYMBOL DESCRIPTION DATE BY mw mw mF m©