Loading...
HomeMy WebLinkAbout20201753 Ver 1_More Info Received_20210525 Carpenter,Kristi From:Herndon, T. Mason Sent:Tuesday, May 25, 2021 3:28 PM To:Shaver, Brad ; Patterson, Robert D Cc:Carpenter,Kristi Subject:B-5303 Duplin Bridge 45 Attachments:B-5303 Duplin 45_Permit Drawings_20210524.pdf Follow Up Flag:Follow up Flag Status:Flagged For your records, please see the attached revised permit drawings for B-5303 Duplin Bridge 45 over Island Creek on SR 1162 in Duplin County. This project was assigned DWR # 20201753 (written approval not required) and SAW 2013- 00229 (written approval required). The resident engineer’s office is requesting cofferdams for the construction of the interior bents due to the minimal clearance between the normal water surface level and bottom of the proposed caps and required form work. The addition of cofferdams for the interior bents increased the temporary SW Impacts to 0.044 acres (+0.033 from original impacts). This change in impacts does not change the authorization status of the previous DWR approval. Brad, per our conversation yesterday, this minor change in temporary impacts is covered by the existing NW permit and reissuance is not required. Robert and Brad, would you please respond to this e-mail that you agree with this assessment of the authorizations and that no further actions are required by the Department for this additional temporary impact. Thank you! Mason Herndon Project Development Environmental Engineer Division 3 NCDOT- Division of Highways 910-341-2036 office 910-604-0050 mobile tmherndon@ncdot.gov 5501 Barbados Blvd Castle Hayne, NC 28429 Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties Email correspondence to and from this sender is subject to the N.C. Public Records Law and may be disclosed to third parties. 1