Loading...
HomeMy WebLinkAboutWQ0036580_Application (FTSE)_20130614• , WATF DENR-FRO 0� JUN1�+2013 v DWQ State of North Carolina Department of Environment and Natural Resources Division of Water Quality FAST -TRACK APPLICATION (FTA 12/07 ver5) for GRAVITY SEWERS, PUMP STATIONS, AND FORCE MAINS (Pressure & Vacuum sewer systems are not to be included as part of this application package) INSTRUCTIONS: Indicate that you have included/addressed the following list of required application package items by checking the space provided next to each applicable item. Failure to submit all required items will lead to your application being returned as incomplete. Forms are available from the web site or by calling the Regional Office serving your county: http://portal. ncdenr.ora/web/wq/swp/ps/cs/ext ® A. Application Form - Submit one original and one copy of the completed and appropriately executed application form. The application should include a project narrative describing the final build -out design (i.e. system and/or pump station to ultimately serve 500 homes, but flow for only 100 homes being requested now). For modifications, clearly explain the reason for the modification (i.e. adding another phase, changing line size/length, etc.). Only include the modified information in this permit application - do not duplicate project information that has already been included in the original permit. Any changes to this form will result in the application being returned. The Division of Water Quality (Division) will only accept application packages that have been fully completed with all applicable items addressed. You do not need to submit detailed plans and specifications unless you respond NO to Item B(13). Separate applications should be made for non-contiguous sewer systems. ® B. Application Fee - Submit a check in the amount of $480 made payable to: North Carolina Department of Environment and Natural Resources (NCDENR). Checks shall be dated within 90 days of application submittal. ® C. Certificates of Public Convenience and Necessity — If the application is being submitted in the name of a privately -owned public utility, submit two copies of the Certificate of Public Convenience and Necessity (CPCN) which demonstrates that the public utility is authorized to hold the utility franchise for the area to be served by the sewer extension. If a CPCN has not been issued, provide two copies of a letter from the North Carolina Utilities Commission's Public Staff that states that an application for a franchise has been received, that the service area is contiguous to an existing franchised area, and/or that franchise approval is expected. The project name in the CPCN or letter must match that provided in Item A(2)a of this application. ❑ D. Operational Agreements — Submit one original and two copies of a properly executed operational agreement, as per 15A NCAC 02T .0115, if the application is submitted by a private applicant and will be serving residential or commercial lots (e.g., houses, condominiums, townhomes, outparcels, etc.) that will be sold to another entity. If the applicant is a home or property owner's association, use Form HOA 02/03. If the applicant is a developer, use Form DEV 02/03. EVEN IF THE PROJECT MAY BE TURNED OVER TO A MUNICIPALITY UPON COMPLETION, FORM DEV 02/03 IS REQUIRED. ® E. Downstream Sewer, WWTF Capacity and Flow Tracking/Acceptance — FORM FTSE 10/07 (Flow Tracking/Acceptance for Sewer Extension Permit Applications) is required with every application. The applicant (and owners of downstream sewers, pump stations and/or treatment facilities submitting FORM FTSE-10/07) certifies that the addition of the volume of wastewater to be permitted in this project has been evaluated along the route to the receiving treatment plant, and that the flow from this project will not cause capacity related sanitary sewer overflows or overburden any downstream pump station en route to the receiving wastewater treatment plant. Where the applicant is not the owner of the downstream sewer, submit two copies of FORM FTSE 10/07 from the owner of the downstream sewer and owner of the WWTF, if different. The flow acceptance indicated in FORM FTSE-10/07 must not expire prior to permit issuance and must be dated less than one year prior to the application date. Submittal of this application and FORM FTSE-10/07 indicates that owner has adequate capacity and will not violate G.S. 143-215.67(a). Intergovernmental agreements or other contracts will not be accepted in lieu of project -specific FTSE 10/07. • F Maps — Include a street level map showing the downstream connection point, and the permit number for the downstream sewer, if known. Submit an 8.5-inch by 11-inch COLOR copy of a USGS Topographic Map of sufficient scale to identify the entire project area and the closest surface waters. Each map or maps must show the location of the sewer line and pump stations and be of reproducible quality. FTA1 2/07 ❑ G. Stream Classifications — Watershed Classification Attachment (Form WSCAS-12/07) If any portion of the sewer system project is within 100 feet of any surface water or wetlands, the Watershed Classification Attachment may need to be completed. A variance must be requested for encroachment within required setbacks or buffers pursuant to 2T .0305 (f) and be indicated in Item B-13 with supporting documentation/justification provided. ❑ H Environmental Assessments — If this project is subject to an Environmental Assessment (EA) [15A NCAC 01 C], this application cannot be used. Send the project application on the most current version of Form PSFMGSA to the Design Management Unit, 1633 Mail Service Center, Raleigh, NC 27699-1633. Applications cannot be accepted until a Finding of No Significant Impact (FONSI) or Environmental Impact Statement (EIS) has been issued. A copy is to be submitted with that permit application. ❑ I. Flow Direction — Many wastewater treatment systems are entering into agreements for regionalization efforts and emergency treatment capacity. Parts of the system are installed so that the wastewater flow can be directed to more than one treatment facility. If this is the case with this project, please indicate in B(12) and give the permit number of the second treatment facility. ® J. Certifications — Section C The application must be certified by both the applicant and the design engineer who is a North Carolina Registered Professional Engineer (PE). The applicant signature must match the signing official listed in Item A(1 b). The PE should NOT certify the application if he/she is unfamiliar with 15A NCAC Chapter 2T, the Gravity Sewer Minimum Design Criteria (most recent version) and the Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and Force Mains (most recent version), as applicable to the project. THE COMPLETED FTA 12/07 APPLICATION PACKAGE, INCLUDING ALL SUPPORTING DOCUMENTS AND $480 FEE, SHOULD BE SENT TO THE APPROPRIATE REGIONAL OFFICE: REGIONAL OFFICE ADDRESS COUNTIES SERVED Asheville Regional Office 2090 US Highway 70 Swannanoa, North Carolina 28778 (828) 296-4500 (828) 299-7043 Fax Avery, Buncombe, Burke, Caldwell, Cherokee, Clay, Graham, Haywood, Henderson, Jackson, Macon, Madison, McDowell, Mitchell, Polk, Rutherford, Swain, Transylvania, Yancey Fayetteville Regional Office 225 Green Street Suite 714 Fayetteville, North Carolina 28301-5094 (910) 433-3300 (910) 486-0707 Fax Anson, Bladen, Cumberland, Harnett, Hoke, Montgomery, Moore, Robeson, Richmond, Sampson, Scotland Mooresville Regional Office 610 E. Center Avenue Mooresville, North Carolina 28115 (704) 663-1699 (704) 663-6040 Fax Alexander, Cabarrus, Catawba, Cleveland, Gaston, Iredell, Lincoln, Mecklenburg, Rowan, Stanly, Union Raleigh Regional Office 1628 Mail Service Center Raleigh, North Carolina 27699-1628 (919) 791-4200 (919) 788-7159 Fax Chatham, Durham, Edgecombe, Franklin, Granville, Halifax, Johnston, Lee, Nash, Northampton, Orange, Person, Vance, Wake, Warren, Wilson Washington Regional Office 943 Washington Square Mall Washington, North Carolina 27889 (252) 946-6481 (252) 975-3716 Fax Beaufort, Bertie, Camden, Chowan, Craven, Currituck, Dare, Gates, Greene, Hertford, Hyde, Jones, Lenoir, Martin, Pamlico, Pasquotank, Perquimans, Pitt, Tyrrell, Washington, Wayne Wilmington Regional Office 127 Cardinal Drive Extension Wilmington, North Carolina 28405 (910) 796-7215 (910) 350-2004 Fax Brunswick, Carteret, Columbus, Duplin, New Hanover, Onslow, Pender Winston-Salem Regional Office 585 Waughtown Street Winston-Salem, North Carolina 27107 (336) 771-5000 (336) 771-4630 Fax Alamance, Alleghany, Ashe, Caswell, Davidson, Davie, Forsyth, Guilford, Rockingham, Randolph, Stokes, Surry, Watauga, Wilkes, Yadkin For more information, please visit our web site at: http://portal. ncdenr. or4/web/wo/s wp/ps/cs or contact the Regional Office serving your county. FTA 12/07 USE THE TAB KEY TO MOVE FROM FIELD TO FIELD! Application Number: i , , ^ (to be completed by DWQ) �{J (X(7 3 S 1. Owner/Permittee: 1 a. Campbell University Full Legal Name (company, municipality, HOA, utility, etc.) 0 1 b. James O. Roberts, VP for Business and Treasurer Signing Official Name and Title (Please review 15A NCAC 2T .0106 (b) for authorized signing officials!) lc. The legal entity who will own this system is: IIIndividual ■ Federal • Municipality • State/County IIPrivate Partnership ►4 Corporation • Other (specify): 0 Q ld. P.O. Box 897 1 e. Buies Creek LL Mailing Address City Z 1 f. NC lg. 27506 Z State Zip Code 1 h. 910-893-1611 1 i. 910-890-1574 1j. dmartin@campbell.edu QTelephone Facsimile E-mail o 2. Project (Facility) Information: 2a. Campbell University Stadium Expansion 2b. Harnett d Brief Project Name (permit will refer to this name) County Where Project is Located d Q 3. Contact Person: Q 3a. Fred Rash, PE, The Wooten Company Name and Affiliation of Someone Who Can Answer Questions About this Application 3b. 9109-828-0531 3c. frash@thewootencompany.com Phone Number E-mail 1. Project is New • Modification (of an existing permit) If Modification, Permit No.: 2. Owner is • Public (skip to Item B(3)) ►il Private (go to Item 2(a)) 2a. If private, applicant will be: 2b. If sold facilities owned by a (must choose one) ►� Retaining Ownership (i.e. store, church, single office, etc.) or • Public Utility (Instruction C) • Leasing units (lots, townhomes, etc. - skip to Item B(3)) ■ Homeowner Assoc./Developer (Instruction D) • Selling units (lots, townhomes, etc. - go to Item B(2b)) 3. Harnett County Z Owner of Wastewater Treatment Facility (WWTF) Treating Wastewater From This Project O 4a. North Harnett WWTP 4b. NC0021636 i— Q Name of WWTF WWTF Permit No. 2 5a. Harnett County 5b. 8" L Gravity 5c. WQ0028647 CC Owner of Downstream Sewer u. 6. The origin of this wastewater is Receiving Sewer Size (check all that apply): ■ Force Main Permit # of Downstream Sewer (Instruction E) Z IIIResidential Subdivision MIRetail 100 % Domestic/Commercial I— 2 ■ Apartments/Condominiums (Stores, shopping centers) ■Institution 0 % Industrial (attach • Mobile Home Park CC W • School a ■ Restaurant IN Office ■Hospital • Church • Nursing Home ►i4 Other (specify): Stadium description.) (RO: contact your Regional Office Pretreatment staff) m % Other (specify): 7. Volume of wastewater to be allocated or permitted for this particular project: 25.000 gallons per day *Do not include future flows or previously permitted allocations 8. If the permitted flow is zero, indicate why: • Pump Station, Outfall or Interceptor Line where flow will be permitted in subsequent permits that connect to this line ■ Flow has already been allocated in Permit No. ■ Rehabilitation or replacement of existing sewer with no new flow expected (see 15A NCAC 02T .0303 to determine if a permit is required) FTA 12/07 . Provide the wastewater flow calculations used in determining the permitted flow in accordance with 15A NCAC 2T .0114 for the value in Item B(7) AND/OR the design flow for line or pump station sizing if a reduced or zero flow is being requested in Item B(7). Values other than that in 15A NCAC 2T .0114 (b) and (c) must be supported with actual water or wastewater use data in accordance with 15A NCAC 2T .0114 (f). 5,000 seat stadium X 5 gallons per seat -day = 25,000 Gallons Per Day. ***NOTE: flow will be conveyed through private sewer and tie in to the public sewer at an existing manhole. 10. Summary of Sewer Lines to be Permitted (attach additional sheets if necessary) (See *** NOTE in section 9 above) Size (inches) 8 Length (feet) 226 (Private only) New Gravity or Additional Force Main Gravity (Private) 11. Summary of Pump Stations w/ associated Force Mains to be Permitted (attach additional sheets as necessary) W ZPump Station Location ID N/A (self chosen - as shown on plans/map for Design Flow Z Operational Point (MGD) GPM @TDH 0 0 Power Reliability Option 1 - permanent generator w/ATS; Force Main Size Force Main Length 2 - portable generator w/MTS Z 0 QPump Station Location ID (self chosen - as shown on plans/map for reference) Design Flow Operational Point Power Reliability Option (MGD) GPM @TDH1 - permanent generator w/ATS; Force Main Size Force Main Length 2 - portable generator w/MTS LL H C W O. 00 12. Will the wastewater flow in the proposed sewer lines or pump stations be able to be directed to another treatment facility? ❑ Yes ® No If Yes, permit number of 2nd treatment facility (RO — if "yes" to B,12 please contact the Central Office PERCS Unit) 13. Does the sewer system comply with the Minimum Design Criteria for the Fast Track Permitting of Pump Stations and Force Mains (latest version), the Gravity Sewer Minimum Design Criteria (latest version) and 15A NCAC Chapter 2T as applicable? ® Yes ❑ No If No, please reference the pertinent minimum design criteria or regulation and indicate why a variance is requested. SUBMIT TWO COPIES OF PLANS, SPECIFICATIONS OR CALCULATIONS PERTINENT TO THE VARIANCE WITH YOUR APPLICATION FTA 12/07 14. Have the following permits/certifications been submitted for approval for the system or project to be served? Wetland/Stream Crossings - General Permit or 401 Certification? Sedimentation and Erosion Control Plan? Stormwater? ❑ Yes ❑ No ZYes ❑No ❑ Yes ❑ No ® N/A ❑ N/A ® N/A 15. Does this project include any high priority lines, [see 15A NCAC 02T .0402 (2)] involve aerial lines, siphons, or interference manholes)? These lines will be considered high priority and must be checked once every six months Check if Yes: ❑ and provide details Owner/Permittee's Certification: (Signature of Signing Official and Project Name) 1, James O. Roberts , attest that this application for Campbell Football University Stadium Expansion has been reviewed by me and is accurate and complete to the best of my knowledge. I understand that if all required parts of this application are not completed and that if all required supporting documentation and attachments are not included, this application package is subject to being returned as incomplete. Note: In accordance with North Carolina General Statutes 143-215.6A and 143-215.68, any person who knowingly makes any false statement, representation, or certification in any application shall be guilty of a Class 2 misdemeanor, which may include a fine not to exceed $10,000 as well as civil penalties up to $25,000 per violation. ,�� 1 a. vi(l�/MA, t R g Official Signature Date ENGINEERING DESIGN DOCUMENTS MUST BE COMPLETED PRIOR TO SUBMITTAL OF THIS APPLICATION. THESE DOCUMENTS MUST INCLUDE PLAN AND PROFILE OF SEWERS, THEIR PROXIMITY N TO OTHER UTILITIES, DESIGN CALCULATIONS. ETC. REFER TO 15A NCAC 02T .0305 Z O Q2. Professional Engineer's Certification: (Signature of Design Engineer and Project Name) - 1, Frederic D. Rash , attest that this application for Campbell Football University Stadium Expansion LL has been reviewed by me and is accurate, complete and consistent with the information in the engineering plans, - calculations, and all other supporting documentation to the best of my knowledge. I further attest that to the best of my CC knowledge the proposed design has been prepared in accordance with the applicable regulations, Gravity Sewer Minimum W Design Criteria for Gravity Sewers adopted February 12, 1996, and the Minimum Design Criteria for the Fast -Track (,) Permitting of Pump Stations and Force Mains adopted June 1, 2000 and the watershed classification in accordance with Division guidance. Although other professionals may have developed certain portions of this submittal package, inclusion of these materials under my signature and seal signifies that I have reviewed this material and have judged it to be consistent with the proposed design. Note: In accordance with NC General Statutes 143-215.6A and 143-215.68, any person who knowingly makes any false statement, representation, or certification in any application shall be guilty of a Class 2 misdemeanor which may include a fine not to exceed $10,000 as well as civil penalties up to $25,000 per violation. 2a. Frederic D. Rash Professional Engineer Name 2b. The Wooten Company Engineering Firm 2c. 120 North Boylan Ave. Mailing Address 2d. Raleigh City 2g. 919-828-0531 2h. 919-834-3589 2e. NC 2f. 27603 State Zip 2i. frash@thewootencompany.com Telephone Facsimile E-mail taaaaoaay00 N A ' C • I t4 SEAL -79 s Z -n 9691.3 Iv - c•-•[°� G,NGv• FTA12/07 State of North Carolina Department of Environment and Natural Resources Division of Water Quality Flow Tracking/Acceptance for Sewer Extension Permit Applications (FTSE —10/07) Project Applicant Name: Campbell University Project Name for which flow is being requested: Campbell University Football Stadium Expansion More than one FTSE-10/07 may be required for a single project if the owner of the WWTP is not responsible for all pump stations along the route of the proposed wastewater flow. I. Complete this section only if you are the owner of the wastewater treatment plant. a. WWTP Facility Name: _North Harnett Regional WWTP b. WWTP Facility Permit #: NC0021636 c. WWTP facility's permitted flow Fuquay Varina Allocated Flow Lillington Allocated Flow Harnett County Angier Allocated Flow d. Estimated obligated flow not yet tributary to the WWTP FV Obligated Flow NYT Lillington Obligated Flow NYT HC Obligated Flow NYT Angier Obligated Flow NYT Erwin Obligated Flow NYT e. WWTP facility's actual avg. flow FV Actual Flow Lillington Actual Flow HC Actual Flow Angier Actual Flow Erwin Actual Flow f. Total flow for this specific request g. Total actual and obligated flows to the facility FV Actual Avg. + Obligated Flow Lillington Actual Avg. + Obligated Flow HC Actual Avg. + Obligated Flow + Request Angier Actual + Obligated Flow Erwin Actual Avg. + Obligated NYT h. Percent of permitted flow used Fuquay Varina - (1.413207 MGD / 2.6 MGD) Lillington — (0.772800 MGD / 1.2 MGD) HCDPU - (0. 8142500 MGD / 1.8 MGD) 5.6 MGD 2.60 MGD 1.20 MGD 1.80 MGD 1.008 MGD 1.068 MGD 0.584207 MGD 0.163800 MGD 0.180510 MGD 0.050950 MGD 0.092900 MGD 3.230 MGD 0.974 MGD 0.609 MGD 0.637 MGD 0.440 MGD 0.570 MGD 0.025 MGD 4.323 MGD 1.413207 MGD 0.772800 MGD 0.842500 MGD 0.490950 MGD 0.662880 MGD 77.19% (Overall) 54.35% 64.40% 45.23% Angier — (0.490950 MGD/ 1.008 MGD) Erwin — (0.662880 MGD/ 1.2 MGD) 48.70% 55.24% *Erwin Flow is now tributary to NHR WWTP flows were averaged for this calendar year. II. Complete this section for each pump station you are responsible for along the route of this proposed wastewater flow. List pump stations located between the project connection point and the WWTP Pump Station Name Approx. Capacity, MGD HCDPU SLS # 10B HCDPU Regional SLS # 120 Approx. Current Avg. (Firm/Design) Daily Flow MGD 2.6MGD 13.0 MGD 0.321 MGD 1.957 MGD III. Certification Statement: I, _Steve Ward — Director of Public Utilities_, certify that the addition of the volume of wastewater to be permitted in this project has been evaluated along the route to the receiving wastewater treatment facility and that the flow from this project will not cause any capacity related sanitary sewer overflows or overburden any downstream pump station en route to the receiving treatment plant. This certification applies to those items listed above in Sections I and II for which I am the responsible a y. Signature of this form indicates acceptance of this wastewater flow. Signing Official Signature Date CAMPBELL UNIVERSITY — FOOTBALL STADIUM EXPANSION Buies Creek, North Carolina Context and General Information: This application has been prepared for a North Carolina Department of Environment and Natural Resources — Division of Water Quality Fast Track Application for Gravity Sewer. The following narrative is being provided to assist staff at DWQ with review the subject project, "Campbell University - Football Stadium Expansion," for the requested Permit. The Project is located on 77.4 acres of property located along Wade Stewart Circle and US Hwy 421 South at approximate Latitude: 35°24'17"N; Longitude 78°44'35"W with access via Wade Stewart Circle and Perry Q. Langston Lane. Buies Creek is located approximately 1,100 feet west of the project site. The project site ultimately drains toward Buies Creek via overland flow; but there are no tributaries onsite that drain directly to Buies Creek and no stream impacts are proposed. No wetlands impacts are proposed. Harnett County owns and maintains an 8-inch gravity sewer on the property adjacent to the project site. Proposed Site The Project consists of a new 5,000 seat stadium on the home side (west) of the existing synthetic turf field. In addition to bleachers, the project includes a press -box tower with areas for coaches, Officials, VIP, and broadcast radio and television crews; restroom facilities located on the concourse area under the bleachers; and paved parking lot located adjacent and behind the new stadium improvements. Wastewater flows from the project will be collected into private gravity sewer at the new stadium and will be discharged into the existing 8-inch gravity sewer publicly owned and maintained by Harnett County. No public sewer is being proposed with this project. Proposed Stadium Project Area Go.g1e earth feet meters bel Ur ve-s'y B,. t:S C:•eeK NC 27546, USA 2000 600 25: "21 "20 182 500 METERS "19 '18 "17 35 ° 22'30" 78045' 1632 500 METERS r``r. i I v • � • Ifs _ � •� .• *11°1+ BM 21,3 IkCI..I. ;, � � ;- ,� , ,.„,f_... 4 I( ark 1,1 ( . - -��� �V � , ,.._ .. • }9 - Hills _ � `�7 � ...,...... ' Derrt„ •, i 1,tee_ a ' >r� ; — : ties _ �f•eek �' i 'A ) > ( . / - f 2 n . a Cem' ear ) • • ' ' I(( • f k 2003 )-''‘'\ ��(�(�y •'• % 34 6,, Cem .' (( li y ( (� `�ri`1���� � O� •`%. � . Duchess . 111 Uni. •: 1��) ( oo `. ewaae Disposal - ,lwTUA - \ag'_ ;6( \ ( 4 •\( _ f - y / $-� _1. � --/-.. -^-%�s _[� �� ' , ••••-:. , /93 {" \. r —�; a i1t . .- e ■ i;T•� \ 1 rp ; \ '. Bud l '' \ ) 0- • (( '-r,15-- % )` ( -j2_-1• \ 'T II • • r E\ } -. , n`— '�' + � .:.›��� (�. 1�i .v1��� V -' i O ii \ rr % rd. HarnettC�wty' � Air00 yill A r i� 1 1 _ • • �� ° I. 11, ( I,J/ylr •j ' .'' «': n ;� ravel Pit / ii y 198-_ ..•.�` = �11 :. n/' h Q�' -�-ram--� .,��r -• .r-. ( 1, - \ \ 1 �._.q� p 1 act' �� NI II ��rJ ., ''f « I �I II ��/ .1 II v �; �, j/,, j1.�T i ,-� _ . , 06 Produced by the United States Geological Survey in cooperation with the North Carolina Department of Environment and Natural Resources Topography compiled by photogrammetric methods from aerial photographs taken 1972. Planimetry derived from imagery taken 1997 and other sources. Survey control current as of 1973 North American Datum of 1983 (NAD 83). Projection and 1 000-meter grid: Universal Transverse Mercator, zone 17 2 500-meter ticks: North Carolina Coordinate System of 1983 North American Datum of 1927 (NAD 27) is shown by dashed comer ticks. The values of the shift between NAD 83 and NAD 27 for 7.5-minute intersections are obtainable from National Geodetic Survey NADCON software Landmark buildings verified 1973 Dashed elliptical outline represents Carolina Bay 07 814° 151 MILS 1°20' 24 MILS UTM GRID AND 2000 MAGNETIC NORTH DECLINATION AT CENTER OF SHEET '08 42'30• 1000 1000 0 � 20% tot TOTAI. RECOVERED FIRER 35° 22'30" 78°45'00* This map was compiled by U.S. Department of Agriculture, Soil Conservation Service and cooperating agencies on 1973 and 1976 photography obtained from U.S. Department of Interior, Geological Survey. 5000 4000 3000 i N 1 11, 112'16191,11111 T SAVOR PLUG 97,11.116.41 11151101.e. 0.791.11 MI RIM 0.1111.64.0 105.1.1.1. .1.610.6 0 110, OMR 5 W. COW. 51131114111..1411 STA 11.61 0/1 111.6 as, m-ln.on R1113.14,11916 VBIBIT1.001TION GENERAL UTILITY NOTES 11.1. Con.. .99,99,6 1 Sawa. Led E. nu V. uer µam. anonon Lo Ins POE Woo 12 All .1. Stoo Woo mod Sawa Lo lue PVC LIOas °Boom No. BEL Vs LEW (LT WM/ • . 119.01 1.12. SPAM, r TAM MARV. P/1/1166 —111.166.11111! ITMOVERIROUT R011.111111.11169.1/511.1.01TO wow maw r ant IT WO OBE. FAO BRUKT11,10.0.101911., MS. MM. II260 1411,1111TCY SWAIM REF SoRINORAO) f)c N6(.1 c-- 6 rzA-kt rti feNvel3- 11.1.111.1.1. 1.17.11.1:110, mor.ors,E., Appro,ed It Ems Calmar Poe Leo Br 2ilIC1114 111 1./141[1 oil IxP22 4n mous (1.111910 Spcnk Prponneenn 17 MI PootoaStoor 41•11 be enema -"num. It AO Ea.. 1141110 t F11,4,111 le Lion a itepooa Mom onun. Qom.. WIND .11R CAW tr Qv 6 . 102 CI WNW • 'V /0 9 *ma mewl uomes 1910.51111109601031.61.1[ /111101.. ma nurpmerr '0.11.1.6.5.3.1114.4 ‘1611.0,11.03110111.16 /5,411 EWER_OliallETIIRES GC) La./ LP. Ore PK • nooL ap .11:f1j.rn6 •Loon,LOIrPoc•Erow CD Ern/ 111110601.1.T.C.012.1061,2.1.1.1.11. JO 411. OE 1 1 To§1 s CAMPBELL FOOTBALL CONSTRUCTION SET 0111113 ROBERT BIBROP.. "sghn''T"wrasruk. 1.7r11- CAMPBELL FOOTBALI STAIN. EXPANS1ON 514983.00 UTILITY PUN C103 tiverron 4,440.0 r/b/w*•It:nreOlrers:HN-nulacmly«v1w-IIw.H.r.} 3l[JOild N3M3S WUOLS N ISSUED FOR CONSTRUCTION TV [HE WOOTEN COMPANY Belinda Henson Regional Supervisor Surface Water Protection Section Fayetteville Regional Office 225 Green Street, Suite 714 Fayetteville, NC 28301 TRANSMITTAL DENR-FRO JUN 1 4 2013 DwQ Transmittal Sent Via: ❑ Regular Mail ❑ FedEx ® UPS ❑ Certified Mail ❑ Courier 0 Pick-up ❑ Electronic DATE: June 12, 2013 TWC No.: 3044-G RE: Campbell University Stadium Expansion - Gravity Sewer Fast Track Application WE ARE SENDING: ® Attached ❑ Under separate cover via the following items: ❑ Shop Drawings ❑ Prints ❑ Plans ❑ Samples ❑ Specifications ❑ Copy of Letter ❑ Change Order ❑ Other COPIES DATE NO. DESCRIPTION 1 Original Fast Track Application for Gravity Sewers 1 Copy of Fast Track Application for Gravity Sewers 1 Check in amount of $480.00 for Application Fee THESE ARE TRANSMITTED as checked below: ❑ For Approval ❑ Reviewed ❑ Revise and Resubmit ❑ For Your Use ❑ Rejected ❑ Submit Copies for Distribution ❑ As Requested ❑ Corrected ❑ Return Corrected Print ❑ For Review and Comment ❑ Other: ❑ For Bids Due [ ] ❑ REMARKS: COPY TO: File SIGNED: Project Engineer If enclosures are not as noted, kindly notify us at once. . (JENR-FI USE THE TAB KEY TO MOVE FROM FIELD TO FIELD! Application Number: (to be completed by DWQ) JUN 1 4 201 1. Owner/Permittee: 1 a. Campbell University ��]� Full Legal Name (company, municipality, HOA, utility, etc.) WYw Z O 1b. James O. Roberts, VP for Business and Treasurer Signing Official Name and Title (Please review 15A NCAC 2T .0106 (b) for authorized signing officials!) lc. The legal entity who will own this system is: • Individual ■ Federal ■ Municipality ■ State/County • Private Partnership Corporation • Other (specify): cc 0 ld. P.O. Box 897 le. Buies Creek LL Mailing Address City Z 1 f. NC 1 g. 27506 Z State Zip Code 0 lh. 910-893-1611 1 i. 910-890-1574 1 j. dmartin@campbell.edu QTelephone Facsimile E-mail o 2. Project (Facility) Information: J 2a. Campbell University Stadium Expansion 2b. Harnett 0- Brief Project Name (permit will refer to this name) County Where Project is Located d a 3. Contact Person: Q 3a. Fred Rash, PE, The Wooten Company Name and Affiliation of Someone Who Can Answer Questions About this Application 3b. 9109-828-0531 3c. frash@thewootencompany.com Phone Number E-mail 1. Project is ►i New ■ Modification (of an existing permit) If Modification, Permit No.: 2. Owner is ■ Public (skip to Item B(3)) ►X1 Private (go to Item 2(a)) 2a. If private, applicant will be: 2b. If sold, facilities owned by a (must choose one) ►� Retaining Ownership (i.e. store, church, single office, etc.) or ■ Public Utility (Instruction C) • Leasing units (lots, townhomes, etc. - skip to Item B(3)) ■ Homeowner Assoc./Developer (Instruction D) • Selling units (lots, townhomes, etc. - go to Item B(2b)) 3. Harnett County Z Owner of Wastewater Treatment Facili+"i' " '' ' — 0 • - JERRY M WALLACE , PRESIDENT BBC 66-112/531 ;AMPBELL P.O.BOX 97 DATE 0082910 N I V E R S I T Y BUIES CREEK, NC 27506 05/01/13 , CHECK NO nowyr PAY -THE FOUR HUNDRED EIGHTY AND 00/100 DOLLARS SUM OF PAY TO THE ORDER OF NCDENR 1634 Mail Service Center Raleigh NC 27699-1634 ********480.00 CAMPBELL UNIVERSITY • 9„, zo.tekta- FTA 12/07 ~ Central pileu�APa__ sWp__ 06/20/13 ��nn^���mnbar WQ0036580 Permit Tracking Slip Program Category Non-discharge Active New Project Status Project Type Permit Type 'n°� 'y � Version Permit Classification Gravity Sewer Extension, Pump Stations, & Pressure Sewer 1.00 Individual Extensions Primary Reviewer Permit Contact Affiliation Coastal SW Rule Permitted Flow 25000 Facility Facility Name Campbell University Stadium Expansion Location Address �wner Major/Minor Region Minor Fayetteville County Harnett Facility Contact Affiliation Owner Name Campbell University Inc 0a1os/Events Owner Type Non -Government Owner Affiliation James O.Roberts P0Box 807 Buies Creek NC 27506 oriuusue OO/2013 06/14/13 AppRp:eivod Draft Initiated Sohoouwu mnuunro Public Notice |nouo Effective Expiration 06/20V13 08/20/13 RoSw)atedAudvihms Reqvesrrd/RecmvodEven|u Wastewater collection Additional information requested Additional information received Ou�sU ^ Waterbody Name Stream Index Number Current Class Subbasin