HomeMy WebLinkAbout20021626 Ver 1_Other Agency Comments_20130318Permit Class Permit Number
3'd RENEWAL 160 -02
STATE OF NORTH CAROLINA
Department of Environment and Natural Resources
and
Coastal Resources Commission
Vermit
for
X Major Development in an Area of
pursuant to NCGS 113A -118
Excavation and/or filling pursuant to NCGS 113 -229
MAR 1 8 2013
Issued to Forest by the Sea Homeowners/Lagoon Boatowners Assoc., Inc., 1200 St. Joseph St. #75, Carolina Beach, NC 28428
Authorizing development in New Hanover County at adi. to Carolina Beach Yacht Basin, 1200
St. Joseph St., Carolina Beach as requested in the permittee's letter dated 12/17/12
This permit, issued on March 4. 2013 , is subject to compliance with the application (where consistent
with the permit), all applicable regulations, special conditions and notes set forth below. Any violation of these terms may
be subject to fines, imprisonment or civil action; or may cause the permit to be null and void.
1) This renewal shall be attached to the original Permit No. 160 -02, which was issued on 12/10/02, as well
as all subsequent renewals and modifications, and copies of all documents shall be readily available on
site when Division personnel inspect the project for compliance.
2) All conditions and stipulations of the active permit remain in force under this renewal.
This permit action may be appealed by the permittee or Signed by the authority of the Secretary of DENR and the
other qualified persons within twenty (20) days of the issuing Chairman of the Coastal Resources Commission.
date. An appeal requires resolution prior to work initiation or
continuance as the case may be.
This permit must be accessible on -site to Department
personnel when the project is inspected for compliance.
Any maintenance work or project modification not covered
hereunder requires further Division approval.
All work must cease when the permit expires on
December 31, 2014
v
Braxt C. Davis, Director
Division of Coastal Management
This permit and its conditions are hereby accepted.
In issuing this permit, the State of North Carolina agrees
that your project is consistent with the North Carolina Coastal
Management Program. Signature of Permittee