Loading...
HomeMy WebLinkAbout20191242 Ver 2_USACE SAW-2019-02106 NWP29 verification_20210524U.S. ARMY CORPS OF ENGINEERS WILMINGTON DISTRICT Action Id. SAW-2019-02106 County: Wake U.S.G.S. Quad: NC-Fuquay-Varina GENERAL PERMIT (REGIONAL AND NATIONWIDE) VERIFICATION Permittee: Greg Bagley Address: 805 Cokesbury Road Fuquay Varina, NC 27526 Telephone Number: 919-609-0300 E-mail: gdb.greg@gmail.com Size (acres) 6.5 Nearest Town Fuquay-Varina Nearest Waterway Basal Creek River Basin Cape Fear USGS HUC 03030004 Coordinates Latitude: 35.5845 Longitude: -78.8127 Location description: The project site is approximately 6.5 acres located adjacent to Coley Farm Rd., near the town of Fuquay Varina, Wake County, North Carolina. Description of projects area and activity: This permit verification allows for 0.23 acre of permanent wetland impacts and 140 linear feet of permanent stream channel impacts from fill for the construction of the Summerdale II residential subdivision. Mitigation is required for this proposal. Applicable Law(s): Section 404 (Clean Water Act, 33 USC 1344) Section 10 (Rivers and Harbors Act, 33 USC 403) Authorization: NWP 29. Residential Developments SEE ATTACHED NWP GENERAL, REGIONAL, AND/OR SPECIAL CONDITIONS Your work is authorized by the above referenced permit provided it is accomplished in strict accordance with the enclosed Conditions, your application signed and dated 9/16/2019, request additional information dated 12/5/2019 and the enclosed plans entitled Summerdale II dated 9/16/2019. Any violation of the attached conditions or deviation from your submitted plans may subject the permittee to a stop work order, a restoration order, a Class I administrative penalty, and/or appropriate legal action. This verification will remain valid until the expiration date identified below unless the nationwide authorization is modified, suspended or revoked. If, prior to the expiration date identified below, the nationwide permit authorization is reissued and/or modified, this verification will remain valid until the expiration date identified below, provided it complies with all requirements of the modified nationwide permit. If the nationwide permit authorization expires or is suspended, revoked, or is modified, such that the activity would no longer comply with the terms and conditions of the nationwide permit, activities which have commenced (i.e., are under construction) or are under contract to commence in reliance upon the nationwide permit, will remain authorized provided the activity is completed within twelve months of the date of the nationwide permit’s expiration, modification or revocation, unless discretionary authority has been exercised on a case-by-case basis to modify, suspend or revoke the authorization. Activities subject to Section 404 (as indicated above) may also require an individual Section 401 Water Quality Certification. You should contact the NC Division of Water Resources (telephone 919-807-6300) to determine Section 401 requirements. For activities occurring within the twenty coastal counties subject to regulation under the Coastal Area Management Act (CAMA), prior to beginning work you must contact the N.C. Division of Coastal Management Morehead City, NC, at (252) 808-2808. This Department of the Army verification does not relieve the permittee of the responsibility to obtain any other required Federal, State or local approvals/permits. If there are any questions regarding this verification, any of the conditions of the Permit, or the Corps of Engineers regulatory program, please contact James Lastinger at 919-554-4884 ext 32or James.C.Lastinger@usace.army.mil. Corps Regulatory Official: _____________________________________________________Date: 1/29/2020 Expiration Date of Verification: 03/18/2022 The Wilmington District is committed to providing the highest level of support to the public. To help us ensure we continue to do so, please complete the Customer Satisfaction Survey located at http://corpsmapu.usace.army.mil/cm_apex/f?p=136:4:0 Copy furnished: Agent: Hal Owen and Associates, Inc. Krissina Newcomb Address: PO Box 400 Lillington, NC 27546 Telephone Number: 910-893-87-43 E-mail: Krissina@Halowensoil.com Property Owner: Prime 1 Builders Lee Balance Address: 2209 Hamrick Dr. Raleigh, NC 27616 Telephone Number: 919-616-7533 E-mail: ball4246@bellsouth.net SAW-2019-02106 SPECIAL CONDITIONS a. In order to compensate for impacts associated with this permit, mitigation shall be provided in accordance with the provisions outlined on the most recent version of the attached Compensatory Mitigation Responsibility Transfer Form. The requirements of this form, including any special conditions listed on this form, are hereby incorporated as special conditions of this permit authorization. Action ID Number: SAW-2019-02106 County: Wake Permittee: Greg Bagley Project Name: Summerdale II subdivision Date Verification Issued: 1/29/2020 Project Manager: James Lastinger Upon completion of the activity authorized by this permit and any mitigation required by the permit, sign this certification and return it to the following address: US ARMY CORPS OF ENGINEERS WILMINGTON DISTRICT Attn: James Lastinger Raleigh Regulatory Office U.S Army Corps of Engineers 3331 Heritage Trade Drive, Suite 105 Wake Forest, North Carolina 27587 or James.C.Lastinger@usace.army.mil Please note that your permitted activity is subject to a compliance inspection by a U. S. Army Corps of Engineers representative. Failure to comply with any terms or conditions of this authorization may result in the Corps suspending, modifying or revoking the authorization and/or issuing a Class I administrative penalty, or initiating other appropriate legal action. I hereby certify that the work authorized by the above referenced permit has been completed in accordance with the terms and condition of the said permit, and required mitigation was completed in accordance with the permit conditions. _______________________________________ ______________________ Signature of Permittee Date Compensatory Mitigation Responsibility Transfer Form    Permittee: Greg Bagley Action ID: SAW‐2019‐02106 Project Name: Summerdale II subdivision County: Wake       Instructions to Permittee: The Permittee must provide a copy of this form to the Mitigation Sponsor, either an approved  Mitigation Bank or the North Carolina Division of Mitigation Services (NCDMS), who will then sign the form to verify the  transfer of the mitigation responsibility.  Once the Sponsor has signed this form, it is the Permittee’s responsibility to ensure  that to the U.S. Army Corps of Engineers (USACE) Project Manager identified on page two is in receipt of a signed copy of this  form before conducting authorized impacts, unless otherwise specified below.  If more than one mitigation Sponsor will be  used to provide the mitigation associated with the permit, or if the impacts and/or the mitigation will occur in more than one  8‐digit Hydrologic Unit Code (HUC), multiple forms will be attached to the permit, and the separate forms for each Sponsor  and/or HUC must be provided to the appropriate mitigation Sponsors.    Instructions to Sponsor: The Sponsor must verify that the mitigation requirements (credits) shown below are available at the  identified site.  By signing below, the Sponsor is accepting full responsibility for the identified mitigation, regardless of  whether or not they have received payment from the Permittee.  Once the form is signed, the Sponsor must update the bank  ledger and provide a copy of the signed form and the updated bank ledger to the Permittee, the USACE Project Manager, and  the Wilmington District Mitigation Office (see contact information on page 2).  The Sponsor must also comply with all  reporting requirements established in their authorizing instrument.    Permitted Impacts and Compensatory Mitigation Requirements:  Permitted Impacts Requiring Mitigation* 8‐digit HUC and Basin: 03030004, Cape Fear River Basin  Stream Impacts (linear feet) Wetland Impacts (acres)  Warm Cool Cold Riparian Riverine Riparian Non‐Riverine Non‐Riparian Coastal       0.23    *If more than one mitigation sponsor will be used for the permit, only include impacts to be mitigated by this sponsor.    Compensatory Mitigation Requirements: 8‐digit HUC and Basin: 03030004, Cape Fear River Basin  Stream Mitigation (credits) Wetland Mitigation (credits)  Warm Cool Cold Riparian Riverine Riparian Non‐Riverine Non‐Riparian Coastal      0.46      Mitigation Site Debited: Daniel’s Creek Umbrella Mitigation bank   (List the name of the bank to be debited. For umbrella banks, also list the specific site.  For NCDMS, list NCDMS.  If the NCDMS  acceptance letter identifies a specific site, also list the specific site to be debited).    Section to be completed by the Mitigation Sponsor    Statement of Mitigation Liability Acceptance: I, the undersigned, verify that I am authorized to approve mitigation  transactions for the Mitigation Sponsor shown below, and I certify that the Sponsor agrees to accept full responsibility for  providing the mitigation identified in this document (see the table above), associated with the USACE Permittee and Action  ID number shown.   I also verify that released credits (and/or advance credits for NCDMS), as approved by the USACE, are  currently available at the mitigation site identified above.  Further, I understand that if the Sponsor fails to provide the  required compensatory mitigation, the USACE Wilmington District Engineer may pursue measures against the Sponsor to  ensure compliance associated with the mitigation requirements.    Mitigation Sponsor Name:      Name of Sponsor’s Authorized Representative:           Signature of Sponsor’s Authorized Representative Date of Signature    Conditions for Transfer of Compensatory Mitigation Credit:   Once this document has been signed by the Mitigation Sponsor and the USACE is in receipt of the signed form, the  Permittee is no longer responsible for providing the mitigation identified in this form, though the Permittee remains  responsible for any other mitigation requirements stated in the permit conditions.   Construction within jurisdictional areas authorized by the permit identified on page one of this form can begin only after  the USACE is in receipt of a copy of this document signed by the Sponsor, confirming that the Sponsor has accepted  responsibility for providing the mitigation requirements listed herein.  For authorized impacts conducted by the North  Carolina Department of Transportation (NCDOT), construction within jurisdictional areas may proceed upon permit  issuance; however, a copy of this form signed by the Sponsor must be provided to the USACE within 30 days of permit  issuance. NCDOT remains fully responsible for the mitigation until the USACE has received this form, confirming that the  Sponsor has accepted responsibility for providing the mitigation requirements listed herein.   Signed copies of this document must be retained by the Permittee, Mitigation Sponsor, and in the USACE administrative  records for both the permit and the Bank/ILF Instrument.  It is the Permittee’s responsibility to ensure that the USACE  Project Manager (address below) is provided with a signed copy of this form.   If changes are proposed to the type, amount, or location of mitigation after this form has been signed and returned to  the USACE, the Sponsor must obtain case‐by‐case approval from the USACE Project Manager and/or North Carolina  Interagency Review Team (NCIRT).  If approved, higher mitigation ratios may be applied, as per current District guidance  and a new version of this form must be completed and included in the USACE administrative records for both the permit  and the Bank/ILF Instrument.    Comments/Additional Conditions: A letter from Wildlands Holdings IV, LLC, confirming they are willing and able to accept  the applicant’s compensatory mitigation responsibility, dated 1/10/2020 was included with the preconstruction  notification.    This form is not valid unless signed below by the USACE Project Manager and by the Mitigation Sponsor on Page 1.  Once  signed, the Sponsor should provide copies of this form along with an updated bank ledger to: 1) the Permittee, 2) the USACE  Project Manager at the address below, and 3) the Wilmington District Mitigation Office, Attn: Todd Tugwell, 11405 Falls  of Neuse Road, Wake Forest, NC 27587 (email: todd.tugwell@usace.army.mil).  Questions regarding this form or any of the  permit conditions may be directed to the USACE Project Manager below.    USACE Project Manager: James Lastinger     USACE Field Office: Raleigh Regulatory Office    US Army Corps of Engineers    3331 Heritage Trade Drive, Suite 105    Wake Forest, North Carolina 27587   Email: James.C.Lastinger@usace.army.mil            1/29/2020    USACE Project Manager Signature Date of Signature    Current Wilmington District mitigation guidance, including information on mitigation ratios, functional assessments, and  mitigation bank location and availability, and credit classifications (including stream temperature and wetland groupings) is  available at http://ribits.usace.army.mil NOTIFICATION OF ADMINISTRATIVE APPEAL OPTIONS AND PROCESS AND REQUEST FOR APPEAL Applicant: Greg Bagley File Number: SAW-2019-02106 Date: 1/29/2020 Attached is: See Section below INITIAL PROFFERED PERMIT (Standard Permit or Letter of permission) A PROFFERED PERMIT (Standard Permit or Letter of permission) B PERMIT DENIAL C APPROVED JURISDICTIONAL DETERMINATION D PRELIMINARY JURISDICTIONAL DETERMINATION E SECTION I - The following identifies your rights and options regarding an administrative appeal of the above decision. Additional information may be found at or http://www.usace.army.mil/Missions/CivilWorks/RegulatoryProgramandPermits.aspx or the Corps regulations at 33 CFR Part 331. A: INITIAL PROFFERED PERMIT: You may accept or object to the permit.  ACCEPT: If you received a Standard Permit, you may sign the permit document and return it to the district engineer for final authorization. If you received a Letter of Permission (LOP), you may accept the LOP and your work is authorized. Your signature on the Standard Permit or acceptance of the LOP means that you accept the permit in its entirety, and waive all rights to appeal the permit, including its terms and conditions, and approved jurisdictional determinations associated with the permit.  OBJECT: If you object to the permit (Standard or LOP) because of certain terms and conditions therein, you may request that the permit be modified accordingly. You must complete Section II of this form and return the form to the district engineer. Your objections must be received by the district engineer within 60 days of the date of this notice, or you will forfeit your right to appeal the permit in the future. Upon receipt of your letter, the district engineer will evaluate your objections and may: (a) modify the permit to address all of your concerns, (b) modify the permit to address some of your objections, or (c) not modify the permit having determined that the permit should be issued as previously written. After evaluating your objections, the district engineer will send you a proffered permit for your reconsideration, as indicated in Section B below. B: PROFFERED PERMIT: You may accept or appeal the permit  ACCEPT: If you received a Standard Permit, you may sign the permit document and return it to the district engineer for final authorization. If you received a Letter of Permission (LOP), you may accept the LOP and your work is authorized. Your signature on the Standard Permit or acceptance of the LOP means that you accept the permit in its entirety, and waive all rights to appeal the permit, including its terms and conditions, and approved jurisdictional determinations associated with the permit.  APPEAL: If you choose to decline the proffered permit (Standard or LOP) because of certain terms and conditions therein, you may appeal the declined permit under the Corps of Engineers Administrative Appeal Process by completing Section II of this form and sending the form to the division engineer. This form must be received by the division engineer within 60 days of the date of this notice. C: PERMIT DENIAL: You may appeal the denial of a permit under the Corps of Engineers Administrative Appeal Process by completing Section II of this form and sending the form to the division engineer. This form must be received by the division engineer within 60 days of the date of this notice. D: APPROVED JURISDICTIONAL DETERMINATION: You may accept or appeal the approved JD or provide new information.  ACCEPT: You do not need to notify the Corps to accept an approved JD. Failure to notify the Corps within 60 days of the date of this notice, means that you accept the approved JD in its entirety, and waive all rights to appeal the approved JD.  APPEAL: If you disagree with the approved JD, you may appeal the approved JD under the Corps of Engineers Administrative Appeal Process by completing Section II of this form and sending the form to the district engineer. This form must be received by the division engineer within 60 days of the date of this notice. E: PRELIMINARY JURISDICTIONAL DETERMINATION: You do not need to respond to the Corps regarding the preliminary JD. The Preliminary JD is not appealable. If you wish, you may request an approved JD (which may be appealed), by contacting the Corps district for further instruction. Also you may provide new information for further consideration by the Corps to reevaluate the JD. SECTION II - REQUEST FOR APPEAL or OBJECTIONS TO AN INITIAL PROFFERED PERMIT REASONS FOR APPEAL OR OBJECTIONS: (Describe your reasons for appealing the decision or your objections to an initial proffered permit in clear concise statements. You may attach additional information to this form to clarify where your reasons or objections are addressed in the administrative record.) ADDITIONAL INFORMATION: The appeal is limited to a review of the administrative record, the Corps memorandum for the record of the appeal conference or meeting, and any supplemental information that the review officer has determined is needed to clarify the administrative record. Neither the appellant nor the Corps may add new information or analyses to the record. However, you may provide additional information to clarify the location of information that is already in the administrative record. POINT OF CONTACT FOR QUESTIONS OR INFORMATION: If you have questions regarding this decision and/or the appeal process you may contact: District Engineer, Wilmington Regulatory Division Attn: James Lastinger Raleigh Regulatory Office U.S Army Corps of Engineers 3331 Heritage Trade Drive, Suite 105 Wake Forest, North Carolina 27587 If you only have questions regarding the appeal process you may also contact: Mr. Phillip Shannin, Administrative Appeal Review Officer CESAD-PDO U.S. Army Corps of Engineers, South Atlantic Division 60 Forsyth Street, Room 10M15 Atlanta, Georgia 30303-8801 Phone: (404) 562-5137 RIGHT OF ENTRY: Your signature below grants the right of entry to Corps of Engineers personnel, and any government consultants, to conduct investigations of the project site during the course of the appeal process. You will be provided a 15 day notice of any site investigation, and will have the opportunity to participate in all site investigations. ________________________________________ Signature of appellant or agent. Date: Telephone number: For appeals on Initial Proffered Permits send this form to: District Engineer, Wilmington Regulatory Division, Attn: James Lastinger , 69 Darlington Avenue, Wilmington, North Carolina 28403 For Permit denials, Proffered Permits and Approved Jurisdictional Determinations send this form to: Division Engineer, Commander, U.S. Army Engineer Division, South Atlantic, Attn: Mr. Phillip Shannin, Administrative Appeal Officer, CESAD-PDO, 60 Forsyth Street, Room 10M15, Atlanta, Georgia 30303-8801 Phone: (404) 562-5137 380384388394202212345678910111213141516171825400390382386392396398402378382FLEMMING RIDGE COURTVARINA TOWNS DRIVE192124262723282930313233343536373839WETLANDSIMPACTWETLANDSIMPACTWETLANDSWETLANDSWET BASIN122 LF OF 18" RCP120 LF OF 15" RCP30 LF OF 15" RCP188 LF OF 15" RCP50'-0"WWWWW32 LF O F 1 5 " R C P 30 LF OF 15" RCP40 LF OF 15" RCP128 LF OF 15" RCP18 LF OF 15" RCPYI#1YI#2 YI#3CB#1 CB#2CB#3CB#4CB#5 CB#6 CB#6HC20' ACCESS EASEMENT TO SCM20' ACCESS EASEMENT TO SCM5 SPACES5 SPACESCOLEY FARM ROADMAIL KIOSKPLANTERISLANDPLANTERISLAND EXI S T D B L 3 0 " R C P23'-3"11'-612"20' ACCESS EASEMENT TO SCM20' ACCESS EASEMENT TO SCM WETLANDSWETLANDSWETLANDS50 LF OF 12" RCPWETLANDSIMPACTWETLANDSIMPACTWETLANDSIMPACT7 8 ' OF DB L 3 6 " RCPW-1W-3W-2W-4S-1S-2Sheet NumberofSITE PLAN RemarksDate:No.132REVISIONS4Client Name: TOWNHOUSE VILLAGE FOR PRIME 1 BUILDERS, LLC Wake County N.C. C. GREGORY BAGLEY ENGINEERSITE PLAN USACOE1" = 100'Date:Project #:Drawn/Design By:Scale:SITE DATA9-16-191" = 40'TOTAL = 98,713 SQ FT OR 2.26 AC12276 SEALPROFESSIONALNORTHCAROLI N AENGINEE RC .GREGORY B A G LEY11-29-19USACOE 202225FLEMMING RIDGE COURTVARINA TOWNS DRIVE2124262723282930313233343536373839WETLANDSIMPACTWETLANDSIMPACTWETLANDSWETLANDS30 LF OF 15" RCP188 LF OF 15" RCPWWWWW32 LF OF 15" RCP CB#5CB#6CB#6 EX I S T D B L 3 0 " R C P11'-612"WETLANDSWETLANDSWETLANDS50 LF OF 12" RCPWETLANDSIMPACTWETLANDSIMPACTWETLANDSIMPACT78' OF DBL 36 " RCPW-1W-3W-2W-4S-1S-2Sheet NumberofWETLAND BLOW-UP RemarksDate:No.132REVISIONS4Client Name: TOWNHOUSE VILLAGE FOR PRIME 1 BUILDERS, LLC Wake County N.C. C. GREGORY BAGLEY ENGINEERWETLAND BLOW-UPUSACOE1" =50'Date:Project #:Drawn/Design By:Scale:SITE DATA9-16-191" = 40'TOTAL = 98,713 SQ FT OR 2.26 AC12276 SEALPROFESSIONALNORTHCAROLI N AENGINE E RC .GREGORY B A G LEY11-29-19USACOE 3 9 4 2 0 2 2 1234 1 6 1 7 1 8 2 5 4 0 0 3923 9 6 398FLEMMING RIDGE C O U R T VARINA TOWNS DRIVE1 9 2 1 2 4 2 6 2 7 2 3 2 8 2 9 3 0 3 1 3 2 3 3 3 4 3 5 3 6 3 7 3 8 3 9 WET L ANDS IM PAC TWET L AN D S IM PAC TWE T L ANDS WET L ANDS OPE N S PACE 2OPEN S PACE 2120 LF OF 15" RCP30 LF OF 15" RCP 188 LF OF 15" RCP29'-0"50'-0"29'-0" W W W WW 32 LF OF 1 5 " R C P30 LF OF 15" RCP40 L F O F 1 5 " R C P 128 L F O F 1 5 " R C P CB#1 CB# 2 CB# 3 CB# 4 CB# 5 CB# 6 CB#6476 LF OF 6 " WATER MA IN GV GV FH A S S Y . GV 484 LF O F 6 " W A T E R M A I N FH ASSY.FH ASSY. 187 LF OF 8" SEWER M A I N 208 LF OF 8" SEWER MAIN266 LF OF 8 " SEWER MA IN HC WM WM WM WM WM WM WM WM WM WM WM WM WM WM WM WM WM WM WM WM WM W M WMWM WMWMWMWMWMCO CO CO CO CO CO CO CO CO CO CO CO CO CO CO CO CO CO CO CO CO COCOCOCOCOCOCOCO24'-0"OPEN SPACE 1OPEN SPACE 1OPEN SPACE 224'-10"24'-0"5 S P A C E S 5 SPACES WM C O WMWM44'-7"MAIL KIOSK PL A N T E R ISL A N D PLANTE RISLA N D GV EXIST DBL 30" RCP11'-612" 20' ACCESS EASEMENT TO SCM 20' ACCESS EASEMENT TO SCM OPEN SPACE 1 OPEN SPACE 2 WE T L AND SWE T L AND SWE T LANDS 50 LF OF 12" RCPWET L ANDS IM PAC TWE T L AND S IM P AC TWE T L AND S IM P AC T 78' O F D B L 3 6 " R C P W- 1 W- 3 W- 2W- 4 S- 1 S - 2 Sheet NumberofPRELIMINARY SITE PLAN RemarksDate:No.132REVISIONS4Client Name: Summerdale II FOR PRIME 1 BUILDERS, LLC Wake County N.C. C. GREGORY BAGLEY ENGINEER Date:Project #:Drawn/Design By:Scale:40540039538538037537039036540540039538538037537039036510+0011+0012+0013+0014+0015+0016+0017+0018+00208 LF 8" PVC SEWER @ 0.5%VC=145.25VARINA TOWNS DRIVE9-16-19NOTED ON PLANHORIZONTAL - 1"=100'VERTICAL - 1"=10'12276 SEALPROFESSIONALNORTHCAROLINA ENGINE E RC .GREGORY B A G LEY11-29-19237 LF 8" PVC SEWER @ 0.5%INVERT OF 36" DBL RCP =389.7BURIED TO 6" BELOW INVERTINVERT OF 12" RCP =390.21BURIED TO 3" BELOW INVERT142 LF @ 0.5%150 LF @ -0.5%