HomeMy WebLinkAboutSW4210501_Supplement-EZ Form_20210525SUPPLEMENT-EZ COVER PAGE
FORMS LOADEL)
PROJECT INFORMATION _
1 Project Name
2 Project Area ac
3 Coastal Wetland Area ac
4 Surface Water Area ac
5 Is this project High or Low Density?
6 Does this project use an off -site SCM?
Dollar General Store
2.03
No
COMPLIANCE WITH 02H .1003(4)
7
Width of vegetated setbacks provided (feet)-
8
Will the vegetated setback remain vegetated?
NIA
9
If BUA is proposed in the setback, does it meet NCAC 02H.1003 4 c-d ?
No
10
Is streambank stabilization proposed on this project?
No
NUMBER AND TYPE OF SCMs:
11
Infiltration System
0
12
Bioretention Cell
0
13
Wet Pond
1
14
Stormwater Wetland
0
15
Permeable Pavement
0
16
Sand Filter
0
17
Rainwater Harvesting RWH
0
18
Green Roof
0
19
Level Spreader -Filter Strip LS-FS
0
20
Disconnected Impervious Surface (DIS)
0
21
Treatment Swale
0
22
Dry Pond
0
23
StormFilter
0
24
Silva Cell
0
25
Bayfilter
0
26
Filterra
0
FORMS LOADED
DESIGNER CERTIFICATION
27
Name and Title:
28
Organization:
29
Street address:
30
City, State, Zi :
31
Phone number(s):
32
Email:
Matt Lowder, PE
Triangle Site Design, PLLC
4004 Barrett Dr, Suite 101
Raleigh, NC 27609
919-553-6570
mlowder@trianglesitedesign.com
Certification Statement:
I certify, under penalty of law that this Supplement-EZ form and all supporting information were prepared under my direction or supervision; that the
information provided in the form is, to the best of my knowledge and belief, true, accurate, and complete; and that the engineering plans,
specifications, operation and maintenance agreements and other supporting information are consistent with the information provided here
SEAL24434
� M
Y 5 Iy
Seal
f
Signature of Designer
�-Z-7 2
Date
DRAINAGE AREAS
1
Is this a high density project?
Yes
2
If so. number of drainage areas/SCMs
1
3
Does this ro'ect have low density areas?
No
4
If so, number of low density drainage areas
0
5
Is all/part of this project subject to previous rule
versions?
No
FORMS LOADED
DRAINAGE AREA INFORMATION
Entire Site
4
Type of SCM
Wet Pond
Wet Pond
5
Total drainage area (sq ft
88448
48714
6
Onsite drainage area (sq ft
88448
48714
7
Offsite drainage area (sq ft
0
0
8
Total BUA in project (sq ft
38841 sf
38022 sf
9
New BUA on subdivided lots (subject to permitting)
(sq ft
-
-
10permitting)
New BUA not on subdivided lots (subject to
(sf)
11
Offsite BUA (sq ft
-
-
12
Breakdown of new BUA not on subdivided lots:
Parking (sq ft
26385 sf
25566 sf
Sidewalk (sq ft
1816 sf
1816 sf
Roof (sq ft
10640 sf
10640 sf
_
Roadway s ft
Future (sq ft
Other, please specify in the comment box
below (sq ft
-
-
-
13
New infiltrating permeable pavement on
subdivided lots (sq ft
14
New infiltrating permeable pavement not on
subdivided lots (sq ft
-
15
Existing BUA that will remain (not subject to
ermitting) (sq ft
-
16
Existing BUA that is already permitted (sq ft
17
Existing BUA that will be removed (sq ft
-
-
18
Percent BUA
44%
78%
19
Design storm inches
1.0 in
20
Design volume of SCM cu ft
3055 cf
21
Calculation method for design volume
Simple Method
ADDfTIONAL
INFORMATION
22
Please use this space to provide any additional information about the
draina a area(s):
Some area at the driveway entrance is not captured.
WET POND
1
IDrain_a92 area number
1
_
2
Minimum required treatment volume cu ft
3055 cf
GENE
L MDC FROM 02H AWO
3
Is the SCM sized to treat the SW from all surfaces at build -out?
Yes
4
Is the SCM located away from contaminated soils?
Yes
5
What are the side slopes of the SCM H: ?
3:1
6
Does the SCM have retaining walls, gabion walls or other
engineered side slopes?
No
7
Are the inlets, outlets, and receiving stream protected from erosion
(10- ear storm)?
Yes
8
Is there an overflow or bypass for inflow volume in excess of the
design volume?
Yes
9
What is the method for dewatering the SCM for maintenance?
Pump referred
10
If applicable, will the SCM be cleaned out after construction?
Yes
11
Does the maintenance access comply with General MDC 8 ?
Yes
12
Does the drainage easement comply with General MDC (9)?
Yes
13
If the SCM is on a single family lot, does (will?) the plat comply with
General MDC 00)?
Is there an O&M Agreement that complies with General MDC (11)?
N/A
14
Yes
15
Is there an O&M Plan that complies with General MDC 12 ?
1 Yes
16
Does the SCM follow the devicespecific MDC?
Yes
17
Was the SCM designed by an NC licensed rofessional?
Yes
3
18
Sizing method used
SA/DA
Yes
650.00
19
Has a stage/storage table been provided in the calculations?
20
Elevation of the excavated main pool depth (bottom of sediment
removal) (fmsl
21
Elevation of the main pool bottom (top of sediment removal) (fmsl)
651.00
22
Elevation of the bottom of the ve etated shelf (fmsl)
656.50
23
Elevation of the permanent pool fmsl)
657.00
24
Elevation of the top of the vegetated shelf fmsl
657.50
25
Elevation of the temporary pool (fmsl)
658.20
26
Surface area of the main permanent pool (square feet)
2012
27
Volume of the main permanent pool cubic feet
4644 cf
28
lAverage depth of the main pool (feet)
3.06 ft
29
Average depth euation used
Equation 3
30
If using equation 3, main pool perimeter feet
189.0 ft
31
If using equation 3, width of submerged veg. shelf feet
3.0 ft
32
Volume of the foreba (cubic feet)
821 cf
33
Is this 15-20% of the volume in the mainpool?
Yes
34
Clean -out depth for foreba inches
36 in
351
Design volume of SCM cu ft
3055 cf
36
Is the outlet an orifice or a weir?
Orifice
37
If orifice, orifice diameter (inches)
1 in
38
If weir, weir height inches
39
If weir, weir length (inches)
40
Drawdown time for the temporary pool (days)
2.13
41
Are the inlet(s) and outlet located in a manner that avoids short-
circuitin ?
Yes
42
Are berms or baffles provided to improve the flowpath?
Yes
43
Depth of forebay at entrance inches
48 in
44
Depth of forebay at exit (inches)
42 in
45
Does water flow out of the forebay in a non -erosive manner?
Yes
46
lWidth of the vegetated shelf feet
6 ft
47
Slope of vegetated shelf H:
6:1
48
Does the orifice drawdown from below the top surface of the
permanentpool?
Yes
Yes
No
49
Does the pond minimize impacts to the receiving channel from the 1-
r 24-hr storm?
50
Are fountains proposed? (If Y, please provide documentation that
MDC(9) is met.
51
Is a trash rack or other device provided to protect the outlet system?
Yes
52
Are the dam and embankment planted in non -clumping turf grass?
Yes
53
Species of turf that will be used on the dam and embankment
Hybrid Bermuda
54
Hasa Elanting plan been provided for the vegetated shelf?
Yes
ADDITIONAL
INFORMATION
55
Please use this space to provide any additional information about
the wet pond(s):
Wet Pond 1 11:01 AM 4/27/2021