HomeMy WebLinkAbout20210968 Ver 1_ePCN Application_20210524 I I DWR
Division of Water Resources
Pre-Construction Notification (PCN) Form
April 4,2021 Ver 4
Initial Review
Has this project met the requirements for acceptance in to the review process?*
6 Yes
✓ No
Is this project a public transportation project?*
0 Yes r No
Change only if needed.
BIMS#Assigned* Version#*
20210968 1
Is a payment required for this project?*
6 No payment required
✓ Fee received Reviewing Office*
✓ Fee needed-send electronic notification Wilmington Regional Office-(910)796-7215
Select Project Reviewer*
Robert Patterson:eads\rdpatterson
Information for Initial Review
1a.Name of project:
US 17 at SR 1518 and NC 172 Intersection Safety Improvements
1a.Who is the Primary Contact?*
Christopher Dustin
1b.Primary Contact Email:* 1c.Primary Contact Phone:*
ext-cdustinl@ncdot.gov (910)612-1302
Date Submitted
5/24/2021
Nearest Body of Water
Juniper Swamp
Basin
Cape Fear
Water Classification
C;Sw
Site Coordinates
Latitude: Longitude:
34.539331 -77.503416
A. Processing Information U
County(or Counties)where the project is located:
Onslow
Is this a NCDMS Project
✓ Yes G No
Is this project a public transportation project?*
6 Yes r No
Is this a NCDOT Project?*
6. Yes r No
(NCDOT only)T.I.P.or state project number:
SS-6003D
WBS#(9)
48874.1.1
Pre-Filing Meeting Information
Is this a courtesy copy notification?*
✓ Yes G No
ID# Version
Pre-fling Meeting or Request Date
Attach documentation of Pre-Filing Meeting Request here:
Click the upload button or drag and drop files here to attach document
Re type rust be FCF
la.Type(s)of approval sought from the Corps:
17 Section 404 Permit(wetlands,streams and waters,Clean Water Act)
r Section 10 Permit(navigable waters,tidal waters,Rivers and Harbors Act)
Has this PCN previously been submitted?*
✓ Yes
6 No
lb.What type(s)of permit(s)do you wish to seek authorization?
7 Nationwide Permit(NWP)
r Regional General Permit(RGP)
r Standard(IP)
1c.Has the NWP or GP number been verified by the Corps?
✓ Yes G No
Nationwide Permit(NWP)Number: 18-Minor Discharges
NWP Numbers(for multiple NWPS):
1d.Type(s)of approval sought from the DWR:
I7 401 Water Quality Certification-Regular r 401 Water Quality Certification-Express
r Non-404 Jurisdictional General Permit r Riparian Buffer Authorization
r Individual 401 Water Quality Certification
le.Is this notification solely for the record because written approval is not required? *
For the record only for DWR 401 Certification: F Yes r No
For the record only for Corps Permit: r Yes s No
If.Is this an after-the-fact permit application?*
✓ Yes 6' No
1g.Is payment into a mitigation bank or in-lieu fee program proposed for mitigation of impacts?
✓ Yes f No
1g.Is payment into a mitigation bank or in-lieu fee program proposed for mitigation of impacts?
✓ Yes rNo
Acceptance Letter Attachment
1h.Is the project located in any of NC's twenty coastal counties?
6 Yes rNo
1i.Is the project located within a NC DCM Area of Environmental Concern(AEC)?
✓ Yes G No r Unknown
1j.Is the project located in a designated trout watershed?
✓ Yes f No
B. Applicant Information
Id.Who is applying for the permit?
[7 Owner r Applicant(other than owner)
le.Is there an Agent/Consultant for this project?*
r Yes r No
2.Owner Information
2a.Name(s)on recorded deed:
NC Department of Transportation-Division 3
2b.Deed book and page no.:
2c.Contact Person:
Mason Herndon
2d.Address
Street Address
5501 Barbados Blvd.
Address Line 2
(Sty State/Bovine/Region
Castle Hayne NC
Postal/Zip Code Country
28429 USA
2e.Telephone Number: 2f.Fax Number:
(910)341-2000
2g.Email Address:*
tmherndon@ncdot.gov
C. Project Information and Prior Project History e).
1. Project Information
1b.Subdivision name:
(if appropriate)
1c.Nearest municipality/town:
Sneads Ferry
2. Project Identification
2a.Property Identification Number: 2b.Property size:
2c.Project Address
Street Address
Intersection of US 17 and NC 172
Address Line 2
(Sty State/Bovine/Region
Sneads Ferry NC
Postal/Zip Code Country
28445 USA
3.Surface Waters
3a.Name of the nearest body of water to proposed project:*
Juniper Swamp
3b.Water Resources Classification of nearest receiving water:*
C;Sw
3c. What river basin(s)is your project located in?*
Cape Fear
3d.Please provide the 12-digit HUC in which the project is located.
030300070606
4. Project Description and History
4a.Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application:*
The project would make the intersection of US 17 and SR 1518
Old Folkstone Road into a temporary Reduced Conflict Intersection(RCI)and
accordingly provide a U-turn bulb-out and four section Flashing Yellow Arrow for the
US 17 northbound to southbound U-turn at the exsting signalized intersection of US 17
and NC 172.
4b.Have Corps permits or DWR certifications been obtained for this project(including all prior phases)in the past?*
r Yes r No r Unknown
4d.Attach an 8 1/2 X 11 excerpt from the most recent version of the USGS topographic map indicating the location of the project site.(for DWR)
HPOTOPO.pdf 308.99KB
4e.Attach an 8 1/2 X 11 excerpt from the most recent version of the published County NRCS Soil Survey map depicting the project site.(for DWR)
20210503_10531910647_3_Soil_Map.pdf 746.67KB
4f.List the total estimated acreage of all existing wetlands on the property:
2 ac.in project area
4g.List the total estimated linear feet of all existing streams on the property:
50'in project area
4h.Explain the purpose of the proposed project:*
The need for the project is to provide for better safety and mobility in
the project area.The purpose of the project is to satisfy the need.
4i.Describe the overall project in detail,including indirect impacts and the type of equipment to be used:*
For the traffic improvements at the Intersection of US 17 and NC 172 there will be a constructed bulb-out for the drivers in the left turning left of US-17 Northbound to make a complete
U-turn within the EOT lane.Fill will be placed and the bulb-out will be paved and a typical shoulder and fill slopes will be constructed.Typical road construction equipment will be used.
4j.Please upload project drawings for the proposed project.
Project Drawing_R-6003D_US_17_at_Old_Folkstone&NC 172.pdf 324.05KB
US 17 and NC 172 Bulb Out Permit Impact Drawing.pdf 90.8KB
5.Jurisdictional Determinations
5a.Have the wetlands or streams been delineated on the property or proposed impact areas?*
6' Yes r No C Unknown
Comments:
5b.If the Corps made a jurisdictional determination,what type of determination was made?*
6' Preliminary r Approved r Not Verified r Unknown r N/A
Corps AID Number:
SAW-2018-00557
5c.If 5a is yes,who delineated the jurisdictional areas?
Name(if known):
Agency/Consultant Company: Carolina Ecosystems,Inc.
Other:
5d.List the dates of the Corp jurisdiction determination or State determination if a determination was made by the Corps or DWR
05/13/2019
5d1.Jurisdictional determination upload
final signed PJD tear sheet.pdf 1.76MB
6. Future Project Plans
6a.Is this a phased project?*
r Yes ( No
Are any other NWP(s),regional general permit(s),or individual permits(s)used,or intended to be used,to authorize any part of the proposed project or related activity?
D. Proposed Impacts Inventory
1. Impacts Summary
1a.Where are the impacts associated with your project?(check all that apply):
rJ Wetlands r Streams-tributaries r Buffers
r Open Waters r Pond Construction
2.Wetland Impacts
2a.Site#*(?) 2a1 Reason(?) 2b.Impact type*(?) 2c.Type of W.* 2d.W.name* 2e.Forested* 2f.Type of 2g.Impact
Jurisdicition*(?) area*
S1 Road Fill P Pine Flat Juniper Swamp Yes Both 0.036
(acres)
S1 Hand Clearing T Pine Flat Juniper Swamp Yes Both 0.029
(acres)
2g.Total Temporary Wetland Impact 2g.Total Permanent Wetland Impact
0.029 0.036
2g.Total Wetland Impact
0.065
2i.Comments:
E. Impact Justification and Mitigation L)
1.Avoidance and Minimization
1a.Specifically describe measures taken to avoid or minimize the proposed impacts in designing the project:
Proposed road fill and shoulders for street bulb-out will be keep to the the minimum slope requirements to avoid increased permanent impacts to
wetland.Hand clearing methods will be used to cut down any trees and will not implement mechanized clearing methods
lb.Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques:
Strict adherence to applicable permit conditions and implementation of sediment and erosion control BMPs in accordance with NCDOT BMP manual.
2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State
2a.Does the project require Compensatory Mitigation for impacts to Waters of the U.S.or Waters of the State?
✓ Yes a No
2b.If this project DOES NOT require Compensatory Mitigation,explain why:
Proposed Impacts fall within the permittable thresholds under NW 18 and GC 4139 without requiring mitigation.
NC Stream Temperature Classification Maps can be found under the Mitigation Concepts tab on the Wilmington District's RIBITS website.
F. Stormwater Management and Diffuse Flow Plan (required by DWR) h
1. Diffuse Flow Plan
la.Does the project include or is it adjacent to protected riparian buffers identified within one of the NC Riparian Buffer Protection Rules?
✓ Yes RNo
If no,explain why:
Project site not located within one of the NC Riparian Buffer Protection areas.
2.Stormwater Management Plan
2a.Is this a NCDOT project subject to compliance with NCDOT's Individual NPDES permit NCS000250?*
C Yes C No
Comments:
This project shall be constructed in accordance with the provisions of NCDOT's NPDES permit NC S000250,including applicable requirements of the NCG01000
G. Supplementary Information V
1. Environmental Documentation
la.Does the project involve an expenditure of public(federal/state/local)funds or the use of public(federal/state)land?*
6 Yes r No
1b.If you answered"yes"to the above,does the project require preparation of an environmental document pursuant to the requirements of the National or State(North Carolina)
Environmental Policy Act(NEPAISEPA)?*
✓ Yes a No
Comments:*
Project falls within Minimum Criteria Determination thresholds under 19A NCAC 02F.0102,therefore not requiring an environmental document.
2.Violations(DWR Requirement)
2a.Is the site in violation of DWR Water Quality Certification Rules(15ANCAC 2H.0500),Isolated Wetland Rules(15A NCAC 2H.1300),or DWR Surface Water or Wetland Standards or
Riparian Buffer Rules(15A NCAC 2B.0200)?*
✓ Yes f• No
3. Cumulative Impacts(DWR Requirement)
3a.Will this project result in additional development,which could impact nearby downstream water quality?*
✓ Yes 6. No
3b.If you answered"no,"provide a short narrative description.
Due to the minimal impact resulting from this roadway improvement project,nearby land uses will not be influenced.A detailed indirect of cumulative
effects study will not be necessary.
4.Sewage Disposal(DWR Requirement)
4a.Is sewage disposal required by DWR for this project?*
✓ Yes r No 6' N/A
5. Endangered Species and Designated Critical Habitat(Corps Requirement)
5a.Will this project occur in or near an area with federally protected species or habitat?*
✓ Yes f• No
5b.Have you checked with the USFWS concerning Endangered Species Act impacts?*
✓ yes ( No
5d.Is another Federal agency involved?*
✓ Yes r' No f Unknown
5e.Is this a DOT project located within Division's 1-8?
6 Yes r No
5j.What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat?
NC National Heritage Program GIS
Consultation Documentation Upload
6. Essential Fish Habitat(Corps Requirement)
6a.Will this project occur in or near an area designated as an Essential Fish Habitat?*
✓ Yes f• No
6b.What data sources did you use to determine whether your site would impact an Essential Fish Habitat?*
NC Natural Heritage PrograrriNOAA EFH GIS data
7. Historic or Prehistoric Cultural Resources(Corps Requirement)
7a.Will this project occur in or near an area that the state,federal or tribal governments have designated as having historic or cultural preservation status?*
✓ Yes f No
7b.What data sources did you use to determine whether your site would impact historic or archeological resources?*
State Historic Preservation Office
7c.Historic or Prehistoric Information Upload
Historic Architecture and Landscapes.pdf 1.02MB
NC Archaeological.pdf 1.47MB
8. Flood Zone Designation(Corps Requirement)
8a.Will this project occur in a FEMA-designated 100-year floodplain?*
✓ Yes f No
8c.What source(s)did you use to make the floodplain determination?*
Flood Risk Information System(FRIS)
Miscellaneous U
Comments
Miscellaneous attachments not previously requested.
US 17 and NC 172 Wetland Impact Summary Sheet.pdf 72.17KB
US 17 and NC 172 Bulb Out Permit Impact Drawing.pdf 90.8KB
DocuSign_R-6003D_US_17_at_Old_Folkstone&NC 172.pdf 4.83MB
Signature U
*
FJ By checking the box and signing below,I certify that:
• The project proponent hereby certifies that all information contained herein is true,accurate,and complete to the best of my knowledge and belief;and
• The project proponent hereby requests that the certifying authority review and take action on this CWA 401 certification request within the applicable reasonable period of time.
• I have given true,accurate,and complete information on this form;
• I agree that submission of this PCN form is a"transaction"subject to Chapter 66,Article 40 of the NC General Statutes(the"Uniform Electronic Transactions Act");
• I agree to conduct this transaction by electronic means pursuant to Chapter 66,Article 40 of the NC General Statutes(the"Uniform Electronic Transactions Act");
• I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature;AND
• I intend to electronically sign and submit the PCN form.
Full Name:
Christopher Dustin
Signature
Date
5/24/2021