HomeMy WebLinkAboutNCC213102_ESC Approval Submitted_20210525ROY COOPER
�4
Governors
DIONNE DELLI-GATTI
Secretary
BRIAN WRENN
Director
NORTH CAROUNA
Environmental Quality
May 6, 2021
LETTER OF APPROVAL WITH MODIFICATIONS
TWP PCP Mocks Retail, LLC
ATTN: Matt Widmaier
445 Bishop Street NW
Atlanta, GA 30318
RE: Project Name: HWY 55
Acres Approved: 1.65
Project ID: DAVIE-2021-014
County: Davie
City: Mocksville
Address: Yadkinville Rd
River Basin: Yadkin Pee -Dee
Stream Classification: C
Submitted By: Commercial Site Design
Date Received by LQS: April 8, 2021
Plan Type: New
Dear Mr. Widmaier:
Registered Agents, Inc.
4030 Wake Forest Rd
Suite 349
Raleigh, NC 27609
This office has reviewed the subject erosion and sedimentation control
plan. We find the plan to be acceptable and hereby issue this Letter of
Approval. The enclosed Certificate of Approval must be posted at the job
site. This plan shall expire three (3) years following the date of approval,
if no land -disturbing activity has been undertaken, as is required by Title
15A NCAC 413.0129.
As of April 1, 2019, all new construction activities are required to
complete and submit an electronic Notice of Intent (NOI) form requesting
a Certificate of Coverage (COC) under the NCGO10000 Construction
Stormwater General Permit.
This form MUST be submitted prior to the commencement of any land
disturbing activity on the above -named project. The NOI form may be
K Q V_ North Carolina Department of Environmental Quality ( Division of Energy, Mineral and Land Resources
:��}} Winston-Salem Regional Office 1 490 Hanes htgl Road Suite 3001 Winston-Salem, North Carolina 27103
��� 336.776.9800
Letter of Approval with Modifications
TWP PCP Mocks Retail, LLC
May 6, 2021
Page 2 of 4
accessed at deq.nc.gov/NCG01. Please direct questions about the NOI
form to Annette Lucas at Annette.lucas@ncdenr.gov or Paul Clark at
Paul.clark@ncdenr.gov. After you submit a complete and correct NOI
Form, a COC will be emailed to you within three business days. Initially,
DEMLR will not charge a fee for coverage under the NCG01 permit.
However, a $100 fee will soon be charged annually. This fee is to be sent
to the DEMLR Stormwater Central Office staff in Raleigh.
Title 15A NCAC 4B .0118(a) and the NCG01 permit require that the
following documentation be kept on file at the job site:
1. The approved E&SC plan as well as any approved deviation.
2. The NCG01 permit and the COC, once it is received.
3. Records of inspections made during the previous 30 days.
Also, this letter gives the notice required by G.S. 113A-61.1 (a) of our right
of periodic inspection to ensure compliance with the approved plan.
North Carolina's Sedimentation Pollution Control Act is performance -
oriented, requiring protection of existing natural resources and adjoining
properties. If, following the commencement of this project, the erosion
and sedimentation control plan is inadequate to meet the requirements
of the Sedimentation Pollution Control Act of 1973 (North Carolina
General Statute 113A-51 through 66), this office may require revisions to
the plan and implementation of the revisions to insure compliance with
the Act.
Acceptance and approval of this plan is conditioned upon your
compliance with Federal and State water quality laws, regulations, and
rules. In addition, local city or county ordinances or rules may also apply
to this land -disturbing activity. This approval does not supersede any
other permit or approval.
Please note that this approval is based in part on the accuracy of the
information provided in the Financial Responsibility Form, which you
provided. This permit allows for a land -disturbance, as called for on the
Letter of Approval with Modifications
TWP PCP Mocks Retail, LLC
May 6, 2021
Page 3 of 4
application plan, not to exceed the approved acres. Exceeding the
acreage will be a violation of this permit and would require a revised
plan and additional application fee. You are requested to file an
amended form if there is any change in the information included on the
form. In addition, it would be helpful if you notify this office of the
proposed starting date for this project. Your cooperation is appreciated.
Sincerely,
Jack Dalton
Assistant Regional Engineer
Land Quality Section
Enclosures: Certificate of Approval with Modifications
NCG01 Fact Sheet
Modifications Required for Approval
cc: Commercial Site Design WSRO
ATTN: Brian Soltz
8312 Creedmoor Road
Raleigh, NC 27613
Letter of Approval with Modifications
TWP PCP Mocks Retail, LLC
May 6, 2021
Page 4 of 4
MODIFICATIONS REQUIRED FOR APPROVAL
Project Name: HWY 55
Project ID: DAVIE-2021-014
County: Davie
1. Be advised that any plan modifications need from the local authority,
City of Mocksville, for post construction stormwater will require a
revised plan to be submitted and reviewed prior to land disturbing
activity. [15A NCAC 4B .0115] [GS 113A-57(3)]
2. Additional measures may be required - The applicant is responsible for
the control of sediment on -site. If the approved erosion and
sedimentation control measures prove insufficient, the applicant must
take those additional steps necessary to stop sediment from leaving this
site. [15A NCAC 413.0115]
Ref: G.S. 113A-54.1 through G.S. 113A-57
Sections 15A NCAC 04A.0101 through 15A NCAC 04E.0504
General Permit NCG 010000 NPDES for Construction Activities