Loading...
HomeMy WebLinkAboutNCC213102_ESC Approval Submitted_20210525ROY COOPER �4 Governors DIONNE DELLI-GATTI Secretary BRIAN WRENN Director NORTH CAROUNA Environmental Quality May 6, 2021 LETTER OF APPROVAL WITH MODIFICATIONS TWP PCP Mocks Retail, LLC ATTN: Matt Widmaier 445 Bishop Street NW Atlanta, GA 30318 RE: Project Name: HWY 55 Acres Approved: 1.65 Project ID: DAVIE-2021-014 County: Davie City: Mocksville Address: Yadkinville Rd River Basin: Yadkin Pee -Dee Stream Classification: C Submitted By: Commercial Site Design Date Received by LQS: April 8, 2021 Plan Type: New Dear Mr. Widmaier: Registered Agents, Inc. 4030 Wake Forest Rd Suite 349 Raleigh, NC 27609 This office has reviewed the subject erosion and sedimentation control plan. We find the plan to be acceptable and hereby issue this Letter of Approval. The enclosed Certificate of Approval must be posted at the job site. This plan shall expire three (3) years following the date of approval, if no land -disturbing activity has been undertaken, as is required by Title 15A NCAC 413.0129. As of April 1, 2019, all new construction activities are required to complete and submit an electronic Notice of Intent (NOI) form requesting a Certificate of Coverage (COC) under the NCGO10000 Construction Stormwater General Permit. This form MUST be submitted prior to the commencement of any land disturbing activity on the above -named project. The NOI form may be K Q V_ North Carolina Department of Environmental Quality ( Division of Energy, Mineral and Land Resources :��}} Winston-Salem Regional Office 1 490 Hanes htgl Road Suite 3001 Winston-Salem, North Carolina 27103 ��� 336.776.9800 Letter of Approval with Modifications TWP PCP Mocks Retail, LLC May 6, 2021 Page 2 of 4 accessed at deq.nc.gov/NCG01. Please direct questions about the NOI form to Annette Lucas at Annette.lucas@ncdenr.gov or Paul Clark at Paul.clark@ncdenr.gov. After you submit a complete and correct NOI Form, a COC will be emailed to you within three business days. Initially, DEMLR will not charge a fee for coverage under the NCG01 permit. However, a $100 fee will soon be charged annually. This fee is to be sent to the DEMLR Stormwater Central Office staff in Raleigh. Title 15A NCAC 4B .0118(a) and the NCG01 permit require that the following documentation be kept on file at the job site: 1. The approved E&SC plan as well as any approved deviation. 2. The NCG01 permit and the COC, once it is received. 3. Records of inspections made during the previous 30 days. Also, this letter gives the notice required by G.S. 113A-61.1 (a) of our right of periodic inspection to ensure compliance with the approved plan. North Carolina's Sedimentation Pollution Control Act is performance - oriented, requiring protection of existing natural resources and adjoining properties. If, following the commencement of this project, the erosion and sedimentation control plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of 1973 (North Carolina General Statute 113A-51 through 66), this office may require revisions to the plan and implementation of the revisions to insure compliance with the Act. Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality laws, regulations, and rules. In addition, local city or county ordinances or rules may also apply to this land -disturbing activity. This approval does not supersede any other permit or approval. Please note that this approval is based in part on the accuracy of the information provided in the Financial Responsibility Form, which you provided. This permit allows for a land -disturbance, as called for on the Letter of Approval with Modifications TWP PCP Mocks Retail, LLC May 6, 2021 Page 3 of 4 application plan, not to exceed the approved acres. Exceeding the acreage will be a violation of this permit and would require a revised plan and additional application fee. You are requested to file an amended form if there is any change in the information included on the form. In addition, it would be helpful if you notify this office of the proposed starting date for this project. Your cooperation is appreciated. Sincerely, Jack Dalton Assistant Regional Engineer Land Quality Section Enclosures: Certificate of Approval with Modifications NCG01 Fact Sheet Modifications Required for Approval cc: Commercial Site Design WSRO ATTN: Brian Soltz 8312 Creedmoor Road Raleigh, NC 27613 Letter of Approval with Modifications TWP PCP Mocks Retail, LLC May 6, 2021 Page 4 of 4 MODIFICATIONS REQUIRED FOR APPROVAL Project Name: HWY 55 Project ID: DAVIE-2021-014 County: Davie 1. Be advised that any plan modifications need from the local authority, City of Mocksville, for post construction stormwater will require a revised plan to be submitted and reviewed prior to land disturbing activity. [15A NCAC 4B .0115] [GS 113A-57(3)] 2. Additional measures may be required - The applicant is responsible for the control of sediment on -site. If the approved erosion and sedimentation control measures prove insufficient, the applicant must take those additional steps necessary to stop sediment from leaving this site. [15A NCAC 413.0115] Ref: G.S. 113A-54.1 through G.S. 113A-57 Sections 15A NCAC 04A.0101 through 15A NCAC 04E.0504 General Permit NCG 010000 NPDES for Construction Activities