HomeMy WebLinkAboutSOUTHPORT RIPRAP_Mean Low Water 04-15-21MEAN LOW WATER LINE
04-15-2021
HIGH WATER LINE
08-26-2020
PROP7
NORTH END RIP -RAP
EXTENDED 266' +/-
BOTTOM OF BERM
08-26-2020
POINT LAT / LONG
PROP7 33.934351249°N 77.992151567°W
PROP8 33.934421331°N 77.991910912°W
PROP9 33.934072053°N 77.991646829°W
PROP10 33.934003647°N 77.991548434°W
RIP1
RIP2
RIPS
RIP4
RIP5
33.934002404°N
33.933898419°N
33.933529568°N
33.933094939°N
33.932874832°N
PROP8
NCSPC 83-2011
N 68650.6495 E 2305748.5553
N 68676.8967 E 2305821.3006
N 68550.5928 E 2305902.7034
N 68525.9999 E 2305932.8052
77.991583889°W N 68525.4383 E 2305922.0541
77.991534630°W N 68487.7453 E 2305937.3819
77.991481507°W N 68353.6680 E 2305954.8611
77.991522215°W N 68195.3619 E 2305944.1187
77.991732510°W N 68114.6070 E 2305881.1370
PROP11 33.932699620°N 77.991986411°W N 68050.0575 E 2305804.7605
FILTER FABRIC TO BE PLACED UNDER RIP RAP FROM TOE OF SLOPE TO TIE
POINT WITH BERM.
CUMULATIVE AVERAGE OF RIP RAP PLACED BELOW THE MEAN HIGH WATER
LINE WILL BE 0.48 CUBIC YARDS per RUNNING FOOT.
MHWL = MEAN HIGH WATER LINE
PROJECT SURVEYED BY NCDOT LOCATION AND SURVEYS PERSONNEL.
LOCATION OF EXISTING RIP -RAP WAS PARTIALLY LOCATED IN FIELD,
2016 IMAGERY WAS USED TO SUPPLEMENT LOCATION.
EXISTING BERM PROFILE
AUGUST 26, 2020
SPOIL SITE
EXISTING BERM PROFILE WITH PROPOSED RIP -RAP
AUGUST 26, 2020
RIP RAP EXTENDS 10.0' SEAWARD OF HWL
24'
a
20'
---- -
�1
+..
Os
4
PROPOSED
0 le
�- .G�
At,
4
RIP -RAP--
w 12
a 8
GC
OF\
FLLsd
• \
4'
I ''
0'
20'
40'
60' 70' 80'
BOTTOM OF BERM
08-26-2020
PROPOSED NEW RIP -RAP
20' WIDTH
SOUTH END RIP -RAP
EXTENDED 100' +/-
PROPOSED PERMITTING CONDITIONS
SOUTHPORT FERRY
RIP -RAP EXTENSION
MAP DATE ; NOVEMBER 09, 2020
REVISED APRIL 15, 2021
Imagery Date: 2016
Map Produced by NCDOT, Location & Surveys
TOE OF PROPOSED
NEW RIP -RAP
PROP 11
North Carolina Dept of Transportation
Location & Surveys Unit
1020 Birch Ridge Drive
Raleigh, NC 27610
(919)-707-6800
J. DALE BURTON PE, PLS
STATE LOCATION & SURVEYS ENGINEER
K. E. HONEYCUTT PE, PLS
REGIONAL LOCATION & SURVEYS ENGINEER
MARK G. WARD, PLS
SONAR OPERATIONS ENGINEER
PROPOSED NEW RIP -RAP
20' WIDTH
TOE OF PROPOSED
NEW RIP -RAP
PROP9
S50°45'S"E
t 38.87'
295 sq ft SPARTINA
ALTERNIFLORA
IMPACTED
PROP 10
CAMA Stake
RIP5
Water Level
-2.32 SFt.
NAVD 88
08/26/2020
10:10 am
DATES OF SURVEY:
AUGUST 26, 2020
APRIL 14, 2021
SURVEYED BY :
WILMINGTON FIELD
OFFICE
MAPPED BY :
KRB
FILE NAME :
SOUTHPORT RIPRAP_LS_SSG_210415.PDF
SOUTHPORT
VICINITY MAP
NOT TO SCALE
LENGTH OF EXISTING RIP RAP
MEASURED ALONG APPROX.
NORMAL HIGH WATER LINE -
437'
DATUM ;
GRIDS = STATE PLANE NAD-83/2011
ZONE = NC-3200 NORTH CAROLINA
DISTANCE UNIT = US SURVEY FOOT
DEPTH UNIT = US SURVEY FOOT
ELLIPSOID = WGS84
GEOID MODEL = G2012aCONUS
V DATUM = N/A
EXISTING RIP- RAP
PROPOSED ON SOUTH END
PROPOSED ON NORTH END
437'+/-
100'+/-
266'+/-
PROPOSED NEW TOTAL LENGTH - 803'+/-
MEA:NAIGH WATER ELEVATION = 1.6',(NAVD88)
MEAN IOW WATER ELEVATION = -2.6' (NAVD88)
•
GRAPHIC SCALE
• ;▪ 'ate - - :
• SEAL
▪ 1 L-4236 °
• , R.i�BI s'
�(evin R. Barefo
Qf,wb,�Barefoot, PIS
e. :3723-04'00'