Loading...
HomeMy WebLinkAboutSOUTHPORT RIPRAP_Mean Low Water 04-15-21MEAN LOW WATER LINE 04-15-2021 HIGH WATER LINE 08-26-2020 PROP7 NORTH END RIP -RAP EXTENDED 266' +/- BOTTOM OF BERM 08-26-2020 POINT LAT / LONG PROP7 33.934351249°N 77.992151567°W PROP8 33.934421331°N 77.991910912°W PROP9 33.934072053°N 77.991646829°W PROP10 33.934003647°N 77.991548434°W RIP1 RIP2 RIPS RIP4 RIP5 33.934002404°N 33.933898419°N 33.933529568°N 33.933094939°N 33.932874832°N PROP8 NCSPC 83-2011 N 68650.6495 E 2305748.5553 N 68676.8967 E 2305821.3006 N 68550.5928 E 2305902.7034 N 68525.9999 E 2305932.8052 77.991583889°W N 68525.4383 E 2305922.0541 77.991534630°W N 68487.7453 E 2305937.3819 77.991481507°W N 68353.6680 E 2305954.8611 77.991522215°W N 68195.3619 E 2305944.1187 77.991732510°W N 68114.6070 E 2305881.1370 PROP11 33.932699620°N 77.991986411°W N 68050.0575 E 2305804.7605 FILTER FABRIC TO BE PLACED UNDER RIP RAP FROM TOE OF SLOPE TO TIE POINT WITH BERM. CUMULATIVE AVERAGE OF RIP RAP PLACED BELOW THE MEAN HIGH WATER LINE WILL BE 0.48 CUBIC YARDS per RUNNING FOOT. MHWL = MEAN HIGH WATER LINE PROJECT SURVEYED BY NCDOT LOCATION AND SURVEYS PERSONNEL. LOCATION OF EXISTING RIP -RAP WAS PARTIALLY LOCATED IN FIELD, 2016 IMAGERY WAS USED TO SUPPLEMENT LOCATION. EXISTING BERM PROFILE AUGUST 26, 2020 SPOIL SITE EXISTING BERM PROFILE WITH PROPOSED RIP -RAP AUGUST 26, 2020 RIP RAP EXTENDS 10.0' SEAWARD OF HWL 24' a 20' ---- - �1 +.. Os 4 PROPOSED 0 le �- .G� At, 4 RIP -RAP-- w 12 a 8 GC OF\ FLLsd • \ 4' I '' 0' 20' 40' 60' 70' 80' BOTTOM OF BERM 08-26-2020 PROPOSED NEW RIP -RAP 20' WIDTH SOUTH END RIP -RAP EXTENDED 100' +/- PROPOSED PERMITTING CONDITIONS SOUTHPORT FERRY RIP -RAP EXTENSION MAP DATE ; NOVEMBER 09, 2020 REVISED APRIL 15, 2021 Imagery Date: 2016 Map Produced by NCDOT, Location & Surveys TOE OF PROPOSED NEW RIP -RAP PROP 11 North Carolina Dept of Transportation Location & Surveys Unit 1020 Birch Ridge Drive Raleigh, NC 27610 (919)-707-6800 J. DALE BURTON PE, PLS STATE LOCATION & SURVEYS ENGINEER K. E. HONEYCUTT PE, PLS REGIONAL LOCATION & SURVEYS ENGINEER MARK G. WARD, PLS SONAR OPERATIONS ENGINEER PROPOSED NEW RIP -RAP 20' WIDTH TOE OF PROPOSED NEW RIP -RAP PROP9 S50°45'S"E t 38.87' 295 sq ft SPARTINA ALTERNIFLORA IMPACTED PROP 10 CAMA Stake RIP5 Water Level -2.32 SFt. NAVD 88 08/26/2020 10:10 am DATES OF SURVEY: AUGUST 26, 2020 APRIL 14, 2021 SURVEYED BY : WILMINGTON FIELD OFFICE MAPPED BY : KRB FILE NAME : SOUTHPORT RIPRAP_LS_SSG_210415.PDF SOUTHPORT VICINITY MAP NOT TO SCALE LENGTH OF EXISTING RIP RAP MEASURED ALONG APPROX. NORMAL HIGH WATER LINE - 437' DATUM ; GRIDS = STATE PLANE NAD-83/2011 ZONE = NC-3200 NORTH CAROLINA DISTANCE UNIT = US SURVEY FOOT DEPTH UNIT = US SURVEY FOOT ELLIPSOID = WGS84 GEOID MODEL = G2012aCONUS V DATUM = N/A EXISTING RIP- RAP PROPOSED ON SOUTH END PROPOSED ON NORTH END 437'+/- 100'+/- 266'+/- PROPOSED NEW TOTAL LENGTH - 803'+/- MEA:NAIGH WATER ELEVATION = 1.6',(NAVD88) MEAN IOW WATER ELEVATION = -2.6' (NAVD88) • GRAPHIC SCALE • ;▪ 'ate - - : • SEAL ▪ 1 L-4236 ° • , R.i�BI s' �(evin R. Barefo Qf,wb,�Barefoot, PIS e. :3723-04'00'