Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
20130046 Ver 1_Stormwater Info_20130403
EVANS ENGINEERING, INC. ENGINEERS, PLANNERS, SURVEYORS 4609 DUNDAS DRIVE GREENSBORO, NORTH CAROLINA 27407 PHONE: (336) 854 -8877 FAX: (336) 854 -8876 DATE: )4- /' 13 CLIENT: 823 PROJECT: 16 PAL616011W.. Z7699-/6&'O From: Itivr►i AW 1) . A.M. P.M. TO BE DELIVERED [ ] TO BE MAILED (t/] TO BE PICKED UP [ ] WORLDWIDE EXPRESS [ ] FEDERAL EXPRESS [ ] COMMENTS: C/ovd a rC6VER North Carolina Department of Environment and Natural- Resources Division of Water quality Pat McCrory Charles Wakild, P. E.• John E. Skvarla, III Governor Director Secretary March 7,2013 DWQ# 13 -0046 Guilford County Mr. Herbert Parks 7CCC, LLC 7B Corporate Center Court Greensboro, North Carolina 27408 APPROVAL of 401 Water Quality Certification with Additional Conditioh5 Dear Mr. Parks: You have.our approval, in accordance with the attached conditions, to place fill and impact 130 linear I feet of jurisdictional stream and 0.22 acres of wetlands to extend Bedstone Dr for the Griffin Mill Subdivision Phase 11 for in Greensboro, NC in Guilford County, as described in your. application received by the Division on January 18, 2613 and subsequent information submitted February 1, 2013, February 18, 2013 and February 22, 2103. After reviewing your application, we have determined that this fill is i covered by General Water Quality Certification .Number.3890, which can be viewed on our web- site at http:// h2o .enr.state.nc.ut /ncwetiands /rd wetlands_tertifications.htm. This Certification allows you to i use Nationwide Permit Number 29 when it is issued by the U.S. Army Corps of Engineers.. In addition, you -should secure any other applicable federal, state or local. permits before you proceed with your project, including_ (but not limited to) those required by Sediment and Erosion Control (including trout buffer • waivers as necessary), Non-Discharge, State Stormwater, and Water Supply Watershed regulations. Also, this approval will expire when -the accompanying 404 permits expire unless otherwise specified in the General Certification. This approval is valid only for the purpose and design that you have described in your application. If you change your project, you must notify us in writing, and you may be required to send us a new application for a new certification. If the property is sold, the new owner must be given a copy of the Certification and approval letter and Is thereby responsible for complying with all conditions. If total wetland fill for this project (now or in the €uture)'exceeds one acre, or total fill to perennial streams equals or exceeds 150 linear feet, additional compensatory mitigation may be required as described in. 15A NCAC 2H .0506, (h). For this approval to be valid, you must follow the conditions listed in the attached certification, as well as the additional conditions listed below: North Carolina DWon of Water c arq, mnstomslem •Reglorrai office Location: 585 Waughtown St. Winston - Salem, North Cpronna 27107 • • Phone: 336-771,50001 FAX 336- 771.46801 Customer Service:1- 877 -EaU48 Internet www.ncwaWqually.org, An Equpl bpporhmily 1 Afflrrndw Action Employer PV Maduratty ne I R -) 7CCC, LLC DWQ# 13 -0046 March 7, 2013 Page 2 of 5 1. The following impacts are hereby approved as long as all other specific and general conditions of this Certification are met. No other impacts, including incidental impacts, are approved: Stream sites Stream Impact length - S1 Unnamed tributary to Reedy Fork 130 linear feet permanent impact Total 8 linear feet of temporary impact Total 130 linear feet permanent impact 8 linear feet of temporary impact Wetland Impacts Identifier Type of impact Impact 'Site 1 Fill 0.22 acres temporary impact Total 0.22 acres temporary impact 2. The proposed project must comply Authorization Certificate issued by the City of Greensboro as required per their local water supply ordinance approved by the N.G. Environmental Management Commission (EMC) as required .under the Jordan Lake Water Supply Watershed: Protection and Maintenance of Riparian Areas (Jordan Buffer Rule) 15A NCAC 02B .0267. 3. The outside buffer, wetland or water boundary and along the construction corridor within these boundaries approved under this authorization shall be clearly marked with orange warning fencing (or similar high visibility material) for the areas that have been approved to infringe within the buffer, wetland -or water prior to any land disturbing activities to ensure compliance with 15A NCAC 2B.0267 and GC 3890. 4. The Permittee shall stake the limits of disturbance at the stream crossing site and conduct a preconstructlon meeting with the construction contractor prior to disturbance of the impact area. The Division shall be notified of the meeting two'weeks prior to its scheduled date. 5. You are required to provide one copy of the approved SMP, including plan details on full -sized plan sheets, with proof of the City of Greensboro's approval. The approved SW must be submitted to the Division's Webscape Unit (1650 Mail Service Center, Raleigh, NC 27699 -1650) be ore an impacts authorized in this certification occur. The following requirements also apply: • The approved SMP must be constructed and operational before any permanent building or other structure is occupied at the site. • The approved SMP as well as drainage patterns must be maintained in perpetuity, • The SUP may not be' modified without prior written authorization from crick hereto enter text A copy of the approval letter and the modified SMP must be submitted to the DWQ Webscape Unit prior to the commencement of the modifications. i F e i' I 7CCC, LLC DWQ# 13 -0046 March 7, 2013 Page 3of5 - 6. Upon finishing the project, the Applicant shall fill out and return • the enclosed "Certificate of Completion" to notify NCDWQ when .all work included in the 401 Certification has been completed. This certificate should be returned to the -Winston-Salem Regional Office of the NCDWQ at the address listed on the form. If you do not accept any of the conditions of this certification, you may ask for an adjudicatory hearing. You must act within 60 days of the state that you receive this letter. To ask for hearing, send a writtery petition which conforms to Chapter 1508 of 'the North Carolina General Statutes to the Office of Administrative Hearings, 6714 Mail Service Center, Raleigh,- N.C: 276996714. - This certification and its conditions are final and binding unless you ask for a hearing. This letter completes the review of the Division of Water Quality under Section 401 of the Clean Water Act. If you have any questions, please contact Sipe Homewood in the DWQ Winston -Salem Regional Office at 336771 -4964 or at sue.homewood @ncdenr.gov. Sincerely, Charles Wakild, P.E., Director i *Division of Water Quality cc: Andy Williams, U. S. Army Corps of Engineers, Raleigh Regulatory Field Office (via email) Virginia Spillman, City of Greensboro (via email) Anthony Lester, Evans Engineering Inc (via email) Brad Luckey, ECS LLP, (via email) DWQ Wbscape Unit x DWQ Winston -Salem Regional Office LZ t * * * ** LANDSCAPE APPROVAL AND INSPECTION * * * ** ❑ A LANDSCAPE PLAN (which depicts the plant types and locations) Must Be Submitted To The Planning Department For Review And Approval On or Before (90 Days). ❑ THE Required LANDSCAPE PLANT MATERIAL Must Be Installed And Inspected Prior. To Receiving A Certificate of Occupancy. To request an inspection contact Landscape /Watershed Planner at 336 - 373 -2918 * * * ** TREE PRESERVATION APPROVAL AND INSPECTION * * * ** • The Required TREE PROTECTION FENCING Must Be Installed and Inspected Prior to Land Disturbance. To request a pre— construction meeting contact the Urban Forester at 336- 373 -2150 • THE Required REFORESTATION AREA Must Be Installed And Inspected Prior 'To Receiving A Certificate of Occupancy. * * * ** ZONING APPROVAL AND INSPECTION * * * ** ❑ The Required Parking Spaces And Drive Aisles Must Be PAVED And STRIPED Prior To Receiving a Certificate of Occupancy. ❑ Tank Permit required* (Contact Zoning Office Office at 336 - 373 -2630) ❑ Sign Permit required* (Contact Zoning Office at 336 - 373- 2630). * * * ** WATERSHED APPROVAL AND INSPECTION * * * ** • A FINAL PLAT Must Be Recorded In The Guilford County Register Of Deeds Prior To Receiving A Certificate of Occupancy. • Construction of the WATER QUALITY DEVICE (POND & BIORETENTION) Must Be Complete and the "Engineer's Certification of Completion" Seca To The Planning Department Prior To Receiving A Certificate of Occupancy. ALLOCATION CHART FOR WET DETENTION POND #1 ON -SITE DRAINAGE AREA TO POND #1 7.88 ACRES OFF -SITE DRAINAGE AREA TO POND #1 1.07 ACRES TOTAL DRAINAGE AREA TO POND #1 8.95 ACRES ON -SITE BUA TO POND #1 3.05 ACRES OFF -SITE BUA TO POND #1 0.00 ACRES TOTAL BUA TO POND #1 3.05 ACRES State Sanitary Sewer System Permit Required. ❑ MAXIMUM BUA TO WET DETENTION POND #1 3.05 ACRES * * * ** FLOODPLAIN APPROVAL * * * ** ❑ Elevation Certification Required ❑ Floodplain Development Permit Required * * * ** SOIL EROSION CONTROL * * * ** (Contact Erosion Control Officer at 336 - 373 -2158) ® Watershed Pond Construction /Surety Or Improvement Guarantee Must Be Submitted. * * * ** ENGINEERING CONSTRUCTION APPROVAL * * * ** (Contact Engineering Division at 336- 373 -2302) ® Utility Construction Plan Approval Required* ❑ Pavement Cut Permit May Be Required* ® Roadway Construction Plans Required* ❑ Storm Sewer System. • Permit Required To Tie Into Storm Sewer System • Driveway Culvert Inspection Required. * * * ** WATER RESOURCES CONSTRUCTION APPROVAL * * * ** (Contact Resources at 336- 373 -2055) Water System* Greensboro City Planning Department Mailing Address P.O. Box 3136, Greensboro, NC 27402 -3136 Office Address: 300 West Washington Street, Greensboro, NC 27402 ® State Water Permit Required. ❑ Outside City — Utility Agreement And Annexation Petition Required. Sanitary Sewer System* Submit 14 copies of plans to the Planning Department for review. ® State Sanitary Sewer System Permit Required. ❑ Outside City — Utility Agreement And Annexation Petition Required. --- - -- 8 E —Mail: *Fee required before construction plans are released. �ixy�I:iz�7� JANUARY 11, 2013 * * * ** PROJECT SUMMARY * * * ** Minimum Number Of Required Parking Spaces: N/A Total Number Of Provided Parking Spaces: N/A Plat book and /or Deed book Reference: N/A Street Classification (s): BEDSTONE DRIVE —LOCAL STREET GRIFFIN'S KNOLL COURT — LOCAL STREET Developer's Name: 7CrisKats, LLC Address: 7B CORPORATE CENTER COURT. GREENSBORO, NC 27408 Daytime Phone Number: (336) 282 -4127 Existing Land Use: VACANT SI C #: 0000 Stormwater Management /Watershed Stormwater Control /Improvements(s) WET DETENTION POND AND BIOCELL Maximum Amount of BUA Allowed Per Stormwater Control Design: 3.05 ACRES BUA TO POND = 15.36% 0.28 ACRES BUA TO BIOCELL =1.41% TOTAL 3.33 ACRES BUA= 16.77% Distance to Nearest Floodway: >2,000 FT On —site soil types(s): CkB, PoC, POE, Ppc2, PpE2 Hydrology groups(s): A, B Amount of site to be disturbed: ±5.51 ACRES; * * * ** FINANCIAL RESPONSIBILITY ,.ACKNOWLEDGEMENT * * * ** 7CrisKats, LLC is to provide a one year warranty to guarantee the public improvement from failure due to faulty workmanship or materials. Once the project is complete, this individual or corporation will be required to sign a notarized agreement, upon completion and return of this agreement, they will receive a final acceptance letter and the year warranty will begin. The City of Greensboro will not release bonds or accept public Infrastructure for mrntencnce without a final inspection. 7CrisKats, LLC Financial Responsibility -Individual or Corpora t ion Signature ADDRESS: 7B CORPORATE CENTER COURT GREENSBORO N.C. 27408 TELEPHONE: (336) 282 -4127 CITY OF GREENSBORO WATER RESOURCES DEPARTMENT COLLECTION SYSTEM EXTENSION PERMIT APPROVAL PROJECT ORIGIN: ® CITY ❑';PRIVATE TYPE OF PROJECT: ® CITY OWNED ❑ ':PRIVATELY OWNED ❑ PORTIONS PUBLIC AND PRIVATELY OWNED PER ARTICLE 21 OF CHAPTER 143 OF THE NOR H CAROLINA GENERAL STATUES, AS AMENDED AND OTHER LAWS, RULES AND REGULATIONS, PERMISSION IS HEREBY GRANTED BY THE CITY OF GREENSBORO, A DELEGATED PERMITTING AUTHORITY APPROVED BY THE NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION, FOR THE CONSTRUCTION AND OPERATION OF THE COLLECTION SYSTEM DEPICTED ON THESE PLANS AND THROUGHOUT THE PERMITTIN' PROCESS. CITY OF GREENSBORO AND ITS STAFF ARE NOT RESPONSIBLE FOR ERRORS IN DESIGN, CALCULATIONS, DRAWINGS OR STATEMENITS, OR FINDING AND CORRECTING ANY ERRORS OR DEFICIENCIES SUBMITTED BY APPLICANTS OR THEIR CONSULTANTS, AND DISCLAIMS ANY LIABILITY. FOR ERRORS, IN ACCORDANCE WITH NORTH CAROLINA GENERAL STATUTE 130A -26.2. ANY PERSON WHO KNOWINGLY MAKES ANY FALSE STATEMENT, REPRESENTATION, OR CERTIFICATION11 IN ANY APPLICATION OR DESIGN DOCUMENTS SHALL BE GUILTY OF A CLASS 2 M..ISDEMEANOR, WHICH MAY INCLUDE A FINE NOT TO EXCEED $10,000 PER VIOLATION. PERMTTTEE SHALL BE RESPONSIBLE FOR ADHERENCE TO ALL CONDITIONS OF THE CITY OF GREENSBORO WATER RESOURCES DEPAIRTMENT AS CHECKED. ❑ WASTEWATER COLLECTION SYSTEM EXTENSION MASTER PERMIT (PUBLIC) ❑ INDIVIDUAL WASTEWATER COLLECTION SYSTEM EXTENSION PERMIT (PRIVATE) ANY SIGNIFICANT CHANGES (SIZE, TYPE, (CONNECTIONS, LENGTH, ALIGNMENT, ETC.) TO THAT APPROVED ON THESE PLANS OR PERMITTING DOCUMENTS SHALL BE REVIEWED AND APPROVED BY THE CITY OF GREENSBORO PRIOR TO CONSTRUCTION. APPROVED BY: CITY OF GREENSBORO COG PERMIT NO. WRCS00 APPROVAL DATE: COVER SHEET APPLICATION FORM (Revised July 18, 2007) Greensboro City Planning Department Mailing Address P.O. Box 3136, Greensboro, NC 27402 -3136 Office Address: 300 West Washington Street, Greensboro, NC 27402 If you have any questions about the process call Jimmy Person with the Planning Department at 336 - 412 -5739 PLAN TYPE: I REVIEW FEE: Site Plans $400 plus $20 per 1,000 sq. ft. gross floor area Multifamily Developments $400 plus $25 per dwelling unit Single Family Subdivisions $260 plus $40 per lot Minor Revisions $260 per lot, square footage, or dwelling unit listed below applied to any increase. Submit 14 copies of plans to the Planning Department for review. Plan review takes 7 -10 working days; the Planning Department staff will contact you when your plan is ready. WATERSHED PLAN------------------------ PROJECT SUMMARY: Owner/Applicant: 7CrisKats, LLC Report Comments to: ANTHONY LESTER Telephone Number: 336 854 -8877 Fax Number: (336h_854-8876 --- - -- 8 E —Mail: Report Comments to: Telephone Number: Fax Number: 14 E —Mail: Tax Ma Block Parcel #(s): PARCEL 137489, 0137392, 0137394, 0137415 -8 Total Tract Acreage: ±19.86 ACRES Zoning District: CD -R5 Watershed Designation: GREENSBORO WCA TIERS 3 & 4 REEDY FORK WS III Proposed Use: SINGLE FAMILY HOMES Number of Lots: 32 Multifamily Developments: # of Units NA T e: Apartments Townhomes Condominiums Non — Residential Developers: Existing GFA 0 —Proposed GFA 0 Amout of Existing BUA: ±0.00 ACRES Amount of proposed BUA: 3.33 ACRES TOTAL = 16.77% PROJECT SUBMISSION GUIDELINES Plans submitted to the Planning Department that do not include the items on the Design Review Application Form will not be rewiewed, and will be returned to the contact person. This portion of the cover steet must be filled out and signed by the person designating the site to show that he /she has read and provided the required information to submit a plan to the Planning Department. 1 have read, understood and completed the attached pion to the best of my knowledge and ability. Name: 041 n. && Phone: 336 - 854 -8877 Date: v By SHEET INDEX AL SHEET TITLE SHEET # COVER SHEET _----- -___ -- --------- ---- -- 1 OVERALL PLAN--------------------------- - - - - -- 2 SUBDIVISION PLAN— _ -------------- — 3 UTILITY PLAN— -------- _ 4 STORM DRAINAGE— --------- ___ -------- - -_ -- 5 WATERSHED PLAN------------------------ - - - - -- 6 WET DETENTION POND PLAN _-- ----- ------ 7 BIOCELL PLAN— --- --- --- --- - -- 8 DETAIL PLAN-------------------------- - - - - -- 9 EROSION CONTROL PLAN ------- ----- — -------- 14 EROSION CONTROL DETAIL PLAN ------- — _ - - -15 Date Map Revised: Revisions By 02 -04 -13 AL 02 -14 -13 AL * * * ** TRANSPORTATION APPROVAL * * * ** (Contact GDOT at 336- 373 —GDOT) Driveway Permit: • City of Greensboro Driveway Permit Required • N.C. Department Of Transportation Driveway Permit Required. Driveway Permit Issued? YES NO, DO NOT ISSUE BUILDING PERMIT N/A * * * ** SUBDIVISION APPROVAL * * * ** ® A FINAL PLAT Must Be Recorded In The Guilford County Register Of Deeds Prior To Issuance Of A Building Permit. Final Plat Recorded? YES NO, DO NOT ISSUE PERMIT. N/A VICINITY MAP NO SCALE The items checked below have not been included on this plan being submitted for Technical Review Committee review and approval. It is understood that additional reviews in the development process (including constructiion and utility plan review, as indicated below) could affect the amount of development possible on this site and the costs associated with this development: ❑ Sidewalk, Road Widening and Turn Lanes Required sidewalk along existing streets, required road widening, and /or required turn lanes have not been depicted and their design has not been reviewed. I understand that the reviews and approval of said improvements will occur during the construction and utility plan process. ❑ Water and Sanitary Sewer Full design information for the proposed water and sanitary sewer system has not been depicted and their design has not been reviewed. I understand that the review and approval of said improvements will occur during the construction and utility plan review process. ❑ BMP Full design information for the proposed water quality /quantity device (BMP) has not been depicted and its design has not been reviewed. I understand that the review and approval of said improvements will occur during the construction and utility plan review process. ❑ STORM SEWER Full design information for the storm sewer system and /or grading has not been depicted and its design has not been reviewed. I understand that the review and approval of said improvements will occur during the construction and utility plan review process. Individual Responsible for Preparation of the Plan Signature / Seal Watershed Plan Approved By The Technical Review Committee (TRC) on , and /or Site Plan, ISubdivisionj Group Development, Approved by eie , on a/as Z/3 ( 2013—ON1 ) TRACKING NUMBER NOTE: TRC approval represents the maximum possible development of the site. Additional reviews in the development process (including Construction Plan Review) could reduce the amount of development possible on this site. NOTE® Conformance with this approved plan is your responsibility; and any change in land use, lot lines, building location, parking, drives utility lines, landscaping, etc. MUST be resubmitted to the Planning Department to eliminate delays in the review process. Clerk TRC (Date) 00 00 LO 00 co M I,e) �I N E Z ai C 0 C_ 0_ a� a� U Z Z_ CK W W Z_ U Z W U7 Z W E a U i 0 a a� L CL in L Q J W _j , C O- 0 Z� 0 U (n z J ZO Li N V) 0 m O U C3 Z Li I N Z W 0 0 Q .0 E W c0 00 00 v-I u7 00 co M u Li 0 d' n N U Z X M V) Z W W U W Q v7 Z 0 O W d' in N i Q O mQ Z Z 3:: W 1 O � O F- 0Q 0 LL U w O= Z LLJ �O O 0 :2 3 - oo'A AP I O Y V) Z LL_ c� E a Z U a� °o L .E L lL 0) t� Z C:O O o C: > M o— :D U V) �- 0 �O 0 n- o °v1 0 > va cn /1z 0 20r POND & 810-CELL ACCESS ESMT. JAMES GLOVER DB 2896, PG 516 Y. DB 2949, PG 708 DB 2951, PG 665 z INICT DETENTM NAP IT I POND ,ZONING RS-4.0 UT NE (0 UMIT LINE LEWIS & MARGIE -A E PUBLIC S, ILL CARTER S fix)- - SEWER LIFT\STA110N 7 DB 2081, PG 548 _717 `7, VEGETATION INSIDE 20'x200' -T ,.ZONING RS-40 SIGHT MANGLES TO BE t REMOVED OR TRIMMED TO A V -10 HEIGHT OF 30* OR LESS I , I " - I/ I I" i 1 54' 58 585 is 'VILILAMUZ� 0>1 - 59 so 61 119 06L 01 62 COMMON J II "Ex ELEMENTS 4- APL, 66 -5.48 AC AND 7.1 UN 7- SW SF/ w DISTURBED N 0+4 :-�_EA$EMEN _j T_ — 6p77 zoom amm tT 7 OtASS/9 5' WALK arm x .610 SF 49 19 SF 8'0;rSF U �5j) ' I � 7 /7.5X SF 07 /7.5X SIF OA_ v, r5 ILI 9,038 SF 25 \V V loop 17 �3) ix $F N \J- 010 26 QD I 11 7 C 7.057 SF 14 48�� vo Al GOAN MILL' \ \\ \ \\ PHASE 1, SECTION 2; N, U27 EX P.B.169, PG. 19 // WF Fr g, 7.126 SIF \ I �- 1755 SF D.B.6284, PG. 78 Or �1.654 SF 5 .00, T - T Ile 8.5r SF/ 1000, \ \\ \ \\ �� � ; I � i 15 ®® _ _ . _ __ _ _. _. �,,. \:;,: \ \ \\ /// ; �� 111 I i � � � 'y°� j � / l l� �p����' � � l NN sit. 446 CITY(OF GREENSBORO ZIN PARCEL # 0089341 SIF PIN- 7857589523 450E ZONING RS-40 �30 40 ZONING INFORMATION: V, 15k EXISTING ZONING CLASSIFICATION: CD—R5 MINIMUM LOT SIZE=7000 SF (SEE NOTE BELOW) 9•6�4 S� MINIMUM LOT WIDTH=50 FT. 'U& 'A 32 =58 FT. (CORNER LOT) MON\ ENTS 1 11 9F A SETBACKS: v\ 5.98 AC • V \\x 43 N FRONT=20 FT. FROM ROW T11 11 SIDE STREEET=15 FT. I �x\ 11.1)f S� 1%, \ \\\ , 25 FT. FROM CENTERLINE 1,07 �F \ \\ V( INTERIOR SIDE=5 FT. us I I ;j\ �\ �\ N, �::7\ �\���NIX1111 REAR=20 FT. (SEE NOTE BELOW) A G MILL- MAXIMUM BUILDING HEIGHT=50 FEET (3 STORIES) RAIN ��� I i /y\ \ / /' \ �\ �� \ \� �, PHASE 1, SECTION 1 MAXIMUM BUILDING COVERAGE=40% OF LOT to P.B.164, PG. 147 CONDITIONS: MIT Ljt4r D B 6284, PG. 785 7* A!G3e- 1. USES. SINGLE FAMILY DETACHED HOMES NOT TO EXCEED 38 UNITS. 1114 (ou LOT REDUCTIONS WHEN ADJOINING OPEN SPACE: (REFERENCE LDO SECTION 30-7-3.2(L)) -7 x; AIC OFFSITE 1) CONVENTIONAL SINGLE—FAMILY DEVELOPMENTS WITH PUBLIC SEWER SERVICE THAT ABUT A DEDICATED AREA DRAINING, . PUBLIC DRAINAGEWAY AND OPEN SPACE AREA OR COMMON ELEMENTS OPEN SPACE THAT IS AT LEAST 30 CTI 0 9 FOE FEET IN WIDTH MAY BE DEVELOPED WITH REDUCED LOT SIZE AND REAR SETBACK REQUIREMENTS AS PROVIDED BELOW: GREENSBORO POLICE.: A. THE MINIMUM REQUIRED LOT SIZE MAY BE REDUCED IN AREA TO 40% BELOW THE BASE CLUB 'T i I 1LA'T E SINGLE—FAMILY REQUIREMENT TO A MINIMUM OF 5,000 SQUARE FEET WHEN ABUTTING OPEN SPACE. DB 2425, PG. 345 N42* 9 1AAKI '7nKI1KIr_' 0Q_40 B. REAR SETBACKS MAY BE REDUCED TO 15 FEET WHEN ABUTTING OPEN SPACE. C. SIDE SETBACKS MAY BE REDUCED TO 3 FEET WHEN ABUTTING OPEN SPACE. 2) A NOTE MUST BE PLACES ON THE FINAL PLAT STATING: "LOTS HAVE BEEN REDUCED IN SIZE IN ACCORDANCE WITH SEC. 30-7-3.2(L), BUT ALL OTHER DIMENSIONAL REQUIREMENTS OF THE CITY OF GREENSBORO LAND ORDINANCE APPLY." LOT #37 IS A FLAG LOT AND MUST BE APPROVED -BY TRC AS A TYPE 11 MODIFICATION. THE JUSTIFICATION FOR THIS APPROVAL PER THE ,DEVELOPMENT ORDINANCE IS TWOFOLD: 1) THIS FLAG LOT IS NECESSARY IN ORDER TO HELP PROVIDE REASONABLE USE OF THIS TRACT DUE TO SEVERE TOPOGRAPHY. 2) THIS FLAG LOT ALSO PROVIDES GREATER PROTECTION OF NATURAL RESOURCE AREAS. LEGEND 1 0 - EXISTING IRON PIPE 0 - NEW IRON PIPE ■ - EXISTING CONCRETE MONUMENT - COMPUTED POINT - UTILITY POLE - OVERHEAD UTILITY o - TELEPHONE PEDESTAL -0 - FIBEROPTIC MARKER R/W RIGHT OF WAY DB DEED BOOK PB PLAT BOOK PG PAGE III FIBEROPTIC BOX RCP - REINFORCED CONCRETE PIPE MH - MANHOLE - EXISTING FIRE HYDRANT 0 - MAIL BOX NEI - WATER METER - GUY WIRE - WOOD RAIL FENCE ZONE 3 ZONE 2 am. ZONE 1 go WIDTH OF STREAM ZONE 1 ZONE 2 ZONE 3 50' 26, 30 FROM TOB TO TOB 30' 26 50' GRADING & GRADING & WOSTURBED UNDISTURBED GRADING & GRADING & REVEGETATION REVEGETATION WFFER BUFFER REVEGETATION REVEGETATION ALLOWED. ALLOWED. ALLOWED. ALLOWED. NO NEW BOA NO NEW BUA NO NEW BUA 140 NEW BUA ALLOWED ALLOWED ALLOWED ALLOWED STREAM BUFFER DETAIL N.T.S. 46 °:14' AC OFFSITE:, AREA DRAINING %K TO''. HIS POINT .4i 01 % LOT 12 SECTION Cb Cr THREE GREAT OAKS PB 46, PG. 75 ZONiJNG RS-40 DENSITY LIMITS: 14.68 AC OFFSITE AREA DRAINING TO THIS POINT GREENSBORO WATERSHED, WS III WCA (HIGH—DENSITY OPTION) TIER 3: 30% BUA MAX TIER 4: 40% BUA MAX TIER 3 ALLOWANCE = 12.89 ACRES X 30% = 3.87 ACRES ALLOWED TIER 3 BUA SHOWN = 2.26 ACRES TIER 4 ALLOWANCE = 6.97 ACRES X 40% MAX = 2.79 ACRES ALLOWED TIER 4 UNITS SHOWN = 1.07 ACRES TOTAL ALLOWED = 6.70 ACRES TOTAL SHOWN = 3.33 ACRES WATERSHED CONTROL NOTES: 1. WATERSHED: GREENSBORO WCA TIERS 3 & 4—REEDY FORK WS III 2. TOTAL BUILT UPON AREA: STREETS: 43,608 SF LOTS: 32 @ 3,000 SF/LOT = 96,000 SF SIDEWALKS: 5,963 SF TOTAL = 145,571 SF (16.98%) 3. DISTANCE TO NEAREST FLOOD PLAIN: >2,000' 4. AVERAGE % SLOPE: +/— 14.9% 5. DISTURBED AREA: TIER 3: 80% MAX TIER 4: 85% MAX TIER 3 DISTURBANCE ALLOWED = 449,191 SF SHOWN = 248,589 SF (44%) TIER 4 DISTURBANCE ALLOWED = 258,071 SF SHOWN = 57,970 SF (19%) v SITE DATA: TOTAL AREA: ±19.86 ACRES TAX MAP PARCELS: 0137489, 0137392, 0137394, 0137415-8 WATERSHED: GREENSBORO WCA TIERS 3 & 4 REEDY FORK WS III PROPOSED ZONING: CD—R5 PROPOSED NUMBER OF LOTS: 32 AREA IN ROW= ±1.59 AC AREA IN COMMON ELEMENTS: ±11.46 AC AREA IN LOTS: ±6.81 AC TOTAL PHASE 11 AREA: ±19.86 AC 100 OWNER/DEVELOPER: 7CrisKats, LLC 713 CORPORATE CENTER COURT GREENSBORO, NC 27408 TELEPHONE: 336-282-4127 FAX:336-282-3797 CONTACT: HERB PARKS EMAIL ADDRESS: hparks0besisuites.com GRAPHIC SCALE 50 100 200 ( IN FEET ) I inch = 100 ft. 400 IL CID r UL WL IL A -Z Cf) M -u if \S2 Xc� lie %Y ji I 17— 14 111111 Til I I -77 C-q1 V 'Y 00 + U-1 co p l - / ' ,_ �` / ISImilim 'o - e. EPQN1? MMON EMENT 6-4, p 30' woo -s — — — — — — N. SZ -A '7 loqc,' )d '.00l ",KIN dp 000, r M- z ax� I d", 7- 0 A I 1 0 1 1� 1 1-0 -A ffisi v. 0 00I Z 'ry LOV., t 7 N. '-1,000 Ooo-\ 11000, -01 Fri 0000". /(A '00or f zx 0000, 1000, 10 00, ;5 14X L I C/) -ron On 0) N, 724 L001� rrl /A col C'y oz,- 0.� 0) z 00 > M K U) CD 100, Z5 OQ 0 q/ —7' f ct '00- U) rn .01 100, CP7 0a, M j COY) 7- Ln LU - -TI 0— y -Fo X 10" M, (A /' ,,/.i� 1 ! t� I. _L'" � � � /', � � '� w �= — � / bL- I 7 1. 1 I y// /� // Ewa- _� \ _ - - - -�- •1W''/�9 "'" �� -'10 -- —_ — -�v-'� I 1 y / t'I I I I �, i` \ t/ J- G) v) -T1 .01 LA 00 rm 0 (D or/ LP N 00 (n Ile (A Ln V' i i �,` — ; — _--� ._ _----- -�-- -r _ — — ° ' ,� / 1 - C>A\ UI -e_ LAX (A (0() N, C.0 ---800— A0 C L 00 (A (_n 00 (A I 11 �" \ / / / 00 00 LA Ln < Ul 0 0) o' Lo Mir ME 09 co --\V-- 00 JIM MN Ln U) __j \ - - - -' N, 0 4h. Ln V) (o t C OD m z 820 M Ln 1> Ln I Lf) m 0 > U) m 00 m KI z I M Z 0 00 (7) co > --j Z LA q M C) V) ri (to j it � ' �� // > fig N 0— -TI 71 FT1 'r- �MuE --n 0 Z 00 1, FT-1 1"a I (f) 00 0 7- :od I 00 cj� CTI Q0 CD CD 0 �69 Q5 N. N, N CV FE F- 0 co Z N) r-) � m 0 -n -10 -J -J 0 KO>MMWO > z ?< rm- m --j (A -0 M 0 0 > L4:C Z 0 7\ >00 (I V 7-� 1 CC) -0 0 zoc>p 00 Mm" O>r- Lom I (A- -0 a) (A (A Z M 00 m ,o M 00 NOS ;o M -0, OD 0 0 c 0 3 ;u;o (A MITI 0 u) < > m M On o 00 z z 0 co M > 00 Ln 0 z T C) q (A 4 -=� 6 Tn ww :0 X t W CD Fwd 8 g � � � , >1 A J > CA 4eN C- > z c > U4 lt-�- 0 IL4 C) m rn rn 0-4 OTJw 0 . 0 z 0 0 c 0 z > O rn rn 1 79 CJN -ft 54, Z 0 Ln > C) > > > 0 m;Q x;o m > > Fri 179 1-TI 0 0 ---1 x m > > > -u -0 m z z z W M = -0 ;u ---i > > > m > r- 0 X 0 0 M P11 ?� 0000 • -U > ---1 7- -C� Z N > m 0 0 K > FF z FF cc) z M M Z m 0() m Lr) co o m 0 C-) > 0 z 0 cyl 00 771 60 CA ::E (-) �o C") > > (A 0 U) C14 > C) (-4 -Ij m m 0 0 71 Ln I 000 v z 0 Cf) n M CrI -p- L-1 0D 0 - < CA 6n m C > > X 0 z V) FA M1 C) A ---I I m C: C 0 -i ;u > m f) L r - 70 -17 CID -r 0 C M 0 0 0 —M —M —M m 70 ---I ;O;o m x m -P� -P� Z (n cf) > I IM > > m r- c: r- 0 0 0 > x 0 z m cn * cri m z Cl) E K --- i C/) 7 >z z --ice 0 -0 ;o --j --i > ;u M x 70 0 CD (D > U) 0 z > Cf) Z 0 zoo 'o-q > 0 m < > > x z z I z m -0 X;u c) 'o-1 I CA om*m m >M r- -n (A 0 0 > I m .. > x omo z M r- z mmx C-1 0) z c: c Cf) x 0 Cn -rj M :-j --j >m- ;mu + (-nj > U) -,- Cc) 0 X L4 :,j > > oil > m r'j K K: 0 (n cn 0600 ::E ::E :E: -.'' L4 m 0 >;u I 0 0>-10�j- >>- X 0. J 00 X X m o cn 0 -TI ZMZM 0 000 -0 00 0 --- i (n r- C/) --- 1 0 ::E ;u U) rr, -,j > > W 0 > C)o > z m 0 o o 60 '01 x LT1 > mcf) m 0 > > m (-) m X m M(nmm CD > iD > > r- L-1 Lf) >7\ m m Lo C/) C/) x > z 1 -'j 00 cri (o x x p Q 0-000-- U) 70 cn x -P z > C) "j (D (D .. @ U) v C4 C'J 0 CA a: 0\� 0 z z oo> �J (A 0) (n -TI Cl) -0 Cil (0- 0 A 0 -17 4�- m Fn 0 0 -0 0 O'� 0 U) -71 0 C/) w I CA 60 c: m (n ---I m N) Co 7- > z 0 0 > 0 nxz m 1 co ---1 00 0 -0 U) 0 0 > z > 0 C/) > x 0 17- m U) 0 0 m 0 v z 0 Cf) n M �- WETLANDS / I::; /� / _ ^► — — -=- _ � T s � — 15 p — COMMON ELEMENTS _ ��' ss— -- =5.48 AC O AND ° :r I - - - =—= 7,638 SF/ / /,30' DRAINAGE — — — _ — — Boo UNDISTURBED -. T ` -EX.f , � ` ! �ESMT. QW.) - - -- - - - - -- - - -- EASEMENT '- _ _ _ _ _ _ _ _ _ _ Tx- _ - - - - ___ / _' – i 1-?– \I \ F �7, 9 S \ L\ / / ' _ �`� - — Bto if 25,y� _40MPOR ,� P. FFIhRtEE Y \ / _ — — — — / �' _ / Eq "" "� __ rt ARY - - r x /' 1 _ �E1t — �f' ; \ �64 J S 5' iRE%R ,/ Y –� , / ��/ _ ,- L___ -- Lau RIM= !"s'sr` RF.�lov. 8° 1 , f A I / /y _ _ _ _ ' Ot: INVI OUT -�58. PLUG AND I I E _ _ — — — — 2� ( /INV. IN X60.7 EXTEND B DIP SSMH #1 / ,(• ,� , y 7, 610 SFt S' DRAINAGE / 56 ' _ ssMH #6 — ` `l I iC\ \ I j ' / �� COG STD# 200 — i I ' / _ J , t I COG STD# 200 f ) ��:.. E TYP.) \ �r' 51 ` 1 ' / 48 i/ - — — - TOP:812.00 TOP:766.07 J / ® \ I J \ / / 8,0� SF s i i INV. OUT-.807.50 INV.IN:763.72 ss11Vt�I\I#2 ' h `i I / / 5 ' I / ' 8, 19 SF ENV. OUT:763.62 r I / J / I I / / J 1 r ICOG STD #too Iii \, \ / ! k 1,958 SW \ \r 1 7,296 i -;-e – = ` — — — �- :-- — / / I ► �/ / W� ANDS \ / / / I TOP-774.78 \ \/ F I\ l �/ / J �\ 7, 4 SF ' , \ ' \ I t PROPx� �� /�� �7 - -� - - °s22 - \ ` ! / �) (�( INV. IN:769.21 .yo �i / J 53 !� i �ROP. w &s - ►- I \ I I y \� \ \ / I 1 /I I IN i \OUT:769.11 I •; ( / \ J i J �;; i sRVICE -- `- _ _ -I-'- /i j - - - {_ LL► (/� 1 `\ 1 > \ I' / \ \ < J 9,038 SF �\ \ (TYP.> _, –° o v /� / YTJ961 Sj / / – I \ �• \' x 1 %' \ \ 2 5 / \ \ SSMH #3 1 \ ONT L i 1-- �" V EsM� �i / / B2s— _ Z / (� (! \ \ I \ Y\INV STD# 2� / �R ' � _ -\ \ LU `T J ! �\ ! }I J669 F �. \\ P:789.52 �\ SETB ,..-� 3+00 \ ( /,Z Q I � \ . IN(MH 5):777.80 \ w ;X IJ' (/ c ( ` 11 ` — ^, // �\ ► INV. IN(MH 4,:777.80 -1" -(- P I \ / :777.70 W 4l �I,� /�< L 1 9 I t 1 ` \ J� /1 / % \/ \ I \ n�tv� ovT / J v it Z +� _ \ ' �` ssMH #s J 1 / ® (, COG STD# 200 ! l \,J J \\ -'"� ( 1 \ g ++ '` $ s / 1 ) R I / TOP-812.94 SFS ^1, �_ 0' S / \ r- ►�" p��1 / / �/ I INV.IN:803.50 / J / :. `� 15 \ I� ti } J J / // INV. OUT :803.31 J / f ! i \ ��0 a J \ '. _ 1.0', \ \ \ j I I 1 7,057 S� \ Si - -L.• / / /14,483 SF \ - - `` \' I I \I \� \ 1 I \`� / \ .� ��'o I-- = ET8�40K�T °" )� J / / /'� \ /// �� / / ) I 1 ((� \ 8" x 6" / 411 1 .► J J EX. POND i, ( III i `� REDUC / / 412 l / I ` ; / �� r(I I ,126 SF \/g1,755 SF , j I l / / i \ ✓ I 1 t \ o.\ • ,. < 20� x god 8,1D96 J \ / da jj I / / / �\ / - 4 //11,654 SF / 1 40 \ /e \- j, ff�� \ N I ��, 3 \ / / V 8,594 SF 1 – 1 \�" / j / 7,199! SF J 7,376 SF, \\ ` \1\ J v /; \ \N «° •• �\ l� Il -- 1 Y, % P) . \�\� I / V �� \\ i 1 I ! V // \ �\ ---5' "' 3�,- � � \\ � � 1 1 / \\ • � ` / J / J .--• SETS ACK( I � I 1, \, 1 \\ \ 29 l l /� J 7 i l �.� �/'� ( \ / f - E$Mr C /\ \ \ 1 t \ PROP. w &S I ! 110, 5 ( . - I ,J/ �y, \\ 8\44 SF SERVICE ! S -I ( ! I "Cl \ts° DRAINAGE ,` \ \ /{TYP.> $ ..t � � I I ___• J--" — .-- � I I / � ( \ \ I y \ `\J 'J.: \! �_ -T- i �1 i //� I /0 1 I\ , CITY/OF 1 GREENSBORO \ J \\ \ \ \,\ E SAT (Np., \ \ / y \ \�� ` \�• \ �' \ \` \ \ o T` J / t PAF�CEL 0089341 t I�\ \ \\ \�� \ \ \ \ J ! �11> >�� t �o1 e i� I i �i + X�• ,, , • \ 7857589523 ,�: J lI f r \ \ \ 1 \ I t 1 PIN. 1 / \ I \ �\ 8,54 SF ! I 37 1«',507/ Q) 1 \ \ \ \ ►� 1 J \ \ \ I / \ \ I I �I 1 \ ZONING RS -40 1' 1 I \ \ \ I \ \ 1 J I\ / 1 \ \ \ 9,3018 SF / .4'\ I I 0,_ I \1• \ w \\ \ \;\�` \ 1�J J \\ \ \ \ 1 1I 1 1 I I I I o� \ I '\WETLANDS �\ • 5 I \ v \ �`:� \ 1 31 I °� , � \ � 1 i 1 1 1 11 1 \ \\ I I � I I �+: I �- �" t \`A . 1 .r► \ \ 10,\Z79 F ssMH#a .COG sra# 200 I i I 136 802.86 PROP. 0IREE .0 tt v I ( I /INV. ; i'T9,6 ?4 SFt OUT .-791.00 I I \ \ \ \\\ \ \.J.. I V \ \ \ \ \ \ \ , \ I\ COMMON \ ti // >v»I\` I �-� \ 3 �\ \ \ `ELEMENTS \ \ \ \ \ \101119`S F i/� 79�s r \�\ \ \ \ \ \ \\ ` X5.98 AC \ FFE 19 ` X245\� F \ i \ \ \ \ \ \ \ 43 1 7 0 / RM \ \ \ \ \ ` \ \ \ I \ \ 11,1716 SF i 34c 1 \\ �\ 1,107 \SF \\ �.� r. 1 if MILL / f ,� \ -- - - - �' �� , CTI ON 1 ; G. 147 , ___ -- G. 785 BORQ - ,� =-- - 0 1 \ G R •� 2223 - - ' I RLIO E _ UNNAME 7REAM PER DWO GUILFORD COUNTY 2010 ENVIRONMENTAL °r / ® : °' ®,. „C. _ " .•ts —a �'�- SENSITIVITY MAP ®�„ STREAM CLASS1FICATIONt WS —III ® TC/� // 4"• ,v. ®;� ` ` �• REQUIRED SEWER MAIN SEPARATION PER ` \y `� e\ . 15A NCAC 02T 3305(f) _ `�.E.I A- it 1 if /z t /Q DENSITY LIMITS: GREENSBORO WATERSHED, WS III WCA (HIGH – DENSITY OPTION) TIER 3: 30% BUA MAX TIER 4: 40% BUA MAX TIER 3 ALLOWANCE = 12.89 ACRES X 30% = 3.87 ACRES ALLOWED TIER 3 BUA SHOWN = 2.26 ACRES TIER 4 ALLOWANCE = 6.97 ACRES X 40% MAX = 2.79 ACRES ALLOWED TIER 4 UNITS SHOWN = 1.07 ACRES TOTAL ALLOWED = 6.70 ACRES TOTAL SHOWN = 3.33 ACRES �;NI NO SCALE NOTE: 1. ALL CONSTRUCTION TO BE TO THE CITY OF GREENSBORO & NCDENR STANDARDS AND SPECIFICATIONS. 2. CONTRACTOR TO VERIFY DEPTH AND LOCATION OF ALL EXISTING UTILITIES PRIOR TO CONSTRUCTION. 3. CONTRACTOR TO COMPLY WITH THE NEW O.S.H.A. REGULATIONS CONCERNING TRENCHING FOR INSTALLATION OF UTILITIES. 4. NO SUBSURFACE INVESTIGATION CONDUCTED BY EVANS ENGINEERING, INC. 5. ANY EXISTING SIDEWALK THAT IS EITHER DAMAGED OR NON —ADA— COMPLIANT TO BE REPLACED AS PART OF THIS PROJECT. U&ITY NO77CE THE UNDERGROUND UTILITIES SHOWN HAKE BEEN LOCATED FROM FIELD SURVEY INFORMA770N, RECORDED EASEMENTS, A ND EXIS77NG DRAWINGS. THE SURVEYOR MAKES NO GUARANTEES THAT THE UNDERGROUND U77LI77ES SHOWN ARE IN THE EXACT LOCA77ON /ND /CA TED ALTHOUGH HE DOES CER77FY 7HA T THEY ARE L OCA 7FD AS ACCURA TEL Y AS POSSIBLE FROM THE INFORMA77ON AVAILABLE. THE SURVEYOR HAS NOT PHYS /CALLY LOCA7FD UNDERGROUND U77LI7ZES. NOTE: IN THE PROCESS OF OBTAINING ALL OF THE NECESSARY APPROVALS FROM THE STATE AND CORPS FOR THE STREAM CROSSINGS AND WETLAND DISTURBANCE. SITE DATA: TOTAL AREA: ±19.86 ACRES TAX MAP PARCELS: 0137489, 0137392, 0137394, 0137415 -8 WATERSHED: GREENSBORO WCA TIERS 3 & 4 REEDY FORK WS III PROPOSED ZONING: CD –R5 PROPOSED NUMBER OF LOTS: 32 AREA IN ROW= ±1.59 AC AREA IN COMMON ELEMENTS: ±11.46 AC AREA IN LOTS: ±6.81 AC TOTAL PHASE II AREA: ±19.86 AC 5 GRAPHIC SCALE 0 0 25 50 100 Ze WATERSHED CONTROL NOTES: 1. WATERSHED: GREENSBORO WCA TIERS 3 & 4 –REEDY FORK WS III 2. TOTAL BUILT UPON AREA: STREETS: 43,608 SF LOTS: 32 @ 3,000 SF /LOT = 96,000 SF SIDEWALKS: 5,963 SF TOTAL = 145,571 SF (16.98 %) 3. DISTANCE TO NEAREST FLOOD PLAIN: >2,000' 4. AVERAGE % SLOPE: +/– 14.9% OWNER /DEVELOPER: 5. DISTURBED AREA: TIER 3: 80% MAX 7CHsKats, LLC TIER 4: 85% MAX 7B CORPORATE CENTER COURT TIER 3 DISTURBANCE ALLOWED = 449,191 SF GREENSBORO, NC 27408 SHOWN = 248,589 SF (44 %) TELEPHONE: 336- 282 -4127 TIER 4 DISTURBANCE ALLOWED = 258,071 SF FAX:336- 282 -3797 SHOWN = 57,970 SF (19 %) CONTACT: HERB PARKS EMAIL ADDRESS: hparks@besisuites.com ( IN FEET ) 1 inch = 50 ft. 0 PROJECT TITLE: GRIFFIN'S KNOLL GREENSBORO, NORTH CAROLINA i ®`0000uotty �� s Vans ®e ®' ®`® ' •® e e I' ngineering, e•e� e' /Q e # —since 1974- e 1 Engineers Surveyors Planners 4609 Dundas Drive Greensboro, NC 27407 .19773 ° Phone 336.854 -8877 Fax 336854 -8876 ®tl0�1� ems• FIRM LICENSE #C.0168 ee�a�+��,`,,, ri"j �• PROJECT: 823 —tt DESIGN BY: ADL DRAWN BY: AL DWG: H:\DRAMNGS\HERB PARKS \Trosper Road \Griffin MRI Site -4th SHEET DESCRIPTION: UTILITY PLAN SCALE: 1 "= 50' DATE: JANUARY 11, 2013 REVISIONS: 02 -04 -13 SHEET NO.: REVISIONS: 02 -14 -13 15 RIP RAP PAD $, _ Wr -2 D.pA.U.E. LIVER �dt - - -RIP RAP PAD _ to =26' S' -A \ i ROUND _ - - W--46' \ \ THICKNESS =26" WET DVE-NTION / - J I 1 �\ LEWIS s - W2=46 �' S I RA -7 - -__ - CLAS RIP P . , _ �N. THICKNESS =ss ® \o ® // ho CLASS 11 RIP RAP S - _ - - �. e _ /J _ - - -�- '_ - 9� b _ NI Y D13 2( TA / - 1tE�ESS�ESM -"\ -� .. �, Z 0 ! ,•� ! ._.1 ( I , , , .,` . , 1. 1 � , .•.,: -_._- Leo --- r i , / . ••. CURB INLET #4 // / / -.."_.. _ , .•.^r..' _-., =� ... '` � � _ ,COG STD# 402 / / tt i ADWALL ;,;TOP- 764.96 .J ` - _ ! DETAIL `INV. IN:760.94 - l t , 2 I! NCDOT � ` 'INV. OITf:76o.74 � .. �.. - ._ _ ns. � - - , ; -.. -, - � _ � - � � ` O \ (STD. 838.39 R / ( p s r,S - _� N. - _ n2s \ - 5'4 � r i . t � s � � ,- :. ,_. \ MAN � _ - - ;-. - -. - __ � � - , -_ % - s t I WETLA DS. l ®E '�n NNP ! � t � 1 � �, ,. , , / _ \\ti X90 � ;- _�__ -_ _ - - _ - -- -• -- _ _ % S 11 / COG STD# ao2 _ _ - - 1 �2 .MANx ' r I TOP:764.35 � � _ 1"• 30" FES #22/ � 1 / N a COGS J �' COMMON / INV.IN:756.65 / - - -� INV. OUT•756.45 - GRATE INLET #19 - / �- --- -- I 15•• FF� et INV. IN:760.35 - e ELEMENTS , C66 NV. OUT:760.15! COG STD# 410 ss - _ C v / GRATE:W9.25 - - - - O 5 48 A / - - INV. _ _ - ====== ' .. �. o ..., �.• \ o c- �..� r n r� /�� - - - -800 FM IFJ i - AND -_ / o S b5 bb ARE TO DRAINAGE MANHOLE #2 _ _ UNDISTURBED - GE 2 . +� � \ e+ , .. � � ��! � � ,� � SMT. TYP1� COG sTD #400 - - - - - - - - - - BE GRADED SO THEY _ ^`� I i r OP 778.33 - -_ _- - -- - - - - -- - __... - w °' 1 DRAIN TO THE POND / \. I ": _ -%-INV 33 1 .OUT 774.13 --- - - - - -- " EASEMENT VTA F� 6 ��� / - - .tip h. r. b 7 9 S \� /' GRATE INLET #21 -=7� ® C STD#STD #4021 ' *, 11 -GRATE INLET #20 w ::. - - - - - - / I -810 2 R - - 4o''- hlNPpR - J. ' /COG / ' , \ \ 1 GRATE:79150 /' /COG ST'D# 410 / - _ _ EA�IItiCY TOP•764.35 / Z IIdV. IN(1 ?):7752(1 /REi / GRATE:? / - _ _ Ex. Wo i INV. OUT:757.75• y L_ -�� _ • �r - -- - -, e t ENV. INV. - R10 .57 PCK\ - E11: IWV O T= 58.�' \ �\ \\ � ` IfdLEf #3 � `"> ^a' //. OU� I I ,. INV. OUT:796.00 i�V a 7 CURB /) ? F 10 SF - Y . %�.00' ' � � . -. GRATE INLET #18 � `'- IWV. IN J- 760.71 \ / \ COG STD* 402 / ^ CURB INLET #17 ®� \( - 2 4 15 DRAINAGE / - COG STD# 410 HEADWALL { TOP 764.:96 t l / :.k f Top: STD #402 \ rl \ I 51 - GRATE:815.50 DETAII. INV.0 :761.10 w\ TOP:779.10 (TYP.) / c Cz S / i /� �/ - - - \ I ' l I I i + i Z33, .19-. SF f INV.OUT:812.50 ` i NCDOT � 4 ., � ,. I / � .�; y� INV. IN(12).775.99 / �s -�. _,.. ., �'� _u a.: `N.� �;a \ I / ! TD. 838.39 i`,:' ( ( )• �. Il 9584 Siff '' 1`� 7,296 //� �/� S / a' INV.IN16.775.99 \ ��` \ \ I W� ANDS \ coG sTD #402 I l / '-- - - - •I•- / ( / ' ,P .,.;`• � INV. OUT:775.79 1 / / 7 k ��' v i I' -�-- - '�- / TOP:782.20 . / '\ \ (7 4 SF I\ ' \ \ / 51 I (j / ( �: I� INV. IN:776.51 -- S *- -- f NV. 2.. 1 �/ J ' \ \ _ \_- •�j // Yi961 SF \ (- Ltl I (/� ► l\ 1 ) \� { (� �; 9,02 8 SF / - C 25 / \ ( I cuRB INLET #1 \ , FRpNS J U OUTS EsM _ - - 826 _ - - Z J I I \ / i \ COG STD# 402 �2 C�'i - W I \ 23 `� j669 TOP 790.32 1 IN-783 w`� ,, I 1 1 , .1 I \_I INV. .99 I \;.:: i a I UT:78 .79 �Z.�L1! - / .r. S BSI Z . \ \ I , / / I l i / t II 46 i ILL ® �• ,A•�� l �S t \ 1 , ZO \ \ I; 7,057 S� o+ _ oy9(,'c:. \ t ' / ° ^ \--- - - - - -® l • p `I �R i i _ / / /i 4,483 /SF / I ,GRATE INLET #Il: \ / ° _ � $ °CURB INLET #15 �' _ n .� / •' / ` ` \ CK( --1cOG STD# 410 I coG sTD# 402 j GRATE:781.80 \ f 1 I I I �\ I y �TOP:791.64 CURB D 1 I / "INV.IN:777.10 { `r: ' 27 \ \ ®r, ( INV.IN(14):784.s4 S \ ( -1 , t \ '. E X . P O [\INV. OUT :776.90 ( I I ' 0 i \ \INV. IN(15A):784.sa / 912 l OG STD# 403 \. \ I \ � -! + - - . , , , - � �° .. { . ovT;7 � / �I / �roP•8os.90 l ` / / \- } i \ ,126 SF �'C `r \ \ ',3155 SF / / ' hn�IV. ouT:797.s6 \\ /� \ `P / _ 8,/096 _,, :\ \� ' 1,654 SF I 1 \ �� ® $ c� ST #14 1 /, / \ 43 / / ' (DRAINAGE 40 I \ I \ / / / / 28 III /Fes\ ®4 \ TOP:7N:78 / \,� / ,,§j551 SF/ \ / / �� /AREA LINES (TYP.) �� ` i � ;, %'`` INv.IN: ?86.76` / I / \r 8,59 SF \ / 1 { �v.OUT:786.56 1 / \ 7, 3�6 1 9 f S v 7 / t / / \�� V ^ \\ INV. IN:777.93 //: �� \ \\ k p�E ' t / 2O.I-) i ( , 1 \� y Z / / \ / \ 1NV.OUT:777.73 � \\ �� � •: "'� -5j / _ � �, ".- \� I I / COG STD# 40313 ( \ ( \ / 98.06 \\ \ 1 • \ ',. \ %� air ..«. n:.:'.T"• A ti M TOP•7 t `,► 1 446 SF:� \ I 5 S f > .; •, INV 1 DRAINAGE o \ CITY / OF GREENSBORO _ i`� �` \�� \� �� \ \\ `\( \i \�► \ \\ I \ I\ I - \ c I 3� / 1, 1 PARCEL # /0089341 DSO O F 1 / ,I PIN: \ 737589523 1 \ 1 �: I �X ••• ... S I _� :� \ \ \ ► 1 / . \ \ 11' 507 Q) i I 1 j e \ t \ 1 \I , ', ti \ 1 ,3 I ► 18,54 i \ 137 I'i \ ZOf�IING RS -40 t/ \ 9 SF � �! I 1 • -pM�E i `� \ \ / GRATE INLET #9 1 \ 1 / / i I 1 ► ° ( DK 1 Q.- ( i 1 4►�\ \\ t t \ 1� t \ \COG STD# 410 \ 1 1' I 1 I I { 1 0 t \ GRATE:782.20 WETLANDS \ \ 1 INV.OUT:778.84 \ , ` ou \\ 1 � 1 � - � fin\ \ � k / (' I ` •\ \\ \�\ \\ 1 I I' I I' I 1 1 1\ \ 110,\279 ti. I I I I I 6 V� 1 / 1 COMMON �\. Cp ,C ELEMENTS \ \ \ 1 10 119\ E \ \ 3 :., (pAL \ \ \ \ \ \ :: J. 9 8 GRATE INLET #8 w 'g w / I nq3 I 1 I 245 F �\ 1 \ \ \ \ \ \ \ \ > `coG STD# 410 \ \ I \ K,P % NGRATE:782.30 1 - - \ R 1 1 \ \ \ \ \ \ ,A \ \ Y IM779. 7 \ \\ �' \ �\ �� \ \` e \ \ \ p \ \ \C(UT.779.67 \ \ 1 11,17 6 SF 1 3A \ \ \ T)I, 1 107 , \SF \.\ GRATE INLET #6 \/\ - % ` COG STD# 410 - -- ��IV ®T 1 COG STD# 410 / \ �R� �GI3 AlTE:797.00 GRATE:782.80 8 \ IN�Z'. OUT 792.76 %INV. IN:780.37 \ \ ° - " V. / o `I ` 1 \ \\ \\ \ \�\ \ \ /INV. / �. ?0 S 1 1 \ \ \ \ \ \\ \ \ \ C "/- ALL BUA MUST DRAIN TO POND OR \ BIOCELL. BUILDER TO GRADE SWALES AS � '._ �M\ I , � �. -� ��, %: ;\ : \ / / �) / �, l I \ \® \ y � \ \ \., •, `.. \ ° - -- -- - _ - - NEEDED To ENSURE THAT ALL BUA > S -FIN MILL �\ 1 - / r , �, •�.\ \ / IICTO STORM SEWER OR ROADWAY I, SECTION 1 -- 34, PG. 147 84, PG. 785 / ,�.._..._ -y- --� r' �.- \ OF G9$ ®�� NOTE: \ 2223 \P _ _ _ _--- -- / l ► P R. - \ - ALL NEW IMPERVIOUS SURFACE AREAS MUST DRAIN A; RLiI'E �-"®'�' . ® TO THE PROPOSED PERMANENT WET DETENTION - - °- /• ®/ _ �. ®_ -� POND AND BIO -CELL. _ P _... _�j / /ate 1 I l N DEVELOPER: NhsKats, LLC , Q.. �C I.,�'� �\ �` COURT �/ i,, ll //r / 7B CORPORATE CENTER C GREENSBORO, C .�/ ' t I > l ._. - TELEPHONE: 336 82 4127 FAX:336- 282 -3797 CONTACT: HERB PARKS EMAIL ADDRESS: hparks®besisuites.com 14.68 AC OFFSITE AREA DRAINING TO THIS POINT Qtoo=77.2 CFS (1 =8.1, C =0.65) DENSITY LIMITS: 0. GREENSBORO WATERSHED, WS III WCA (HIGH - DENSITY OPTION) TIER 3: 30% BUA MAX TIER 4: 40% BUA MAX TIER 3 ALLOWANCE = 12.89 ACRES X 30% = 3.87 ACRES ALLOWED TIER 3 BUA SHOWN = 2.26 ACRES TIER 4 ALLOWANCE = 6.97 ACRES X 40% MAX = 2.79 ACRES ALLOWED TIER 4 UNITS SHOWN = 1.07 ACRES TOTAL ALLOWED = 6.70 ACRES TOTAL SHOWN = 3.33 ACRES WATERSHED CONTROL NOTES: 1. WATERSHED: GREENSBORO WCA TIERS 3 & 4 -REEDY FORK WS III 2. TOTAL BUILT UPON AREA: STREETS: 43,608 SF LOTS: 32 © 3,000 SF /LOT = 96,000 SF SIDEWALKS: 5,963 SF TOTAL = 145,571 SF (16.98 %) 3. DISTANCE TO NEAREST FLOOD PLAIN: >2,000' 4. AVERAGE % SLOPE: +/- 14.9% 5. DISTURBED AREA: TIER 3: 80% MAX TIER 4: 85% MAX TIER 3 DISTURBANCE ALLOWED = 449,191 SF SHOWN = 248,589 SF (44 %) TIER 4 DISTURBANCE ALLOWED = 258,071 SF SHOWN = 57,970 SF (19 %) OUTLET PROTECTION FES# SIZE FLOW(cfs) La (ft) W. W. Thickness (ft) RIP -RAP 5 15" 0.71 10' 3.75' 12' 13" CLASS B 22 30" 1 31.21 14' 7.5' 1 16.5' 16" CLASS B 23 72 414.43 40' 18 46 36" CLASS II GEOTEXTILE LINER TO BE INSTALLED UNDERNEATH RIPRAP PAD NOTE: IN THE PROCESS OF OBTAINING ALL OF THE NECESSARY APPROVALS FROM THE STATE AND CORPS FOR THE STREAM CROSSINGS AND WETLAND DISTURBANCE. SITE DATA: TOTAL AREA: ±19.86 ACRES TAX MAP PARCELS: 0137489, 0137392, 0137394, 0137415 -8 WATERSHED: GREENSBORO WCA TIERS 3 & 4 REEDY FORK WS III PROPOSED ZONING: CD -R5 PROPOSED NUMBER OF LOTS: 32 AREA IN ROW= ±1.59 AC AREA IN COMMON ELEMENTS: ±11.46 AC AR EA I N LOTS: f 6.81 AC TOTAL PHASE II AREA: ±19.86 AC C__ 0.65 PIPE CHART 1= 5.75 IN/HR DESIGN STORM = 10 YR NO. AREA (Acre) TOT. (Acre) CXI Q (C.F.S.) ppEREQ. (Aches) SLOPE (%) CAP. (C.F.S.) ppEUSE) (inches) SLOPE USED (%) CAP. (C.F.S.) 1 0.07 0.07 3.74 0.26 15 0.00 0.26 15 3.33 11.82 2 0.06 0.13 3.74 0.49 15 0.01 0.49 15 4.53 13.78 3 0.10 0.10 3.74 0.37 1 15 0.00 0.37 15 0.50 4.58 4 0.19 0.29 3.74 1.08 15 0.03 1.08 15 0.50 4.58 5 0.00 0.29 3.74 1.08 15 0.03 1.08 15 0.50 4.58 6 0.55 0.55 3.74 2.06 15 0.10 2.06 15 8.72 19.12 7 0.28 0.83 3.74 3.10 15 0.23 3.10 18 0.50 7.45 8 0.33 1.16 3.74 4.34 15 0.45 4.34 18 0.50 7.45 9 0.34 1.50 3.74 5.61 15 0.75 5.61 18 0.75 9.12 10 0.31 1.81 3.74 6.76 15 1.09 6.76 24 0.50 16.04 11 0.28 2.09 3.74 7.81 15 1.45 7.81 24 0.60 17.57 12 0.27 2.36 3.74 8.82 15 1.86 8.82 24 0.70 18.98 13 1.30 1.30 3.74 4.86 15 0.56 4.86 15 4.02 12.98 14 1.06 2.36 3.74 8.82 15 1.86 8.82 18 4.12 21.38 15 0.46 4.04 3.74 15.10 15 5.44 15.10 24 0.90 21.52 15A 1.22 1.22 3.74 4.56 15 0.50 4.56 1 15 7.00 17.13 16 0.34 4.38 3.74 16.37 15 6.39 16.37 24 5.82 54.71 17 0.60 7.34 3.74 27.43 15 17.94 27.43 30 0.50 29.08 18 0.17 0.17 3.74 0.64 15 0.01 0.64 15 5.84 15.65 19 0.31 0.48 3.74 1.79 15 0.08 1.79 15 2.98 11.18 20 0.15 0.63 3.74 2.35 15 0.13 2.35 15 8.00 18.32 21 0.33 8.30 3.74 31.02 15 22.95 31.02 30 0.94 39.87 22 0.00 8.30 3.74 31.02 15 22.95 31.02 30 0.60 31.85 23 110.00 110.00 5.80 414.43 72 0.95 414.43 72 1.00 424.58 GRAPHIC SCALE 5 0 50 50 100 2( ( IN FEET ) 1 inch = 50 ft. 0' i � -- ' -�, � — -r.l ®` !`\, v ,4" , I I ,i , �\ � � � / ' % q jv I 1 I / I • i . I 1 r C/) Z �� ® \�� . ��� ®� I � / / , / - -- \ /\ n / " / i, I Ii�11_ 111 I I Dr Z -0 i I-1 \ - / / ° ® I W ' , � / / - - 1� I 11- � � I I I I ®._ � � • _ - -- -- 1 I - I - y - 1 ., °"� ° I / 170 - i I x_11. -- - / / .1, ry it I- II I I — (- / \ -, ° I " i ' l / - � � � c;�; fN - h' (~ i I (' 0 - _ � i _ JI I I \! O / / -- - -- ' °e I � / / „�y G' 1 I. - 11 i -i {._ `m �; 1 I 00 Z / I I i _ - _ / -- -- N O Q �IQ I 1 I ; CJl r / I / / � /` �\ _ I \ =_al 1 - I . 1 - - -- A-x _ s I I / / - �, 01 J I ': /'� o / 0 � Flo j e_ - 11 _ 1I 0 - i / I _ / r � + ., a i ° I I 1% I P / , �w ��, .\ i� / �/ / _O E'ER 11 / �-`- I • _ oo ®I - % _ : , -� - ��-T BEN r - _ - _ ` ' /,- ° w ' i / , -rte /. � 1CI Tip ET - _ - 11 1 - _ - - - , - � - - / / N -- \ a / - �- � /.� - 4 - / o�i I /� - --j�' / l y � i �,_ ENT /i'.big / zp��'` - F- -11 � N u r \�j l ( '\ / ° °'�� - /- �},/ �/ - -'�� -�^ ' iii y�� � �✓� /�QJ�� I - I r NJ �-.., � L -� (n ���� N. I �' /// , \ .,,°...► �' r _ _ _ .. _ ' __- y.- `� �� , ` ^ ,N to .O� N i Vi i •1' _ I _ _ alo F _ _ _ y� \\ - �-�' '��� - .� -- .1 // -� - �\' % "mot (An N'i� �/ - '� i ".` a / n - ®� - °/ — �/ �y - _ 1� , I I ..j -f - - / / / ;/ 1 I 11 _. _. ' t / / __ 7 \ \ /,, / _ 1 �' - �/ / b� � � .t. ", %i� Z � / i i i, / / /� - - -- / / ! v !cy �I i II v y \. `�. W. / / C - / Cfl / Q -,..,� (J1 / / ..� i \ o� ,ti \ D N - I 3 0' I / / // fi� / � ...a i- ��."I �� , —77- . -/. l�'' "%, . 1 \ J�..� �� � O - — �l W (Sy \ 8� "1�� � / \ ` V , /!' ; _._. _ -- / \ O�° \ / / / A �y••� / 11 ° z �- � -- �1' I- I / / / ///j / // / / sr � — `� ; (�j , > ) �) / >e -�' _ \ \ � \ • . --- 7- �/ ,y Z � ° �. -X151_ I i // -� ' �.�/ / / / / / , r-, \ // �%/ �` . ,-' - � W T \ `® I I /"� ,_��'� // i� // / /// _C -, - r;; Z?' -,-,-, I-- : / /�'' ��ryryoCCr \ _ pNN �• 11 / I / / // — - ( I ,oz0 �, I' :4 N .. t/� • J DD I r ® �// / O� / / - //� -C -•IC awNA / �/ .ion ;f A / t��t y Z1 �' L.�... -- +./ / / / � / CTS - ✓ \ / ,� �- J o r N J • / p / i // /./ '\' 6 M O_ OF 8 - - / /'i > - o �l+'- `° "' \ v l 11 M .. yC ,q i - � G7 y� (n Z / / / �° .�°'� . -- � '-- (n / >>8 — 00 CT .z� n \ / a / ' u: C - - V / ? \ A `i / i / I I �I C� n _// m trl / / / / ' / N N ��1j8��\ (� / -(: C , Gj / % P*1 W_\ Ifp� D -I't -7 �6 . , �O-zz !� " - - - - "IV . / /. - 11 I / / .; "g ;A ,- M-- - * - . --- - 1 P \ p � � Y52 A / W I / / ® / J ° / / Og �'' �cl _ — i� '1\ \ �__— _.._ 0�,) \ — •�_ - -' /`' — — / \/ c° \ \ 1 I 1 1 \ �/ %� / I A / / / �'8` - -- (O rn -C° - _ - , \ / / -9r -; - - - \ 3 ° n k `� cn _ _ _ / / I \ \ �II ,sue ! / _ _ _ \ � , �� , \ //f / % 1 I N l 11 !O � \ , .,� - - o , � - a o \ �' J�) - �. i -- \ \ -�� /- >- % I ' i I � 1 ` / + / i I. ' t° / CCP)), if r:° ) / Al I Fr ::: ::� - -) l` ®� / f.. F- _-I �i' �" - - - - \ / / V �`�it,�� �' - - r*� c� n c�� I y /� t� i I (,t t / / /,, I ®�� ,,, 8'. 1 .` � \ __ —__ �/ / / 13 oyQn5nW \ � =•r' $ e y / i i � i l . e I / I �� / - \ -� i; � / `�. ` I ` / ` :T 4J W ( w 11% � Ag `7 ri ~ A �i l., I I ,}`. / v 'i X. 1 / . _ — _. / — — — — — — — C . t o v 0 / , / :: F : / \ / - I.° I l i I ®�/ '/ L ---O) C'd -.c -_d� i Hn �o_��ev'I �� > _ 1 1 / l / I //i I / / /g6 C/) �: / �O O r'? 1. t� - `o �_ '� I/ 1 / '�/ i I / / I I J . I / I ,% 1 "'-t -- � g w � �° V, %® 1 i� (� I \ i ° I I / / / . I /� / - ---T_ _ _ // / 5 a (.n Vii` ��-i�y � o �� u, I / / / /: I / _ - - -- �-_ o - \+ �� 9 �-+, -�a \� JAI 1 o I I / / \/ Ca n Gao C'•r /' \ ' N \' oo_ ,. .. �- w w -I' / / / /��1/ '' / / / , 11 11 I I I 11 / I / ,- \� -4 1 ,� � :! - -.n ' / /, I,\ �m -71 -;;\- .. - 1, (= I -- j --- I .F , 11 -1-1u- NDtnN. /JJ /% / \ - -� — \ � / � C�n \ / / , ); Z O � D ��� / / / N W �� °' �} u*t \ \ $/ 1�(*N� / _ � r t�r tr7 / ' ' OD \ / � $ O , G„t � O - 7c -- \ I O I . -L `JO `0, I .. �y \ / , I /I J I /All . q — — -� — -A �- ' PO I q J-- i 1-1 9 _ - - - -- w I I / / , I I ,- . . --,\ - -- -- - - - -- 0 $ / 1 00 � 1 �i I I / / �{ f/ 1// 1�/ \cQ 1 o n ca , /. I / / / " " / - �R 'I-, . I � t� to / I I . . / ; i i / -., I - I--- � 1-1 -q "I ---- *, , — � (1) \ .1 I mal / 11 , , , � � , I / / / I / " 1 i ` V v s �p f �� I/ 8v�o I �I;I , 1' i (a) \ BOO f f { i`1t - -- - \ / �d ` - '�C / -� - - - - � rl � -, y v � - , y \ I / I ( II / 11 11 11 I I , , ,I /�` / Ln ' v P - Cn \ N I I I I' l ! i 1! I' / / / I _'_- �o \ -� ,� \ \� - -_ / \ \ \ \_,�� \ ,/ I I i / /. ;r; ! , • . 1, i i � -v \ ' � � \ \ \ \ / /-- - � �- \\ \ \ \ P I I I I / I / / . •�� \ V/ / \ \ \ \\ \ \\ I I i I I I / I 1 / lr /l 11, / co / AO $1 -_� / \ \IN \\ ( I I I I o n i / . / / 11 crr\ --\ \ `> I I m Z r>1 \� � J \\ v, / \ \ I \\ i I I IDS 11 Ln r-C) J r*1c>-'l -IOVVO �oam�ooc->g -m O m N -, kZxr 5 r- -•I iA -0 m . CO) z r- r- �- PWW= -I-I -_IZ N 0 -� w m � r-� 0 0 MD Z C c �m m O� c= NZOO° -q D O rP -I.. Z Z m m mr- Z DaD CO mm �NmO�r cnML4(Az T n0 r!l m z Z Cn D (/> D O =1 f�Tl C/am�D m D �nmm� 00 O Z mz m \ - I r- m 0 DO 3 O(D I y00 o M 00 ,,j z v O g N -� p -I (f) r- Cn O W Ioz � m�; -0r- gNm D C v�0 O 2 II r- C4 cCia --I M- W. C Z i♦ N •• . �J (n C. E9 v -P © W N (17 Ut W 1-1 Tl 'r1 '*1 _ O J (0- O P O � G�w A O (n � � -71 m -Q 1 3 m\ m e3. o� 0 v O 0 - 3 � A < H ® 36 c o � a _Q ME 3. �, � H Q � 7 O- - p k. -- ro o = m a aQ.4D o M ° N Rro 3 a-� m S .09 _3 roOQS 0 CD N Q -O•'• (CD :3 O 1r. a y 9 S Q m ro ro (D < y ro y Q X 0 CD CT 0 $. O Q. O Q (D on - -O Z N3 0 0 roro Q A 3a< ro o m = p o a O w a v Q . 9. 6 3 3 O 0 OL •O ° w '< � D n n n CD 3 ca, w g 0 fD + O O f1 <D 0 (D � � N• c 7 y 6 C LA. ^ 290 o m y I D 5- `D -°o 0 CD a n n /ri 0 C s o CD c o - 3 c O N Q O ro- y O ro O O Q. Q (D Q a y O� (m 0 Q- m ° "Z :- 3 (�: g N < O Q Q. (D 6 ` 0 Q < Q CID 0 o2. O n' Q. O CD N (Q -- 0j \ \ \w rn , \\ �, 1 I\I I �iz�n DSO' / . \ \ / / I I \ \ \I II �W C) V) / \ -1 - I / I / %' I I !1 / i � \ —\ \ , \ \ \ \_ ' � I / I r j/ � IIi1/ l � / j n X 830 �� \ - --- y � L T— I--/ I I i , / - / I / / , / D—i ` \ `' • �-- — - _ — ` \ £� I n n Ica `�'10, 'I I / i 11 \Z� \ \ I I o y ,I SID //14 / / O' /'n O -- --- ` I I I 00N�' 1, 10l r i I / (— \- -- I N �8 *III I / 1` / �o� / z oo 1 \ N I' hi I i , i AMU �/ 1. 0 Cn � �7 I I I / I ll I I vIl, i /i i E \1 m / / I / I I Ili ?Iij" 11' I `! �C7 CTI Q ( i / I / / 1 /,I$1 i ; ( / , ` / / i l l C%) 00 O z I i I// 1 / I/ III1 I / . can II /1 / / / / I/ I 2i11 i ► . O / / / i // / /45c, 1 i . I I / �/ , CA � / / / / 1 ) `! ' -� I I l l� i l r� 1 `j -. " J l I i/ 1 !; �; 1' r I 1 � 1 i' ' � ;1`� ; . / \ f, 'Cq \ i , I I I / � L 11 I � "I ;1 ,; . I , v; v �+ � � <P L H C �.+ \\\1 \ \\ I Oo S A \ \" \ ;% / / �/ Q� 't3ro17 •aQ.O Croro ;OO A \ \\ I CD (D QTroaVC OQ`O �O0O, \\ \ -,V ro S 0 ro v 7 < ' 8-.(D A `^ - Z S0 = Q- Z 3 ro ro S H Q ro 0 �p O \' \i �� u Q !Z � Q v- (Q 3 �r ro (D @ - 5 g< ro 6 < w S O- O v a 3 Q ro 0' O Q n (D ro „ '\ f Q3 QC 00? 07ro QroNV Ov CDv ro? v Q-�i. o (pro O(Qn O -ti <Q ro I q \ � / 3 �roO _ C �`^ 7y0= Q 3? 3-+ Q•i OC . (D CD 3Q0<D3y Q \ \ •� ro ro C S Q Q S C: (I y Q V1 1 - \ \ /' co C0 3 *._e.A roeC on .ro jroO (a C 3�� Q �O (Q 2 m O• -, 0 Q m Q ,ro„ c � �S Q n� Q n N. � A G Q 0� 9.50 C p.2 3 C y O -`p fD 3• ep \ j \' Q O Q (D Q 3 ro ro n (D ro ro S �� � 2 � ro N S C7 n ro Q Q Q D D A% � �� O Cl Q. -« 0 W 3 _. /-1�« O �T •a y S N O O Q O /� Q -« O Q_ Q Q O �' (� Q. a � / (a roro 3 Q f ro '^ ro Q ro jp /�1. O �4 O 3 = i.L �' C Q Q y ro T Q g'i • 0 m. ro � 1 /\ - \ \ - 0 � p X W Y O y< O S ys O C OQ-« O 3�Q1iQ f9 m \ °- Q °� Q cD o� Q3m< o� Q < (aa m a �oS ro cQ� sa �x \' \/ _ N A 0 roro O -. , n \ O/1 o �o Qo °^_ �(Q ° Q o o °° 0 3 m m °-T o(Q Q Q O m fl Q �c ° �pN lJ � =0 Q � ,DO3 -am nm0 Q Qw3. �C(g 0 Oro Q 5(8 X DL CD -« � � A n O C cD< ro ° ro o n -_=+ (3D O< a N 0_ CD a-- O Q n � j Q Q O 3 0 O Q N Q oQ -1 �a Qa y o roro a o Q o� Q QQ O p 0 0 (D �6 CD x N C M N ro ro O. c Q H Q Q O c < O n (D O °t 0 a m Q $ 0 � (D Q. N N Q. � O (Q O n O y ro s0 0ro y HO: �Q Q ro 0 O Q. 3 3 -' ? m 0< 0. -0 H Q ro y A S 3 3 QQ- QQ O Q Q O S� � 1 •� (D CD n N , Q -•, 3ro° < g Q. ro Q• ` O N N j• Q 3 Q. A _, CD Q S _ CD S� < 0<OQ (QD 0' CD Q- < � Q s 0 =. N ,-O+ C (D a y �c ro 7 0 ro Q (D O (CD 9 0 Q- O B 6 C a° flQ Q (Q �N N ? O Q- a CID c 3 S < to ro 0 ro n "+ Q y Q S a Q o0 (p ro O A W Q C !J N N (D Q 0 � Q g O O ro Q O y (QD O (oy � o CL o 3 c°a ro ro O 0 0 N 5 = -w. S ro ro 2 c � Qm � 'a m "' "' 0 Q 9. cc Qo Q. Q O .yam - a0_ �0�CpO QO 0 <OQr 7 CD O �. ro (D c 3 Q ~ Q A a Q , Q. CD�Q O = Q C y ?• S. o; 0 Q 3 C (p N Q Q OD p �mm (rod 7 3 R 9 CT a �3 3 !p CD 3 z 3 S C N � 0 0 Q -6 'a N Q Q 0 O QS ,< ro CD 00 Q .0 `c' C. a. m c O (=D O Q CD Z < a C ro oa N C1 a9 Q 9QQc�„ a :< = Z i OO�"3 Q (a a O Q.O.O 0 Q.; 3 ro a < O - Q n'� D.(roa COD Q � Q Q. a o S; am o Q. n•pG� -0 Q T o o Q 0_ � a ro N 0 =L 07 O (DD O Q Q $QC ,Oa Q-0 a- 3 Q- Q < ro a O n 0 CD >? $0 ro O 7' y O (Q c t?:�ro Q 0.= N f 7 ", O (a Q•Q O Q-6 - iDDD -U -u gv -I A -p -IDZ ND- � -+mrnrn00 --1x0 OOrO .- 0z DDDD•u -0 m DID Z r- --q M-p - r C)C)X�r r O =Zm Dx =� Dr'C)��OmTm� Zm* �D"D o -0 0 rr mO�gZN DD 0 n- �(nO - K 11 �zm0 ��m (n�m > Wzmzm�o IOcnC z�N -r -Un V) � moo c0n�0 r,icoOOaoorn r- C D =m D� Ti OW r- -0 � m �0��0 °m -P x �cn o�� 00 to cn * IM D ; *vv Z `� n° Zm El m - � D N D° -Z-Im zZC C7 n 41 r;j► 4 00> �N mm °Or 0 n W �D --•iMO Roo OCn C"D� m X W --i m �\WI MC Zom C Mto -Z-j-4 n�Z m� O O m= n -C O Z M rrt N �W D O � Z M UI (A 00 D r r v r Z m --j --t --I --i ---i -I G) 0 0 m m m m O m N -, z r- r- �- PWW= -I-I -_IZ N 0 -� w m � r-� 0 0 MD Z C c �m m O� c= � X CD CO -q D O rP -I.. Z Z m m mr- Z DaD CO mm m r!l m z Z Cn D (/> D O =1 f�Tl C/am�D m D �nmm� 00 O Z mz m \ - I r- m 0 DO ��0o O g 11 it If II �A(D p -I (f) r- Cn O Cn N JN�-P�K � m�; -0r- gNm D Cp ,j CbN c�oxx 2 II r- C4 cCia --I M- 0-000 - Z i♦ N •• . �J (n U) - - "Tt U) v -P © W N (17 Ut W 1-1 Tl 'r1 '*1 _ O J (0- O P O � p -� Gi 0 00 A O (n � � -71 m -Q 1 m\ m M O O 0 -< A 11 :. O � O O � O O m O 11 - D r r v r Z m --j --t --I --i ---i -I G) 0 0 m m m m O m D D ;u ;7 :D x m z r- r- �- PWW= -I-I -_IZ N V) 2rCDCpD��� --1 C/o 00zr•Dr Pw� g --I0 O„ g - z 0 O� Z= Z O O g 11 II pC) :*0A 4--H w gmZm m (A0)z cow X II ii 11 DD S DO II 0) - C)D ONN��o mC77' JN)00>>" O C/am�D m D �nmm� - g tmnXN� X D 0 O = O x II 0 W m II 00 L N n O � n m x O Z r rD' g 0 0 g M O O C) D 1- m . \I 0 r-- Q O co --1 C/o 00 --q9 E .;0 . ND(n p -0 ZM00 LD ZO >D O . ( IVELOCITY- L41 FPS _ r' 3r DEPTH - 1154' Weir Calculator GRASS LINED SPILLWAY DS75 EXM" LEER w APLE PATTERN D Given Input Data: 20' Shape ........................... Trapezoidal Solving for ..................... Flowrate Depth ....................... 0.54' Manning's n ..................... 0.030 Bottom width .................... 20 ft Left slope ...................... 0.3300 ft/ft Right slope ..................... 0.3300 ft/ft Computed Results: Bottom width .................... Flowrate ........................... 28.14 cfs Velocity ............................ 2.41 fps EMERGENCY SPILLWAY CONTROL SECTION NTS 0.26' ft 6° X e SPACING CAP. TRASH •o. DIA IL_`_ _,"UI ANn- vORTEx t2' SUPPORT PLATES M. 42" RISER LOCKING HARDWARE TO STABILIZE TRASH GUARD (4 REQUIRED CAP. ALUMINUM EKKT WELDING TO ANn- YORfEX PLATE 3-'I DETAIL FOR SECURING TRASH RACK SIDE VIEW TO RISER BARREL TRASH RACK DETAIL NTS POND MAINTENANCE SCHEDULE DESCIPTION OR MAINTENANCE ITEM RESPONSIBLE PARTY SCHEDULE PROCEDURE Acess to Pond HOA Monthly Page 3 Dam Top and Faces HOA Annually Page 3 Grass Cutting HOA Monthly Page 3 Rip -Rap Channels HOA Bi- Monthly Page 3 Rip -Rap Pads HOA BI-Monthly Page 3 Rip -Rap Spillway HOA Bi- Monthly Page 3 Emergency Spillway HOA Bi- Monthly Page 3 Dewatering Pipe HOA Monthly Page 3 48" TRASH RACK - ALUMINUM ANGLE & ROD COVER (9' O.C.) 10' Met TRASH RACK WITH ANTIVORTEX DEVICE ---JQP W-A& N MLEV 779.50 - • 100 YR_ 24 M1 ELEY. _777A3 - - - - - - - - - - - - C4 10 VR - 24 HR qR . 7X_R j;MQ �L0ULW6X�dEVA119NL 77. -V- - -� 2 YR = 24 Mt ELEV. - rMW - - - - - - - t VR = 24 NN aEV. =7755! - 1• Y TOP OF RISER ELEY -775 25 _ - 3 s' COMPACTED EAR n TEMPORARY WATER QUALITY POOL I°_"l DEWATERING PIPE INVERT ELEV - 774.00 To' MN. TOP ELEVATION n4 So - 771.94 - - 2° DNA. DEWATETNG -R - 773M GALVANIZED WIRE SCREEN a0- is FILTER DIAPHR OYS DEWAM" ME SHELF (SEE DETAIL) PERMANENT WATER QUALITY POOL 36" CAP RISER-INV. - 768.00 coN EcnDN TO BE WEl=' VALVE KEY 8" BOTTOM DRAIN & SHEAR GATE VALVE INV ELEV - 769.50 PERMANENT SEDIMENT STORAGE VOLUME in 14872 Of zi° CAP BARREL o 536% BOTTOM OF BASIN ELEV = 768.00 FLANGE CONNECTION WITH STAGE - STORAGE TABLE ELEVATION OEM - a2B 20' CUM. VOLUME (CF) �� -• Channel Calculator _ GRASS LINED SPILLWAY W/ DS75 EXCELSIOR LINER, STAPLE P/ Given Input Data: 0.00 Shape........................... Trapezoidal Solving for .................... Depth Flowrate ........................ 28.14 cfs Slope ........................... 0.0718 ft /ft Manning's n ..................... 0.030 Bottom width .................... 20 ft Left slope ...................... 0.3300 ft /ft Right slope ..................... 0.3300 ft/ft Computed Results: 14,475 Depth ........................... 0.26' ft Velocity ........................ 5.21 fps EMERGENCY SPILLWAY EXIT SECTION NTS 8,343 VALVE KEY 4,706 774.010 PREN GASKET 33,477 STEEL BOLTS 0 12,779 O 13,506 0 tSTAINLESS M DRAIN 0 0 14,988 O 15,743 67,787 FLANGE FRONT VIEW SIDE VIEW BOTTOM DRAIN & SHEAR NTS GATE VALVE 6° X e SPACING CAP. TRASH •o. DIA IL_`_ _,"UI ANn- vORTEx t2' SUPPORT PLATES M. 42" RISER LOCKING HARDWARE TO STABILIZE TRASH GUARD (4 REQUIRED CAP. ALUMINUM EKKT WELDING TO ANn- YORfEX PLATE 3-'I DETAIL FOR SECURING TRASH RACK SIDE VIEW TO RISER BARREL TRASH RACK DETAIL NTS POND MAINTENANCE SCHEDULE DESCIPTION OR MAINTENANCE ITEM RESPONSIBLE PARTY SCHEDULE PROCEDURE Acess to Pond HOA Monthly Page 3 Dam Top and Faces HOA Annually Page 3 Grass Cutting HOA Monthly Page 3 Rip -Rap Channels HOA Bi- Monthly Page 3 Rip -Rap Pads HOA BI-Monthly Page 3 Rip -Rap Spillway HOA Bi- Monthly Page 3 Emergency Spillway HOA Bi- Monthly Page 3 Dewatering Pipe HOA Monthly Page 3 48" TRASH RACK - ALUMINUM ANGLE & ROD COVER (9' O.C.) 10' Met TRASH RACK WITH ANTIVORTEX DEVICE ---JQP W-A& N MLEV 779.50 - • 100 YR_ 24 M1 ELEY. _777A3 - - - - - - - - - - - - C4 10 VR - 24 HR qR . 7X_R j;MQ �L0ULW6X�dEVA119NL 77. -V- - -� 2 YR = 24 Mt ELEV. - rMW - - - - - - - t VR = 24 NN aEV. =7755! - 1• Y TOP OF RISER ELEY -775 25 _ - 3 s' COMPACTED EAR n TEMPORARY WATER QUALITY POOL I°_"l DEWATERING PIPE INVERT ELEV - 774.00 To' MN. TOP ELEVATION n4 So - 771.94 - - 2° DNA. DEWATETNG -R - 773M GALVANIZED WIRE SCREEN a0- is FILTER DIAPHR OYS DEWAM" ME SHELF (SEE DETAIL) PERMANENT WATER QUALITY POOL 36" CAP RISER-INV. - 768.00 coN EcnDN TO BE WEl=' VALVE KEY 8" BOTTOM DRAIN & SHEAR GATE VALVE INV ELEV - 769.50 PERMANENT SEDIMENT STORAGE VOLUME in 14872 Of zi° CAP BARREL o 536% BOTTOM OF BASIN ELEV = 768.00 FLANGE CONNECTION WITH STAGE - STORAGE TABLE ELEVATION AREA (SF) VOLUME (CF) CUM. VOLUME (CF) 768.00 2,396 316 0.00 1,316 768.50 2,866 1,316 3,357 769.50- 3,848 4,673 4,368 770.50 4,887 9,040 5,435 771.5 0 5,982 14,475 6,558 772.50 7,134 21,033 7,739 773.50 8,343 28,771 4,706 774.010 10,482 33,477 5,815 774.50 12,779 39,293 13,506 775.5 0 14,233 52,799 14,988 776.50 15,743 67,787 16,526 777.50 17.309 84,313 18,121 778.50 -18-.93'3'' 8, 933 102,434 FOREBAY STAGE - STORAGE TABLE BIEVAININ A!A an VOUBIE (CF) Our. VOURE (CF) 768.00 561 316 0 768.50 704 316 866 769.50 1,028 1,182 1,216 770.50 1,404 2,398 1,619 771.50 1,833 4,017 2,074 772.50 2,314 6,091 1,222 773.00 2,575 7,313 ENGINEER STATEMENT OF POND AND DAM SAFETY THE STORMWATER POND AND DAM SHOWN ON THIS PLAN SATISFIES REQUIREMENTS OF THE NORTH CAROLINA STATE DAM SAFETY LAW OF 1967 (AS AMENDED THROUGH 1995] AND THE RULES AND REGULATIONS AS PRESENTED IN THE NORTH CAROLINA ADMINISTRATIVE CODE TITLE 15A, SUBCHAPTER 2K - DAM SAFETY. EVEN IN THE CASE WHERE THE DAM SHOWN ON THIS PLAN IS DETERMINED BY THE STATE TO BE EXEMPT FROM THE ABOVE NOTED DAM SAFETY REQUIREMENTS, 1, AS THE QUALIFIED DESIGN ENGINEER, STATE THAT THE POND AND DAM ARE DESIGNED TO BE SAFE AND ADEQUATE FOR THE PROTECTION OF PUBLIC HEALTH, SAFETY, WELFARE, AND DOWNSTREAM PROPERTY.I UNDERSTAND THAT THIS STATE- MENT AS THE DESIGN ENGINEER SHALL NOT RELIEVE THE OWNER OR OPERATOR OF THE POND AND DAM FROM THE LEGAL DUTIES, OBLIGATIONS, AND LIABILITIES ARISING FROM SUCH OWNERSHIP OR OPERATION. 10' VEGETATED SHELF PLANTING SPECIFICATIONS: MINIMUM REQUIRED PLANTINGS: 50 PLANTS /200 SF SHELF AREA (per NCDENR STORMWATER BMP MANUAL) "In accordance with the requirements in articles GS 143- 215.25A and 143 - 215.26 of the VICINITY MAP NO S 10' MINIMUM REQUIRED PLANTINGS- 50 SF P MS /2000 SF 05.638 SF = 1.410 PLANTS j4" container) NC Dam Safety Law and NC Administrative Code 15A NCAC 2K .0200, the Regional ................ SHALLOW WATER PLANTS Engineer in the Winston -Salem Regional Office of the NC State's Land Quality Section .................... Iris Virginica (common name: Blue Flag Iris): 352 plants (4' Container) has been / will be contacted for the determination of whether the proposed dam is • ' • • • ' ' • ',', Sagittaria Lancifolia (common name: Bulftounge): 352 plants (4' container) governed by or exempt from the Dam Safety Law." LAKE �o BRANDY. SHALLOW LAND PLANTS .'.'.'.' � Carex Tenera (common name. Sedge): 353 plants (4' container) Planting and After -Care Reyuiremsnts:. 10 O`� O FO Lobelia Cardinalis (common name: Cardinal Flower): 353 plants (4" container) • . • • • • • • Soil amendments should be incorporated at the end of the site development process to prevent sediment from , ....... Note: Any shallow water and shallow land herbaceous plant from the NCDENR Stormwater BMP Manual entering the BMP focaility. The BMP should be planted and mulched immediately after emending the soil to PLANTS & MIXTURES PLANTING RATES /ACRE PLANTING DATES Oy p Chapter 9, Table 9 -1 be substituted for the above mentioned plant 9 stabilize the site as soon as possible. TAU_ FESCUE too -150 Wes AUG. 15 -OCT, is P �Y p species on the vegetated 4 shelf. A minimum of three (3) different species of plants is to be used. The herbaceous plant (Low MAINTENANCE) FMB. 15-MAY 1 � species specified above are common locally and readily avis to for purchase. All plant species used Newly installed plant material requires water in order to recover from the shock of being transplanted. Be sure r that some source of water is provided, especially during dry periods. This will reduce plant loss and provide the (if they differ from those shown above) are to be reported to Engineer for approval prior to planting. new materiels with o chance to establish root growth. TAIL FESCUE zoo -z50 Wes AUG. AUK FFB. . 15--OCT. is (NIGH MAINTENANCE) t Total Number of Plants Specified: 1,000 plants In general, fall and winter are optimal for planting in North Carolina. There are some exceptions. Shallow water W plants should be installed between April 1 and July 15. TALL FESCUE k 100 Res E AUG. t5-= t Soil SpecificatiOnS: KOBE OR KIXEIW lESPEDEZA 20-25 LBS (SCARIFIED S® FOR SPR1MiG AU 15 -OCT. 15 x Minimize or eliminate the use of pesticides and fertilizers. A one -time application of fertilizer is allowable to a txNSCARIETED FOR LATE FALL & WINIlER) Z The soil mix must be uniform and free of stones, stumps, roots, or other similar material greater than two help stablishment. inches. P TALL FESCUE dt 50 LBS k NOV. 1-FEB. 1 � it A minimum two year warranty is required. At the end of the first year, and again at the end of the second` LESoEDEZA so Les /aaE GUNS) - W z Soil texture of the mix should be loamy sand with no more than 10% clay (USDA soil texture classification) Y ear, all plants that do not survive must be replaced. TALL FESCUE E 60 LBS AuY a AuKASr PR A minimum organic content of 1Ox by dry weight for areas planted with woody species and 5X for turf areas. If best professional practices show that mowing is needed to maintain optimal plant health, mow according to OFRSUD NGRAS 3o Les ,R N OR SUDANCRASS (MILLET A SJDANGRASS MUST BE KEPT AT 10-1 Y) A The PH should be between 5.5 and 7.0. If the PH foils outside of this range, it my be modified with lime to best professional practices. increase the PH or iron sulfate and sulfer to lower the PH. The lime or iron sulfate must be mixed uniformly If plants are dead, diseased, or dying, determine the source of the problem, remedy it, and replace affected TAU FESCUE E 70 Les & Nov. 1 -JAN. 30 into the soil prior to use. P lants. RYELYRAIN 25 Les (RYORAIN MUST BE KEPT AT 10-12-) Planting soil can be amended on -site soil material or soil brought in from off -site. in either case, it must If weeds are present, remove weeds, preferably by hand. If a pesticide is used, wipe it on the plant rather than COMMON BEGANDAGRASS s LBS (NULIM) APRIL 15 -JUNE 30 VA N = 774.00 meet the requirements specified and o soil analysis furnished stating that the soil meets all the requirements spraying. 15-20 Les (UFNHUILED) FEB. I -MARCH 30 PERMANENT WATER - before any planting can begin. ° �r�DBED PREPARATION ELEV = 773.00 ' 5' WIDE CLASS 'B' STRIP THE AREA TD LE SEEDED TO A MINIMUM DEPTH OF 1-6 INCHES. RIP -RAP EMOVE ALL LOOSE ROCK. ROOM ETC. LEAVING SURFACE SMOOTH AAA UNIFORM. PPLY SEED. AGRICULTURAL UME, FERTILIZER, AND SUPERPHOSPHATE UNIFORMLY AND N MIX WITH THE SOIL (RATES ARE BELO"). EEO ON A FRESHLY PREPARED SEEDBED AND COVER THE SEED LIGHTLY WITH SEEDING 768.00 768.00 EQUPMENT OR CULTPACK AFTER SEEDING. IULCH IMMEDIATELY AFTER SEEDING AND ANCHOR MULLCH. (`= -� ITT- rES: AGRICULTURAL LIMESTONE- 2 TONS /ACRE FERTILIZER- 10 -10-10 AT 1100 -1000 POUNDS /ACE BAFFLE - RIP -RAP SECTION SUPERPHOSPHATE- 500 POUNDS /ACRE OF 2OX ANALYM SUPERPHOSPHATE NTS MULCH- 1.5 TONS SMALL GRAIN STRAW /ACRE (APPROXNATELY 60 BALES) ANCHOR- CRIMP STRAW INTO SOIL WITH MACHINE OR TACK WITH LIQUID ASPHALT AT 400 GALLONS /ACE OR EMULSIFIED ASPKALT AT 300 GALLONS /ACRE I I I I I I I 11= FILL RISER WI o ` •• ° ELEVATION 761.50 (6) 24" X 6' STEEL PLATES WELDED SECURELY IN PLACE r r ' 24° 12 "�� COMPACTION / INFILTRATION NOTE: DUE TO NO EVIDENCE OF A SEASONAL HIGH WATER TABLE WITHIN 6' OF THE POND'S PROPOSED PERMANENT POOL ELEVATION (766), THE BOTTOM OF POND, SIDE SLOPES, AND DAM EMBANKMENT TO BE COMPACTED SO THAT THE INFILTRATION RATE OF WATER OUT OF THE POND IS LESS THAN 0.01 IN/HR. ONCE THE POND HAS BEEN GRADED, THE CONTRACTOR IS TO HAW THE POND'S SURFACE TESTED FOR INFILTRATION RATE BY A LICENSED GEOTECHNICAL ENGINEER. ENGINEERING REPORTS FOR THE COMPACTION AND INFILTRATION TESTS PERFORMED ON THE POND ARE TO BE SUBMITTED TO THE ENGINEER /OWNER. IF AN INFILTRATION RATE OF LESS THAN 0.01 IN/HR CANNOT BE OBTAINED BY CONVENTIONAL COMPACTION METHODS, THE CONTRACTOR IS TO INSTALL AN IMPERMIABLE LINER IN THE POND PER THE DIRECTION OF A LICENSED GEOTECHNICAL ENGINEER. lzmemffiml EOPREE GASKET (TIP) NOTE: ALL PPE CONNECTIONS ARE FO BE WATERTIGHT. CAP - CORRUGATED ALLIWINU11 PIPE Z1tAJVIM nLtwrt YYAICR% IADL r- E[Gr VE%E NVVRL, DUE TO THE AMOUNT OF CUT TO THE BOTTOM OF THE PROPOSED PERMANENT WET DETENTION POND #1 FROM THE EXISTING GRADE, THE CONTRACTOR /OWNER IS TO PERFORM A SEASONAL HIGH WATER TABLE INVESTIGATION ONCE THE POND HAS BEEN ROUGH GRADED. CONTRACTOR /OWNER TO PROVIDE THE CITY OF GREENSBORO A SEASONAL HIGH WATER TABLE REPORT ONCE THIS INVESTIGATION HAS TAKEN PLACE. CGS CUT-OFF TIENCH. EXCAVATED THEN BAC RILED AM COMPACTED 4.0! WITH LOW PEF.EABRUTY SOIL SECTION THRU BERM AND SPILLWAYS r1S OUT. 3760.00 4' PVC PIPE FROM FILTER DIAPHRAGM I DETAIL - OUTLET PROTECTION 5 �la�T 0.71 10' 3.75' 12' 13" CLASS 8 22 30° 31.21 OUTLET PROTECTION 7.5' 16.5' 16" 1 ■ 23 72" 414.43 40 18' 1 46' 1 FES# SIZE FLOW(cfs) Lo (ft) W1 W2 Thickness (ft) RIP -RAP CLASS 1 - WS NIPRAP iz I DETAIL - OUTLET PROTECTION 5 15" 0.71 10' 3.75' 12' 13" CLASS 8 22 30° 31.21 14' 7.5' 16.5' 16" CLASS 8 23 72" 414.43 40 18' 1 46' 36" CLASS 11 GEOTEXTILE LINER TO BE INSTALLED UNDERNEATH RIPRAP PAD NOTE: THE PER, MI ANENT WET DETENTION POND SHOWN ON THIS PLAN MUST BE STABILIZED WITHIN 14 DAYS OF THE COMPLETION OF CONSTRUCTION. NOTE: THE WET DETENTION POND HAS BEEN SIZED TO STORE THE RUNOFF EXCEEDING THE PREDEVELOPEMENT RATE. AN ORIFICE HAS BEEN SIZED SUFFICIENTLY TO ENSURE THAT THE PRE - DEVELOPMENT FLOW RATE IS NOT EXCEEDED. INV. IN:796.20 RW. OUT:796.00 HYDRAFLOW HYDROGRAPH ROUTING RESULTS: 1 -yr Pre - Development Flow: 12.05 cfs 1 -yr Inflow: 19.94 cfs 1 -yr Outflow: 5.515 cfs 1 -yr Max. Water Surface Elevation: 775.56 il ALLOCATION CHART FOR WET DETENTION POND #1 ON -SITE DRAINAGE AREA TO POND #1 7.88 ACRES OFF -SITE DRAINAGE AREA TO POND #1 1.07 ACRES TOTAL DRAINAGE AREA TO POND #1 8.95 ACRES ON -SITE BUA TO POND #1 3.05 ACRES OFF -SITE BUA TO POND #1 0.00 ACRES TOTAL BUA TO POND #1 3.05 ACRES MAXIMUM BUA TO WET DETENTION POND #1 3.05 ACRES COLLECTOR PIPES TO BE CAPPED ON WITH ENDS 1� ,,. FROM FINE GRAIN OR CLAYEY SOILS) 4-IICH SO UD WALLED SCH 6o PVC PIPE DISCHARGES TO DAYLIGHT IN DISSFATOR. VMWT SCREEN TO 1E PLACED ON ENDS 4 -INCH SOLID WALED SCH 60 PVC PIPE DISCHARGES TO DAYLIGHT IN OISSIPATOR. VARMn SCREEN TO BE PLACED ON ENDS NO. 20 SCH 80 PVc OR PPE PLAN VIEW 1 3 2.0 - WIN FROM FINE GRAIN OR CLAYEY FLOW - -® /-INCH N0. ZO SIATTEU SC1 !IG PVC 4-INCH SOLID WAl1FD SCH 80 PVC PIPE COLLECROR PIPE 01SCWRCES TO DAYLX,YNT IN aISSIPATOR. VARIAT SCREEN TO BE PLACED ON ENDS PROVIDE 6-INCHES OF CLEARANCE BETWEEN BOTTOM OF FILTER AND BOTTOM OF SLATTED WE FILTER DIAPHRAGM DETAIL NTS 14' 4.0' 6. ' 2.0'' DIA O Qj 3.0' FILTER DIAPHRAGM DETAIL NTS 2 -yr Pre - Development Flow: 17.77 cfs ENGINEER'S CERTIFICATION OF STORMWATER QUALITY CONTROL: 2 -yr Inflow: 26.73 cfs 1 CERTIFY THAT, PURSUANT TO GENERALLY ACCEPTED ENGINEERING STANDARDS IN THE COMMUNITY, IT IS MY 2 -yr Outflow: 13.89 cfs PROFESSIONAL OPINION THAT RUNOFF FROM THE FIRST INCH OF RAINFALL FROM AREAS THAT ARE REQUIRED 2- r Max. Water Surface Elevation: 775.83 TO BE CONTROLLED PER SECTION 30 -7 -1.12 OF THE GREENSBORO DEVELOPMENT ORDINANCE IS CONTROLLED Y BY A PERMANENT ENGINEERED STORMWATER QUALITY CONTROL THAT HAS BEEN DESIGNED TO MEET OR EXCEED THE GREENS STORMWATER 7MJAGET MANUAL. eW,' ®S¢1a1 /11®DSd 10 -yr Pre - Development Flow: 34.41 cfs oo•,�� GARO t® 000 10 -yr Inflow: 45.10 cfs ® ®° �"•• °tiS� %00 �2 ®�00 10 -yr Outflow: 33.36 cfs sl RE SEAL 10 -yr Max. Water Surface Elevation: 776.35 .. Z, `�¢ DATE r s 1.,977 ° o 100 -yr Pre - Development Flow: 63.06 cfs ®� .s 100 -yr Inflow: 74.50 cfs °'y 100 -yr Outflow: 60.16 cfs PERMANENT WET DETENTION POND NOTES: r"o ••4+a+. �� ® ®`` 100 -yr Max. Water Surface Elevation: 777,03 Top of Dam Elevation: 778.50 1. THE ENGINEER'S CERTIFICATION OF COMPLETION WILL BE REQUIRED PRIOR AL PLAT OR CERTIFICATE OF OCCUPANCY. THE STORMWATER CONTROL IS TO BE INSPECTED TO ENSURE IT IS FUNCTIONING AS DESIGNED AND Freeboard Provided: 1.47 HAS FULL DESIGN VOLUME PRIOR TO ISSUANCE OF THE FINAL CERTIFICATE OF OCCUPANCY. 2. THE PROPERTY OWNER IS RESPONSIBLE FOR MAINTAINING THE STORMWATER CONTROL(S) ACCORDING TO THE APPROVED MAINTENANCE PLAN AND DIRECTION OF THE CITY OF GREENSBORO. ENGINEER CERTIFICATION NOTE OF STORMWATER QUANTITY CONTROL 3. THE CONTRACTOR SHALL SCHEDULE A PRE - CONSTRUCTION MEETING WITH THE CITY OF GREENSBORO WATERSHED ENGINEER WHEN THE PERMANENT WET DETENTION POND SITE HAS BEEN CLEARED AND THE THE STORMWATER CONTROL STRUCTURE(S) SHOWN ON THIS PLAN IS(WILL BE) POND HAS BEEN FIELD STAKED. DESIGNED TO REDUCE THE POST - DEVELOPMENT 1 -YEAR, 2 -YEAR, AND 10 -YEAR 4. THE CITY OF GREENSBORO AND THEIR ASSIGNS HAVE RIGHT TO ACCESS THE STORMWATER CONTROL(S) 24 HOUR STORM EVENTS TO THEIR RESPECTIVE PRE - DEVELOPMENT RATES. FOR INSPECTION OR MAINTENANCE, AS NECESSARY. TOTAL DRAINAGE AREA = 18.95 ACRES ON -SITE DRAINAGE AREA = f7.88 ACRES OFF -SITE DRAINAGE AREA = 11.07 ACRES PROPOSED BUA DRAINAGE TO POND = 13.12 ACRES (34.86X) PERMANENT SEDIMENT STORAGE: REQUIRED= 1/8 AC -IN /AC x 8.95 AC DRAINAGE AREA = 4,062 CF BOTTOM ELEVATION = 768.00 TOP ELEVATION = 769.50 PROVIDED = 4,682 CF FOREBAY ALLOCATION: FOREBAY VOLUME: 7,313 CF PERMANENT POOL VOLUME: 33,477 CF FOREBAY ALLOCATION: (7,313 CF/33,477 CF)X(100) = 21.84% PERMANENT WATER QUALITY POOL' 3.0' WATER QUALITY POOL AVE. DEPTH, 40% B.U.A., 90% TSS REMOVAL REQUIRES 2.5% SURFACE AREA REQUIRED = 2.5% x 8.95 AC x 43,560 SF /AC = 9,747 SF TOP ELEVATION (AVE. DEPTH = 3')= 774.00 PROVIDED = 10,482 SF TEMPORARY WATER QUALITY STORAGE VOLUME: FOR 40% B.U.A. Rv= 0.05+ (0.009)(40) R\-- 0.41 VOLUME REQ'D.= 1.0 • Rv • DA = 1.0. 0.41 •8.95 = 13,321 CF 12 WHERE DA = DRIANAGE AREA (ACRES) VOLUME REQUIRED = 13,321 CF BOTTOM ELEVATION = 774.00 TOP ELEVATION = 775.25 PROVIDED = 15,216 CF PRINCIPLE SPILLWAY. DESIGN STORM= 1 YR, 24 HR STORM 2 YR, 24 HR STORM RISER= 36" 10 YR, 24 HR STORM BARREL =24" NOTE: A 24" BARRELL HAS BEEN CHOSEN IN ORDER TO LIMIT POST DEVELOPMENT FLOW TO THE PRE - DEVELOPMENT FLOW RATE. THE REMAINDER IS BEING STORED IN THE POND. RELEASE RATE: AVERAGE HEAD= 0.625' HOLE DIAMETER= 2" AREA OF HOLE= 0.0218 SF TEMP. WATER QUALITY DETENTION TIME: 2.20 DAYS ELEVATION OF WEEP HOLE INVERT = 774.00 EMERGENCY SPILLWAY: DESIGN STORM= 100 YR EMERGENCY SPILLWAY TYPE: 20' TRAPEZOIDAL WEIR ELEVATION OF WEIR = 776.50 CONTROL SECTION: DS75 EXCELSIOR LINER /GRASS LINED EMERGENCY SPILLWAY 3:1 SIDE SLOPES BOTTOM WIDTH= 20' n= 0.030 FLOW DEPTH = 0.54' DISCHARGE = 28.14 CFS VELOCITY =2.41 FT /SEC FREEBOARD AND SETTLEMENT= 1.46' TOP OF DAM ELEVATION= 778.50 EXIT SECTION: DS75 EXCELSIOR LINER /GRASS LINED CHANNEL DISCHARGE =28.14 CFS 3:1 SIDE SLOPES 7.18% SLOPE BOTTOM WIDTH = 20' n= 0.030 DEPTH= 0.26' VELOCITY= 5.21 FT /SEC CONCRETE ANCHOR DESIGN: RISER DIAMETER = 36" VOLUME DISPLACED = 51.25 CF BOUYANCY FORCE= ( 51.25 CF)(62.4 PCF)= 3,198 LBS VOLUME OF CONCRETE REQUIRED= 3,198 LBS/ (150- 62.4)= 36.50 CF FACTOR OF SAFETY = 2.0 ..... 36.5 X 2.0 = 73 CF SIZE= 6.5' X 6.5' X 2' = 84.50 CF I ti IL/ � O O 1 / 6' T 1 � I i 1 NOTE: 1. ALL CONSTRUCTION TO BE TO CITY OF GREENSBORO AND NCDENR STANDARDS AND SPECIFICATIONS 2. CONTRACTOR TO VERIFY DEPTH AND LOCATION OF ALL EXISTING UTILITIES PRIOR TO CONSTRUCTION. 3. CONTRACTOR TO COMPLY WITH THE NEW O.S.H.A. REGULATIONS CONCERNING TRENCHING FOR INSTALLATION OF UTILITIES. 4. NO SUBSURFACE INVESTIGATION CONDUCTED BY EVANS ENGINEERING, INC. r A r • SCALE: 1 "=10' 4" CLEANOUT (TYPICAL) TO BE STUBBED AND CAPPED AT TOP OF SOD LAYER (4 TOTAL FOR BIOCELL# 1) RIP RAP DOUGHNUT (050 = 6-) WITH #57 WASHED STONE ON FACE 18' HIGH WITH FABRIC TO CREATE FOREBAY TOP OF SOD ELEI/AT /ON FES 15 = 760.00 ® INV.- 760.00 PIPE #5 SEE PIPE CHART FOR PIPE INFOMATION TOP OF SOD ELEVATION= 760.00 ------------ - - - - -- - - -- TOP OF FILL SOIL MEDIA ELEVATION= 759.75 2' TOP OF WASHED SAND ELEVATION =757.75 - - - - - - - - - - - - - - - - - - - - - - TOP OF UNDERDRAIN STONE ELEVATION= 757.42 4" ------------ - - - - -- - - -- TOP OF 4" UNDERDRAIN PIPE ELEVATION= 757. 09 4" BOTTOM OF 4" UNDERDERAIN PIPE ELEVATION= 756.75 _ 4 ---------- - - - - -- 756.75/ POND ING DEPTH (12� = 761.00 �O �cS.Gf�O D.M.U.E. OVER & �p _ 15' AROUND ' BIO -CELL 75 6 -�-- 558 BIORETENTION NOTES: 1. THE ENGINEER'S CERTIFICATION OF COIMPLETION WALL BE REQUIRED PRIOR TO THE FINAL PLAT OR CERTIFICATE OF OCCUPANCY. THE STORMWATER CONOL IS TO BE INSPECTED TO ENSURE IT IS FUNCTIONING AS DESIGNED AND HAS FULL DESIGN VOLUME PRIOR TO ISSIJ.ANCE OF THE FINAL CERTIFICATE OF OCCUPANCY. 2. THE PROPERTY OWNER IS RESPONSIBLE: FOR MAINTAINING THE STORMWATER CONTROLS) ACCORDING TO THE APPROVED MAINTENAPH!CE PLAN AND DIRECTION OF THE CITY OF GREENSBORO. 3. THE CONTRACTOR SHALL SCHEDULE A PRE - CONSTRUCTION MEETING WITH THE CITY OF GREENSBORO WATERSHED ENGINEER WHEN THE PERMANENT BIOCELL SITE HAS BEEN CLEARED AND THE BIOCELL HAS BEEN FIELD STAKED. 4. THE CITY OF GREENSBORO AND THEIR ASSIGNS HAVE RIGHT TO ACCESS THE STORMWATER CONTROL(S) FOR INSPECTION OR MAINTENANCE, AS NECESSARY. BLUEGRASS OR FESCUE SOD PLANTING ON ENTIRE SURFACE OF BIOCELL BIOCELL #1 CALCULATIONS: DRAINAGE AREA= 0.68 ACRES BUA= 0.28 AC. RUNOFF VOLUME CALCULATIONS (1" RO FROM ENTIRE WATERSHED %BUA = 0.28 AC. / 0.68 AC. x 100 => 41.18% Rv = 0.009( %BUA) + 0.05 = 0.009(41.18) + 0.05 = 0.42062 RUNOFF VOLUME = [(Rv)(1 ")(DA)(43,560 sf /ac)] / 12 in /ft RUNOFF VOLUME = [(0.42062)(1")(0.68 ac.)(43,560 sf /ac)] /12 in /ft RUNOFF VOLUME REQUIRED = 1,039 CF TOTAL PONDING VOLUME FOR BIOCELL(REQUIRED) = 1,039 CF TOTAL PONDING VOLUME FOR BIOCELL(PROVIDED) = 1,437 CF TOTAL PONDING DEPTH = 12" (760 -761) UNDERDRAIN CALCULATIONS (per NCDWQ BMP Desian Manual Flow Through Fill Soil Media - 193 CF /HR = 0.05 CFS Factor of Safety = 10 x 0.05 CFS = 0.50 CFS D =16[(0.50x0.01 1) / (0-5)'_'0.5)]'_'0.375 - 2.59 Per Table 5-1, if D < 5.13, then 2 runs of 4" pipe will be required. BIOCELL #1 DRAWDOWN CALCULATIONS: FLOW THROUGH FILL SOIL MEDIA @ 2 IN /HR = 193 CF /HR TIME TO DRAIN PONDING DEPTH = 1,437 CF / 193 CF /HR = 7.45 HOURS TIME TO DRAIN TO 2' BELOW SURFACE OF BIOCELL #1 = 7.45 HOURS + 24 IN / 2 IN /HR TIME TO DRAIN TO 2' BELOW SURFACE OF BIOCELL = 7.45 HOURS + 12 HOURS = 19.45 HOURS ZONE 3 ZONE 2 ZONE 1 WIDTH OF STREAM ZONE 1 ZONE 2 ZONE 3 50' 20' 30' FROM TOB TO TOB 30' 20' S0' GRADING & GRADING & UNDISTURBED UNDISTURBED GRADING & GRADING & REVEGETATION REVEGETATION BUFFER BUFFER REVEGETATION REVEGETATION ALLOWED. ALLOWED. ALLOWED. ALLOWED. NO NEW 8UA NO NEW BUA NO NEW BUA NO NEW BUA ALLOWED ALLOWED ALLOWED ALLOWED J. STREAM BUFFER DETAIL N.T.S. BIORETENTION CONSTRUCTION SEQUENCE: 1. DO NOT BEGIN INSTALLATION OF BIORETENTION AREA UNTIL AFTER CONSTRUCTION HAS BEEN COMPLETED AND ALL UPSTREAM AREAS ARE COMPLETE AND STABILIZED. 2. PRIOR TO CONSTRUCTION, THE CONTRACTOR SHALL SUBMIT TO THE ENGINEER FOR REVIEW AND APPROVAL ALL MATERIALS PROPOSED IN THE 810-CELL CONSTRUCTION. 3. EXCAVATE TO BOTTOM OF BIOCELL. 4.INSTALL STORM DRAINAGE PIPES, STONE AND 4" UNDERDRAIN PIPE. 5. INSTALL FILTER FABRIC, SAND, SOIL MEDIA, AND NON CLAY SOD. AVOID COMPACTION OF SOIL MEDIA WITH HEAVY EQUIPMENT. EMBANKMENTS TO BE A NON -CLAY SOD. V100-YEAR ELEVATION = 761.23 410 -YEAR ELEVATION = 761.16 'g2-YEAR ELEVATION = 761.11 - 01 -YEAR ELEVATION = 761.05 y 12" 3" SOD LAYER-----\ \IIIA,IIAIIIAI IIIAIIIAIIIAIIIA, IIA, IIA` IIA\ IIAIIIAIIIA \IIAIIIAIIIA,IIA \IIAIIIA,II A�IIA IAIIIA�IIA, IIAIIIA` IIAIIIA1IIAIIIA�.' �AIIIA, IIA, IIAIIIAIIIA, IIA1 II A IIIA \IIA,IIA \IIAIIIAIIIAIIIA,II A,IIAIIIAIIIAI IIIA,IIAIIIAIIIA,IIA,IIA\IIAI II A,IIA,IIA�IIA1IIAIIIAI SOD NOTE: CONTRACTOR TO SOD ENTIRE SURFACE, SLOPES, AND EMBANKMENTS OF BIOCELL. WITH BLUEGRASS OR FESCUE SOD. CONTRACTOR IS TO ENSURE THE USE OF SOD GROWN IN SANDY SOILS. NO SOD THAT HAS BEEN GROWN IN CLAY OR IMPERMIABLE SOILS IS TO BE USED. CONTRACTOR TO PROVIDE DOCUMENTATION TO ENGINEER /OWNER OF SOD GROWN IN SANDY SOILS PRIOR TO INSTALLATION OF SOD. 3 -RUNS OF 4" SCH 40 PVC @ MIN. 0.57. REQUIRED. A MINIMUM OF 4 ROWS OF PERFORATIONS SHALL BE PROVIDED AROUND THE DIAMETER OF THE PIPE, NO STONE REQU IRED UNDER PIPE AND THE PERFORATIONS SHALL BE PLACED 6 INCHES ON CENTER WITHIN p EACH ROW FOR THE ENTIRE LENGTH OF THE DRAINAGE LATERAL. SEASONAL HIGH WATER TABLE PERFORATIONS SHALL BE 3/8 -INCH IN DIAMETER.. . • NOT TO SCALE 5' TOP OF EMBANKMENT ELEVATION = 762.00 15' WIDE OVERFLOW WEIR ELEVATION = 761.00 O�F`oW "I, DAYLIGHT 4" PVC TO RIPRAP PAD FOR PERMANENT WET - DETENTION POND #1 BARREL AS SHOWN ON PLANS NO EVIDENCE OF SEASONAL HIGH WATER TABLE ABOVE AN ELEVATION OF APPROXIMATELY 754.00. CONTRACTOR TO FIELD VERIFY THAT SEASONAL HIGH WATER TABLE IS GREATER THAN OR EQUAL TO 2' BELOW THE BOTTOM ELEVATION OF THE BIOCELL 100 -YEAR ELEVATION = 761.23 Q 10 -YEAR ELEVATION = 761.16 p 2 -YEAR ELEVATION = 761.11 p 1 -YEAR ELEVATION = 761.05 w i TO BE SODDED FESCUE SOD BIOCELL OVERFLOW WEIR DETAIL NIS HYDRAFLOW HYDROGRAPH ROUTING RESULTS: 1 -yr Pre - Development Flow: 0.916 cfs 1 -yr Inflow: 1.665 cfs 1 -yr Outflow: 0.849 cfs 1 -yr Max. Water Surface Elevation: 761.05 2 -yr Pre - Development Flow: 1.350 cfs 2 -yr Inflow: 2.191 cfs 2 -yr Outflow: 1.840 cfs 2 -yr Max. Water Surface Elevation: 761.11 10 -yr Pre - Development Flow: 2.614 cfs 10 -yr Inflow: 3.597 cfs 10 -yr Outflow: 3.443 cfs 10 -yr Max. Water Surface Elevation: 761.16 100 -yr Pre - Development Flow: 4.791 cfs 100 -yr Inflow: 5.824 cfs 100 -yr Outflow: 5.667 cfs 100 -yr Max. Water Surface Elevation: 761.23 Top of Embankment Elevation: 762.00 Freeboard Provided: 0.77' ENGINEER'S CERTIFICATION OF STORMWATER QUALITY CONTROL: I CERTIFY THAT, PURSUANT TO GENERALLY ACCEPTED ENGINEERING STANDARDS IN THE COMMUNITY, IT IS MY PROFESSIONAL OPINION THAT RUNOFF FROM THE FIRST INCH OF RAINFALL FROM AREAS THAT ARE REQUIRED TO BE CONTROLLED PER SECTION 30 -7 -1.12 OF THE GREENSBORO DEVELOPMENT ORDINANCE IS CONTROLLED BY A PERMANENT ENGINEERED STORMWATER QUALITY CONTROL THAT HAS BEEN �D®SI`tlJV TO MEET OR EXCEED THE GREENSBOR ORMWATER MANAGEM T M UAL. N ♦ 01 GARO< m®g,� ♦ � �1•°•••e z �I SIGN I Ullt ®O ® °tt0° 2'Q 1 L 1'9773 _ DATE a � .a • s ENGINEER CERTIFICATION NOTE OF STORMWATER QUANTITY CONTROL��•� THE STORMWATER CONTROL STRUCTURE(S) SHOWN ON THIS PLAN IS(WILL BE) DESIGNED TO REDUCE THE POST - DEVELOPMENT 1 -YEAR - 24 HOUR STORM EVENT TO ITS RESPECTIVE PRE - DEVELOPMENT RATE. GRAPHIC SCALE 20 0 Ha ( IN FEET ) 1 inch = 20 ft. 80 ( QIDTHS VARY** R /a VARIES VARY** REQUIRED MODIFICATIONS TO COG 04'O2 CURB Avim ( -WIDTHS - -- -- _ N U' OF PRECAST C�ICiY;TE CUPS -R/N' YA�� INLET TO ACCOA>'/OOATE COG rA4t2 ff TOP ��& ( 26' F-F ARIES e e o �i ALL AOITA# .re M AW ID W 1/2" t &9% C09 STD. /412 aT if" INLETS IS SUBJECT TO THE 'POL.ICY gpgp I 30' F-F •: :.•- am A" w STATEMENT FOR THE USE OF PRECAST I 1 AG1ES f i� DUOr AMSOM CAN d?E STAADYD a0Y CONCRETE DRAINAGE STRUCTURES IN O i - ! CITY MAINTAI/�D STOWI ttlL1IMAGE BiIO�' JOtt� B4lQ a9' Li71Q07F BilaT. COG STD. 0412 94SOC A6iSmA/AY CAN O< 1!' 11 SYSTEMS' AVAILABLE IMA IN THE REVISED A LAY CLAY r c ,A,R60 13' - 19' �S," - ' _ c : `'• :: • - +Ql � RR 000F S Oa9T 3'•6- !.l'� SUPS QY 16• ..'•• •i • • , 1. •.•A PRECAST TOP 2007 ST �UINAGE SIGN NAIAIAL• Q9AA'i� I 4i y •. " •. -. _ {�' (P •. 4 1/2' ON THE STOR101ATER M M%&EWT BtiITX Q9 6Rls:T _ °' a' Ov ACCRO41LE 2.27% 2.27% _ w CVA�TE 60rY iMS' SMALL v 4% %," A S/ Q41C S7 A01�IEL �- w (i F AUO AS&Uiff AkSaWY. vovv ov vvo 00000 ovvoovvvovv000vvvov {- 2•�% 2.60% :.• �;: + �yj S CONSTRUCTION _ M6V LEIIBTACA.7IMC ITE STALCTTIyE D/6t •• . . + •: _ CONCRETETITR AND USE HA PRECAST _ o v v v +O 1 b •• -e'' !' °.: 6•, CONCRETE 5TFAHCTlAiE3 SHALL ADHERE h vovvvovvvvvoovovoovovavovvovvoovv .?!• j �+0 AN EA7STIMI POE [�� S,W QTT AAD JMWIF ( „ -dy _ 9"- h TO ALL PERTINENT REQUIREMENTS OF q ALL IAI9TAR ,A'AINTS ARE TrP. i MT 3• BTpE UNDER v v v v v v o o.v ! A SECTIDV aF PIFE Ea'XL ITT IMF DIEJIE •� ( - _� -�l�c 7HE 9TAIA7Afm E402/403 BRICK NA901MY A L 1%2' 3 JNrS �iF are MINIMUM -0' rti. a n , - iq ®OIC IoLK • E.tl°AABIQIt 87nW AS SA�MV AAO Ln1Si1BCT )W AHM -� -TW' : , t= • . -•i " . ^rC� f /2' EXP. 9.00' SF9. SA a°Ofai°w. 3' STONE UNDER �,,,• OI.I�IB/ OF i!E SRMCROE. itxB A A6V "'°�` -d �• - A •6 STHl1CTU#c8. FM a9"M OYFR 3'-6' (ASE 2.00' S9.58 CURB MIMANUM 9.00 - SF9.5A i''..; .AIM (TYP.I STA161!/E. At]r S01tClGlES AE ADT 100E v MATERIAL •''.` STEEL DESIGN IS NOT SHOWN ON THIS STEPS ON 16' CENTERS. 7.00' ABC 7i00. � 81/ILT aY nr GF IIF PINE " +_ Z '010,+0 JL 6,f/2- A RESPONSIBILITY S OF THE SHOWN S7E:t9 S/i1LL � 1N ALLYXD- • � 3 EABIIEEA AND SHALL BE SIbMN OF! cmw _ p AAEE M77N Gm STD. 0414. � LT,FF ELEYATIaV am � ng im lF B' £XPAMSI STD. c s B AfOTE' SEALED SHOP IXiANIN65 SUBMITTED DIFFERENTIAL FDA . CLOD . EYA>IQV AmisT caves S OILETS IS 51B.ESr m RE JOIAfr (TYP.) m FOR APPROVAL FOR USE IN THE AOWAL CROW SECTION DIFFEfE�NTt.,e Fag COG S7D. 0Ut!? pl%ICy STAIHILdvT !Yl ITE DBE OfFl�T CITY OF GREENSBORO DRAINAGE NORMAL CROWN SECTION IS 0.30' CROW SECTION Irs 0.30 SLMw sFCrILW I� m TF ONZOW 97R49'em IN@lly CURB NOTCH MODIFICATIONS FOR 412 -H TOP INFRASTRUCTURE. AWJWAlAW STa9N SEMG9 S1SIE7!^.' AVARAKE IN TAE finnO m7 Snm OZI Tuff amen OW Muff =DEW "Its w AiSS maw, aY DF sawmIHI ANAfw"aff STAA:7NVE 1)E' AW1tFACT1/bl 51ML1 /.N STALLING THE IN4_ET BOX, THE 3 31/4 STRAP /N SA91C3 ITS L06b 09 Al1AE av INSIDE FACE OF THE FRONT WALL IS TO FM RECAST a1M7E7E Away [F' TNIS RF BMW AAD 941W aF DE SIATICII� aIDTHS VARY** aI0TH6 tlApYWW LINE IA• WITH THE BACK OF CIAiB. S7ALCT1/A°, r7E AMAIFACAOV? &MALL ' STAi1t0Aflli CG948 INLET T/rFIdAT ass rA f412 - N CAR W ro° racIL O 1(rS" of "C SSnXCnW. lie - EAR RIV ATECA9T a>woyETe A107K1S a= 865 FAR 2' 6 ` CG098 6 &UTTER lal r4a2 tr1� OtET PY.AN ( .f 0? ANNE 41Y ,. AHrEIarAL ST .& Irs � Mw av 26' F-F ARIES 1E I 30' F-F " :ARIES Q A 4 A A DF INSM AW 407SW OF IrF srRtclut: , .. � • ,. y:. .a% ` •�•� QAS STD. H>2 Av WzPCl9 '•io :' . = f..•'•- .. AR�9M�A'JAWla rr� FT �SA1X.641 COs Sm. a4as a2 0407 stn c s s aAy4 IAIE7 /av _ _ _ _ _ _ MATE s f7AAAE / j - 6% pUX.I MA%•i 7 -4 a I (14031 / a -.. a::... . " :. d ° lP TO fDNL 6810. 1.6IA19 BNI(il' ANSTSIRY. 3.00• ASPHALT IYARIAOU -E v o v v v v v vv �✓ 3.00• ASPHALT (VAR1/,gt,E - v o 0 o v v o o °+ am a� Taa prey NT /O np : - • , I: - -- avvoovvvv voovoov oo ..'1 •• :A:1t a':: f9' � � '� ... • ?F••;d .�`'•: °+ � 5' PO• (707 (/IO2l vvovov ovv 90000000 - �•! ,�� �,_�� -�,4 �,�•; -,' 6 j • 6 1/2' voovoov voovoov 1 � J °• -' v vs -v v o v o 1.00' 9F9. 5A v o v v v o v 1.00' SF9. 5A 2 0" S9.58 2.00' S9.58 i ••.:° ..i, OLNNTITIES TF. IHT 7.00 ABC 7.00" A6C 7'+!- (may 1 d ... - ASPH - 71/2- vv Y.) H. Dill FT. 1EISllTA ' �iauc ' • Z - :.. ATED SECTION I-- �: 8 ' Tzs sm. i41r SrOAE a-'-= ; y- -�- THIS TALI TAN n f/2• SM o. tslNr o.256 SUPERELEVATEO SECTION N RIBS s DT7YFR 6° h a : • ; . TF4W THE STANDAfD 3402 Bmc • �° ,4• TO AOCOMODATE TfE 0412 -H TOP 5• vvvo -° 1' PVC B STONE •tN j :• 3W -�-. B' WHICH IS f' THM9ZR THAN THE = ELEV. RIFF %GRADE 0.EV. DIFF�. `.%GRADE • O v •B. STD. 0Af2 TOP. =U .. -.� 1' PVC i SUES v BASE -- :, -•: -. 3;.Ac y.: -{ _� :. S- • - +�` v •.. AT SUMP �•, rxrAtl7E' 0.40' 1.82 1.92 2 n ••, II B CAST 5' DIA. Q°O6CTI01B FQ4 61AAF PIPE SEE 7IE °SIFPET aSI6N STAAOAALNi AHMWL' PTBLISiEO SEF7E 0.50' ,� y OPENING OR BY TTE CIrt OF 6REfA 's aPT. aF vuAL9vgrATIOV 0.50' 2.27 SEF TAE' 'STRi,FP LESISN STAAOAImS AHAfAOD • PLBLI57ED i I' -la' (5S7 U4021 STEPS AT LEAVE A NOTCH 1 PIPE SIZE C. N. R.C. IN 00WER TO LE 0WIAE rW LOCArrav OF SIDENALK$ BY TIE CITY OF 6AEEI15YI"'S DEPT. OF TMAASIMrA TIaV 0.60' 2.30 ND B NT B' -4' /7S'J --- (04031 !6' O.C. IN THE FRONT SILEN.ILK nom AAt7 auss STRIP #10TH. 0 °60• 2,73 IN 47DM TO DE7 rAE TTE LOCATIaV OF SILEXUAC4 0 70• �: 260 4 /4W y, 9IMS ,f402 CURB INLET THROAT MODIFICATIONS ., 2._5. MALL FOR THE 12- 0.0m o.03z COTS SID A(18 -A HAS A S'LMVANY OF TAEIR 6UIDELINES SIQENALK MOTH AAV SUSS STRIP WIDTH. 8' B -o- (04tw TO ACCOMODA TE THE f412 -H TOP I m / ORAIN• • • ,�� t5' 0.031 0.047 AS � STRIP OIN N.LOD'ATIaK SIdffi'NAL!( 0.70' 3. f8 ACD6� /�TF m SIC L�rr&4 SIDAE�KK 0.80' (, .3.06 2. 3 I q '• ,., • FLOW q °' ••' °: .. y MIOTH AA17 GROSS STRIP MID7N. • � 1 _ !B' 0.044 0.005 O. BO' 3.64 0.90' 3.46 �� I - _-T 0.90' 4.09 f.00' 3.85 /• 1 1'FIBPAT: 1 BUILD U P TO INVERT SASS a TaaHOaFTr~ :- .. STANDARD CL INLET T1519CJAT 412 -H IS FOR USE AT COMMERCIAL AND INDUSTRIAL WITH coHCrETe 2500 PSI 1.00' 4.t2i -� �� t+ Aa`d: ;r. • . • .- . - .+;;;� INTERSECTIONS WHERE THERE IS THE POTENTIAL "-BUILD UP TO INVERT WITH CONCRETE --�- FOR 2'-0` CEM 19 &UTTER FOR HEAVY TRUCK TRAFFIC. SECTIQN A A Sass 8 •„ �+T'ul I - - BECAUSE OF THE THICKER TOP, THIS DETAIL SHOWS C / T Y ® F G R B R ® �+` / �» '/ ® F G R L� E Al 1� B ® R ® AI4IAm �• MODIFICATIONS THAT MUST BE MADE TO STD. #402 SECTION A -A SECTION B -e STREET ACTION Sid?., �° �V. STREET SECTION SECTIQilt A A SECTIAN B-B AND CURB AND GUTTER TO ACCOMODATE THE THICKER TOP. av4 s^TD. M9. -f f iilEN. : aF 4 a or 4 26' FACE TO FACE 8 : 9F4 C T Y O F G R E B N S B O R O c T Y O F O R E E N S B O R O +D 2 3601 0' FACE TO FACE 603 STD, AO, c/ T Y O F R E RNS B® O 0 Y O F G E E N B B O R O � tH1EV. ST d99IQK M . Y /XN1G� SM. o S IAI'.�ET DTI Y 40 •RIO. O6� CLi�9 IRKET ITf TORT! 40 06-W -07 ALM STD. AS?. REV. o�991ra7 STA BRICK MASawy Ste• �. ST PRECAST CONCRETE CURB INLET oe-02 3-0e 06-99 12-07 3 as-D7 12-09 IAlYET FM 24X24 dSyRATE 410 12°107 ST d�ild:K Y CU99 IA�ET 40 ®� o00-aW M 03 Os o� Iran 03 46 -071 o m to• z .. 10° Ot/) m ° O 2- 6 2" 2 ~1' O'0 /o' -ow To���••• To^ M �orH z o' 12-61 ^ FILL FACE 2" Q <� 2-- Gw 2" rJ 2'- ° A MO•H O 70D I, FILL a ACE "O~C o C3 C0 O a - 2 -01 ,) II.-2" FILL FACE 2• w a TO 1 �'ruav V FRaV m O'f1 -.1 B // 2-VI P 9' FILL FAZE ,JILL V•9 1' -8° LL J O H T. H -Qty O N - FILL FACE 2 V o. 0' Ai E vAASlavF NT 2 = ` "V" @ 9° z Z �-•1 D o / 2-VI 8 9' FILL FACE _ ^ ^Y" @ B° •V "@ 1' -8" li- J Q- M1 Z O O x m i -t B / p O r0 4.O' ®CMt7L1C ,L)O `y -a 9 -VI STii. FACE Nt 99" » ~ 00 x -y.0��'' m H• W ILx AO -1 1 -VI STH. FACE N & e! x tl) � O 6' f RA ' • ^! "Z^ T4 a Cl O p S. -M ITI = r. M1 0 9" ^H+ W ,mod' z �- = ,I -A-' J, !ry,4r- y# #10TH z,.., o y-'n O1 • ° ® +ras erv..� 1 a F- x �` z W =_c_ 0' 1 ` V _ " 8^ _ "Z° T4 ,� ,� w ® 191 -ILo z►.,45 '0 �y N f-xl-z \ �,. y 5 P ' FAtf FAQ A 9 o t 3° DIA. DRAINS = Dr t-! O • 1 W '�p�Q -i� o `a 8" ABOVE ® o 0008 AGi�M -1 w s H = -it B c��vti g r a0$ O/a? - A °• FIOM LINE T4 n Z M-M -y o f I 3• DIA. DRAINS =o OC O M-4 e yrYb• c yy ® t L r a a ° _ ~ FLOW ARM a 1D Ta 2 , NNU�Fq PAdS?6V! #10TH Sv-7t [i.aaE ►+ . _ _ e _ T5 p 6' �^ d ® w i r N ti s %a SN-tii Q26[� MB O 7 ? Z 8" 2 -N1 ®° ' C �Z gw 6 _� 8' I-• = O. & •' s'4' ATM OMS5 RAT SET O RfM CONST. JT. BT , . IN)IIST. JT. et 2 -NI 3'-0w N' AYD QUM FLff s � 13-j SECTION BB SECTION - AA SECTION - BB SECTION - AA ELEVATION SEE STD.# 838.45 FOR QBMRAL NOTES. .- �•q: °_ ,•p'U- YECE 6114 r L17YSi�/ !B- ANIN +- - 8EE BTO.s 83s.4s FOB OEMENLLL NOTES. tid 2" Aft Al�AR►• EX7H1lSI1015 BILL OF wTQ1IAL FOR ENOIdALL ELEVATION 5 y,L vvvvovovvoovoov� m " e' -0' T3 TOP a BOTTOM REINF. STEEL 1 PIPE REINF. STEEL 1 PIPE �, �yQ BILL OF MATERIAL FOR ENDIIW.L p Qestiv BAR SIZE LENGTH No. Koff BAR SIZE LENGTH NO. EI9R " , rF9 CIEAAOIlT S'1Nf.L ffi • - m y'� Tt TOP a BOTTOM J Ate+ ;� v ovvvvvv000vvvvvv000voo •••, - ?`• g7 m U B1 � 5` -6" 4 15 � Q � � 1.1 m 11NA;s• �/" T2•x A2'x s•DDUC PAD nIn aY N►D91141 t, v --- '- °+•••.a v o ' _ BBlAAf O Z z tt9fe a SPA. a 9" 6 #O4. q/ r- ' H TOP BARS IN iq B2 #4 4' -6" 4 12 LL ®= z I W B1 #4 5'-6" 4 15 x0 W Ar Ir m DUN ►N4 ( I I Ot #7 9` -8" 2 40 (7 Z ® r- ( , 9 SPA. 9 9" ° io �, PIPE NOT B2 #4 4' -6" 4 12 U. ®� AQOr a7gwm W o O M Z' BARS IN BNOgd r n z 1C x AY x s• [BYC !Ms y`L ;r; A/1AE TAW �� 17 x o _ I H1 #4 7' -2" 10 48 w o Z dm: _ ® I TOP OF FOOTING u ,:4:, g G7 #7 9r -8" 2 40 Z W o e>aetc r ' 46• AlV6iF f- m CO) L T4 H2 #4 5' -6" 2 7 3 W W p ° ^ BLDPE Ht #4 7 -2 10 48 r! O ISDMETAIC VIE# AMD TD m ® -1 H3 #4 W -5° 4 ¢ W r m co _ _ _ T4 H2 #4 5' -6" 2 7 Q F 0) �► a�AtsE/E A�IIN .N a7 9 q (DI6 AM181 N 0 • H® N1 #5 3 -11 14 57 C It Na-N V O .4 `Z N Ic 0 N.® o Ni #5 3 -11 14 57 O m H n 9 m -a = H3 #4 3' -5" 4 9 Q W D o o , I �5" N2 #4 3' -5° 8 18 G 30 ° R ' " :i sralP MIM.s/N noHts o N2 #4 3 -5 8 18 GRASS Cure +9 z_ - D p �°' I �6^ r N c a mss 040PMC - Z SLIT e° I C, O N T• e N TAPER DETAIL ¢ Z _ xmrM Tara s/M a" °° AETLAV FLARE 1. LETGTN OF m' IS VARIABLE. PE 6 SPA. 9 9" FILL FACE ' n v '@'• Q PL LS MIDTH NIO A°:N:N AEI6NT NIaIN � Lt]V7+ltZLlAf, FAC109 rS of 3.0�•L� . '+ HID. VAL t£ AL6/ DISTALL A L O r° 9 SPA. @ 9' 3-42, 2-43, 2 -V4 2 -V5 Ti #4 14 -6 6 58 ci ^ H m I O O N M L' OF H: MrIOV Is 5.0A MIN. AM 6-M WX. m 2 SPA. 9 2' -8° M. , n 1 B SPA. 0 9" FILL FACE , rr z » 0ar 2. MAX. ^.,L(ri OV TIE FWES ARE fOX !I[tD „':.Y: BE AJES/AIDI® f/4 6BiD m N• BAGS IN TOP AND T4 #4 8 .9 6 27 t- W m G 7" 8 SPA. @ 9" 3-42, 2 -V3, 2 -V4 2•YS Tt #4 14 -6 6 58 L% n 3. TTW:ATED mES MIIN vlsac aTV7RLST 4' PIAF FACE 2 -H1, 1-HS ® m 2 SPA. 0 2' -8' STS. < 6'-0' 0'-0. 6'-0' 2'-0' 4• 2' -O- 4' -0- �'�rv.5i r m.�g MD m 1/B' A N FT. m m ®' 3' -9 BOTTOM OF FOOTING H3 T5 #4 2'-8" 40 67 O {{♦ JO #, 3, 3•_ N" BARS IN TOP AND FACE 2 -H1, 1 -H3 T4 #4 6' -9" 6 27 F- ® W To aF fLACFD FRW SIGY OF are 7D arr O1Tr s� Q PYc •,'..v' '•�T` fRov Slav OF are Amlf S[SE or n g mMH TIl%V O ► M r M S m m Z 3" BOTTOM OF FOOTING r n CO) J 6' -6' f -6" 5'-0 2'-6" 4' 2' °6' 4 -0' 4. 77E fW7BE aAS ~4 FAN EAPAASIOV s�4 1/4° l�J FI 7E f +X o m P� 4 SPA. 9 1' -3" FILL V2 STS. FACE I'-G' Y1 #a 7 -3 6 29 CO m t,y ® Z FACE 3 -H1,r 1 -N2, 1L H3 4 �A. @ 9'•8° T5 #4 2, -8n 6 29 = 7'-0' 2''0' 5''0' 3'-0• 4- 3'-0' 4' -0- fi rN" cavorrE. XBff L �yY �qgE O FiM2 3- Nt,t•H2,t -ip H2 H2 242,1-Y3,144.,1-45 Y2 #4 5' -10" 10 39 °'! CO m p PLAN Y2 SM. FACE Yt #4 7 -3 B 29 O H H J ® �' 7' -6" 2' -6- 5'-0' 3' -6' 4' 3' -6' 3• -6- m ®'ty V3 #4 5' -0" 6 20 (9 W6 O fA = N2 H2 2 -V2, t -V3 Y2 #4 5' -10" 10 39 J ® O • DIA. m g o g V3 r . �. °� O ® •TI p 1 -Y4, 1 -Y5' , n 0' °O- 3 " -0' 5'-0' 4' -O' 4' 4' -O' 3..'_O. 3Y$• �- _ll a1 4' -o L1 L vq #4 4' -1M 6 16 W 3E � zt a' -o" Va #4 a -1 6 16 W MIN. m ° e• u j V4 O z z V3 #4 5 -0 6 20 (7 �• OG yy W 0 3J1t• B" I n Z = O 6' -6' 3' -6' S ° -0 6 N/A 6' 3' -0° Y9ESMOlMY'fal = 7• V5 #4 W -2" 6 13 R'-0' 4'-0- 5'-0- 5'-0' N/A 5' -0' 2' -6- yy = 7• vs Y5 A4 3 -2 6 13 {{I r -,--L V4 m �- euAnwr To Ar N89ae aowus THNa mw O �* 3'_5w B" Z1 #6 4'-S" 6 42 r 3' -5" 1 vs I rr � R' °5' 4''6° 5'-0' S' °5. N/A 5'-5' �'-6° « « z3 2' -to" w w Z2 #5 4'-0" 6 25 « « @» Z1 #6 4'.8" s 42 CLEANOUT DETAIL S� crzaN NT 8.7- T 'a• j . H1 8' -7" z3 2' -10• ie w Z2 #5 4' -0" 6 25 10' -0 5' -0 5' O' 0-1 N/A 6' -0' Z' 6' Z3 #4 3 -4 6 13 T 'Z" t OF s ApI msRWHc pg N8 2' -90° 9' -1' N2 4' -19• 1. 1° 5 L E 9 7 R l 6 C E A t I A A I M M P A L M / PIM D T C w a < C G Y B T O e• LATERAL. u n n n n n ® 9 REINF. STEEL LBS. 555 HS r -10• �r 5 -N1 4 -N2 #4 3'-4" 8 13 c / T Y O F G R E E N S O O R O �i H S N BARS Z n n n n n n 49 ST[1.N0. REV. iR>$ ET 1 2 E TI EET 1 OF 2 N BAR$ N BARS z BARS REINF. STEEL CBS. 555 TAE METER fi" LQCATTaV MAY BE N7slWW aV #IaENIMI AV,&TTS BT TAE BWAEEA. °N•, •N•. a •z" BAN oIEN8I0116 ARE OuT TO arr. 2 � z WING ELEVATION CON. /C.S. EL OS. 7.5 EET z OF z STANUARO CONCRETE CUFB RAMP 4IB °9 -0 °5 0 l2 d° ® amaw tV AEG -LLW EETAOE N VALW 6 HM WT INSTEAD QF W JL=rIAIOS. 838.39 CON.(R.C. CU. YDS 7.1 836.39 838.39 "N'. "N ". A "z" BAR DIMENSIONS ME OUT To WT. 838.39 09 -07 1 4 TWO POUROUS BAFFLES TO BE INSTALLED IN POND HERE UPSTREAM OF WET DETENTION POND TO ACT AS A SEDIMENT BASIN ONCE SITE HAS BEEN EXISTING Rip RAP BAFFLE DURING CONSTRUCTION. POND IS TO BE CONSTRUCTED STABILIZED, CLEAN OUT JL ` _ -;-_ _ -- _ __ AS SOON AS THE SITE HAS BEEN CLEARED AND A 6' SEDIMENT ACCUMULATION - RIP RAP PAD / / / 1 ; rte• - _ _ - _� _ - -- SKIMMER ASSEMBLY W/ A 2.0' ORIFICE IS TO BE FITTED FROM SKIMMER BASIN #1 AND Wt =6* / / _ :-' X�"" = s✓LT - T _ - JO THE 8 BOTTOM DRAIN ON THE 36 RISER. TWO V REMOVE POROUS BAFFLES ,.� �S IMMER BASIN BAFFLES VI12=28, i /J / ; : �'� --X'� -a _ POUROUS BAFFLES ARE TO BE ADDED TO THE POND _ AND SKIMMER ASSEMBLY. • _ - - -:` .r.. �J WITH 3 POROUS - � , )�,." • • ;; ••:' ;: - =�$� ,. -- _ ,. _ -- - ... _ _ JJPSTREAM OF THE RIP -RAP BAFFLE. POND TO BE • - -- -- - i � • � - - - - _.._ _ ._ __ -- - -- -_ , . •� �- "'' _� INSTALL 810-CELL AS SHOWN TOP EL :774,00 La -26 _INSPECTED PERIODICALLY DURING CONSTRUCTION TO MAKE - - ON PLANS. - _.BOTTOM - 770.50 THICKNESS -26" � � � - ' - __ _ ._._ . PN _ �- j - r� ; :; . •: • - --' ,- - - - - - � - --SURE THE POUROUS BAFFLES AND SKIMMER ASSEMBLY t - - -- "' - CLASS I RIP RAP / / na �, •-,-: Cana - ` \R�Go _ _ _ - _'� tMPORARY v r, -- - -- �s 90- - J ,- Try"' "^- - - BEEN COMPLETED ALL ACCUMULATED CONSTRUCTION HAS ABE - ` \NQ� J �.-- °� ! + SONS �t1C1►ON / / 7 +•,,, - - _ _REMOVED FROM THE EXISTING WET DETENTION POND AND V ` I C-•- - \ r4-- IT IS TO BE RESTORED TO ITS ORIGINAL DESIGN VOLUME. 900 RIP RAP PAD ' / \� / / / i C - - _ T73• \ _ - --POUROUS BAFFLES ARE TO BE REMOVED. THE SKIMMER - / / -r-- - _ - s X EASEMENL -E' r- ASSEMBLY IS TO BE REMOVED AND THE 8" SHEAR GATE I / �' i a k -VALVE IS TO BE ATTACHED TO THE BOTTOM DRAIN AND .Wt -18 - - -- [ - - - - -- W2=48� \ I / I ( / r �i n�• 0 it CLOSED. THE WET DETENTION POND IS TO THEN BE - La =40' �- - - - - '" / 764 I _-RE BY A P�?FESSIONAL ENGIN�R. - THICKNESS =36' ` - CLASS it RIP RAP (\ c 770. ' ' T1'N E i _ - - - - - t- - - i�X_ � � _X_� -X� -- � -_ _. ✓ � / / i _ X X-�X X X- \ �•- _' � ... �. , \ \ \ _ _.. 773. - / $4 it 14' � \ -" -� X822•' \ ` -774 - \ - - \ 4• CP X82 _ 7 -7 GRAVEL INLET is x (TYPICAL) I \ \ \ �, � \ \ i \ \. �w -;,• �~��' ,_ r x I � •/I 56 I / I � � I \ �9 SF \ 1 \11 1 bill ou i I � \ ,\ c-G . \ S� \ \ \ \\ - c,0 0 �\ nI�r1IRaFn I Irullrc A 4$ i ) I C__ 0.65 TEMP ®RAY BERM CHART NOTE: EX CEL SIORLIMMMBE NORTH AMMCANGRMENOREQUI /ALINIT, 1/22/2013 1-- 5.75 IN/HR NOTE: GRASS CAN WITHSTAND VELOCITIES OF6 FPS. NOTE: MAX VELOCITY W ITHOUT A LINER PER N.C. EROSION MANNUAL IS 2 FPS. SWALE I FLOW (C.F.S.) VELOCITY FT /sec) FLOWDEPTH (FT.) CHANNEL- SHAPE LINER STAPLE PATTERN CALCULATED SHEAR STRESS SHEAR STRESS 16.5• 16" NO. AREA SLOPE ( %) SIDE SLOPES FLOW (C.F.S.) (FT /sec) (FT.) SHAPE LINER PATTERN SHEAR STRESS SHEAR STRESS 7.69% 21 0.41 239 0.08 TRAPEZOIDAL r BOTTOM DS75 D 0.38 1.55 2 0.11 3.57% 2:1 0.41 1.87 0.10 TRAPEZOIDAL z BOTTOM DS75 TRAFROKAL 0.22 1.55 3 0.11 1 2.78 4.72% 2:1 10.39 4.28 0.71 z BOTTOM I SC15OBN D 209 210 4.28% 2:1 0.49 211 0.11 TRAPEZOIAL Z BOTTOM DS75 TRAPEZOIDAL 0.28 1.55 5 1 0.16 2 0.23 10.130/o 2:1 0.86 3.41 0.11 z BOTTOM DS75 D 0.72 1.55 2040/o 2:1 0.67 1.85 0.16 TRAPEZOIAL z BOTTOM DS75 TRAPEZOE4L 0.20 1.55 7 0.18 3 0.10 2.68% 2:1 0.37 1.65 0.10 Z BOTTOM DS75 D 0.17 1.55 La CLASS 1 - E RIPRAP i2 I DETAIL - OUTLET PROTECTION W �(� ILT FENCE O \ / / ��� •\ � I I 1 t�'l I I v I / \ /O WET DETENTION POND TO ACT AS SKIMMER BASIN Q 1.\ � / TYPICAL) �'�, ,� d \ I SF 1 / G� I I �g / ` \ 1 \ DURING CONSTRUCTION. SEE SKIMMER BASIN �',- 1 \ \ / 21 \ �o a \\ \ I I 1191991 / /�-(�P' I / \ \ / �/ \i�� CALCULATIONS FOR WET DETENTION POND BELOW. [ll. 1 .` ' .. \ � . of \ \� / � \ o • .I� \ � I S I f \ � \ lei-' Z w SF \ i 1 ��� ,•� I / / ,1'S \"� I I I I 1 f 0• \\ ( DRAINAGE AREA = 8.95 ACRES DISTURBED AREA = 6.63 ACRES S� ^D4' \ REQUIRED VOLUME = 1800 CF /DISTRUBED AREA ,SKIMMER BASIN #2 ; REQUIRED VOLUME = 11,934 CF / a �\ t \ I \ 1 10' 1 / \ \ \ \ \ fir+ I VOLUME PROVIDED (768 -771)= 14,475 CF WITH 3 POROUS BAFFl.ES' / $ , \ � _ TOP EL - 780.00 / \ \ \ \ \ 2 / 1 1 \ d \ �` `: \ / / � 4- � .BOTTOM EL, -77s \\ \ \ \ \ ��j1 \\ � SURFACE AREA REQUIRED = 325 SF 10 -YR INFLOW h ' 1 / / \ SE � P /' ;� I �° 193 \ �o. / / 3 1 \ \ o \ SURFACE AREA REQUIRED = 325 SF X 45.10 \ �I 1 J o \ \ x \ \ \ SF \ > \ /\ SURFACE AREA REQUIRED = 14,658 SF AV \ SURFACE AREA PROVIDED = ±15,743 @ AT EL. 776.50 (EMERGENCY SPILLWAY) SKIMMER SIZED FOR ±2.5 DAY DEWATERING TIME (SEE SIZING CHART BELOW) ONCE LOTS 25 -29 HA BEEN' / CLEARED, STOCKPILE EXCESS CUT IN \ / ; / \o LOT 25 AROUND SKIMMER BASIN 2. / 1 / \ \ \ ' �� \ \ 0� \ \ \ # # \. \ \ 0 �• 8" SKIMMER TO BE ,ONCE SITE HAS BEEN STABILIZED, \ �, �/ +f / / ' . / \ \ ` \ \ 1 REMOVE SKIMMER BASIN #2 AND \ ` / /, ^ \ \\ \ \ \ \ \ \ \ \ �\ \ \ \\ /\ \ \ \ \ DMEWA RIG ORFICE A"" '�""b" 6* ASSEMBLY R 2 REMOVE POROUS BAFFLES AND \ �' /: / \ \\ \ i \ \ X \ \ \ PER FIGURE 6.64B KIMMER ASSEMBLY. BRING PAD #25 ' \ % �/ / / / // % r - \ \ \� ` \ / d\ • ^ • \ \ \ \ \ \ \ OF THE NORTH \� \ / \ 6 CAROLINA EROSION C Enclosure 0 GRADE WITH PREVIOUSLY __ \' Ir \ \ \� \ \/ \ \ �. \ �� , \ \ \� \ AND SEDIMENT TOCKPILED DIRT. _ �\ \ \ 1 O // / / f / �\\ \ \ \ \ \ \ / / \ \d �\ \ \ \ 1 \ Sh \ \ CONTROL PLANNING • - _ _ `�, \\ \ // / / \ \ `� \�� \� \ \ \ \ �g \ \ \, \ 6C �\ ND DESIGN MNU Water ERSPECTIVE VIEW Un PVC Elbow Pi Schedule 40 PVC End vve vent �� \ �.. \ \'\ \ \ ` \: - ._ - I \ \ \ �� \ / \ d ` •o, \ \ \ �` \ \ ( Water Surface PVC End Cap _f - •C I ,I , I \ \ \ \ \ d \\ \ \ ♦ ^V \\ \ \ Schedule 40 \ _ 30 SS. -r '\ \� % ` •� \ \ \® \ �.. I \ PVC Pipe PVC Pipe �.� ,_p\ PVC Ta Onfi -. . -, \ ,•,�- - ��\ / i \ \ \ \ \ \/ t' Holes e \ PVC Tee e Urdermde flexible Plate se ESMT:" ,�' �.: \ �..�\y\ \ \ \, \ t �I ` \ \ \ \ \ \ \ 1 , \ \ \ �o� \ 3 \ �� e T \� Bottom Surfxe END VIEW 1' \ Fi20NT VIEW \ \ f \ \ Figure &64a Schematic of a skimmer, from Pennsylvania Erosion and Sediment Pollution Control Manual, March, 2000. \ 1 \ \ \ \ \ \ \ SF X \\ \ - - - -- - -- - - -- - \ \ C= 0.65 PERMANENT SWALE CHART NOTE: Ec ELs ORLmm -rowNORTHAmmomo#tmoReomALgir. 21112013 1-- 5.75 IN/HR NOTE GRASS CAN WITHSTAND VE OCITIES OF 6 FPS. NOTE: C=.35 FOR UNIMPROVED CLEARED AREA NOTE: MAX VEOCITY WITHOUT A lUNER PER N C. EROSION MANNUAL IS 2 FPS. _PERMMEI5_ SWALE NO. DRAINAGE AREA SLOPE SIDE SLOPES FLOW (C.F.S.) VELOCITY FT /sec) FLOWDEPTH (FT.) CHANNEL- SHAPE LINER STAPLE PATTERN CALCULATED SHEAR STRESS SHEAR STRESS 16.5• 16" CLASS B 23 72" 414.43 40' 18' 46' 36" CLASS 11 1 0.11 7.69% 21 0.41 239 0.08 TRAPEZOIDAL r BOTTOM DS75 D 0.38 1.55 2 0.11 3.57% 2:1 0.41 1.87 0.10 TRAPEZOIDAL z BOTTOM DS75 D 0.22 1.55 3 0.11 213% 21 0.41 1.59 0.12 TRAPEZOIDAL z BOTTOM DS75 D 0.15 1.55 4 0.13 4.28% 2:1 0.49 211 0.11 TRAPEZOIAL Z BOTTOM DS75 D 0.28 1.55 5 1 0.16 3.77% 21 0.60 218 0.12 TRAR ZOOkL r BOTTOM DS75 D 0.29 1.55 6 0.18 2040/o 2:1 0.67 1.85 0.16 TRAPEZOIAL z BOTTOM DS75 D 0.20 1.55 7 0.18 1.89% 21 0.67 1.81 0.16 TRARZOIDA . z BOTTOM DS75 D 0.19 1.55 8 0.15 2.00% 2:1 0.56 1.73 0.14 TRAPEZOIDAL z BOTTOM DS75 D 0.18 1.55 9. 0.27 10.07% 21 1.01 3.60 0.12 TRAFR20DAL z BOTTOM DS75 D 0.78 1.55 10 0.30 8.90% 2:1 1.12 3.59 0.14 TRAPEZOIDAL z BOTTOM DS76 D 0.76 1.55 Figure 6.64b Skirr orifice diameter as of the basin volumi \\ 9 \O '`., \ • \ , \ M� (` \ \ \ \ ,96, \ \ \ �v1P basin dewatering ti DISTURBED 0o MITS (TYPICAL) USE 2' ORIFICE FOR t2.5 DAY ,Q DEWAIERING TM \ \ , OWNER /DEVELOPER: 7CrisKats, LLC 7B CORPORATE CENTER COURT �. . a \ \. � � a �• _ �. - _ --- � � � � \�. \ � � �%.® � ®� GREENSBORO, NC 274.08 TELEPHONE: 336 - 282 -4127 FAX:336- 282 -3797 CONTACT: HERB PARKS EMAIL ADDRESS: hparks@besisuites.com 2 OUTLET PROTECTION FES# SIZE FLOW(cfs) La (ft) W, W Thickness (ft) RIP -RAP 5 15' 0.71 10' 3.75' 12' 13" CLASS B 22 30" 31.21 14' 7.5' 16.5• 16" CLASS B 23 72" 414.43 40' 18' 46' 36" CLASS 11 GEOTEXTILE LINER TO BE INSTALLED UNDERNEATH RIPRAP PAD ON -SITE SOIL TYPES: CkB, PoC, POE, Ppc2, PpE2 HYDROLOGY GROUPS: A, B TOTAL DISTURBED AREA EROSION CONTROL LEGEND - X X X - TEMPORARY SEDIMENT FENCE CONSTRUCTION ENTRANCE BERM 1 DB- TEMPORARY DIVERSION BERM xX- X -X -X STONE WEIR OUTLET IN SILT FENCE DISTURBED LIMITS TEMPORARY INLET PROTECTION PRE DEVELOPMENT DRAINAGE DELINEATION LINE SWALE 2 -.� - R PERMANENT DRAINAGE SWALE ChB SOIL LINE (TYPICAL) GRAPHIC SCALE ( IN FEET ) 1 inch = 40 ft. STEEL POST DRIVEN INTO GROUND (t24") _ NCDOT #5 or #57 washed stone INCDOT #5 or #57 washed stone - 4' max ----------- ° - - - - -- - -- HARDWARE CLOTH AND GRAVEL INLET PROTECTION NOT TO SCALE TEMPORARY SEEDING DEFINITION Seeding disturbed areas with annual grasses or legumes to provide temporary ground cover to lessen soil erosion. PURPOSE To temporarily stabilize graded cut and fill slopes that cannot be seeded with permanent vegetation within thirty days after completion. To temporarily stabilize graded areas of bare soil where permanent vegetative cover is not needed or where grading has not been completed and permanent seeding will be done later. CONDITIONS WHERE PRACTICE APPLIES Where bare soil has been exposed by grading, and vegetative cover is needed for one year or less. May include such areas as temporary sediment pond, diversions, soil stockpiles, building pads, rough - graded road banks, etc. It is also used to provide a temporary perimeter buffer. PREPARATION Prepare seedbed by ripping, chiseling, harrowing, or plowing to depth of at least six inches so as to produce a loose, friable surface. Incorporate 750 -1,000 pounds 10-10- 10 fertilizer and up to two tons of dolomitic lime per acre (Note: Lime may not be needed if a soil test indicates a pH of 6.5 or higher). Mulching is required according to the same specifications as for permanent seeding unless waived by Soil Scientist. Select seeding mixture and best planting dates from Table 12. c TABLE12 TEMPORARY SEEDINGS SEEDING MIXTURE SEEDING RATE (LB /ACRE) PLANTING DATE: Rye Grain and 120 lbs. Jan. 1 - May 1 Kobe Lespedeza 50 lbs. German Millet or 40-50 lbs. May 1 -Aug. 15 Sudan Grass Rye (Grain) 120 lbs. Aug. 15 - Dec. 30 (may substitute cats before Oct. 1 or wheat from Oct. 1 -Nov. 15) Annual ryegrass 40 lbs. Aug. 15 - Nov. 30 Weeping Lovegrass 1/ 5lbs. May 1 -Aug. 15 I/ Weeping Lovegrass is a perennial grass but is included here because of its adaptability to poor soil conditions and droughty sites. ME MEN 19 -gtwge hardware cloth (a mesh openings) T__ 2' `''I 16" 1 POROUS BAFFLE IN ROCK DAM- ZSEDIMENT PIT DETAIL SCALE: NOT TO SCALE Table 6.108 Temporary Seeding Recommendardorm for Late winder and Early Spring Seeding mixture spe•ies Rata (Maas) Rye (grain) 120 Annual despeders (Kobe in Piedmont and coo" Plain, Korean in Maintains) 50 On* annual lespailm when duration of temporary cover is not to extend beyond .hare. Seeing dater Monmtse- -Above 2500 feet Feb. 15 - May 15 Below 2500 feat Feb. 1- May 1 Piedmont -Len. 1- May 1 Coastal Plain -Dec. 1 -Apr. 15 Soil amendments Follow recommendations of soil testa or apply 2,OD0 biacre ground apdadkaal Isnestone and 750 b(acre 10-10.10 Mulch Apply 4,000blacrestrew. Anchor straw by lacking with asphak nailing. or a mulch anchoring tool. Adisk with blades set nearly ~A can be used as a mulch anchoring Md. Maintenance Rehitill if growth is not fully adequate. Reseed, retertirme and mulch immediately fallowing erosion or other damage. Table 6.10b Temporary Seeding Recommendations for Summer COMPACTED SOIL 2' -O' MIN. 1 6' -0" (TYP.) ST► cs OW CONSTRUCTION SPECIFICATIONS NORTH J. REMOVE AND PROPERLY DISPOSE OF ALL TREES. BRUSH. STUMPS, AMERICAN AND OTHER OB,IECTIONAL MATERIAL. GREEN EROSION CONTROL PPaduefe 2. ENSURE THAT THE MINIMUM CONSTRUCTED CROSS SECTION 14W NIGIMY 41 110M MEETS ALL DESIGN REQUIREMENTS. �20,6,°, 3. ENSURE THAT THE TOP OF THE BERM IS NOT LONER AT ANY POINT 2.47 AC THAN THE DESIGN ELEVATION PLUS THE SPECIFIED SETTLEMENT. 1615 SF 4. PROVIDE SUFFICIENT ROOM AROUND DIVERSIONS TO PERMIT © MACHINE REGRADING AND CLEANOUT. soorn Nice 5. VEGETATE THE BERM IMMEDIATELY AFTER CONSTRUCTION, 4' (t.Ztss) 0 UNLESS IT NILL REMAIN IN PLACE LESS THAN 30 WORKING DAYS. CAROLINA EROSION MAINTENANCE O 0 INSPECT TEMPORARY DIVERSIONS ONCE A WEEK AND AFTER EVERY 3.T (1.0m) RAINFALL L. IMMEDIATEL Y REMOVE SEDIMENT FROM THE FLOW AREA I O O 0 AND REPAIR THE DIVERSION BERM. CAREFULLY CHECK OUTLETS stowUon of Seam Stitch will eLocation of Sean Stitch will ('�") AND MAKE TIMEL Y REPAIRS AS NEEDED. WHEN THE AREA PROTECT- product tpw Ana. product Wc ED IS PERMANENTLY STABILIZED, REMOVE THE BERM ANO THE 3.7s Smims PER SQ. Ye. (43 SrAPIES PER SM M) CHANNEL TO BLEND NITN THE NATURAL GROUND LEVEL AND APPRO- For Wr pk- slapiss/dokes PRIATELY STABILIZE IT. through each of the YELLOW oalorod dab. Ara mantas con d stotetno OUT de No? Craws do b 'claw loo grapes estsoos Are mantes con el ditamo Dar ds North American Gsan, clove loe grepw /ostaws I ry OF GREENSBORO a trews de los pwkas d. ootores Aneariao STD. NO. I REV. rr��rl�l,rra f; crci l��i� SEDIMENT CROSS SECTION VIEW NTS sKnom To BE NORTH DRAINAGE AREA AMERICAN 1160E WIrK A AM Assembly GREEN EROSION CONTROL PPaduefe 4 14W NIGIMY 41 110M DOT SYSTEM �20,6,°, STAPLE PATTERN GUIDE 2.47 AC PARA EL ENGRAPADO 1615 SF a D O © 02"-0- m- -r-.r (saw- taswn) 'Y-� (sane- t23oes)+ ,r k ° (Ra12.som) "2'-s° Oom- 12_4m) soorn Nice 1tY (O.Zim) 4' (t.Ztss) 0 4' (1.2m) • • • ,,, Sadm CAROLINA EROSION 'C' Ersclosure O 0 2r�QAne) 3.T (1.0m) I O O 0 • • stowUon of Seam Stitch will eLocation of Sean Stitch will ('�") an product tpw Ana. product Wc 3.4 STAPLES PER 90. YO. (4.I Sgr�APfiS PER SQ. M) 3.7s Smims PER SQ. Ye. (43 SrAPIES PER SM M) For Dater Sys plow staples /stakes, For Wr pk- slapiss/dokes through each of #is WMrE oobrod dots. through each of the YELLOW oalorod dab. Ara mantas con d stotetno OUT de No? Craws do b 'claw loo grapes estsoos Are mantes con el ditamo Dar ds North American Gsan, clove loe grepw /ostaws punntee de ook,reo a trews de los pwkas d. ootores Aneariao SEDIMENT CROSS SECTION VIEW NTS sKnom To BE DISTURBED AREA DRAINAGE AREA VOLUME REQ'D. 1160E WIrK A AM Assembly BOTTOM DIMEN. VOLUME PROV'D./ SURFACE AREA PROV'D. ORIFICE DIAL.. DrFATEMG ORFICE 1 1.23 AC 2.47 AC PER FIGURE 6.60 1615 SF -=40, W =20' DEEP 3624 CF/ 1664 SF OF T8E NORTH 5' WIDE 2 Figure 6.64b Skimmer 3.86 AC CAROLINA EROSION 'C' Ersclosure =34', DEEP orifice diameter as a function C !' 5' WIDE i -T of the basin volume and REV. CONTROL PLANNING basin dawatertg time. AND DESIGN MANUAL water - BAfWrt L Av,E1 PERSPECTIVE VIEW COMPACT THDROUGht Y PVC End cap Elbow PVC Vent Schedule 40 'SFCWO arm r,MPArTFO SOT! Pin vtle ape sL ICING WjrhVD ' MAY Al 50 BF :13FO TO INSTALL SIL T FENCE ISEE A &FAW 2 -DAY t�S AV£ UAPAO ac DEWATERMIG 5 PVC PERIOD USE COG S10/432 57&lF DITCH CAECA CUP fON FENCE OVILL15 AI A MAXIWM,W !00 r l SPACING AND AT ALL NATURAL DRAINAGE Schedule 40 AREAS, (SEE SHEET 2 OF 2r raiC Tae PVC Pipe PVC Pipe 2 t' I-Wks in PVC Tee orifice 3 Underside Flexible Plate 6 H*s6 7 e to Bottom Surface END VIEW FRONT VIEW Figure 6.64a Schematic of a skimmer, from Pennsylvania Erosion and Sediment Pollution Control Manual, Watch. 2000. ■1 ■� lit, S dairs 10 days I i �SIII���Nf1111��� ■�s1 VOLUME REQ'D= (1800 CF) (DIST. AREA) SURFACE AREA REQ'D= (325) (Q10) Seeding mxture sped" Rate (Ib/acre) German millet 40 In the Piedmont and Mountains, a small- stemmed Sudangrass may be substituted at a rate of 50 Iblecre. Seeding dates Mamtairo -#AW 15 -Aug. 15 1 -Aug. 15 Coastal 15 -Aug. 15 Soil mrandm rris Follow of soil tests or apply 2,000 Iblacre ground agricultural Imestane and 750 Iblacxe 10 -10.10 fertilizer. Mulch Apply4,0001b/aco straw. Anchor straw by tacking with asphalt, netting, or a m ulcn anchoring tool. A disk with blades set nearly straight c a n be used as a mulch ancdhorkv tool. Maintenance Ref fize if growth is not duly adequate. Reseed, refertilize and mulch Immediately followkV erosion or other damage. • 1111116-y-N. Table 6.10c Temporary Seeding Recommendatlons for Fall Seeding mixture Species Rate (Iblacm) Rye (grain) 120 Seeding dates Mountains -Aug. 15 - Dec. 15 Coastal Plaint and Piedmont -Aug. 15 - Dec. 30 Soo amendments Follow soil tests or apply 2,000 Ib/acre ground agricultural lhntesionte'''' and 1,000 b/acre 10 -10-10 fertilhoef•. Mulch Appy4,0001b/acre straw . Ancfarstrawbytacking with asphalt netintg,' or a mulct anchoring tool. A disk with blades set nearly straight can be used as a mulch anchoring tool. Maintenance Repair and ree damaged areas immediately. Topdress with 50 lb/acre of nitrogen In Marla. If it is necessary to extent temporary cover beyond June 15, overseed with 50 Iblscxe Kobe (Piedmont and Coastal Plain) or Korean (Maintains) lespedeza in late February or early March. METAL FENCE POST DISTURBED AREA DRAINAGE AREA VOLUME REQ'D. SURFACE AREA REQ'D. BOTTOM DIMEN. VOLUME PROV'D./ SURFACE AREA PROV'D. ORIFICE DIAL.. SPILLWAY 1 1.23 AC 2.47 AC 2214 CF 1615 SF -=40, W =20' DEEP 3624 CF/ 1664 SF 1" 5' WIDE 2 1.91 AC 3.86 AC 3438 CF 2525 SF =34', DEEP CF/ 2574 SF 1.5'' 5' WIDE VOLUME REQ'D= (1800 CF) (DIST. AREA) SURFACE AREA REQ'D= (325) (Q10) Seeding mxture sped" Rate (Ib/acre) German millet 40 In the Piedmont and Mountains, a small- stemmed Sudangrass may be substituted at a rate of 50 Iblecre. Seeding dates Mamtairo -#AW 15 -Aug. 15 1 -Aug. 15 Coastal 15 -Aug. 15 Soil mrandm rris Follow of soil tests or apply 2,000 Iblacre ground agricultural Imestane and 750 Iblacxe 10 -10.10 fertilizer. Mulch Apply4,0001b/aco straw. Anchor straw by tacking with asphalt, netting, or a m ulcn anchoring tool. A disk with blades set nearly straight c a n be used as a mulch ancdhorkv tool. Maintenance Ref fize if growth is not duly adequate. Reseed, refertilize and mulch Immediately followkV erosion or other damage. • 1111116-y-N. Table 6.10c Temporary Seeding Recommendatlons for Fall Seeding mixture Species Rate (Iblacm) Rye (grain) 120 Seeding dates Mountains -Aug. 15 - Dec. 15 Coastal Plaint and Piedmont -Aug. 15 - Dec. 30 Soo amendments Follow soil tests or apply 2,000 Ib/acre ground agricultural lhntesionte'''' and 1,000 b/acre 10 -10-10 fertilhoef•. Mulch Appy4,0001b/acre straw . Ancfarstrawbytacking with asphalt netintg,' or a mulct anchoring tool. A disk with blades set nearly straight can be used as a mulch anchoring tool. Maintenance Repair and ree damaged areas immediately. Topdress with 50 lb/acre of nitrogen In Marla. If it is necessary to extent temporary cover beyond June 15, overseed with 50 Iblscxe Kobe (Piedmont and Coastal Plain) or Korean (Maintains) lespedeza in late February or early March. METAL FENCE POST NOTES• r4 GAU6£ MINIS W i CONTROL FARRTCS TO BF B' - 0' ON CENrFR. hW MIRE ( EROSTOIf Crd'sTROf, FABl7TC FABRIC.• 3' -0' IN 11IDTH (MUST BE STAACARO 5PECIFICArIONS Z 51OAC' (1F USED) 04 MASHED 5TOft' PLACED 1'-0' Lt 4P e I SIL .' f LNWL. -SPI. ICES IN FABRIC SHOU10 BF OVFM APPED A MTN. OF c Fr MAINIAIN ADEGUAl6 u1SMACE AOR - MAXIAN DRAINAGE AREA - 114 ACRE PER 100 FT OF FENCE FOR 2r &? LESS SLOPE. -SILT FENCE TO BE• HEMDVE47 AF TEN CONSARUCTION IS L' tIL AS O1HLC!£4; BY SEOIAKNT REMOVAL 6 MAI1TLhA1NC£ ti PAGE 1 Or 2 c iT Y ®F G-R EEN S B 0 i -T STD. NO. REV. SILT FENCE DETAIL £X. EAR 7t - BAfWrt L Av,E1 COMPACT THDROUGht Y SILT FENCE Mtd6T 8E £NTW..NGH£0 AND 'SFCWO arm r,MPArTFO SOT! Pin sL ICING WjrhVD ' MAY Al 50 BF :13FO TO INSTALL SIL T FENCE ISEE A &FAW N AV£ UAPAO DESIGN PLANNIN DESICrf i MANIiAL ' SECTTON R. 6,P) . USE COG S10/432 57&lF DITCH CAECA fON FENCE OVILL15 AI A MAXIWM,W !00 r l SPACING AND AT ALL NATURAL DRAINAGE AREAS, (SEE SHEET 2 OF 2r NOTES• - SPACING OF POSTS USING HOG NIKE WITH APPROVED EROSION CONTROL FARRTCS TO BF B' - 0' ON CENrFR. POST.' METAL 7 --POST 50' OR 6'-0- IN HEIGHT DEPEAwDING ON FILL SLOPE 00N. 1. 33 1 8/1F STFFI. CONSTAt rTT^tr) . FABRIC.• 3' -0' IN 11IDTH (MUST BE STAACARO 5PECIFICArIONS FOR SIL T FENCE - ASTM D ) MITH 12' BURIED IN T.nENCH. 51OAC' (1F USED) 04 MASHED 5TOft' PLACED 1'-0' Lt 4P e I SIL .' f LNWL. -SPI. ICES IN FABRIC SHOU10 BF OVFM APPED A MTN. OF c Fr - MAXIAN DRAINAGE AREA - 114 ACRE PER 100 FT OF FENCE FOR 2r &? LESS SLOPE. -SILT FENCE TO BE• HEMDVE47 AF TEN CONSARUCTION IS L' tIL AS O1HLC!£4; BY l +fE CONSTRUCTION INS%EECTOR. PAGE 1 Or 2 c iT Y ®F G-R EEN S B 0 STD. NO. REV. SILT FENCE DETAIL ?lc9 CONSTRUCTION ENTRANCE DETAIL NTS Aaamw AW JEW-MARY aNNI OV RAM'Lr art AYD6t r AwwT ar saw7m a m ar mmme At r d rla7. 07Y or �x®a1G a1Ga14W am 210 2= ^SP11 E R1A9alCA>gS' NOTE, SMOX711M STOE SHALL BE CWTRd. PURPOSES.F� EFOS11l1 BED05 O CDNTR� STDE SttAl i ��_T_7 S' DE as L7i fS7 sTmlE. CONSTRUCTION NOTES 1. EROSION CONTROL MEASURES ARE TO BE MAINTAINED BY THE OWNER UNTIL GROUND COVER HAS BEEN WELL ESTABLISHED. DISTURBED AREA MUST BE STABILIZED WITHIN ANY PHASE OF GRADING. 2. THE APPROVED COVER AND WATER CONTROL PLAN MAY BE AND WILL BE REVISED DURING CONSTRUCTION WHEN IN THE OPINION OF THE CONSERVATION ENGINEERS OR INSPECTORS THAT ADDITIONAL MEASURES FOR THE PREVENTION OF SIOL LOSS ARE NECESSARY. GENERAL PLAN NOTES 1. SOIL EROSION CONTROL DEVICES MUST BE INSTALLED INITIALLY AFTER THE GRADING PERMIT IS ISSUED AND ROUGH GRADING STARTS. PLANNING AND DEVELOPMENT STAFF WILL CHECK THESE DEVICES FOR PROPER INSTALLATION AND COMPLIANCE WITH THIS PLAN. A "CERTIFICATE OF PERFORMANCE" WILL BE ISSUED. THIS CERTIFICATE MUST BE BROUGHT TO OUR INSPECTIONS DIVISION BEFORE A BUILDING PERMIT WILL BE ISSUED. 2. ALL EROSION CONTROL DEVICES ARE TO BE INSTALLED IN ACCORDANCE WITH THE APPROVED , PLANS AND SPECIFICATIONS. ANY CHANGES ARE TO BE APPROVED BEFORE CONSTRUCTION BY CITY OF GREENSBORO PLANNING AND DEVELOPMENT, OFFICE OF SOIL SCIENTIST. ADDITIONAL DEVICES WILL BE REQUIRED IF NECESSARY. 3. IF FILL MATERIALS ARE BEING BROUGHT ONTO THIS PROPERTY OR IF WASTE MATERIALS ARE TAKEN FROM THIS PROJECT, THIS INFORMATION MUST BE DISCLOSED AND SHOWN ON THE EROSION CONTROL AND GRADING PLAN. BORROW AREAS AND DUMP SITES ARE CONSIDERED TO BE PART OF THIS PROJECT. 4. UNDER THE CITY OF GREENSBORO SOIL EROSION AND SEDIMENTATION CONTROL ORDINANCE (SECTION 19); AGENTS, OFFICIALS, OR OTHER QUALIFIED PERSONS ARE AUTHORIZED TO PERIODICALLY INSPECT THE SITES OF LAND - DISTURBING ACTIVITIES. OBSTRUCTING, HAMPERING OR INTERFERING WITH SUCH INSPECTIONS CARRIES A $500 PER DAY CIVIL PENALTY: THE INSTIGATION OF THIS CIVIL PENALTY REQUIRES NO PRIOR NOTICE. 5.IN AN EFFORT TO MINIMIZE EROSION AND EXPOSURE TIME, EASEMENT AREAS SHALL NOT BE GRUBBED OR GRADED UNTIL UTILITIES ARE READY TO BE INSTALLED. ALSO, THE IMMEDIATE SEEDING OF DISTURBED EASEMENT AREAS AFTER UTILITIES ARE INSTALLED WILL ELIMINATE MANY PROBLEMS. EASEMENT AREAS WHICH CROSS OR ARE ADJACENT TO WATERCOURCES SHOULD RECEIVE SPECIAL CONSIDERATION. 6. NO LAND - DISTURBING ACTIVITY SHALL BE PERMITTED IN PROXIMITY TO A LAKE OR NATURAL WATERCOURSE UNLESS A BUFFER ZONE IS PROVEDED ALONG THE MARGIN OF THE WATER BODY OF SUFFICIENT WIDTH TO CONFINE VISIBLE SILTATION WITHIN THE TWENTY -FIVE PERCENT OF THE BUFFER ZONE NEAREST THE LAND - DISTURBING ACTIVITY. 7. IF AN EXISTING POND IS DESIGNATED AS A PERMANENT WATER QUALITY POND, ALL SEDIMENT DEPOSITED IN IT DUE TO CONSTRUCTION MUST BE REMOVED WHEN THE SITE HAS BEEN STABILIZED. THE POND MUST BE CLEANED OUT BEFORE THE GRADING PERMIT IS FINALIZED. SEEDING SPECIFICATIONS CITY OF GREENSBORO - SOIL EROSION CONTROL SECTION Apply 4000 lbs. agricultural limestone per acre. Apply 1000 lbs. 10 -10 -10 fertilizer per acre for grass seeding. Lime and fertilizer are to be disked into the soil surface to a minimum depth of 4 inches. Late Winter - Early Spring A: Grass: (1) Tall Fescue - 150 lbs. per acre. B. Grass - Legume Mixture (1) Tall Fescue - 100 lbs. per acre plus Serecia Lespedeza (scarified) - 60 lbs. per acre. (2) Tall Fesue - 100 lbs. per acre plus Crownvetch - 25 lbs. per acre. Early Spring - Late Spring A. Grass: 1) TAII Fescue - 150 lbs. per acre 2) Tall Fescue - 100 lbs. per acre plus Weeping Lovegrass - 5 lbs. per acre. B. Grass - Legume Mixture (1) Tall Fescue - 100 lbs. per acre plus Serecia Lespedeza (scarified) - 60 lbs. per acre. Summer A. Grass: f 1) Tall Fescue - 150 lbs. per acre plus Weeping Lovegrass - 5 lbs. per acre. 2) Weeping Lovegrass - 5 lbs. per acre plus Browntop Millett or Sorghum -Sudan Hybrids - 50 lbs. per acre. B. Gross- Legume Mixture (1) Weeping Lovegrass - 5 lbs. per acre plus Serecia Lespedeza (scarified) - 60 lbs. per acre. Late Summer - Early Winter A. Gross: 1) Tall Fescue - 150 lbs. per acre. 2) Tall Fescue - 100 lbs. per acre plus Annual Ryegrain - 25 lbs. per acre. B. Grass - Legume Mixture 1) Tall Fescue - 100 lbs. per acre plus Serecia Lespedeza (unscarified) - 60 lbs. per acre. 2) Tall Fescue - 100 lbs. per acre plus Crownvetch - 25 lbs. per acre (((3 Tall Fescue - 75 lbs. per ocre plus Annual Ryegrain - 25 lbs. per acre plus Serecia Lespedeza (unscarified) - 60 lbs. per acre. After seeding, the area is to be rolled or cultipacked to insure that the seed is pressed into contact with soil surface. All seeded areas are to be mulched with straw mulch at the rate of 3000 lbs. per acre (approx. 100 bales per acre). Apply asphalt emulsion to the straw mulch at the rate of 150 gallons per acre. The above seeding recommendations and rates have been prepared for selection of a vegetative cover suitable for soil erosion control in the Greensboro area. Area soil types, climotic conditions, seed availability and individual plant characteristics are all taken into account in the above recommendations. Due to density, uniformity and textural quality reasons, the above selecions are not recommended for lawn CONSTRUCTION NOTES EROSION CONTROL MEASURES ARE TO BE MAINTAINED BY THE OWNER UNTIL GROUND COVER HAS BEEN WELL ESTABLISHED. DISTURBED AREA MUST BE STABILIZED WITHIN ANY PHASE OF GRADING. THE APPROVED COVER AND WATER CONTROL PLAN MAY BE AND WILL BE REVISED DURING CONSTRUCTION WHEN IN THE OPINION OF THE CONSERVATION ENGINEERS OR INSPECTORS THAT ADDITIONAL MEASURES FOR THE PREVENTION OF SIOL LOSS ARE NECESSARY. CONSTRUCTION SEQUENCE 1. OBTAIN PLAN APPROVAL AND GRADING PERMIT AT A SCHEDULED PRE - CONSTRUCTION CONFERENCE WITH CITY EROSION CONTROL INSPECTOR, CONTRACTOR RESPONSIBLE FOR EROSION CONTROL, ENGINEER, AND OWNER. 2. INSTALL PROPOSED SILT FENCE, STONE WEIR OUTLETS IN SILT FENCE FROM BEDSTONE DRIVE DOWN TO EX. STREAM ON BOTH SIDES OF PROPOSED ROADWAY. 3. CLEAR AND GRUBB THIS AREA. 4, INSTALL CONSTRUCTION ENTRANCE. SITE SELF INSPECTION AS REWIRED BY NCGS 113A -54.1; SIGNATURE DATE 5. INSTALL TEMPORARY STREAM CROSSING AND PUMP AROUND PER DETAIL SHOWN ON PLAN. 6. INSTALL 72" RCP AND HEADWALLS. INSTALL RIP RAP PAD AT CONCLUSION OF PIPE & HEADWALL INSTALLATION. 7. ROADWAY TO BE FILLED ONCE PIPE IS INSTALLED. B. CLEAR AND GRUBB AREAS AT SKIMMER BASINS #1 & #2. CLEAR AND GRUBB AREA WHERE SILT FENCE IS TO BE INSTALLED BEHIND LOTS 25 -33. INSTALL SILT FENCE AND SKIMMER BASINS IN THESE AREAS. 9. CLEAR AND GRUBB SKIMMER BASIN /WET DETENTION POND AREA. CLEAR AND GRUBB LOTS 25-29. 10. INSTALL WET DETENTION POND /SKIMMER BASIN. INSTALL SILT FENCE AT TOE OF SLOPE. EXCESS CUT FROM THIS AREA SHALL BE PLACED ON LOTS 25 -29 AS INDICATED ON THE GRADING PLAN. 11. CLEAR AND GRUBB REMAINDER OF SITE. 12. ROUGH GRADE STREETS. CONSTRUCT RETAINING WALL WHERE SHOWN. INSTALL ANY REMAINING PERIMETER EROSION CONTROL DEVICES SUCH AS SILT FENCE. GROUND COVER SHALL BE ESTABLISHED ON ALL EXPOSED SLOPES AND FILLS WITHIN 7 CALENDAR DAYS FOLLOWING THE COMPLETION OF ANY PHASE OF GRADING. 13. INSTALL STORM DRAINAGE AS SHOWN ON PLANS. INSTALL HARDWARE CLOTH AND GRAVEL INLET PROTECTION ON ALL PROPOSED STORM SEWER STRUCTURES AS THEY ARE BUILT AS SHOWN ON PLANS. SITE SELF INSPECTION AS REWIRED BY NCGS 113A -54.1; SIGNATURE DATE 14. INSTALL WATER AND SANITARY SEWER UTILITIES AS SHOWN ON PLANS. SITE SELF INSPECTION AS REWIRED BY NCGS 113A -54.1; SIGNATURE DATE 15. BRING ROADWAY TO FINAL GRADE. 16. ONCE ROADWAY AND LOTS HAVE BEEN BROUGHT TO FINAL GRADE, INSTALL BASE ABC STONE ON ALL STREET AREAS. MAINTAIN PREVIOUSLY INSTALLED EROSION CONTROL DEVICES. REMOVE SEDIMENT ACCUMULATION FROM IN FRONT OF SILT FENCE AND INLET PROTECTION AS NEEDED. 17. INSTALL CURB AND GLITTER. BACK FILL CURB. 18. INSTALL FIRST LAYER OF ASPHALT. 19. REMOVE SKIMMER BASIN #1 AND INSTALL BIO -CELL. 20. REMOVE SKIMMER BASIN #2 AND FILL AND GRADE PAD #25. SITE SELF INSPECTION AS REWIRED BY NCGS 113A -54.1; SIGNATURE DATE 21. ONCE ENTIRE SITE HAS BEEN STABILIZED, CLEAN OUT SEDIMENT ACCUMULATION IN THE WET DETENTION POND AND RESTORE POND TO ITS ORIGINAL VOLUME. REMOVE POROUS BAFFLES AND SKIMMER ASSEMBLY FROM POND AS SHOWN ON PLANS. INSTALL SHEAR GATE VALVE ON EXISTING BOTTOM DRAIN FOR THE POND. SITE SELF INSPECTION AS REWIRED BY NCGS 113A -54.1; SIGNATURE DATE 22. INSTALL ALL SIDEWALKS AND SEED ANY DISTURBED AREAS WITHIN 7 CALENDAR DAYS FOLLOWANG THE COMPLETION OF ANY PHASE OF GRADING. PERMANENT GROUND COVER SHALL BE ESTABLISHED ON ALL DISTURBED AREAS WITH 14 CALENDAR DAYS FOLLOWING COMPLETION OF CONSTRUCTION. 23. INSTALL FINAL LAYER OF ASHPALT. 24. ONCE SITE CONSTRUCTION IS COMPLETE, PERMANENTLY SEED ALL DISTURBED AREAS. GROUND COVER SHALL BE ESTABLISHED ON ALL EXPOSED SLOPES AND FILLS WITHIN 7 CALENDAR DAYS FOLLOWING THE COMPLETION OF ANY PHASE OF GRADING. PERMANENT GROUND COVER SHALL BE ESTABLISHED ON ALL DISTURBED AREAS WITHIN 14 CALENDAR DAYS FOLLOWING THE COMPLETION OF CONSTRUCTION. SITE SELF INSPECTION AS REWIRED BY NCGS 113A -54.1; SIGNATURE DATE 25. ONCE THE ENTIRE SITE IS STABILIZED, REMOVE ALL EROSION CONTROL MEASURES. SITE SELF INSPECTION AS REWIRED BY NCGS 113A -54.1; SIGNATURE DATE NOTE: GROUND COVER SHALL BE ESTABLISED ON ALL EXPOSED SLOPES AND FILLS WITHIN 7 CALENDAR DAYS FOLLOWING THE COMPLETION OF ANY PHASE OF GRADING. PERMANENT GROUND COVER SHALL BE ESTABLISHED ON ALL DISTURBED AREAS WITHIN 14 CALENDAR DAYS FOLLOWING THE COMPLETION OF CONSTRUCTION. CITY OF GREENSBORO BEFORE BEGINNING ANY UTILITY OR GRADING WORK WITHIN DEDICATED UTILITY OR STREET RIGHT - OF - WAYS CONTACT ENGINEERING DIVISION ® 373 -2302 EROSION CONTROL INSPECTION NOTE: PROPERTY OWNER, FINANCIALLY RESPONSIBLE PARTY, OR AGENT TO PERFORM SELF INSPECTION FOLLOWING ALL PHASES OF EROSION CONTROL AND CONSTRUCTION. SIGN AND DATE SELF INSPECTION CHART ON COVERSHEET FOLLOWING SELF INSPECTION OF EACH PHASE OF EROSION CONTROL AND CONSTRUCTION. NOTE: 1. ALL CONSTRUCTION TO BE TO THE CITY OF GREENSBORO STANDARDS AND SPECIFICATIONS. 2. CONTRACTOR TO VERIFY DEPTH AND LOCATION OF ALL EXISTING UTILITIES PRIOR TO CONSTRUCTION. 3. CONTRACTOR TO COMPLY WITH THE NEW O.S.H.A. REGULATIONS CONCERNING TRENCHING FOR INSTALLATION OF UTILITIES. 4. NO SUBSURFACE INVESTIGATION CONDUCTED BY EVANS ENGINEERING, INC. PROJECT TITLE: GRIFFIN'S KNOLL GREENSBORO, NORTH CAROLINA U -Since 1974- I Engineers Surveyors Plana 977 �r 4609 Dundas Drive Gseeosboro, NC 27407 -�/ 1e Z• 22•i3 a Phone 336-854-8877 Fax 336-85 4,8876 ®® Vr ee• F�,e se FIRM LICENSE #C -0168 4i«4 eee *sosrtaee" a , ®® s PROJECT: 823-11 DESIGN BY: AOL DRAVM BY: AL �P4 Q • sr�,<r DWG: H:\DRAVANGS\HERB PARKS \Trooper Rood \Gift Mill Site -4th LAYOUT.d SR'1-kt SHEET DESCRIPTION: EROSION DETAIL SCALE: NTS DATE: JANUARY 22, 2013 REVISIONS: SHEET NO.:/ 15 15 PERMANENT STREAM IMPACT SI 72• CULVERT AND RIP RAP BASIN FOR BEDSTO DRIVE STREAM CROSSING r TOTAL IMPACT = 130 LF kx. P ERjEN T -'- DFT�T�ON P WET o�p OMMON - E�EMEN TS , 0. / \ _ \ \ Av TEMPORARY STREAM IMPACT SAND BAGS, #57 STONE & HOSE FOR CULVERT PUMP AROUND (CHANNEL MUST BE RESTORED TO EXISTING CONDITION UPON COMPLETION OF CONSTRUCTION) / PERMANENT WETLAND IMPACT Wl TOTAL IMPACT = 8 LF CONSTRUCTION OF BEDSTONE 770 2 DRIVE AND CORRESPONDING STREAM CROSSING TOTAL IMPACT = 021 AC. STREAM AND WETLAND IMPACT NOTES: TEMPORARY STREAM IMPACT FOR CULVERT PUMP AROUND: 8 LF PERMANENT STREAM IMPACT OF CULVERT AND RIP RAP: 130 LF WETLAND IMPACT OF CULVERT AND RIP RAP PAD: 0.21 AC 1_— ■ ■ ■ ■ ■ ■ ■- ■ ■�����- ■- ., ■ ■ ■ ■ ■ ■ ■ ■■ 0101■■■■ • 1 ■ ■ ■ ■■■■mm■minmdmte■■■■■■■m■ _ M■■■■■ ■■■■■■■■■■ ■■■� ®�■■■ � ■ ■■ ■e■®■■■■■■ 01®01 750 1 NEpDwp�` NcpOj 5tD #g3a•39 RIPRAP WATER NOT 3 SHOWN . 1— 72" CULVERT 2'' HORIZONTAL 2:1 APRON FLOOR /yC - "' KipRq'�� � tjcStiz oot Sri #sa8, 3g NfgpWq`C PLAN VIEW NTS 37.5' '-. 25' .. 12.5' T I I 5' 15' 5' 1 1 I 1 I 72" CULVER i TOP OF RIPRAP T— � -�.... 1 I FLOW, ?. - t - - - - -- 2.5'_ 1 O ' I I o CLASS II RIPRAP 28" CLASS 11 RIPRAP PROFILE VIEW D(50) = 14" NTS D(max) = 23" RIPRAP BASIN DETAIL NTS NOTE: 1. ALL CONSTRUCTION TO BE TO THE CITY OF GREENSBORO STANDARDS AND SPECIFICATIONS. 2. CONTRACTOR TO VERIFY DEPTH AND LOCATION OF ALL EXISTING UTILITIES PRIOR TO CONSTRUCTION. 3. CONTRACTOR TO COMPLY WITH THE NEW O.S.H.A. REGULATIONS CONCERNING TRENCHING FOR INSTALLATION OF UTILITIES. 4. NO SUBSURFACE INVESTIGATION CONDUCTED BY EVANS ENGINEERING, INC. w PROPOSED PUMP PIPE PROPOSED SILT FENCE O o (TYP.) TEMPORARY CONSTRUCTION STREAM CROSSIN CLASS FLOW RIP RAP X X X X \ 5' 3 MIN O) RIP RAP #57 STONE AROUND PIPE INLET STREAM FLOW — — — — — 5 MIN / X SAND BAGS X X _X _*j PROPOSED DISTURBANCE LIMITS SILT FENCE PLAN (rn' -) 3' 3' MIN. MIN. FROM TO TOP OF PUMP PUMP BANK �STftE7GFf_ F L ow — EX. K CREEK TEMPORARY STONE DAM REMOVE ENOUGH SANDBAGS TO ALLOW FLOW POLTETHYLENE FABRIC ON FACE (8 ML THICK) THROUGH WHEN NOT PUMPING AROUND. SECTION A —A TEMPORARY "CULVERT CROSSING — PUMP AROUND" FOR CULVERT INSTALLATION NOTES 1) EROSION STONE TO BE -CLASS I- RIP -RAP UNLESS DESIGNATED DIFFERENTLY ON CONSTRUCTION PLAN. 2) PUMP AND LINE SIZE TO BE DETERMINED BY THE CONTRACTOR USING THE BASE FLOW SHOWN ON THE CONSTRUCTION PLANS 3) MATERIAL SPECIFICATIONS SANDBAGS: SANDBAGS SHALL CONSIST OF MATERIALS WHICH ARE RESISTANT TO ULTRAVIOLET RADIATION, TEARING AND PUNCTURE, AND WOVEN TIGHTLY ENOUGH TO PREVENT LEAKAGE OF FILL MATERIAL (i.e. SAND, FINE GRAVEL, ETC.) CONSTRUCTION SEQUENCE FOR CULVERT CROSSING -PUMP AROUND 1) INSTALL PUMP AND LINE TO PUMP FLOW FROM AREA UPSTREAM OF TEMPORARY STREAM CROSSING TO AREA DOWNSTREAM OF CONSTRUCTION AREA. BEGIN PUMPING AND CONTINUING PUMPING WHILE WORKING WITHIN THE STREAM. 2) INSTALL DOWNSTREAM TEMPORARY STONE DAM AND FILTER FABRIC TO PREVENT BACKFLOW INTO CONSTRUCTION AREA. 3) INSTALL PROPOSED SILT FENCE ALONG TOP OF BANK EACH SIDE OF THE CONSTRUCTION AREA. 4) UPON CONSTRUCTION COMPLETION, REMOVE TEMPORARY DAMS, FILTER FABRIC. DEPRESS TEMPORARY DAM BOTTOMS INTO STREAM BED UNTIL TOP OF RIP RAP IS LEVEL WITH STREAM BOTTOM. 5) UPON STABILIZATION OF CLEARED AREAS, REMOVE TEMPORARY EARTH BERM, SEDIMENT TRAP, AND DEWATERING BASIN. v vrn H � w' Z eo r0 -4 co ►mrZ -A1 =D =OItDArn =cDoo z H'o r'n {,SOH ADDD F � H Y yo z 3D O Z Z w ® r z 0 m ® co N 0 O O D Z cl v M m o Im D � O rn Z co Z m JE O r r v H � H' Z IDH'n�m HZ'S -11x> =�ZDrn xl)00 N H z z m M m o Z z 01) O Cc M •A H w :! _ m ® -4 N O =z D m 3°D Q m H M ,Z Z m 3E o :IE A r @ 9" FILL FACE ITR. FACE " DIA. DRAINS " ABOVE LOW LINE 2 -N7 ELEVATION 5' -0" T1 TOP & BOTTOM 1 �8 SPA. @ 9" Z" BARS IN TOP OF FOOTING a o _ SECTION - BB 1D={ n N1 z FIJFAM" Q < Q M = H ¢ 0' z Z V r 1– W a) ® J W C9 U3 M � ® N C7 IL. ¢ w M o LL (V N2 T"T. H ¢ W 8 FW –V`ZCT4 ' ~ ul STEEL LBS. z0 #4 14' -6" >� ~H 58 #4 , " 6 -9 6 0 T5 SECTION - AA SEE STII 938.45 FOR GENERAL NOTES. 40 BILL OF MATERIAL FOR ENDMWLL #4 REINF. STEEL 1 PIPE .I J a V2 BAR SIZEI LENGTH NO. 6E[tlIT V3 B1 #4 5' -6" 4 15 #4 ¢ 3~ uj N 6 B2 #4 4' -6" 4 12 13 0 W G1 #7 s' -8" 2 40 H1 #4 7' -2" 10 46 z O 3 H2 #4 5' -6" 2 7 H3 f #4 W -5" 4 9 ¢p W d le 5" lb I P 8 SPA. @ 9" FILL FACE 7" 8 SPA. @ 9" 3 -V2, 2 -V3, 2 -V4 2 -V5 N• BARS IN TOP AND 2 SPA. @ 2'11 - STR. 8" 3'_3• 3'- B07TDY FOOTING FACE 2 -H1, 1 -H3 Ha PLAN FACE 3- H1,/ -H2 1A43 Tdi V 2 STR. FACET' 8° H2 2- V2,1- V9,1 -W,145 n 31•t ={ I-- J. J„ Zt 4• -D" 8" 4 o a Z2 3' -5" T" H� v5 N1 #5 1 W -11" 14 57 = H ¢ 0' z Z V r 1– W a) ® J W C9 U3 M � ® N C7 IL. ¢ w M o LL (V N2 #4 3' -5" 8 18 REINF. STEEL LBS. T1 #4 14' -6" 6 58 T4 #4 , " 6 -9 6 27 T5 #4 2' -6" 40 67 V1 #4 7, -3" 6 29 V2 #4 5' -70" 10 39 V3 #4 5' -0" 6 20 V4 #4 4' -1 " 6 16 V5 #4 3' -2" 6 13 ZI #6 4' -8" 6 4 9 r Bn a 21_10" Nt� e -7" r Z3 H2 a' -11" 1, -1� „� �■ H3 2'10 "N" BARS 'IN#' BARS "Zoo BARS °H ", "N ", & -Z" BAR DIMENSIONS ARE OUT TO OUT. N io T4 Z. 5 -Nt 4 -N2 PA WING ELEVATION Z2 #5 4' -0" 6 Z3 #4 3' -4" 6 REINF. STEEL LBS. HVZC= T4 CON. /R.C. CU. YDS 7.1 10' -0" DE SECTION - BB ELEVATION 2'-6- TI TOP & BOTTOM 1191e" m � 8 SPA. @ 9" I TOP OFRFOOTING m T" ELOPE e. 10" m O1 Z. N1 48 SPA. @ 9 WING ELEVATION z oco #5 4'-0" Q FILL FACE 2" #4 Q Q ;MccCjV 6 000x nHn nZn 5 HVZC= T4 Fxz.O, TpF -IyOWj OOQ O cc w v 0 SECTION - AA SEE STD.0 533.45 FOR GENERAL NOTES. BILL OF NITERIAL FOR ENDWALL REINF. STEEL 1 PIPE ..d BAR SIZE LENGTH NO. EIGIT J 61 #4 5' -6" 4 15 W G Y B2 #4 4' -6" 4 12 G1 #7 9' -8" 2 40 C7 w Hl #4 7' -2" 10 48 o " O H2 #4 ' -" 56 2 7 Q W ~ H3 #4 W -5" 4 9 p W a N1 #5 3' -11" 14 57 CC H �5. TAPER DETAIL N2 #4 3' -5" 8 18 ¢ Z n ,� lb e SPA. @ 9" s V22A'2 vs, 2-V4 i-VS T1 #4 14' -6" 6 58 Q ti n •K' BARS IN TOP AND 2 SPA. @ 2' -8" STR. W 9' W -3° 3 - ° BOTTOM OF FOOTING FACE 2 -H1, 1 -N3 T4 #a 6' -9" 6 27 N ® 4 SPA. @ V -3" FILL 113 T5 #4 2' -6" 40 67 C9 PLAN FACE 3 -N1, 1 -H2, 1 -H3 y2 SM. SPA. 1' S" V1 #4 7' -3" 6 29 3 �Z-I H2 H2 2 -v2, 1 -V3, V2 #4 5' -10" 10 39 J U3 1 -V4, 1 -V5 z i V3 V3 #4 5' -0" 6 20 C9 LL- 0 ¢ 31 't- I- �1 21 4' -0" e" V4 V4 #4 4' -1" 6 16 w M LL Z2 s' -5" �" HI yb V5 #4 3, -2" 6 9 W —� a � Z1 #6 4' -8" 6 a� I w Nt 8' 7- N N Z3 W -ton 9 .j 4' -11" — — Na W -10" III.-- -_-- -- w. I'll" BARS "N" BARS "Z" BARS "H -, "N ", & -Z- BAR DIMENSIONS ARE OUT TO OUT. m O1 Z. N1 48 SPA. @ 9 WING ELEVATION Z2 #5 4'-0" 6 Z3 #4 3'-4" 6 REINF. STEEL LBS. 5 CON./C.S. CU. YDS 7.5 ■■■■■■ ■■�■■������._�._ ■ ■ ■■■ ■■■■■■■■.■■■ E■■■■■ E■■■■■■■■■■■■ E■ E■■ ■ ■■■■■■■■■■■■E■■■ ■m■■■ ■■■■■■■E■ ■ ■E ■EM■E■EN ■■■■E■■■E■ - ■ N■■■ ■ON'inA■ .� ■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■m®■■■■■■■■■ ■ ■■■■ ■■■■■■■■■■■■■■■■■■■■■ ■ ■■■■r ■■ ■ ■�E■E■■■ ■■ ■■■■■■■■■■ 0101■ �.'�� ■ ■ ■■ ■■■■■■■®®■■■■■■■■■ m■ 1■■■■■■■■®®®■■ OM■!�1:!■ ■ ■ ■ ■ ■ ■ ■lti:. / ■ ■ ■ m■ m■■■■ ■m ■ ■m ■ ■m ■ ■ ■ ■ ■ ■mmmm ■ ■m ■ ■ ■ 0101■■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■■ MEIMMEMIMEIMMEMEM ■■ mum■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■®■®■■■■■■■■®■■■®■■■■■■■■■■■■ ■■■■■■■■■ ■■■■■ ■ ■■■■■■■m■■■■■■ ■■ 0101■■■■■ ■ ■■■■ ■■■■■ ■■1001■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■®®■■■■■■■■■■■■ ■■■■■■■■ ■■ ■■�■■■■■■■■■■■■■■■■ ■■ ■ ■■o■■ ■■■■■ ■ ■ ■■■■■■■■ ■■■■■■■■■■' ■■■■■■■■■■■■■■■■■■■■■■■■■■ ■ ��■■■■■■■■■■■■■■■■■■■■®■■■■■■■■■■■■ ■■■■ ■■■sE■■■■■■■E■■■■■■■E ■ ■■■■■ mm No ■■ ■ ■ ■■■■■� ■■■■■■■■■■■■■■■■■■■■■■■■■■ 01 01■ ��■®■■■®■■■■■■■■■■®®■■■®■■■■■■■■ ■■■■■■■■ ■■■■■■■ ■■ ■■■■■■■■■■■■■ ■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■ 0101■■ ■ ■■■■■■■■®■■■®■■■■■■®■■®®■®®■®■■■■■■ ■■■■■■■�■■■■■■■ ■■■■■■■■■■■ ■E■ ■■ ■■■■ ■ ■■■■■■ ■■■■■■■ NONE M, ■■■ ■■■■■■■■■■ ■■■■■■■ ■■■■■■■■■■ ■■■■■ ■■ ®■® ■®■■■■■ ■■ ■ ■®■■■■ ■ ®■■■ ■■■ ■■ ■■■■■■■oN ■ ■E■■■■■■■■■■■■■■■■■ ■■ ■■N 01E ■■■■■■■■■■■■■■■■■■■■;■■■■■■■ ■■■■■■■■■®■■■■■■■■■■®®■■®■®®®■■■■■ ■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■E■■ i■■■■■ 0101 ■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■®■■®■■■■■■®■■■■■®■■®■■■■■■ ■■■■■■■■■■■ ■■ ■®■■ ■■■■■■■■■■ ■■■■ ■ MEN ■■■■ ■■■NONE OEM ■■■■M ■■■. ■■■■■■■■■ t■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ �I�:■■■®■■■■■■®®®■■■ t■■ ■ ■■■■■■ ■■ ■■■■■■� ■■■■■■■■■■■ ■■■■ ■ OEM ■■ ■ ■ ■ ■ ■ ■ ■ ■ ■E ■ ■ ■ ■EE ■ ■E■10E ■: i .t ! y • :•'• is . . - • R KNOLL BEDSTONE DR. 72" CULVERT 287' SOUTH OF MILLSHIRE CT. TM PW.;M tinrrlx� lV BE INSTALLED IN POND WET DETENTION POND TO ACT AS A SEDIMENT BASIN HERE UPSTREAM OF Exlsnrvc RIP -RAP BAFFLE DURING CONSTRUCTION POND IS TO BE CONSTRUCTED - _ ONCE SITE HAS BEEN - - STABILIZED. CLEAN OUT / / - / - - - . THE 36 RISER TWO D _ \ P AS SOON AS THE SITE HAS BEEN CLEARED AND A 6" V " SEDIMENT ACCUMULATION RIP 6P PAD / / / ��0 _ : ,� .:� _ - -_- -T0 BOTTOM DRAIN ON - - _._ , �J IMMER ASSEMBLY ORIFICE IS TO BE FITTED �✓ G FROM SKIMMER BASIN #1 AND ' R \vow P �yyt =g' / / ° / _ /� . •- -X""'X _ SILT '� - : _ _ _POUROUS "BAFFLES ARE TO BE ADDED "TO THE POND - REMOVE POROUS BAFFLES EX' W2-28' ° / / - :: L �g� N - -- _ . _ _ - _:::UPSTREAM OF THE RIP -RAP BAFFLE. POND TO BE AND SKIMMER ASSEMBLY. La -26' i s1 :: :: 11a- - ® : - -- INSPECTED PERIODICALLY DURING CONSTRUCTION TO MAKE - \�' O SHOWN --- -':: _ '� _ INSTALL BIO CELL AS SHO � ., � �._ ®- - -� _SURE THE POUROUS BAFFLES AND SKIMMER ASSEMBLY s N � ON PLANS. ` THICKNESS =26 ° / -/ 778 77a A NCI NING PROPERLY. ONCE CONSTRUCTION HAS - CLASS I RIP RAP / 'C RE FU TO 4- �V �•: -- `" � BEEN COMPLETED, ALL ACCUMULATED SEDIMENT IS TO BE O�J ,- �� -" � ONS ' ' :. 774 n5 f, 90- - REMOVED FROM THE EXISTING WET DETENTION POND AND j p0 _ � 9- / - - - IT IS TO BE RESTORED TO ITS ORIGINAL DESIGN VOLUME. i 8 P, _� s 5� pER�N - / r4 POUROUS BAFFLES ARE TO BE REMOVED. THE SKIMMER �g06 - \ 773 \ ° - i \ ,... ASSEMBLY IS TO BE REMOVED AND THE 8" SHEAR GATE - RIP RAP \ \ / / / / / i `VALVE IS TO BE ATTACHED TO THE BOTTOM DRAIN AND PLUNGE POOL 2• CLOSED. THE WET DETENTION POND IS TO THEN BE / W1=18'' 76 §. I - J2E- CER1IFIED BY A P�QF EE ESSIONAL ENGINEER. . THICKNESS =28" (\ o ` / I I �`� / / I / I T / CLAS\S it RIP RAP \ - - - -` -j I 1 I / - - - - - - \ 770 °�G = 77 `i/ -X °X- -x - X -X -xT =2i - -x- 773. 1 A 20 _774 - 15E RCP \ \\ `` \ �•S - - L_ - {- 774• \ '\ / �' r1 �/ / 773. e - 1 / �4v / i• ' / / / // / / / l // i / / / _ . 776.5- Nk I I� 7---- , \ \ IMMER B #1 BIL 6 / I PROTECTION WITH 3 POROUS BAFFLES GRAVEL INLET NOS TOP EL. = 774.00 15" R (TYPICAL) / BOTTO =770.0 1g TEE FM CON TRUCITON ENTRANCE I \/ PC' \ 1 \ \ / 6 / \ \ 1 \ zs• wIDE x too• LONG x �. .1, � � w � 06 � r0� \ 1 1 \ �y \ 2 S� \ \ / �2 �6 E 8' THICK 1 �. /1- ' o \/ \ Y \ /\ \� \ , \ of \ i I .g. 1 r /k C= 0.65 T EM PORAY BERM CHART NOTE: EXCELSIOR LINER TO BE NORTH AMERICAN GREEN OR EQUIVALENT- 1/22/2013 I= 5.75 IN/HR NOTE: (MASS CAN WITHSTAND VE- OCRIES OF FPS. NOTE: MAX VELOCITY W TTHOUT A LINER PER N.C. EROSION MANNUAL IS 2 FPS. SWLE NO. DRAINAGE AREA SLOPE ( %) SIDE SLOPES FLOW (C.F.S.) EL ITY (FT /sec) F W DEP (FT.) SHAPE LINER TAPLE PATTERN AL ULED SHEAR STRESS PERMITTED SHEAR STRESS CLASS B 23 72" 414.43 40' 18' 46 36" CLASS 11 TRAPEZOIDAL 1 2.78 4.72% 2:1 10.39 4.28 0.71 7 BOTTOM SC15OBN D 2.09 2.10 TRAPEZOIDAL 2 0.23 10.13% 2:1 0.86 3.41 0.11 Z BOTTOM DS75 D 0.72 1.55 TRAPEZOIDAL 3 0.10 2.68% 2:1 0.37 1.65 0.10 Z BOTTOM DS75 D 0.17 1.55 CLASS 1 Pipe - FES RIPRAP WZ W DETAIL - OUTLET PROTECTION vv v v v v v v v WET DETENTION POND TO ACT AS SKIMMER BASIN DURING CONSTRUCTION. SEE SKIMMER BASINf CALCULATIONS FOR WET DETENTION POND BELOW. DRAINAGE AREA = 8.95 ACRES j DISTURBED AREA = 6.63 ACRES r REQUIRED VOLUME = 1800 CF /DISTRUBED AREA REQUIRED VOLUME = 11,934 CF VOLUME PROVIDED (768 -771)= 14,475 CF SURFACE AREA REQUIRED = 325 SF /10 -YR INFLOW SURFACE AREA REQUIRED = 325 SF X 45.10 SURFACE AREA REQUIRED = 14,658 SF SURFACE AREA PROVIDED = ±15,743 @ AT EL. 776.50 (EMERGENCY SPILLWAY) / SKIMMER SIZED FOR ±2.5 DAY DEWATERING TIME (SEE SIZING CHART BELOW) t ONCE LOTS 25 -29 HAVI BEEN CLEARED, STOCKPILE EXCESS CUT IN \\ ` LOT #25 AROUND SKIMMER BASIN #2. k ONCE SITE HAS BEEN STABILIZED, / REMOVE SKIMMER BASIN #2 AND \ / /� / / \ \ \ X TO HE 2 REMOVE POROUS BAFFLES AND \ /\ \ \ \ \ �' / \ \ r0 �\ e" E WITH R KIMMER ASSEMBLY. BRING PAD #25 \ // / I / // \ \ \� \ \ \ \ 9� / \ J \ MADE WITH A 2.0" Arm Assembly B" SKIMMER F\ \ �O \ / sb'. �\ � \ � \ \ \ \ DEWATERING ORFICE ASSEMBLY 0 GRADE WITH PREVIOUSLY / / / \ \ \ \ �( / / \ ` s \� ' I \ \ \ �- / \ \ \ \ \ � \ PER FIGURE 8.64H TOCKPILED DIRT. // J \ a \ \ \ \ \ \ \ \,o \\ \ O 4 S \ OF THE NORTH \\ VC- \ / \ CAROLINA CEre:�eure A D �Nr \ \ \ \ \ \\ \ \ 2 s \ \ \ \ CONTROL PLANNING \ 1 \ \ t\ \ \ \ r \ \ AND DESIGN MANUAL Water Entry PERSPECTIVE VIEW Unit \ \ �� e \ ✓ // �\ \ `\ �. \ \ d� \ /'\ / \ d \ \ \ �\ \ T ` \ \ Pvc End schedule 40 % Pvc vent PVC Elbaw Pi PVC Pipe -- - 7 r PVCErtd Water surface Q69 3 ✓ \ Schedule 40 PVC Tee PVC Pipe PVC Pipe ' \ Hales in � PVC `ax Orifice ESMT. \- \ \ \ \ \ \ ` \� �\ \ \ a \ \ \ ` \ i \ t� \ / \ \ \ Underside Ple nble Plate Hase - - -- -- ------ - -lam\ \� \ \� \\ \\ \ \ ( OIL g D \ \ 24 1` - a \ \ \ V't. j \ \\ / \ ` \ 5 O \ \ \ \ \ \ /\ END VIEW ENO VIEW FRC Figure 6.64a Schematic of a skimmer, from Figure 6.64a Schematic of a skimmer, `ijm Pennsylvania Erosic \ \ \\ � \ \ \ ! \ March. 2000. March, 2000. 2/1!2013 C__ 0.65 PERMANENT SWALE CHART NOTE: ExOsLsxm ut4m TO BE ORAERCN GRE3OR CdVmlw- \ 1= 5.75 IN/HR NOTE: GRASS CAN WTTHSTANDYEI OCTTIES OF FPS. NOTE. C=.35 FOR UNIMPROVED CLEARED AREA NOTE: MAX VELOCITY W I HOUT A LINER PER N.C. EROSION MA ANNUAL IS 2 FPS• !� \ \ �i SI✓ E \ \ \ \ \\ \ OJS \ \ \ \ X`'� , 1S "R \ / Figure 6meter safu J SWALE DRAINAGE NO. AREA SLOPE (%) SIDE SLOPES FLOW (C.F.S.) (FTJsec) (FT) SHAPE LINER PATTERN SHEAR STRESS SHEAR STRESS \ \ \ \ \ \ \ \ \ \ - orifice diameter as a function \ \ \ \ `__ 0 basin dasin volume g timed \ \, J \ \\ \ \ \ \ o � \ \ / TRAPEZOIDAL \ \A \ \ \ \ ( \ �\_DISTU� BED 1 0.11 7.69% 2:1 0.41 239 0.08 7 BOTTOM DS75 D 0.38 1.55 , \ \ \ ` \\ \ \ \ \ `/�� \ \ ` \\ \ \ \ ' V �2�' \ X LIMITS (TYPICAL TRAPEZOIDAL �\ \ \ \ \ \ \\ \ \ \ \\ \. \ \ ( ° \ \ \ \ \ \ \ - - -- -- 2 0.11 3.57% 2:1 0.41 1.87 0.10 7 BOTTOM DS75 D 0.22 1.55 \ \ \ \� \ \ \ \ \ ® \ \ \ \ \ \ \ \ I \ �\ \ \ \ \ \ / o.zs TRAPEZOIDAL \ \` \ \ \ \` \ \ \ \ \ \ / \ \ \ \ \ \ \ \ \ ` WATERING TIME N USE 2' ORIRCE 3 0.11 2.13% 2:1 0.41 1.59 0.12 Z BOTTOM DS75 D 0.15 1.55 \ FOR t ,5 TRAPEZOIDAL 4 0.13 4.26% 2:1 0.49 2.11 0.11 7 BOTTOM DS75 D 0.28 1.55 \ \\ TRAPEZODAL \ �\ \ \ \`� o^ ' \ I ® \ 5 0.16 3.77% 2:1 0.60 2.18 0.12 7 BOTTOM DS75 D 0.29 1.55 /` s \\ \ '� ._ � \ � \ \ \ \ .\ \ \ � ;� -�-. ® _ OWNER /DEVELOPER: 3 TRAPEZOIDAL C ` I ,� i i ` 7CrisKats, LLC 6 0.18 2.04% 2:1 0.67 1.85 0.16 7 BOTTOM DS75 D 0.20 1.55 \ ' _ 7B CORPORATE CENTER COURT TRAPEZODAI \ \ \ \\ `-- J t\ ` \ \` \ \` . \• GREENSBORO, NC 27408 r 7 0.18 1.89% 2:1 0.67 1.81 0.16 Z BOTTOM DS75 D 0.19 1.55 \ \ \ <� ' TMPEZOIDAL \� e \ \ \ \ ® \ _ \ \ \ 8 0.15 200% 2:1 0.56 1.73 0.14 ZBOTTOM DS75 D 0.18 1.55 TELEPHONE: 336- 282 -4127 � �� FAX:336- 282 -3797 0.1000 9 0.27 10.07% 2:1 1.01 3.60 0.12 Z BOTTOM DS75 D 0.78 1.55 CONTACT: HERB PARKS TRAPEZOIDAL 10 0.30 8.90% 2:1 1.12 3.59 0.14 7BOTTOM DS76 D o.7s 1.55 EMAIL ADDRESS: hparks®besisuites.com I P181 OUTLET PROTECTION ccclf cl7c rl nwf,fsl I . iffl W. W. Thickness (ft) RIP -RAP 5 15" 0.71 10' 3.75' 12' 13" CLASS B 22 30" 31.21 14' 7.5' 16.5' 1 16" CLASS B 23 72" 414.43 40' 18' 46 36" CLASS 11 GEOTEXTILE LINER TO BE INSTALLED UNDERNEATH RIPRAP PAD ON -SITE SOIL TYPES: CkB, PoC, PoE, Ppc2, PpE2 HYDROLOGY GROUPS: A, B TOTAL DISTURBED AREA _ ±5.84 ACRES EROSION CONTROL LEGEND - X X X - TEMPORARY SEDIMENT FENCE CONSTRUCTION ENTRANCE _D� DRBM 1 DB --. TEMPORARY DIVERSION BERM x -x- x -x -x STONE WEIR OUTLET IN SILT FENCE DISTURBED LIMITS E3 TEMPORARY INLET PROTECTION ®®®® ®® PRE DEVELOPMENT DRAINAGE DELINEATION LINE + SWALEn PERMANENT DRAINAGE SWALE C k B SOIL LINE (TYPICAL) GRAPHIC SCALE n 40 ( IN FEET ) 1 inch = 40 ft. PROJECT TITLE: GRIFFIN'S KNOLL GREENSBORO, NORTH CAROLINA 161 + -.vans + ngineenng, In °ee �5. •. -Since 1974 - e 1 Engineers Surveyors Planne e, r 977 a 4609 Dundas Drive Greensboro, NC 27407 Phone 336- 854 -8877 Fax 336. 854 -8876] reoe ��,���� y FIRM LICENSE #C -0168 v��� ®e ® ®e„ as, p1°°i'r�� ®®® 4 PROJECT: 823 -11 DESIGN BY: ADL DRAWN BY. AL DWG: H: \DRAWINGS \HERB PARKS \Trosper Road \Griffin Mill Site -41 h LAYOUTd [fd�S'i'•�34 SHEET DESCRIPTION: EROSION CONTROL, PLAN SCALE: 1 "= 40' DATE: JANUARY 22, 2013 REVISIONS: 02 -27 -13 SHEET NO.: REVISIONS: 03 -05 -13 14 REVISIONS: 03 -19 -13 15 STEEL POST DRIVEN INTO GROUND ( ±24" _ NCDOT #5 or #57 washed stone - NC60T #5 or #57 washed stone - HARDWARE CLOTH AND GRAVEL INLET PROTECTION NOT TO SCALE TEMPORARY SEEDING DEFINITION Seeding disturbed areas with annual grasses or legumes to provide temporary ground cover to lessen soil erosion. PURPOSE To temporarily stabilize graded cut and fill slopes that cannot be seeded with permanent vegetation within thirty days after completion. To temporarily stabilize graded areas of bare soil where permanent vegetative cover is not needed or where grading has not been completed and permanent seeding will be done later. CONDITIONS WHERE PRACTICE APPLIES Where bare soil has been exposed by grading, and vegetative cover is needed for one year or less. May include such areas as temporary sediment pond, diversions, soil stockpiles, building pads, rough - graded road banks, etc. It is also used to provide a temporary perimeter buffer. PREPARATION Prepare seedbed by ripping, chiseling, harrowing, or plowing to depth of at least six inches so as to produce a loose, friable surface. Incorporate 750 -1,000 pounds 10-10- 10 fertilizer and up to two tons of dolomitic lime per acre (Note: Lime may not be needed if a soil test indicates a pH of 6.5 or higher). Mulching is required according to the same specifications as for permanent seeding unless waived by Soil Scientist. Select seeding mixture and best planting dates from Table 12. TABLE 12 TEMPORARY SEEDINGS SEEDING MIXTURE SEEDING RATE (LB /ACRE) PLANTING DATE! Rye Grain and 120 lbs. Jan. 1 - May 1 Kobe Lespedeza 50 lbs. German Millet or 40-50 lbs. May 1 -Aug. 15 Sudan Grass Rye (Grain) 120 lbs. Aug. 15 - Dec. 30 (may substitute cats before Oct. 1 or wheat from Oct. 1 -Nov. 15) Annual ryegrass 40 lbs. Aug. 15 - Nov. 30 Weeping Lovegrass 1/ 5lbs. May 1 -Aug. 15 1/ Weeping Lovegrass is a perennial grass but is included here because of its adaptability to poor soil conditions and droughty sites. 19 -guage hardware cloth / (; mesh openings) T__ 2' COMPACTED SOIL 2• -0- MIN. 6' -0' (TYP.) CONSTRUCTION SPECIFICATIONS 0 1. REMOVE AND PROPERLY DISPOSE OF ALL TREES, BRUSH, STUMPS, • • • AND OTHER OB✓ECTIONAL MATERIAL. BOTTOM DIMEN. 2. ENSURE THAT THE MINIMUM CONSTRUCTED CROSS SECTION ORIFICE DIA.. MEETS ALL DESIGN REQUIREMENTS. 1 3. ENSURE THAT THE TOP OF THE BERM IS NOT LOWER AT ANY POINT 2.47 AC THAN THE DESIGN ELEVATION PLUS THE SPECIFIED SETTLEMENT. 1615 SF 4. PROVIDE SUFFICIENT ROOM AROUND DIVERSIONS TO PERMIT 1 0 0 MACHINE REGRADING AND CLEANOUT. 5' WIDE 5. VEGETATE THE BERM IMMEDIA TEL Y AFTER CONSTRUCTION, 1.91 AC UNLESS IT WILL REMAIN IN PLACE LESS THAN 30 WORKING DAYS. 3438 CF MAINTENANCE -34, W -270 INSPECT TEMPORARY DIVERSIONS ONCE A WEEK AND AFTER EVERY 1.5" RAINFALL. IMMEDIATELY REMOVE SEDIMENT FROM THE FLOW AREA O 0 0 AND REPAIR THE DIVERSION BERM. CAREFULLY CHECK OUTLETS REV. AND MAKE TIMELY REPAIRS AS NEEDED. WHEN THE AREA PROTECT- ED IS PERMANENTLY STABILIZED, REMOVE THE BERM AND THE CHANNEL TO BLEND WITH THE NATURAL GROUND LEVEL AND APPRO- "Location of Seam Stitch w� PRIATEL Y STABILIZE IT. (1Am) IT V OF ORE ENS 0 OR O 0 0 Arrb�ncah STD. NO. I REV. Fl-1; lid /,;f -E /% -7-'I / /i/ %14a� I DOT SYSTEM" W80M 2010"m STAPLE PATTERN GUIDE PARA EL ENGRAPADO O "2'-5' (5on -1�)- r (gem) -r--V (3cm- 12.5an) � seam Sube "2'-5' (- t2.Scm) ® *2"-8- (sem- t2.San) 4' (1.2m) 0 $ (1.2m) • • • Sean Stadh° BOTTOM DIMEN. Lt ORIFICE DIA.. SPILLWAY 1 1.23 AC 2.47 AC 2214 CF 1615 SF -=40, WP20' 1 0 0 1" 5' WIDE 2 1.91 AC 3.86 AC 3438 CF 3.Y (1.Qn) -34, W -270 t°-�F20- ie.Sms 1.5" 5' WIDE O 0 0 STD. AV REV. ® ® •�IOe %Location of Seam Stitch will "Location of Seam Stitch w� (1Am) a,>r•�s O 0 0 Arrb�ncah oil ct�type; Glean product type: A n p :f3-V 3.4 STAPLES PER SQ. YD. (4.1 SrAPLES PER SQ. M) 3.75 STAPLES PER SO. YD. (4S SrAPLiS PER SQ. M) For SVOZtha Nottl American /Gnsen For Ob rata with the North American Grow place through each of the *#TE colored dots through each of the YELLAW colored dote Ara mates can at sivisma DOT de North Ammioon Groan. clove los a troves de los de grapoe atst.cas Ara mantes con el sistano DoT de American Or- �coloraa puntos hav bs ae / POROUS BAFFLE IN ROCK DAM /SEDIMENT PIT DETAIL SCALE: NOT TO SCALE Table 6.10a Temporary Seeding Recommendations for Late winter and Early Spring Seeding mixture Species Rate (Ib/acre) Rye (gam) 120 Annuallespedeza(Kobein Piedmont and Coastal Plain, Korean in Mountains) so Omil annual lespedeza when duration of temporary cover is not to extend beyond Juno. Seeding dates Maintains- -Above 2500 feel: Feb. 15 - May 15 Below 25DO feet Feb. 1- May 1 Piodmont- i . 1- May 1 Coastal Ptamn -Dec. 1 -Apr. 15 Soil amendments Follow recommendations of sal tests or apply 2,000 lb/acre ground agrloullurd limestone and 750 lb/acre 10 -10-10 *Wiz c Mulch Apply 4.000Ib/acre straw. Anchor straw by tacking with asphalt, netbrg, or a mulch anchoring W. A disk with blades set nearly straight can be used as a mulch anchoring tool. Maintenance Retertilize If growth is not fully adequate. Reseed, felertilize and mulch immediately following erosion or other damage. Table 6.10b Temporary Seeding Recommendations for Summer W WIDE EkSANKMENT V FREEBOARD 1120 FLOW DEPTH 0 0.25 day a O.S day day 5 days 10 days VOLUME REQ'D= (1800 CF) (DIST. AREA) SURFACE AREA REQ'D= (325) (Q10) Seeding mixture species Rate (Ib/acre) German millet 40 In the Piedmont and Mountains, a small- stemmed Sudangrass may be substituted at a rate of 50 Ib lacre. Seeding dates Mountains --May 15 -Aug. 15 Piedmont -May 1 -Aug. 15 Coastal PlairE -Apr. 15 -Aug. 15 Soil amendments Follow recommendations of soil tests or apply 2,000 Ibtacxe ground agricultural limestone and 750 Ib/acre 10 -10-10 fertilizer. Mulch Apply 4,000lb(acrestraw Anchor straw bytadting with asphatt ,netting, or a mulch anchodng tool. A disk with blades set nearly straight can be used as a mulch anchoring tool. Maintenance Refertilize if growths not fully adequate. Reseed, refimblize and mulct immediately kWo&*V erosion or other damage. TYPICAL SKIMMER SEDIMENT BASIN NTS Table 6.10c Temporary Seeding Recommendations for Fall Seeding mixture species Rate (Lbtatxe) Rye (grain) 120 Seeding dates Mountains -Aug. 15 - Dec. 15 Coastal Plain and Piedmont -Aug. 15 - Dec. 30 Soil amendments Follow soil tests or apply 2,000 Ib/acre ground agricultural limestone and 1,000 Ib/acxe 10 -10-10 fertilizer. Mulch Apply 4,000 Ib/acae straw. Anchor straw by taddng with Asphalt, netting, or a mulch anchoring tool. A disk with blades set nearby straight can be used as a mulch anchoring tool. Maintenance Repair and refertilize damaged areas immediately. Topdress with 50 Ib/acxe of nitrogen in March. If it is necessary to extent temporary cover beyond June 15, overseed with 50 lb/acre Kobe (Piedmont and Coastal Plain) or Korean (Mountains) Lespedeza in late February or early March. 4 4 O ti O N 17 NOTEB' DISTURBED AREA DRAINAGE AREA VOLUME REQ'D. SURFACE AREA REQ'D. BOTTOM DIMEN. VOLUME PROV'D./ SURFACE AREA PROM ORIFICE DIA.. SPILLWAY 1 1.23 AC 2.47 AC 2214 CF 1615 SF -=40, WP20' 3624 CF/ 1664 SF 1" 5' WIDE 2 1.91 AC 3.86 AC 3438 CF 2525 SF -34, W -270 5976 CF/ 2574 SF 1.5" 5' WIDE VOLUME REQ'D= (1800 CF) (DIST. AREA) SURFACE AREA REQ'D= (325) (Q10) Seeding mixture species Rate (Ib/acre) German millet 40 In the Piedmont and Mountains, a small- stemmed Sudangrass may be substituted at a rate of 50 Ib lacre. Seeding dates Mountains --May 15 -Aug. 15 Piedmont -May 1 -Aug. 15 Coastal PlairE -Apr. 15 -Aug. 15 Soil amendments Follow recommendations of soil tests or apply 2,000 Ibtacxe ground agricultural limestone and 750 Ib/acre 10 -10-10 fertilizer. Mulch Apply 4,000lb(acrestraw Anchor straw bytadting with asphatt ,netting, or a mulch anchodng tool. A disk with blades set nearly straight can be used as a mulch anchoring tool. Maintenance Refertilize if growths not fully adequate. Reseed, refimblize and mulct immediately kWo&*V erosion or other damage. TYPICAL SKIMMER SEDIMENT BASIN NTS Table 6.10c Temporary Seeding Recommendations for Fall Seeding mixture species Rate (Lbtatxe) Rye (grain) 120 Seeding dates Mountains -Aug. 15 - Dec. 15 Coastal Plain and Piedmont -Aug. 15 - Dec. 30 Soil amendments Follow soil tests or apply 2,000 Ib/acre ground agricultural limestone and 1,000 Ib/acxe 10 -10-10 fertilizer. Mulch Apply 4,000 Ib/acae straw. Anchor straw by taddng with Asphalt, netting, or a mulch anchoring tool. A disk with blades set nearby straight can be used as a mulch anchoring tool. Maintenance Repair and refertilize damaged areas immediately. Topdress with 50 Ib/acxe of nitrogen in March. If it is necessary to extent temporary cover beyond June 15, overseed with 50 lb/acre Kobe (Piedmont and Coastal Plain) or Korean (Mountains) Lespedeza in late February or early March. 4 4 O ti O N 17 NOTEB' - SPACING OF POSTS USING HOG X RE WIT" APPROVED ERASION CONTROL FAHRTCS TO BF B 0' fill CFNTFA. POST METAL T POST 5 0' OR 6 0- It., DE.PENDIAt; ON FILL . OPF (NTH. 1.. -r3 18/1 F STFFI CIJIJ.STAI .`TTOPr) . FABRIC- 3' -0- IN jVlDrAr !MUSE BE STANSAfO SPECIFICATIONS FOR SILT FENCE - ASfN O T WITH 12- BURIED IN THE /dL'H. Siva: (!I' ItiLL0 14 MASHLO SI&ft PLACLO 1' -0' &LLP AI 51L /LiV . -SPI Tr'F.S TN FAPPr D BF OV.-F9 APPFO A ITN. OF d FT. -MAXIM N ORA1PtAGE AREA = 114 ACirE .PER 100 FT OF FENCE FOR 2% &7 LESS SL 5PF. -SILT fLNL'E TO BE RLA47VLD AfILIJ C&AYIRUCIIDN 15 COMPLEIL AS DIRECTED BY It& c'ON,ilHucIION INSPLCIOR. PA6E 1 4W2 C/ T V O F 0 R EE N 5 B 0 R 0 STD. AV REV. SILT FENCE DETAIL •�IOe 430 ar�� a,>r•�s EOM STRUCTURAL STONE SHALL BE (CLASS 'B') STOW FOR EROSION CONTROL PISS 15-SR-T FENCE ED CONTROL STONE SHALL BE 05 OR f57 ST OE �I -� POST ° I D° 0° ° ° ° ° ° 0000000000°311" X SIT FENCE 0 0 000 00 0 00 o o SILT FENCE o °o °o °o o o °o °0 ° SEET sTRUCTUM � CONSTRUCTION NOTES 1 - EROSION CONTROL MEASURES ARE TO BE MAINTAINED BY THE OWNER UNTIL GROUND COVER HAS BEEN WELL ESTABLISHED. DISTURBED AREA MUST BE STABILIZED WITHIN ANY PHASE OF GRADING. 2. THE APPROVED COVER AND WATER CONTROL PLAN MAY BE AND WILL BE REVISED DURING CONSTRUCTION WHEN IN THE OPINION OF THE CONSERVATION ENGINEERS OR INSPECTORS THAT ADDITIONAL MEASURES FOR THE PREVENTION OF SIOL LOSS ARE NECESSARY. GENERAL PLAN NOTES 1. SOIL EROSION CONTROL DEVICES MUST BE INSTALLED INITIALLY AFTER THE GRADING PERMIT IS ISSUED AND ROUGH GRADING STARTS. PLANNING AND DEVELOPMENT STAFF WILL CHECK THESE DEVICES FOR PROPER INSTALLATION AND COMPLIANCE WITH THIS PLAN. A "CERTIFICATE OF PERFORMANCE" WILL BE ISSUED. THIS CERTIFICATE MUST BE BROUGHT TO OUR INSPECTIONS DIVISION BEFORE A BUILDING PERMIT WILL BE ISSUED. 2. ALL EROSION CONTROL DEVICES ARE TO BE INSTALLED IN ACCORDANCE WITH THE APPROVED PLANS AND SPECIFICATIONS. ANY CHANGES ARE TO BE APPROVED BEFORE CONSTRUCTION BY CITY OF GREENSBORO PLANNING AND DEVELOPMENT, OFFICE OF SOIL SCIENTIST. ADDITIONAL DEVICES WILL BE REQUIRED IF NECESSARY. 3. IF FILL MATERIALS ARE BEING BROUGHT ONTO THIS PROPERTY OR IF WASTE MATERIALS ARE TAKEN FROM THIS PROJECT, THIS INFORMATION MUST BE DISCLOSED AND SHOWN ON THE EROSION CONTROL AND GRADING PLAN. BORROW AREAS AND DUMP SITES ARE CONSIDERED TO BE PART OF THIS PROJECT. 4. UNDER THE CITY OF GREENSBORO SOIL EROSION AND SEDIMENTATION CONTROL ORDINANCE (SECTION 19); AGENTS, OFFICIALS, OR OTHER QUALIFIED PERSONS ARE AUTHORIZED TO PERIODICALLY INSPECT THE SITES OF LAND - DISTURBING ACTIVITIES. OBSTRUCTING, HAMPERING OR INTERFERING WITH SUCH INSPECTIONS CARRIES A $500 PER DAY CIVIL PENALTY. THE INSTIGATION OF THIS CIVIL PENALTY REQUIRES NO PRIOR NOTICE. 5.IN AN EFFORT TO MINIMIZE EROSION AND EXPOSURE TIME, EASEMENT AREAS SHALL NOT BE GRUBBED OR GRADED UNTIL UTILITIES ARE READY TO BE INSTALLED. ALSO, THE IMMEDIATE SEEDING OF DISTURBED EASEMENT AREAS AFTER UTILITIES ARE INSTALLED WILL ELIMINATE MANY PROBLEMS. EASEMENT AREAS WHICH CROSS OR ARE ADJACENT TO WATERCOURCES SHOULD RECEIVE SPECIAL CONSIDERATION. 6. NO LAND - DISTURBING ACTIVITY SHALL BE PERMITTED IN PROXIMITY TO A LAKE OR NATURAL WATERCOURSE UNLESS A BUFFER ZONE IS PROVEDED ALONG THE MARGIN OF THE WATER BODY OF SUFFICIENT WIDTH TO CONFINE VISIBLE SILTATION WITHIN THE TWENTY -FIVE PERCENT OF THE BUFFER ZONE NEAREST THE LAND - DISTURBING ACTIVITY. 7.IF AN EXISTING POND IS DESIGNATED AS A PERMANENT WATER QUALITY POND, ALL SEDIMENT DEPOSITED IN IT DUE TO CONSTRUCTION MUST BE REMOVED WHEN THE SITE HAS BEEN STABILIZED. THE POND MUST BE CLEANED OUT BEFORE THE GRADING PERMIT IS FINALIZED. SEEDING SPECIFICATIONS CITY OF GREENSBORO - SOIL EROSION CONTROL SECTION Apply 4000 lbs. agricultural limestone per acre. Apply 1000. lbs. 10 -10 -10 fertilizer per acre for gross seeding. Lime and fertilizer are to be disked into the soil surface to a minimum depth of 4 inches. Late Winter - Early Spring A: Grass: (1) Tall Fescue - 150 lbs. per acre. B. Grass - Legume Mixture (1) Tall Fescue - 100 lbs. per acre plus Serecia Lespedezo (scarified) - 60 lbs. per acre. (2) Tall Fesue - 100 lbs. per acre plus Crownvetch - 25 lbs. per acre. Early Spring - Late Spring A. Grass: �1) TAII Fescue - 150 lbs. per acre 2) Tall Fescue - 100 lbs. per acre plus Weeping Lovegrass - 5 lbs. per acre. B. Grass - Legume Mixture (1) Tall Fescue - 100 lbs. per acre plus Serecia Lespedeza (scarified) - 60 lbs. per acre. Summer A. Grass: (1) Tall Fescue - 150 lbs. per acre plus Weeping Lovegrass - 5 lbs. per acre. 2) Weeping Lovegrass - 5 lbs. per acre plus Browntop Millett or Sorghum -Sudan Hybrids - 50 lbs. per acre. B. Gross - Legume Mixture (1) Weeping Lovegrass - 5 lbs. per acre plus Serecia Lespedeza (scarified) - 60 lbs. per acre. Late Summer - Early Winter A. Grass: 1) Tall Fescue - 150 lbs. per acre. 2) Tall Fescue - 100 lbs. per acre plus Annual Ryegrain - 25 lbs. per acre. B. Gross- Legume Mixture (1) Tall Fescue - 100 lbs. per acre plus Serecia Lespedeza (unscarified) - 60 lbs. per acre. 2) Toll Fescue - 100 lbs. per acre plus Crownvetch - 25 lbs. per acre 3) Tall Fescue - 75 lbs. per acre plus Annual Ryegrain - 25 lbs. per acre plus Serecia Lespedeza (unscarified) - 60 lbs. per acre. After seeding, the area is to be rolled or cultipacked to insure that the seed is pressed into contact with soil surface. All seeded areas are to be mulched with straw mulch at the rate of 3000 lbs. per acre (approx. 100 bales per acre). Apply asphalt emulsion to the straw mulch at the rate of 150 gallons per acre. The above seeding recommendations and rates have been prepared for selection of a vegetative cover suitable for soil erosion control in the Greensboro area. Area soil types, climatic conditions, seed availability and individual plant characteristics are all taken into account in the above recommendations. Due to density, uniformity and textural quality reasons, the above selecions are not recommended for lawn CONSTRUCTION NOTES EROSION CONTROL MEASURES ARE TO BE MAINTAINED BY THE OWNER UNTIL GROUND COVER HAS BEEN WELL ESTABLISHED. DISTURBED AREA MUST BE STABILIZED WITHIN ANY PHASE OF GRADING. THE APPROVED COVER AND WATER CONTROL PLAN MAY BE AND WILL BE REVISED DURING CONSTRUCTION WHEN IN THE OPINION OF THE CONSERVATION ENGINEERS OR INSPECTORS THAT ADDITIONAL MEASURES FOR THE PREVENTION OF SIOL LOSS ARE NECESSARY. CONSTRUCTION SEQUENCE 1. OBTAIN PLAN APPROVAL AND GRADING PERMIT AT A SCHEDULED PRE - CONSTRUCTION CONFERENCE WITH CITY EROSION CONTROL INSPECTOR, CONTRACTOR RESPONSIBLE FOR EROSION CONTROL, ENGINEER, AND OWNER. 2. INSTALL PROPOSED SILT FENCE, STONE WEIR OUTLETS IN SILT FENCE FROM BEDSTONE DRIVE DOWN TO EX. STREAM ON BOTH SIDES OF PROPOSED ROADWAY. 3. CLEAR AND GRUBB THIS AREA. 4, INSTALL CONSTRUCTION ENTRANCE. SITE SELF INSPECTION AS REQUIRED BY NCGS 113A -54.1; SIGNATURE DATE 5. INSTALL TEMPORARY STREAM CROSSING AND PUMP AROUND PER DETAIL SHOWN ON PLAN. 6. INSTALL 72" RCP. BEGIN WORK ON HEADWALLS. INSTALL RIP RAP PAD AT CONCLUSION OF P'I'PE & HEADWALL INSTALLATION. 7. ROADWAY TO BE FILLED ONCE PIPE IS INSTALLED. & CLEAR AND GRUBB AREAS AT SKIMMER BASINS #1 & #2. CLEAR AND GRUBB AREA WHERE SALT FENCE IS TO BE INSTALLED BEHIND LOTS 25 -33. INSTALL SILT FENCE AND SKIMMER BASINS IN THESE AREAS. 9. CLEAR AND GRUBB SKIMMER BASIN /WET DETENTION POND AREA. CLEAR AND GRUBB LOTS 25 -29. 10. INSTALL WET DETENTION POND /SKIMMER BASIN. INSTALL SILT FENCE AT TOE OF SLOPE. EXCESS CUT FROM THIS AREA SHALL BE PLACED ON LOTS 25 -29 AS INDICATED ON THE GRADING PLAN. 11. CLEAR AND GRUBB REMAINDER OF SITE. 12. ROUGH GRADE STREETS. INSTALL ANY REMAINING PERIMETER EROSION CONTROL DEVICES SUCH AS SILT FENCE. GROUND COVER SHALL BE ESTABLISHED ON ALL EXPOSED SLOPES AND FILLS WITHIN 7 CALENDAR DAYS FOLLOWING THE COMPLETION OF ANY PHASE OF GRADING. 13. INSTALL STORM DRAINAGE AS SHOWN ON PLANS. INSTALL HARDWARE CLOTH AND GRAVEL INLET PROTECTION ON ALL PROPOSED STORM SEWER STRUCTURES AS THEY ARE BUILT AS SHOWN ON PLANS. SITE SELF INSPECTION AS REQUIRED BY NCGS 113A -54.1; SIGNATURE DATE 14. INSTALL WATER AND SANITARY SEWER U11UTIES AS SHOWN ON PLANS. SITE SELF INSPECTION AS REQUIRED BY NCGS 113A -54.1; SIGNATURE DATE 15. BRING ROADWAY TO FINAL GRADE. 16. ONCE ROADWAY AND LOTS HAVE BEEN BROUGHT TO FINAL GRADE, INSTALL BASE ABC STONE ON ALL STREET AREAS. MAINTAIN PREVIOUSLY INSTALLED EROSION CONTROL DEVICES. REMOVE SEDIMENT ACCUMULA71ON FROM IN FRONT OF SILT FENCE AND INLET PROTECTION AS NEEDED. 17. INSTALL CURB AND GUTTER. BACK FILL CURB. 16. INSTALL FIRST LAYER OF ASPHALT. 19. REMOVE SKIMMER BASIN #1 AND INSTALL BIO -CELL. 20. REMOVE SKIMMER BASIN #2 AND FILL AND GRADE PAD #25. SITE SELF INSPECTION AS REQUIRED BY NCGS 113A -54.1; SIGNATURE DATE 21. ONCE ENTIRE SITE HAS BEEN STABILIZED, CLEAN OUT SEDIMENT ACCUMULATION IN THE WET DETENTION POND AND RESTORE POND TO ITS ORIGINAL VOLUME. REMOVE POROUS BAFFLES AND SKIMMER ASSEMBLY FROM POND AS SHOWN ON PLANS. INSTALL SHEAR GATE VALVE ON EXISTING BOTTOM DRAIN FOR THE POND. SITE SELF INSPECTION AS REQUIRED BY NCGS 113A -54.1; SIGNATURE DATE 22. INSTALL ALL SIDEWALKS AND SEED ANY DISTURBED AREAS WITHIN 7 CALENDAR DAYS FOLLO`61NG THE COMPLETION OF ANY PHASE OF GRADING. PERMANENT GROUND COVER SHALL BE ESTABLISHED ON ALL DISTURBED AREAS WITH 14 CALENDAR DAYS FOLLOWING COMPLETION OF CONSTRUCTION. 23. INSTALL FINAL LAYER OF ASPPALT. 24. ONCE SITE CONSTRUCTION IS COMPLETE, PERMANENTLY SEED ALL DISTURBED AREAS. GROUND COVER SHALL BE ESTABLISHED ON ALL EXPOSED SLOPES AND FILLS WITHIN 7 CALENDAR DAYS FOLLOWING THE COMPLETION OF ANY PHASE OF GRADING. PERMANENT GROUND COVER SHALL BE ESTABLISHED ON ALL DISTURBED AREAS WITHIN 14 CALENDAR DAYS FOLLOWING THE COMPLETION OF CONSTRUCTION. SITE SELF INSPECTION AS REQUIRED BY NCGS 113A -54.1; SIGNATURE DATE 25. ONCE THE ENTIRE SITE IS STABILIZED, REMOVE ALL EROSION CONTROL MEASURES. SITE SELF INSPECTION AS REQUIRED BY NCGS 113A -54.1; SIGNATURE DATE NOTE: GROUND COVER SHALL BE ESTABLISED ON ALL EXPOSED SLOPES AND FILLS WITHIN 7 CALENDAR DAYS FOLLOWING THE COMPLETION OF ANY PHASE OF GRADING. PERMANENT GROUND COVER SHALL BE ESTABLISHED ON ALL DISTURBED AREAS WITHIN 14 CALENDAR DAYS FOLLOWING THE COMPLETION OF CONSTRUCTION. CITY OF GREENSBORO BEFORE BEGINNING ANY UTILITY OR GRADING WORK WITHIN DEDICATED UTILITY OR STREET RIGHT - OF - WAYS CONTACT ENGINEERING DIVISION 0 373 -2302 EROSION CONTROL INSPECTION NOTE: PROPERTY OWNER, FINANCIALLY RESPONSIBLE PARTY, OR AGENT TO PERFORM SELF INSPECTION FOLLOWING ALL PHASES OF EROSION CONTROL AND CONSTRUCTION. SIGN AND DATE SELF INSPECTION CHART ON COVERSHEET FOLLOWING SELF INSPECTION OF EACH PHASE OF EROSION CONTROL AND CONSTRUCTION. NOTE: 1. ALL CONSTRUCTION TO BE TO THE CITY OF GREENSBORO STANDARDS AND SPECIFICATIONS. 2. CONTRACTOR TO VERIFY DEPTH AND LOCATION OF ALL EXISTING UTILITIES PRIOR TO CONSTRUCTION. 3. CONTRACTOR TO COMPLY WITH THE NEW O.S.H.A. REGULATIONS CONCERNING TRENCHING FOR INSTALLATION OF UTILITIES. 4. NO SUBSURFACE INVESTIGATION CONDUCTED BY EVANS ENGINEERING, INC. PROJECT TITLE: GRIFFIN'S KNOLL GREENSBORO, NORTH CAROLINA ihv6��yyanS ®� ®� ® ®� C� r� Oct -- -I- - -- -Since 1974- rid yV I Engineers Surveyors Planners g • X773 e 4609 Dundas Drive Greensboro, NC 27407 ®, '� ti ® 3 . GV °1 /t��o Phone 336 - 854 -8877 Fax 336 - 854-8876 r e FIRM LICENSE #C -0168 as"a °e • ®o�s�ars e PROJECT: 823-11 DESIGN BY: ADL DRAWN BY: AL DWG: H: \DRAWINGS \HERB PARKS \Trosper Rood \Griffin Mill Site -4th IAYOUT.dwg`' "'1T SHEET DESCRIPTION: EROSION DETAIL SCALE: NTS DATE: JANUARY 22, 2013 REVISIONS: 02 -27 -13 %15 SHEET REVISIONS: 03 -05 -13 REVISIONS: 03 -19 -13