Loading...
HomeMy WebLinkAbout20120118 Ver 1_Staff Comments_20130405 Homewood, Sue From:Homewood, Sue Sent:Friday, April 05, 2013 1:36 PM To:'Aden Stoltzfus ' Cc:dmoore11@triad.rr.com; 'Moore, Dwight W'; Tim Shoaf; 'Jeff Hunter' Subject:RE: Triad Baptist Parking Expansion DWQ#12-0118 Aden, As we discussed, the 401 approval requires that the approved stormwater system be installed and operational before “occupying” the new impervious surface. The Division understands that you are unable to convert the sediment basin over to the wet detention pond until the sediment and erosion control authority releases the project. As long as all impervious surfaces are draining to the sediment basin, the Permittee takes all measures to ensure final stabilization as quickly as possible, and the Permittee ensures timely conversion of the basin over to the wet pond upon release, then the Division will extend the timeline for compliance with Condition #3 in DWQ#12-0118. Thank you for your attention to the 401 approval conditions. Sue Homewood NC DENR Winston-Salem Regional Office Division of Water Quality 585 Waughtown Street Winston-Salem, NC 27107 Voice: (336) 771-4964 FAX: (336) 771-4630 E-mail correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties. From: Aden Stoltzfus [mailto:astoltzfus22@gmail.com] Sent: Friday, April 05, 2013 1:21 PM To: Homewood, Sue Cc: dmoore11@triad.rr.com; 'Moore, Dwight W'; Tim Shoaf; 'Jeff Hunter' Subject: Triad Baptist Parking Expansion DWQ#12-0118 Sue, As discussed, the paving has been completed for the above project and we would like to utilize the parking area as early as this Sunday. At this point, the wet detention pond is still being utilized as an erosion control device until upstream areas are established. The project was seeded yesterday so it will be several weeks before the upstream areas are grassed and the pond can be dredged and converted over to a storm water pond. The church is aware that due diligence and timeliness is required during the transition process. If you are ok with the use of the parking on a temporary basis, please reply. 1 Thanks, Aden R. Stoltzfus, PE SEI-Stoltzfus Engineering, Inc. Civil Consulting Engineers 1009 Lisa Run Drive Kernersville, NC 27284 Cell: (336) 908-1371 astoltzfus22@gmail.com 2