Loading...
HomeMy WebLinkAbout20130918 Ver 11_U-2525B UT to N_ Buffalo Site #'s 4 & 5 and UT to S_ Buffalo Site #2 NCDOT Closeout Request_20210520 Wanucha, Dave From:Elliott, Jason C Sent:Thursday, May 20, 2021 11:11 AM To:David.E.Bailey2@usace.army.mil; Chapman, Amy; Monte Matthews (Monte.K.Matthews@saw02.usace.army.mil); Wanucha, Dave; Wilson, Travis W.; Amanetta Somerville (somerville.amanetta@epa.gov); Gary Jordan (gary_jordan@fws.gov); Harris, David B; Parker, Jerry A Cc:Griffin, Randy W; Green, Matthew L Subject:U-2525B UT to N. Buffalo Site #'s 4 & 5 and UT to S. Buffalo Site #2 NCDOT Closeout Request Attachments:U-2525B UT to N. Buffalo Site #'s 4 & 5 and UT to S. Buffalo Site #2 NCDOT Closeout Request SIGNED.pdf Good morning all, Please see the attached NCDOT closeout request for the U-2525B UT to N. Buffalo Site #'s 4 & 5 and UT to S. Buffalo Site #2 stream mitigation sites. Please let me know if you have any questions or need additional information. Thank you for your assistance in this matter. Jason C. Elliott Environmental Analysis Unit Environment Analysis Engineering Group NC Department of Transportation 1598 Mail Service Center Raleigh, NC 27699-1598 Phone: 919-707-6114 Cell: 919-669-2414 Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. _____________________________________________________________ Facebook Twitter YouTube Email correspondence to and from this sender is subject to the N.C. Public Records Law and may be disclosed to third parties. 1 STATE OF NORTH CAROLINA DEPARTMENT OF TRANSPORTATION ROY COOPER GOVERNOR May 20, 2021 Mr. David Bailey Raleigh Regulatory Field Office 3331 Heritage Trade Drive, Suite 105 Wake Forest, NC 27587 J. ERIC BOYETTE SECRETARY Re: UT to North Buffalo Creek Site #4 & Site #5 and UT to South Buffalo Creek Site #2; Guilford County, TIP No. U-2525B; Action ID No. SAW-2005-21386; DWR Project No. 20130918 v.8 Mr. Bailey: As you are aware, the Department has monitored the UT to North Buffalo Creek Site #4, UT to North Buffalo Creek Site #5 and UT to South Buffalo Creek Site #2 since construction was completed in November of 2015. All three sites are located in Guilford county and were constructed as a part of I-785 Greensboro Eastern Loop. UT to North Buffalo Creek Site #4 is located east of the McKnight Mill road bridge and adjacent to I-785. The site reforestation was completed in February of 2017 and provides 386 linear feet of stream restoration to offset impacts associated with the U-2525B project. Per the permit requirements, NCDOT was required to monitor the stream mitigation site for channel stability on an annual basis for five years or until success criteria were met. UT to North Buffalo Creek Site #5 is located east of the US 29 interchange and adjacent to I-785. The site reforestation was completed in February of 2017 and provides 362 linear feet of stream restoration to offset impacts associated with the U-2525B project. Per the permit requirements, NCDOT was required to monitor the stream mitigation site for channel stability on an annual basis for five years or until success criteria were met. UT to South Buffalo Creek Site #2 is located east of the Huffine Mill road interchange and adjacent to I-785. The site reforestation was completed in February of 2017 and provides 1,307 linear feet of stream restoration to offset impacts associated with the U-2525B project. Per the permit requirements, NCDOT was required to monitor the stream mitigation site for channel stability on an annual basis for five years or until success criteria were met. Mailing Address: Telephone: (919) 707-6000 Location: NC DEPARTMENT OF TRANSPORTATION Fax: (919) 212-5785 CENTURY CENTER BUILDING A ENVIRONMENTAL ANALYSIS UNIT Customer Service: 1-877-368-4968 1020 BIRCH RIDGE DRIVE 1598 MAIL SERVICE CENTER RALEIGH, NC 27610 RALEIGH, NC 27699-1598 Website: www.ncdot.gov During the monitoring period, annual monitoring reports were submitted to the appropriate regulatory agencies via the Environmental Analysis Unit (EAU) website: https: //connect. ncdot.gov/resources/Environmental/EAU/Monitoring-Stewardship/Pages/default. aspx After five years of vegetation and stream stability monitoring, the UT to North Buffalo Creek Site #4, UT to North Buffalo Creek Site #5 and UT to South Buffalo Creek Site #2 stream restoration sites indicate that the planted vegetation is surviving, and the streams remain stable at this time. Individual annual monitoring reports are available on EAU's website for 2016-2020. A site visit was conducted for UT to North Buffalo Creek Site #5 on May 11th, 2021 with the regulatory agencies and NCDOT personnel present. No site visit was required for Site's #2 and #4. It was determined at that meeting that the sites had met the success criteria and that no further monitoring would be required. NCDOT requests that the appropriate resource agencies provide documentation stating that no further monitoring is required and that the site is closed. If you have any questions about this project, please contact Mr. Randy Griffin at (919) 707-6121. Sincerely, -DocuSigned by: g4.4y -B8BFC9470D9E461... For Philip S. Harris, III, P.E., Unit Head Environmental Analysis Unit cc: Ms. Amy Chapman, NCDWR Mr. Monte Matthews, USACOE Mr. Dave Wanucha, NCDWR Mr. Travis Wilson, NCWRC Ms. Amanetta Sommerville, USEPA Mr. Gary Jordan, USFWS Mr. David Harris, P.E., NCDOT-REU Mr. Jerry Parker, NCDOT Division 7 Mr. Randy Griffin, NCDOT-EAU