Loading...
HomeMy WebLinkAbout13_Inspection Reports for SCMs at W.A. Foster Center-11-0 4)PoN'ojogsplo9 A o g ;S asnoH S£Z v d (� yoSfaUa(� <� a �I.iud POM �wW �� as;ua� V p o - -------- a Jci�y/ ir r— IM/ a i _ IT sa al�ggg2g g�gg�gm g�#g€g3ga�� 'LS SNNWO"' /'� l% `€_�— — — s l[j g741 00 All �v II�— E1\ I ° " /i Yy _ 0 T\ tag is a 01 'fill ik @awe s ga g s AN Jig HIS ffi! F11 bii r g — 1 0- _ : _ g as €Fsa os R Fye a'$ 3 gaF �w 0 e H-$ a $a$ I�w Vie$€ oa IN ix 'e� @�$ 4$ sae ■ g�5 alt a�nF � .,, �� r ��;�\6��✓? Q�, �� a9 �g €$e �e� $s �sff $4� $� my$ mH City of Goldsboro Control Number: Operation, Maintenance, and Management Inspection Checklist For Ponds INSPECTION FORMS FOR STORMWATER MANAGEMENT SYSTEMS Inspector Name: John M. Heath BMP:1 Dry Pond Inspection Date: 3/10/20 Owner/Operator: City of Goldsboro Date BMP Put Into Service: June 2016 Address: Site Plan: WA Foster Location: 235 House St Phone #: Items inspected Checked Maintenance Needed Remarks Yes No Yes No I. Pond components A. Embankment and emergency spillway 1. Vegetation and ground cover adequate X X 2. Embankment erosion X X 3. Animal burrows X X 4. Unauthorized plantings X X 5. Cracking, bulging, or sliding of dam RP RP a. Upstream face X X b. Downstream face X X c. At or beyond toe Upstream X X Downstream X X d. Emergency spillway X X 6. Pond, toe & chimney drains clear and functioning X X 7. Seeps/leaks on downstream face X X 8. Slope protection or riprap failures X X 9. Vertical and horizontal alignment of top of dam as per "As -Built" plans X X 10. Emergency spillway clear of obstructions and debris X X 1/4 City of Goldsboro Control Number: Items inspected Checked Maintenance Needed Remarks Yes No Yes No 11. Other (specify) N/A B. Riser and principal spillway Type: Reinforced concrete X Corrugated pipe Masonry _ _ 1. Low flow orifice obstructed X X 2. Low flow trash rack a. Debris removal necessary X b. Corrosion control X X 3. Weir trash rack maintenance a. Debris removal necessary X X b. Corrosion control X X 4. Excessive sediment accumulation inside riser X X 5. Concrete/Masonry condition Riser and barrels a. Cracks or displacement " b. Minor spalling (<1") " c. Major spalling (rebars exposed) " d. Joint failures " e. Water tightness " 6. Metal pipe condition N/A 7. Control valve N/A a. Operational/exercised " b. Chained and locked " 8. Pond drain valve N/A a. Operational/exercised " b. Chained and locked " 9. Outfall channels functioning " 10. Other (specify) " cc C. Permanent pool (wet ponds) N/A 1. Undesirable vegetative growth " 2. Floating or floatable debris removal required " 3. Visible pollution " 4. Shoreline problems " 5. Other (specify) " 2/4 City of Goldsboro Control Number: Items inspected Checked Maintenance Needed Remarks Yes No Yes No D. Sediment forebays N/A 1. Sedimentation noted " 2. Sediment cleanout when depth < 50% design depth " E. Dry pond areas 1. Vegetation adequate X X 2. Undesirable vegetative growth X X 3. Undesirable woody vegetation X X 4. Low flow channels clear of obstructions X X 5. Standing water or wet spots X X 6. Sediment and/or trash accumulation X X Remove Trash from site 7. Other (specify) X X X X F. Condition of outfalls into pond 1. Riprap failures X X 2. Slope erosion X X 3. Storm drain pipes X X 4. Endwalls/headwalls X X 5. Other (specify) G. Other 1. Encroachments on pond or easement area X X 2. Complaints from residents (describe on back) X X 3. Aesthetics a. grass mowing required X X b. graffiti removal needed N/A c. Other (specify) X X 4. Any public hazards (specify) X X 5. Maintenance access X X X X H. Constructed wetland areas N/A 1. Vegetation healthy and growing " 2. Evidence of invasive species " 3. Excessive sedimentation in wetland area " 3/4 City of Goldsboro Control Number: II. Summary 1. Inspector's Remarks: Remove trash from site. Remove baffles from aond This is past due 2. Overall condition of Facility (Check one) Acceptable, Performing as Designed X Needs Some Maintenance, Performing as Designed/May Fail Before Next Inspection Unacceptable, Not Performing as Designed 3. Action to be taken: If the overall condition of the facility is Unacceptable, a time frame shall be established for correction or repair. No action necessary. Continue routine inspections Correct noted deficiencies before next inspection Correct noted facility deficiencies by jrl (initials) JH (initials) (date/initials) Facility repairs were completed. Site is ready for re -inspection to verify corrections. Date Signature of Owner/Operator Name of Owner/Operator Initials Site reinspection accomplished on: Site reinspection was satisfactory. Month of January 2021 Next routine inspection is scheduled for: John M. Heath Signature of Inspector Marty Anderson Signature of City Engineer 4/4 City of Goldsboro Control Number: Operation, Maintenance, and Management Inspection Checklist For Ponds INSPECTION FORMS FOR STORMWATER MANAGEMENT SYSTEMS Inspector Name: John M. Heath BMP:1 Dry Pond Inspection Date: March 20, 2019 Owner/Operator: City of Goldsboro Date BMP Put Into Service: June 2016 Address: Site Plan: WA Foster Location: 235 House St Phone #: Items inspected Checked Maintenance Needed Remarks Yes No Yes No I. Pond components A. Embankment and emergency spillway 1. Vegetation and ground cover adequate X X 2. Embankment erosion X X 3. Animal burrows X X 4. Unauthorized plantings X X 5. Cracking, bulging, or sliding of dam RP RP a. Upstream face X X b. Downstream face X X c. At or beyond toe Upstream X X Downstream X X d. Emergency spillway X X 6. Pond, toe & chimney drains clear and functioning X X 7. Seeps/leaks on downstream face X X 8. Slope protection or riprap failures X X 9. Vertical and horizontal alignment of top of dam as per "As -Built" plans X X 10. Emergency spillway clear of obstructions and debris X X 1/4 City of Goldsboro Control Number: Items inspected Checked Maintenance Needed Remarks Yes No Yes No 11. Other (specify) N/A B. Riser and principal spillway Type: Reinforced concrete X Corrugated pipe Masonry _ _ 1. Low flow orifice obstructed X X 2. Low flow trash rack a. Debris removal necessary X X b. Corrosion control X X 3. Weir trash rack maintenance a. Debris removal necessary X X b. Corrosion control X X 4. Excessive sediment accumulation inside riser X X 5. Concrete/Masonry condition Riser and barrels a. Cracks or displacement " b. Minor spalling (<1") " c. Major spalling (rebars exposed) " d. Joint failures " e. Water tightness " 6. Metal pipe condition N/A 7. Control valve N/A a. Operational/exercised " b. Chained and locked " 8. Pond drain valve N/A a. Operational/exercised " b. Chained and locked " 9. Outfall channels functioning " 10. Other (specify) " cc C. Permanent pool (wet ponds) N/A 1. Undesirable vegetative growth " 2. Floating or floatable debris removal required " 3. Visible pollution " 4. Shoreline problems " 5. Other (specify) " 2/4 City of Goldsboro Control Number: Items inspected Checked Maintenance Needed Remarks Yes No Yes No D. Sediment forebays N/A 1. Sedimentation noted " 2. Sediment cleanout when depth < 50% design depth " E. Dry pond areas 1. Vegetation adequate X X 2. Undesirable vegetative growth X X 3. Undesirable woody vegetation X X 4. Low flow channels clear of obstructions X X 5. Standing water or wet spots X X 6. Sediment and/or trash accumulation X X Remove Trash from site 7. Other (specify) X X X X F. Condition of outfalls into pond 1. Riprap failures X X 2. Slope erosion X X 3. Storm drain pipes X X 4. Endwalls/headwalls X X 5. Other (specify) G. Other 1. Encroachments on pond or easement area X X 2. Complaints from residents (describe on back) X X 3. Aesthetics a. grass mowing required X X b. graffiti removal needed N/A c. Other (specify) X X 4. Any public hazards (specify) X X 5. Maintenance access X X X X H. Constructed wetland areas N/A 1. Vegetation healthy and growing " 2. Evidence of invasive species " 3. Excessive sedimentation in wetland area " 3/4 City of Goldsboro Control Number: II. Summary 1. Inspector's Remarks: Remove trash from site. Remove baffles from aond This is past due 2. Overall condition of Facility (Check one) X Acceptable, Performing as Designed Needs Some Maintenance, Performing as Designed/May Fail Before Next Inspection Unacceptable, Not Performing as Designed 3. Action to be taken: If the overall condition of the facility is Unacceptable, a time frame shall be established for correction or repair. No action necessary. Continue routine inspections Correct noted deficiencies before next inspection Correct noted facility deficiencies by jrl (initials) _JH (initials) (date/initials) Facility repairs were completed. Site is ready for re -inspection to verify corrections. Date Signature of Owner/Operator Name of Owner/Operator Initials Site reinspection accomplished on: Site reinspection was satisfactory. Month of January 2020 Next routine inspection is scheduled for: John M. Heath Signature of Inspector Marty Anderson Signature of City Engineer 4/4 City of Goldsboro Control Number: Operation, Maintenance, and Management Inspection Checklist For Ponds INSPECTION FORMS FOR STORMWATER MANAGEMENT SYSTEMS Inspector Name: David Ratliff BMP:1 Dry Pond Inspection Date: Sept. 24, 2017 Owner/Operator: City of Goldsboro Date BMP Put Into Service: June 2016 Address: Site Plan: WA Foster Location: 235 House St Phone #: Items inspected Checked Maintenance Needed Remarks Yes No Yes No I. Pond components A. Embankment and emergency spillway 1. Vegetation and ground cover adequate X X 2. Embankment erosion X X 3. Animal burrows X X 4. Unauthorized plantings X X 5. Cracking, bulging, or sliding of dam RP RP a. Upstream face X X b. Downstream face X X c. At or beyond toe Upstream X X Downstream X X d. Emergency spillway X X 6. Pond, toe & chimney drains clear and functioning X X 7. Seeps/leaks on downstream face X X 8. Slope protection or riprap failures X X 9. Vertical and horizontal alignment of top of dam as per "As -Built" plans X X 10. Emergency spillway clear of obstructions and debris X X 1/4 City of Goldsboro Control Number: Items inspected Checked Maintenance Needed Remarks Yes No Yes No 11. Other (specify) N/A B. Riser and principal spillway Type: Reinforced concrete X Corrugated pipe Masonry _ _ 1. Low flow orifice obstructed X X 2. Low flow trash rack a. Debris removal necessary X X b. Corrosion control X X 3. Weir trash rack maintenance a. Debris removal necessary X X b. Corrosion control X X 4. Excessive sediment accumulation inside riser X X 5. Concrete/Masonry condition Riser and barrels a. Cracks or displacement " b. Minor spalling (<1") " c. Major spalling (rebars exposed) " d. Joint failures " e. Water tightness " 6. Metal pipe condition N/A 7. Control valve N/A a. Operational/exercised " b. Chained and locked " 8. Pond drain valve N/A a. Operational/exercised " b. Chained and locked " 9. Outfall channels functioning " 10. Other (specify) " cc C. Permanent pool (wet ponds) N/A 1. Undesirable vegetative growth " 2. Floating or floatable debris removal required " 3. Visible pollution " 4. Shoreline problems " 5. Other (specify) " 2/4 City of Goldsboro Control Number: Items inspected Checked Maintenance Needed Remarks Yes No Yes No D. Sediment forebays N/A 1. Sedimentation noted " 2. Sediment cleanout when depth < 50% design depth " E. Dry pond areas 1. Vegetation adequate X X 2. Undesirable vegetative growth X X 3. Undesirable woody vegetation X X 4. Low flow channels clear of obstructions X X 5. Standing water or wet spots X X 6. Sediment and/or trash accumulation X X Remove Trash from site 7. Other (specify) X X X X F. Condition of outfalls into pond 1. Riprap failures X X 2. Slope erosion X X 3. Storm drain pipes X X 4. Endwalls/headwalls X X 5. Other (specify) G. Other 1. Encroachments on pond or easement area X X 2. Complaints from residents (describe on back) X X 3. Aesthetics a. grass mowing required X X b. graffiti removal needed N/A c. Other (specify) X X 4. Any public hazards (specify) X X 5. Maintenance access X X X X H. Constructed wetland areas N/A 1. Vegetation healthy and growing " 2. Evidence of invasive species " 3. Excessive sedimentation in wetland area " 3/4 City of Goldsboro Control Number: II. Summary 1. Inspector's Remarks: Remove trash from site. Remove baffles from aond 2. Overall condition of Facility (Check one) X Acceptable, Performing as Designed Needs Some Maintenance, Performing as Designed/May Fail Before Next Inspection Unacceptable, Not Performing as Designed 3. Action to be taken: If the overall condition of the facility is Unacceptable, a time frame shall be established for correction or repair. No action necessary. Continue routine inspections Correct noted deficiencies before next inspection Correct noted facility deficiencies by DR (initials) (initials) (date/initials) 4. Facility repairs were completed. Site is ready for re -inspection to verify corrections. Date Signature of Owner/Operator Name of Owner/Operator Initials Site reinspection accomplished on: Site reinspection was satisfactory. Next routine inspection is scheduled for: Month of Sept. 2018 David Ratliff Signature of Inspector Marty Anderson Signature of City Engineer 4/4 City of Goldsboro Control Number: Operation, Maintenance, and Management Inspection Checklists For Infiltration Practices: Basins, Trenches, Dry Wells, Paving, and Swales INSPECTION FORMS FOR STORMWATER MANAGEMENT SYSTEMS Inspector Name: John M. Heath BMPA Swale Inspection Date: 3/10/20 Owner/Operator: City of Goldsboro Date BMP Put Into Service: June 2016 Address: Site Plan: WA Foster Rec Center Location: 235 House St Phone #: Items inspected Checked Maintenance Needed Remarks Yes No Yes No I. Basins A. Debris cleanout 1. Basin bottom clear of debris X X 2. Inlet clear of debris X X 3. Outlet clear of debris X X 4. Emergency spillway clear of debris N/A B. Sediment traps or forebays N/A 1. Obviously trapping sediment " 2. Greater than 50% of storage volume remaining " C. Vegetation N/A 1. Mowing done when needed " 2. Fertilized per specifications " 3. No evidence of erosion " D. Dewatering N/A 1. Basin dewaters between storms " E. Sediment cleanout of basin N/A 1. No evidence of sedimentation in basin " 2. Sediment accumulation does not require cleanout " 115 City of Goldsboro Control Number: Items inspected Checked Maintenance Needed Remarks Yes No Yes No F.Inlets N/A 1. Good condition " 2. No evidence of erosion " G. Outlets/overflow spillway N/A 1. Good condition, no need for repair " 2. No evidence of erosion " H. Structural repairs N/A 1. Embankment in good repair " 2. Side slopes are stable " 3. No evidence of erosion " I. Fences/access repairs N/A 1. Fences in good condition " 2. No damage which would allow undesired entry " 3. Access point in good condition " 4. Locks and gate function adequate " II. Infiltration Trench N/A A. Debris cleanout " 1. Satisfactory Unsatisfactory " 2. Trench surface clear of debris " 3. Inlet areas clear of debris " 4. Inflow pipes clear of debris " 5. Overflow spillway clear of debris " B. Sediment traps, forebays, or pretreatment swales N/A 1. Obviously trapping sediment " 2. Greater than 50% of storage volume remaining " C. Vegetation N/A 1. Mowing done when needed " 2. Fertilized per specifications " 3. No evidence of erosion " D. Dewatering N/A 1. Trench dewaters between storms " E. Sediment cleanout of trench N/A 1. No evidence of sedimentation in trench " 2/5 City of Goldsboro Control Number: Items inspected Checked Maintenance Needed Remarks Yes No Yes No 2. Sediment accumulation does not yet require cleanout N/A F.Inlets N/A 1. Good condition " 2. No evidence of erosion " G. Outlets/overflow spillway N/A 1. Good condition, no need for repair " 2. No evidence of erosion " H. Aggregate repairs N/A 1. Surface of aggregate clean " 2. Top layer of stone does not need replacement " 3. Trench does not need rehabilitation " I. Vegetated surface N/A 1. No evidence of erosion " 2. Perforated inlet functioning adequately " 3. Water does not stand on vegetative surface " 4. Good vegetative cover exists " III. Infiltration Dry Well N/A A. Debris cleanout N/A 1. Satisfactory Unsatisfactory " 2. Roof drains and downspouts clean " B. Vegetation on top of dry well N/A 1. Mowing done when needed " 2. Fertilized per specifications " 3. No evidence of erosion " C. Dewatering N/A 1. Dry well dewaters between storms " D. Inlets N/A 1. Good condition of down spouts " 2. No evidence of deterioration " 3. Roof gutters drain correctly into dry well " E. Outlets/overflow spillway N/A 3/5 City of Goldsboro Control Number: Items inspected Checked Maintenance Needed Remarks Yes No Yes No 1. Good condition, no need for repair N/A 2. No evidence of erosion " IV. Infiltration Paving N/A A. Debris on infiltration paving parking area N/A 1. Paving area clean of debris " B. Vegetation (any buffer areas or pervious areas in drainage area) N/A 1. Mowing done when needed " 2. Fertilized per specifications " 3. No evidence of erosion " C. Dewatering N/A 1. Infiltration paving dewaters between storms " D. Sediments N/A 1. Area clean of sediments " 2. Area vacuum swept on a periodic basis " E. Structural condition N/A 1. No evidence of surface deterioration " 2. No evidence of rutting or spalling " V. Infiltration Swale A. Debris cleanout 1. Swales and contributing areas clean of debris X X B. Vegetation 1. Mowing done when needed X X 2. Fertilized per specifications X X 3. No evidence of erosion X X 4. Minimum mowing depth not exceeded X X C. Dewatering 1. Swale dewaters between storms X X D. Check dams or energy dissipators N/A 1. No evidence of flow going around structures " 2. No evidence of erosion at downstream toe " 4/5 City of Goldsboro Control Number: Items inspected Checked Maintenance Needed Remarks Yes No Yes No E. Sediment deposition 1. Swale clean of sediments X X F. Outlets/overflow spillway 1. Good condition, no need for repair X X 2. No evidence of erosion X X VI. Summary 1. Inspector's Remarks: 2. Overall condition of Facility (Check one) X Acceptable, Performing as Designed Needs Some Maintenance, Performing as Designed/May Fail Before Next Inspection Unacceptable, Not Performing as Designed 3. Action to be taken: If the overall condition of the facility is Unacceptable, a time frame shall be established for correction or repair. No action necessary. Continue routine inspections JH (initials) Correct noted deficiencies before next inspection (initials) Correct noted facility deficiencies by (date/initials) 4. Facility repairs were completed. Site is ready for re -inspection to verify corrections. Date Signature of Owner/Operator Name of Owner/Operator Initials Site reinspection accomplished on: Site reinspection was satisfactory. Month of January 2021 Next routine inspection is scheduled for: John M. Heath Marty Anderson Signature of Inspector Signature of City Engineer 515 City of Goldsboro Control Number: Operation, Maintenance, and Management Inspection Checklists For Infiltration Practices: Basins, Trenches, Dry Wells, Paving, and Swales INSPECTION FORMS FOR STORMWATER MANAGEMENT SYSTEMS Inspector Name: John M. Heath BMPA Swale Inspection Date: March 20, 2019 Owner/Operator: City of Goldsboro Date BMP Put Into Service: June 2016 Address: Site Plan: WA Foster Rec Center Location: 235 House St Phone #: Items inspected Checked Maintenance Needed Remarks Yes No Yes No I. Basins A. Debris cleanout 1. Basin bottom clear of debris X X 2. Inlet clear of debris X X 3. Outlet clear of debris X X 4. Emergency spillway clear of debris N/A B. Sediment traps or forebays N/A 1. Obviously trapping sediment " 2. Greater than 50% of storage volume remaining " C. Vegetation N/A 1. Mowing done when needed " 2. Fertilized per specifications " 3. No evidence of erosion " D. Dewatering N/A 1. Basin dewaters between storms " E. Sediment cleanout of basin N/A 1. No evidence of sedimentation in basin " 2. Sediment accumulation does not require cleanout " 115 City of Goldsboro Control Number: Items inspected Checked Maintenance Needed Remarks Yes No Yes No F.Inlets N/A 1. Good condition " 2. No evidence of erosion " G. Outlets/overflow spillway N/A 1. Good condition, no need for repair " 2. No evidence of erosion " H. Structural repairs N/A 1. Embankment in good repair " 2. Side slopes are stable " 3. No evidence of erosion " I. Fences/access repairs N/A 1. Fences in good condition " 2. No damage which would allow undesired entry " 3. Access point in good condition " 4. Locks and gate function adequate " II. Infiltration Trench N/A A. Debris cleanout " 1. Satisfactory Unsatisfactory " 2. Trench surface clear of debris " 3. Inlet areas clear of debris " 4. Inflow pipes clear of debris " 5. Overflow spillway clear of debris " B. Sediment traps, forebays, or pretreatment swales N/A 1. Obviously trapping sediment " 2. Greater than 50% of storage volume remaining " C. Vegetation N/A 1. Mowing done when needed " 2. Fertilized per specifications " 3. No evidence of erosion " D. Dewatering N/A 1. Trench dewaters between storms " E. Sediment cleanout of trench N/A 1. No evidence of sedimentation in trench " 2/5 City of Goldsboro Control Number: Items inspected Checked Maintenance Needed Remarks Yes No Yes No 2. Sediment accumulation does not yet require cleanout N/A F.Inlets N/A 1. Good condition " 2. No evidence of erosion " G. Outlets/overflow spillway N/A 1. Good condition, no need for repair " 2. No evidence of erosion " H. Aggregate repairs N/A 1. Surface of aggregate clean " 2. Top layer of stone does not need replacement " 3. Trench does not need rehabilitation " I. Vegetated surface N/A 1. No evidence of erosion " 2. Perforated inlet functioning adequately " 3. Water does not stand on vegetative surface " 4. Good vegetative cover exists " III. Infiltration Dry Well N/A A. Debris cleanout N/A 1. Satisfactory Unsatisfactory " 2. Roof drains and downspouts clean " B. Vegetation on top of dry well N/A 1. Mowing done when needed " 2. Fertilized per specifications " 3. No evidence of erosion " C. Dewatering N/A 1. Dry well dewaters between storms " D. Inlets N/A 1. Good condition of down spouts " 2. No evidence of deterioration " 3. Roof gutters drain correctly into dry well " E. Outlets/overflow spillway N/A 3/5 City of Goldsboro Control Number: Items inspected Checked Maintenance Needed Remarks Yes No Yes No 1. Good condition, no need for repair N/A 2. No evidence of erosion " IV. Infiltration Paving N/A A. Debris on infiltration paving parking area N/A 1. Paving area clean of debris " B. Vegetation (any buffer areas or pervious areas in drainage area) N/A 1. Mowing done when needed " 2. Fertilized per specifications " 3. No evidence of erosion " C. Dewatering N/A 1. Infiltration paving dewaters between storms " D. Sediments N/A 1. Area clean of sediments " 2. Area vacuum swept on a periodic basis " E. Structural condition N/A 1. No evidence of surface deterioration " 2. No evidence of rutting or spalling " V. Infiltration Swale A. Debris cleanout 1. Swales and contributing areas clean of debris X X B. Vegetation 1. Mowing done when needed X X 2. Fertilized per specifications X X 3. No evidence of erosion X X 4. Minimum mowing depth not exceeded X X C. Dewatering 1. Swale dewaters between storms X X D. Check dams or energy dissipators N/A 1. No evidence of flow going around structures " 2. No evidence of erosion at downstream toe " 4/5 City of Goldsboro Control Number: Items inspected Checked Maintenance Needed Remarks Yes No Yes No E. Sediment deposition 1. Swale clean of sediments X X F. Outlets/overflow spillway 1. Good condition, no need for repair X X 2. No evidence of erosion X X VI. Summary 1. Inspector's Remarks: 2. Overall condition of Facility (Check one) Acceptable, Performing as Designed X Needs Some Maintenance, Performing as Designed/May Fail Before Next Inspection Unacceptable, Not Performing as Designed 3. Action to be taken: If the overall condition of the facility is Unacceptable, a time frame shall be established for correction or repair. No action necessary. Continue routine inspections (initials) Correct noted deficiencies before next inspection JH (initials) Correct noted facility deficiencies by (date/initials) 4. Facility repairs were completed. Site is ready for re -inspection to verify corrections. Date Signature of Owner/Operator Name of Owner/Operator Initials Site reinspection accomplished on: Site reinspection was satisfactory. Month of January 2020 Next routine inspection is scheduled for: John M. Heath _ Marty Anderson Signature of Inspector Signature of City Engineer 515 City of Goldsboro Control Number: Operation, Maintenance, and Management Inspection Checklists For Infiltration Practices: Basins, Trenches, Dry Wells, Paving, and Swales INSPECTION FORMS FOR STORMWATER MANAGEMENT SYSTEMS Inspector Name: David Ratliff BMPA Swale Inspection Date: Sept. 24, 2017 Owner/Operator: City of Goldsboro Date BMP Put Into Service: June 2016 Address: Site Plan: WA Foster Rec Center Location: 235 House St Phone #: Items inspected Checked Maintenance Needed Remarks Yes No Yes No I. Basins A. Debris cleanout 1. Basin bottom clear of debris X X 2. Inlet clear of debris X X 3. Outlet clear of debris X X 4. Emergency spillway clear of debris N/A B. Sediment traps or forebays N/A 1. Obviously trapping sediment " 2. Greater than 50% of storage volume remaining " C. Vegetation N/A 1. Mowing done when needed " 2. Fertilized per specifications " 3. No evidence of erosion " D. Dewatering N/A 1. Basin dewaters between storms " E. Sediment cleanout of basin N/A 1. No evidence of sedimentation in basin " 2. Sediment accumulation does not require cleanout " 115 City of Goldsboro Control Number: Items inspected Checked Maintenance Needed Remarks Yes No Yes No F.Inlets N/A 1. Good condition " 2. No evidence of erosion " G. Outlets/overflow spillway N/A 1. Good condition, no need for repair " 2. No evidence of erosion " H. Structural repairs N/A 1. Embankment in good repair " 2. Side slopes are stable " 3. No evidence of erosion " I. Fences/access repairs N/A 1. Fences in good condition " 2. No damage which would allow undesired entry " 3. Access point in good condition " 4. Locks and gate function adequate " II. Infiltration Trench N/A A. Debris cleanout " 1. Satisfactory Unsatisfactory " 2. Trench surface clear of debris " 3. Inlet areas clear of debris " 4. Inflow pipes clear of debris " 5. Overflow spillway clear of debris " B. Sediment traps, forebays, or pretreatment swales N/A 1. Obviously trapping sediment " 2. Greater than 50% of storage volume remaining " C. Vegetation N/A 1. Mowing done when needed " 2. Fertilized per specifications " 3. No evidence of erosion " D. Dewatering N/A 1. Trench dewaters between storms " E. Sediment cleanout of trench N/A 1. No evidence of sedimentation in trench " 2/5 City of Goldsboro Control Number: Items inspected Checked Maintenance Needed Remarks Yes No Yes No 2. Sediment accumulation does not yet require cleanout N/A F.Inlets N/A 1. Good condition " 2. No evidence of erosion " G. Outlets/overflow spillway N/A 1. Good condition, no need for repair " 2. No evidence of erosion " H. Aggregate repairs N/A 1. Surface of aggregate clean " 2. Top layer of stone does not need replacement " 3. Trench does not need rehabilitation " I. Vegetated surface N/A 1. No evidence of erosion " 2. Perforated inlet functioning adequately " 3. Water does not stand on vegetative surface " 4. Good vegetative cover exists " III. Infiltration Dry Well N/A A. Debris cleanout N/A 1. Satisfactory Unsatisfactory " 2. Roof drains and downspouts clean " B. Vegetation on top of dry well N/A 1. Mowing done when needed " 2. Fertilized per specifications " 3. No evidence of erosion " C. Dewatering N/A 1. Dry well dewaters between storms " D. Inlets N/A 1. Good condition of down spouts " 2. No evidence of deterioration " 3. Roof gutters drain correctly into dry well " E. Outlets/overflow spillway N/A 3/5 City of Goldsboro Control Number: Items inspected Checked Maintenance Needed Remarks Yes No Yes No 1. Good condition, no need for repair N/A 2. No evidence of erosion " IV. Infiltration Paving N/A A. Debris on infiltration paving parking area N/A 1. Paving area clean of debris " B. Vegetation (any buffer areas or pervious areas in drainage area) N/A 1. Mowing done when needed " 2. Fertilized per specifications " 3. No evidence of erosion " C. Dewatering N/A 1. Infiltration paving dewaters between storms " D. Sediments N/A 1. Area clean of sediments " 2. Area vacuum swept on a periodic basis " E. Structural condition N/A 1. No evidence of surface deterioration " 2. No evidence of rutting or spalling " V. Infiltration Swale A. Debris cleanout 1. Swales and contributing areas clean of debris X X B. Vegetation 1. Mowing done when needed X X 2. Fertilized per specifications X X 3. No evidence of erosion X X 4. Minimum mowing depth not exceeded X X C. Dewatering 1. Swale dewaters between storms X X D. Check dams or energy dissipators N/A 1. No evidence of flow going around structures " 2. No evidence of erosion at downstream toe " 4/5 City of Goldsboro Control Number: Items inspected Checked Maintenance Needed Remarks Yes No Yes No E. Sediment deposition 1. Swale clean of sediments X X F. Outlets/overflow spillway 1. Good condition, no need for repair X X 2. No evidence of erosion X X VI. Summary 1. Inspector's Remarks: Re -seed swale for around cover 2. Overall condition of Facility (Check one) Acceptable, Performing as Designed X Needs Some Maintenance, Performing as Designed/May Fail Before Next Inspection Unacceptable, Not Performing as Designed 3. Action to be taken: If the overall condition of the facility is Unacceptable, a time frame shall be established for correction or repair. No action necessary. Continue routine inspections (initials) Correct noted deficiencies before next inspection DR (initials) Correct noted facility deficiencies by (date/initials) 4. Facility repairs were completed. Site is ready for re -inspection to verify corrections. Date Signature of Owner/Operator Name of Owner/Operator Initials Site reinspection accomplished on: Site reinspection was satisfactory. Month of September 2018 Next routine inspection is scheduled for: David Ratliff Marty Anderson Signature of Inspector Signature of City Engineer 515