HomeMy WebLinkAbout20130319 Ver 1_Application_20130404 (2)Hiss, Amy
From: Slaughter, Johnathan H
Sent: Thursday, April 04, 201311:38 AM
To: Matthews, Monte K SAW; Euliss, Amy; Chambers, Marla J
Subject: FW: bridge to culvert justification Br Nos 130 and 189, Ashe
See below.
From: Eleni Riggs [mailto:eriggs @rkk.com]
Sent: Thursday, April 04, 201311:18 AM
To: Slaughter, Johnathan H
Cc: Guynn, Jami C; Johnston, Gregory W
Subject: Re: bridge to culvert justification Br Nos 130 and 189, Ashe
Heath,
Here is the cost estimate numbers that we have come up with. Ricky asked for some assistance in coming up with numbers from Harry Lucas in DOT's Structures
Management Unit since they have a better idea of what projects are costing right now.
#130
Culvert Option �2 @ 9'x4' RCBC, 42' long) _ $97,000
Bridge Option X35' single span, 21" cored slab, 30' wide) _ $111,000
#189
Culvert Option �1 @ 13'x3' ABC, 80' long) _ $103,000
Bridge Option X50' single span, 21" cored slab, 33' wide) _ $165,800
These estimates are for the structures only and do not account f or bridge removal, roadway, traffic, future maintenance, etc. Please let me know if you need
anything else.
Thanks,
Eleni
RK&K
900 Ridgefield Drive, Suite 350
Raleigh, NC 27609
919-878-9560 P
919-790-8382 F
www.rkk.com
Emai I correron(dence, to and from `hi_ I I to 'he I I,^,, PL,hjjc Rec or(I's La,,,, amd ma he (disdose' to 'hir(d pa r'IP-