Loading...
HomeMy WebLinkAbout20130319 Ver 1_Application_20130404 (2)Hiss, Amy From: Slaughter, Johnathan H Sent: Thursday, April 04, 201311:38 AM To: Matthews, Monte K SAW; Euliss, Amy; Chambers, Marla J Subject: FW: bridge to culvert justification Br Nos 130 and 189, Ashe See below. From: Eleni Riggs [mailto:eriggs @rkk.com] Sent: Thursday, April 04, 201311:18 AM To: Slaughter, Johnathan H Cc: Guynn, Jami C; Johnston, Gregory W Subject: Re: bridge to culvert justification Br Nos 130 and 189, Ashe Heath, Here is the cost estimate numbers that we have come up with. Ricky asked for some assistance in coming up with numbers from Harry Lucas in DOT's Structures Management Unit since they have a better idea of what projects are costing right now. #130 Culvert Option �2 @ 9'x4' RCBC, 42' long) _ $97,000 Bridge Option X35' single span, 21" cored slab, 30' wide) _ $111,000 #189 Culvert Option �1 @ 13'x3' ABC, 80' long) _ $103,000 Bridge Option X50' single span, 21" cored slab, 33' wide) _ $165,800 These estimates are for the structures only and do not account f or bridge removal, roadway, traffic, future maintenance, etc. Please let me know if you need anything else. Thanks, Eleni RK&K 900 Ridgefield Drive, Suite 350 Raleigh, NC 27609 919-878-9560 P 919-790-8382 F www.rkk.com Emai I correron(dence, to and from `hi_ I I to 'he I I,^,, PL,hjjc Rec or(I's La,,,, amd ma he (disdose' to 'hir(d pa r'IP-