Loading...
HomeMy WebLinkAbout20040275 Ver 10_20040275-02272013-401 inspection_20130402Wetland Inspection Report Project Num: 20040275 Project Name: NCDOT - 1 -85 County: Rowan Location: NCDOT - 1 -85 Latitude: SW Plan Location: Site Owner Name: NC DOT PDEA Inspection Date: 02/27/2013 Reason for Inspection: Routine Inspection Type: Site Inspection (DOT) Inspection Contact Person: On -Site Representative(s): Primary Inspector: Amy C Euliss Secondary Inspector(s): Facility compliance Status: M Compliant Program Area: 401 (includes isolated /non -404) Question Areas: 0 Permit (401 WQC) Inspection Summary: Version: 5 Status: Issued I -2304a Project Type: Road maintenance /repair /improvements Region: Winston -Salem I -2304a Longitude: Title: n Not Compliant Phone: Phone: Permit (401 WQC) Yes No NA NE Does the impact(s) match what was approved in the 401 WQC or non 404 permit? M 11 11 11 Are the culverts and /or filled areas installed properly? I] ■ 11 11 Is the site compliant with additional conditions of the 401 WQC or non 404 permit? I] I] I] Comment: Site 6 has minor headcut. Will monitor to see if it moves. Page: 1