Loading...
HomeMy WebLinkAbout20130248 Ver 1_More Info Received_20130326WITHERS'' RAVEN EL 3 _ 8 ENGINEERS I PLANNERS I SURVEYORS MEMORANDUM TO: Laurie Dennison - NCDWQ FROM: Troy Beasley DATE: March 21, 2013 PROJECT: Mims Stormwater Control Structure — Courtesy Notification SUBJECT: Submittal of Revised Impact Plans Laurie, As a result of coordination with the Corps, the Impact Plans for the Mims Stormwater Control Structure have been revised. W &R submitted courtesy copies of the PCN for the Mims project to DWQ, and we are providing 3 copies of the revised Impact Plans for your files. Please note that the revisions to the Impact Plans consisted only of showing the proposed park design, and the proposed impacts have not changed. Please let me know if you have any questions. Sincerely, Troy Beasley MAR 262013 3 NR -_ Ww unuTY 1410 Commonwealth Drive I Suite ioi I Wilmington, NC 284031 tel: 910.256.9277 1 Pax: 910.256.2584 1 www.withersravenel.com R 4 e E 2 41 W\ \\ u \ , EXISTING . WETLAND 1 W Ii I _W � 1 I --"— Z 4 y II W &\ \� lI I II I I l/ OMP2 I I \ \ PROPOSED / 1 / I HEADWALL �1 G � /II \ \ ®/ PROPOSED RIP RAP / IN CHANNEL BOTTOM / / / f / PERMANENT STREAM IMPACTS: L.F. 24 LF AREA 62 SF (0.001 AC) EX. TOP OF BANK / / / D MAR 2 6 2013 Nrt - WR ALiTY Wetlands s Sk mwaW Branch GRAPHIC SCALE 20 0 10 20 40 1 inch = 20 ft. TOWN OF HOLLY SPRINGS STREAM IMPACTS WITHER8 &— RAVENEL MIMS STORMWATER EXHIBIT 1 ENGINEERS I PLANNERS I SURVEYORS rings Wake County North Carol lna _... - - __ mw_Awiiii� 0 \ \ PROPOSED RIP RAP \ I l\ \ \ \ \\ BM IN CHANNEL BOTTOM I l \ \ \\ \ AND ON STREAM BANKS \ \ \ PROPOSED \ \ \ \ \\ \ \ \ \ LLLL HEADWALL LLLLL LLLLL p vo CID �L \\ \\ \\ \\ \\ \\ LLL \ \ L I C/ Qr / / /PROPOSED RIP RAP TO BE / PLACED ON STREAM BANKS ABOVE 100 YR FLOOD ELEVATION, NO IMPACTS r \ PERMANENT STREAM IMPACTS: L. F. 41 LF AREA - 244 SF (0.006 AC) EX. TOP OF BANK // GRAPHIC SCALE 40 0 20 40 80 1 inch = 40 ft. TOWN MSOSTOR HOLLY SPRINGS STREAM IMPACTS WITHERS `AN.NN :RAVENEL EXHIBIT 2 ELEVATED PEDESTRIAN BRIDGE "NO I M PACTS" FUTURE ELEVATED PEDESTRIAN BOARDWALK OPEN i 1 1 1 "V EARP �Ell������� ! \ foll EXISTING WETLAND FUTURE TRAIL EXHIBIT 1 ELEVATED PEDESTRIAN \\ BOARDWALK "NO IMPACTS" \ \< FUTURE GREENWAY EXISTING WETLAND I ` ////�l1/�% \ / / /// PROPERTY BOUNDARY / EXISTING STREAM Fi ELEVATED PEDESTRIAN 1 BRIDGE _ "NO IMPACTS" ELEVATED PEDESTRIAN ' BOARDWALK NO IMPACTS" �7 5�- \ I I � ♦ 94 ♦ ti� I I PROJECT SUMMARY PERMANENT STREAM IMPACTS: L.F. 65 LF AREA EX. STREAM EX. WETLANDS 300 SF (0.007 AC) GRAPHIC SCALE t� 0 50 100 200 I I I I z —i 1 inch = 100 ft. No. Revision Date B , =�aM,. ,�. TOWN OF HOLLY SPRINGS STREAM IMPACTS WITHERS 51ePN` DrawnOy J` MIMS STORMWATER RAVENEL �" �,� WE -0 `�e�a. " OVERALL PLAN AND INDEX ENGINEERS 1 PLANNERS 1 SURVEYORS xcr 20705 .t. Holly Springs Wake County North Carolina 4 ELEVATED PEDESTRIAN BRIDGE "NO I M PACTS" FUTURE ELEVATED PEDESTRIAN BOARDWALK OPEN i 1 1 1 "V EARP �Ell������� ! \ foll EXISTING WETLAND FUTURE TRAIL EXHIBIT 1 ELEVATED PEDESTRIAN \\ BOARDWALK "NO IMPACTS" \ \< FUTURE GREENWAY EXISTING WETLAND I ` ////�l1/�% \ / / /// PROPERTY BOUNDARY / EXISTING STREAM Fi ELEVATED PEDESTRIAN 1 BRIDGE _ "NO IMPACTS" ELEVATED PEDESTRIAN ' BOARDWALK NO IMPACTS" �7 5�- \ I I � ♦ 94 ♦ ti� I I PROJECT SUMMARY PERMANENT STREAM IMPACTS: L.F. 65 LF AREA EX. STREAM EX. WETLANDS 300 SF (0.007 AC) GRAPHIC SCALE t� 0 50 100 200 I I I I z —i 1 inch = 100 ft. No. Revision Date B , =�aM,. ,�. TOWN OF HOLLY SPRINGS STREAM IMPACTS WITHERS 51ePN` DrawnOy J` MIMS STORMWATER RAVENEL �" �,� WE -0 `�e�a. " OVERALL PLAN AND INDEX ENGINEERS 1 PLANNERS 1 SURVEYORS xcr 20705 .t. Holly Springs Wake County North Carolina