Loading...
HomeMy WebLinkAboutNCC203996_NOT Closeout Documents_20210521North Carolina Department of Environmental Quality Land Resources: Systel Building, 225 Green Street, Suite 714, Fayetteville, NC 28301-5094 (910) 433-3300 County: Harnett Project: Quail Glen Phase lots 67, 68, 69, 70 River basin: Cape Fear Person financially responsible: NVR, Inc. - Michael Cole, GM Project #: HARNE-2021-014 COC: NCC203996 Address: 5734 Trinity Road, Suite 200, Raleigh, NC 27607 1. Project Location: SR 2215, Black River Pictures: No 2. Weather and soil conditions: sunny, workable soils 3. Is site currently under notice of violation? No 4. Is the site in compliance with S.P.C.A. and rules? Yes 5. Violations: Initial inspection: No If no, check violations below: 6. Is the site in compliance with NPDES Permit NCG010000 Construction Stormwater requirements? Describe: 7. Has sedimentation damage occurred since last inspection? No If Yes, where? (check all that apply) Degree of damage: 8. Contact made with (name): Inspection report: Sent Report 9. Corrective action needed: Title: Date given/sent: May 18, 2021 10. Comments: Permanent ground cover sufficient to restrain erosion has been established. No additional self -monitoring or self -inspections are required. Project is in compliance and released under the SPCA. Termination of coverage under the NPDES General Stormwater Permit for Construction Activities (NCGO1) must be requested by the permittee via a Notice of Termination (NOT). The NOT is available at: https://edocs.deq.nc.gov/Forms/NCGOI-Termination. Please note that this correspondence must be uploaded as part of completing the NOT process. Reported by: Lori Britt Date of inspection: April 07, 2021 cc: Ross Tummire, via email Meredith Sweitzer, via email Yes Others present: Time arriving on site: 11:57 AM Time leaving site: 12:08 AM