HomeMy WebLinkAbout20130304 Ver 1_CAMA Permit Application_20130325r
A 1 O 20 130304 Y'
NCDENR
North Carolina Department of Environment and Natural Resources
Division of Coastal Management
Pat McCrory
Govemor
March 21, 2013
MEMORANDUM
TO:
FROM:
SUBJECT:
Applicant:
Project Location:
Proposed Project:
Braxton C. Davis
Director
Karen Higgins, Webscape Unit Supervisor
Division of Water Quality - Raleigh
Doug Huggett
Major Permits Processing Coordinator
CAMA Permit Application Review
Waterfall Greens, Inc., c/o Brian Newman
John E. Skvada, III
Secretary
Promenade Watersports, 105 Promenade Lane, Kitty Hawk, Dare Co.
Tie pilings, floating jet ski racks, mooring fields
Please indicate below your agency's position or viewpoint on the proposed project and return this
form by 04/11/13 to 400 Commerce Avenue, Morehead City, NC 28557. If you have any
questions regarding the proposed project, please contact Ron Renaldi at (252) 264 -3901. When
appropriate, in -depth comments with supporting data are requested.
REPLY: This agency has no objection to the project as proposed.
SIGNED
This agency has no comment on the proposed project.
This agency approves of the project only if the recommended changes are
incorporated. See attached.
This agency objects to the project for reasons described in the attached
comments.
DATE
1367 US 17 South, Elizabeth City, NC 27909
Phone: 252 - 264 -3901 \ FAX: 252-264-3723; Internet: www.n=astalmanagement.net
An Equal Opportunity \ Affirmative Action Employer
[J .'JnJr
�U
f4AR252Q143
i
NO do UAI
DIVISION OF COASTAL MANAGEMENT
FIELD INVESTIGATION REPORT
1. APPLICANT'S NAME: Waterfall Greens, Inc. c/o Brian K. Newman
2. LOCATION OF PROJECT SITE: Access is through 105 Promenade Lane (Dare GIS
lists the property as 6400 N. Croatan Highway), adjacent to US -158, Town of Kitty
Hawk, Dare County, adjacent to the Albemarle Sound.
Photo Index —
2006: 184 -7366 (K, L 10,11) 2000: Not Available 1995: 187 -1975 (S,T 11)
1989: 144 -6 (Q,R 10) 1984:137-492 (N 20) 1978: Not Available
State Plane Coordinates - X: 2962076 Y:867668
Lat/Long: 36.09061670, - 75.74330000 Quadrangle: Kitty Hawk, NC (U.L.)
3. INVESTIGATION TYPE: CAMA
4. INVESTIGATIVE PROCEDURE: Dates of Site Visit — 3/15/2013
Was Applicant Present - No
5. PROCESSING PROCEDURE: Application Received Complete — 2/26/2013
Office - Elizabeth City
6. SITE DESCRIPTION:
(A) Local Land Use Plan — Kitty Hawk
Land Classification From LUP — Commercial, Conservation
(B) AEC(s) Involved: Public Trust Area (PTA) and Estuarine Waters (EW)
(C) Water Dependent: Yes
(D) Intended Use: Commercial
(E) Wastewater Treatment: Existing - Septic
Planned - N/A
(F) Type of Structures: Existing — 8 slip Docking facility, walkway over
wetlands, several buildings within upland area, golf
driving range, miniature golf course, parking lots
Planned - Tie - pilings, floating jet -ski racks, mooring
fields
(G) Estimated Annual Rate of Erosion: N/A
Source — N/A
7. HABITAT DESCRIPTION: [AREA, square feet (sf)]
SHADED DISTURBED OTHER
(A) Estuarine Waters /Public Trust Area
768 sf
±48,866 sf
usurped
(D) Total Area Disturbed: ±49,634 sf
(E) Primary Nursery Area: No
(F) Water Classification: SB Open to Shellfishing: Yes
Waterfall Greens, Inc. c/o Brian K. Newman
Field Investigation Report
Page 2
8. PROJECT SUMMARY: The applicant proposes to install two floating drive -on jet -ski
storage racks, tie - pilings and several mooring fields.
Proiect Setting
The site of the proposed development is located at Promenade Watersports, accessed through
105 Promenade Lane (Dare GIS lists the property as 6400 N. Croatan Highway), adjacent to
US -158, within town of Kitty Hawk, Dare County, adjacent to the Albemarle Sound.
The property is ±17.89 acres in size and has ±1,750' of natural shoreline vegetated
predominately by wetland species Phragmites and Black Needlerush (Juncus reomerianus).
Structures within the highground area include a miniature golf course, a driving range, a large
rental home in which the first floor is used for the watersport business, several smaller
buildings, an asphalt road and parking areas. An elevated ±650'x6' walkway /pier extends to the
west from the first floor of the rental home. Of this length, ±100' is over highground, ±120' is
over wetlands and ±430' is waterward of normal water level (NWL) within the Albemarle Sound.
A ±28'x28' octagonal gazebo with an observation deck on top is located ±315' waterward of
NWL on the pier. The remaining pier section to the west of the gazebo has four finger piers and
associated tie pilings located on each side of the pier creating 8 slips. This docking facility was
previously permitted through CAMA Major Permit #10 -92 issued on February 4, 1992.
The adjacent riparian property to the north has a similar shoreline and contains a horse bam in
the highground area. The adjacent riparian property to the south is located ±900' away from the
docking facility and also has a similar shoreline with a docking facility and a single family
dwelling within the highground area. The Wright Memorial Bridge is located ±700' to the north
of the docking facility. Based on available information, there appears to be no archaeological
sites on this property.
The waters of the Albemarle Sound are classified as SB by the Environmental Management
Commission and are open to shellfish taking. Water depths within the proposed development
area are z2' feet below NWL. There is approximately 3 miles of open water to the west of the
site. The bottom substrate within the project area is made up of fine and medium sands. Due to
the time of year, submerged aquatic vegetation was not observed growing within the project
area; however, it is known to grow within the shallow waters of this area.
Development Proposal
The applicant has operated a seasonal jet -ski, parasailing and boat rental business at this site
for a number of years and is now proposing to expand the operation. The applicant proposes to
construct three 16'x16' drive -on jet -ski ramps that will each hold 4 jet -ski's each for overnight
storage. Each ramp will be constructed using 2x8's for structural support and 44's as drive -on
rails that will be mounted on 8 floats. The ramps have been designed to alleviate bottom
shading while still being functional. These ramps will be tied to the north side of the pier,
landward of the existing gazebo within water depths of ±2.5 below NWL.
The operator of the watersport business has indicated that due to the large fetch across the
Albemarle Sound, the area within the current 8 slips becomes too rough to safely store and
service their customers. To alleviate this, the applicant proposes to install two seasonal
Waterfall Greens, Inc. c/o Brian K. Newman
Field Investigation Report
Page 3
mooring fields on the north side of the pier. The first mooring field will be located 2250'
waterward of NWL and will be for jet -ski use. The field will consist of two 50' lines laid parallel
15' apart with a 15 pound anchor on each end and four evenly spaced pennants with 4" buoys.
The applicant has indicated that these moorings will be for day use only. The second mooring
field will be located >_250' waterward of NWL and will be for pontoon and small sailboat use.
This field will consist of two 100' lines laid parallel 50' apart with a 22 pound anchor on each
end and four evenly spaced pennants with 4" buoys. Field measured water depths within these
areas are ±2.5 below NWL and the applicant has indicated that SAV coverage is 30 %.
In addition to the mooring fields, the applicant proposes to install four individual moorings for
larger boats. The moorings will be placed ±550' to ±800' waterward of NWL and will consist of
two 50' lines with 22 pound anchors connected to a 12" mooring buoy. The applicant has
indicated that water depths within these areas are ±3' to 5' below NWL.
Also, to accommodate easy loading and unloading of passengers and to prevent damage to
the business's boats, two tie - pilings are proposed to be installed at the western end of the
docking facility creating an additional permanent slip for a total of 9 on the docking facility.
Anticipated Impacts
• The proposed floating drive -on jet -ski ramps will result in the partial shading of ±768 sf of
PTA and EW AECs.
The seasonal moorings will usurp ±48,866 sf of PTA and EW AECs based on arc -of -swing
area.
• The proposed development will increase the docking facilities permanent slips from 8 to 9
slips. It will also create 12 slips for jet -ski night storage and 20 seasonal moorings fora total
of 41 slips.
Submitted by: Ron Renaldi
Date: March 20, 2013
MAJOR PERMIT FEE MATRIX
Applicant: \ vca �t f 5 t \ G ru rnL0 Y-%(_
Selection
Development Type
Fee
Fee
DCM %
DWQ
(143001601 4351000931625 6253)
(243001602 435100095 2341)
Private, non - commercial
development that does not
$250
100%($250)
0%($0)
involve the filling or
excavation of any wetlands
or open water areas:
II. Public or commercial
development that does not
$400
100%($400)
0%($0)
involve the filling or
excavation of any wetlands
or open water areas:
III. For development that
involves the filling and /or
excavation of up to 1 acre
of wetlands and/or open
water areas, determine if A,
B, C, or D below applies:
III(A). Private, non-
E]
commercial development, if
$250
100%($250)
0%($0)
General Water Quality
Certification No. 3490 (See
attached ) can be applied:
III(B). Public or commercial
development, if General
$400
100%($400)
0%($0)
Water Quality Certification
No. 3490 (See attached)
can be applied:
III(C). If General Water
Quality Certification No.
$400
60%($240)
40%($160)
3490 (see attached) could
be applied, but DCM staff
determined that additional
review and written DWQ
concurrence is needed
because of concerns
related to water quality or
aquatic life:
III(D). If General Water
Quality Certification No.
$400
60%($240)
40%($160)
3490 (see attached) cannot
be applied:
IV. For development that
El
involves the filling and /or
$475
60%($285)
40%($190)
excavation of more than
one acre of wetlands and/or
open water areas:
FEB 2 6 2013 €
� s
January 25, 2013
Overview of proposed improvements of watersports center located at the
Promenade at the Kitty Hawk end of the Wright Memorial Bridge.
We operate a boat and jet ski rental business from the dock at the Promenade. We
rent waverunners, pontoon boats, sailboats, kayaks and other small vessels as well at
take people on Parasail flights. There are currently 8 slips on the dock for our use,
however, due to the exposed nature of the area, It is not safe to leave boats tied to the dock
overnight or any time no one is there.
We would like to be able to install moorings in order to store our boats safely
and service our customers efficiently.
For the waverunners, we would like to install three floating platforms along the existing
dock. Each platform would measure 16' x16' and hold 4 waverunners. In addition, we would
like to install a mooring field to hold 8 waverunners during the day. The moorings would consist
of two 50' lengths of line 15' feet apart with a 15 pound anchor at each end. On each line there would
be 4 evenly spaced pennants with 4 11mooring buoys.
The pontoon and sailboat mooring field would consist of two 100' lines spaced 50' apart with 22
pound anchors on each end and 4 evenly spaced pennants on each line with 4" mooring buoys.
We would also like to install 4 individual moorings as shown on the drawing for our larger
boats. These would consist of two 50' lines with 221b anchors connected to a central mooring buoy
of 12 inches.
In addition, we would like to set two 8" pilings off the end of the pier to keep our parasail
boat from banging into the dock while we load and unload passengers.
All moorings would be seasonal and could be removed over the winter.
There would be no disturbance of any upland or marshy areas.
IUPUCnnOMror
FEB 2 6
major nevelopment Permit _ - --- - - -
(laM revised IV"=)
North Carolina DIVISION OF COASTAL MANAGEMENT
-1
91P 9�
Business Name
Businqsg Name
I fe
Agentl Contractor 1: First Name
& A-- I.— �
-2:
Project Name (if applicable)
Ml
J fli? -� 6/l
6--
Agent/ Contractor First Name
Applicant 1: First Name
, 0 ,00�, /
Last Name
Ml
h
Last Name
�
VQ--
Applicant 2: First Name
Cl�o/ //. " �,- 4
Ml
Last Name
ff additional applicants, please attach an additional page(s) with names listed.
--
Phone No. 1
ZS2-- ZoL 63 72w.
Mailing Address
wak-Aill 6J-Ce-,kL!k
lt7C
PO Box
Ai) awi
State
Street Address (if different from above)
I
city
ZIP
7L711
Country
14 -5�42—.20
I
PhoiN o.
ext.
FAX No�L
Street Address (if different from above)
/3�-,vw e- 12 qj,.—
/ef Y7
city
f 4 1A wh"
State
ZIP
A 7-
Email
<Form continues on backs
2S2-808-2808 -: 1-888-4RCOAST :- www.ncceastalmanagement.not
Business Name
Agentl Contractor 1: First Name
& A-- I.— �
-2:
Ml
Last Name
Agent/ Contractor First Name
Ml
Last Name
Mailing Add
/ rr/
VQ--
PO Box
Cl�o/ //. " �,- 4
State
1 .41c--
ZIP
.2-7q�V
--
Phone No. 1
ZS2-- ZoL 63 72w.
Phone No. 2
ext.
FAX No.
Contractor #
Street Address (if different from above)
city
State
ZIP
Email
<Form continues on backs
2S2-808-2808 -: 1-888-4RCOAST :- www.ncceastalmanagement.not
Form DCM MP-11 (Page 2 of 4)
APPLICATION for
Major Development Permit
'4�.��tkdop dff-L= J,
a. Total length f shoreline on the tract ft)
County (can be multiple)
Street Address
14
State Rd. #
. Approximate elevation of tract above NHW (normal high water) or
dNWL (normal water level)
/0S
J510M It r) AJ't_
a. Vegetation on tract
A '7.1, -4 �
Subdivision Name
f. Man-made features and uses now on tract
Cjht
711 /�
Sla!e
/VC- ,
Zip
'047?11t�'
Phone No.
h. How does local government zone the tract?
'Lot No.(s) (if many, attach additional page with list)
ext.
(Attach zoning compliance certificate, if applicable)
❑No ❑NA
I I P I
a. in which NC river basin Is tho project located?
1. Is the proposed activity part of an urban waterfront redevelopment proposal? ❑Yes EfNo
b. Name of body of ter neamst to proposed prof95
77n ry
It?
I. Is the proposed project located in a National Registered Historic District or does it Involve a ❑Yes Jallo ❑NA
-
__5 e IA ix
c. is the water body Identified in (b) above, natikk or manmade?
d. Name the closest major wpter o the proposed project site.
t'
- 70
atural OManmade OUnknown
A
1-1 )1
C - / t
c4 L/I
e. is proposed work within city limits or planning jurisdiction?
I. If applicable, list the planning jurisdiction or city limit the proposed
Q*es ONo
work Is wi n.
4
ly //a ly�
<Form continues on next page>
252-808-2808 :: 1-888-4RCOAST -: www.necoastalmanagement.net
a. Total length f shoreline on the tract ft)
b. Size of entire tract (sq.ft.)
410
ys-
T&.7
c. Size of individual lot(s)
. Approximate elevation of tract above NHW (normal high water) or
dNWL (normal water level)
(If man; lot size;, please attach additional page with a list)
❑NHW or ❑NWL
a. Vegetation on tract
A '7.1, -4 �
tJ',-b IA r7
f. Man-made features and uses now on tract
q � fl e— P)
g. Identify and describe the existing land uses adjacent to the proposed project site.
/? e 5; rle -7 f,,a to S P (4
C-0 -i) -e - e- I I / '40 W, '4/0
h. How does local government zone the tract?
I. Is the proposed project consistent with the applicable zoning?
J0
(Attach zoning compliance certificate, if applicable)
❑No ❑NA
i
.0Yes
1. Is the proposed activity part of an urban waterfront redevelopment proposal? ❑Yes EfNo
k. Hasa professional archaeological assessment been done for the tract? If yes, attach a copy. ❑Yes JONo ❑NA
If yes, by whom?
I. Is the proposed project located in a National Registered Historic District or does it Involve a ❑Yes Jallo ❑NA
National Register listed or eligible property?
<Form continues on next page>
252-808-2808 :: 1-888-4RCOAST -: www.necoastalmanagement.net
Form DCM MP -1 (Page 3 of 4)
APPLICATION for
Major Development Permit
m. (I) Are there wetlands on the site?
Yes ❑No
n Are there coastal wetlands on the site?
VYes ❑No
(iii) If yes to either (I) or (H) above, has a delineation been conducted?
.° .►�-s° w-- -❑Yes �Pkr -
(Attach documenladon, //available)
,
n. Describe existing wastewater treatment facilities.
F
y
RECEIVED
�
F
e. Are the proposed activities maintenance of an existing project, new work, or both?
,
�e—
tV r 0 't—
v
o. Describe existing drinking water supply source.
fY
❑Sq -Ft or []Acres
g. Will the proposed project encroach on-anypublic easement public accessway or other area
Y o ❑NA
that the public has established use of?
!
G,
/Y A
1. Will wastewater or stonnwater be discharged into a wetland?
❑Yes No ❑NA
If yes, will this discharged water be of the same salinity as the receiving water?
p. Describe existing stone water management or treaMlent systems.
ELIZABETH CITY
-a
a. Will the project be for commercial, public, or pri to use? ETCommercial ❑PublictGovemment
7
G'o I //) rr1 -G / 'T
❑PdvatatCommunity
b. Give a brief de tion of pure e, use, and dally ope bons of the project when complete.
c. Describe the proposed construction methodology, types of construction equipment to be used during construction, the number of each type
of equipment and where it is to be stored.
d. List all development activities you propose. �.
e. Are the proposed activities maintenance of an existing project, new work, or both?
,
�e—
tV r 0 't—
v
f. What Is the approximate total disturbed land area resulting from the proposed project?
❑Sq -Ft or []Acres
g. Will the proposed project encroach on-anypublic easement public accessway or other area
Y o ❑NA
that the public has established use of?
h. Describe location and type off ae)dsting and proposed discharges to waters of the state.
/Y A
1. Will wastewater or stonnwater be discharged into a wetland?
❑Yes No ❑NA
If yes, will this discharged water be of the same salinity as the receiving water?
[]Yes []No J*A
J. Is there any mitigation proposed?
❑Yes ❑No ['[VA
✓
If yes, attach a mitigation proposal.
<Form continues on back>
252 -808 -2808 :: 1- 888- 4RCOAST :: www.necoastaimanagement.net
Form DCM MP -1 (Page 4 of 4)
APPLICATION for
rM
Major Developmerit Pe * it
t
4"Ad Wa 9m, 10) 4
w 411do 74 �:i�
Pff T
to
;package ro"n-
a. A project narrative-
b. An accurate, dated work plat (Including plan view and cross - sectional drawings) drawn to scale. Please give the present status of the
proposed project. Is any portion already complite? If previously authorized work, clearly indicate on maps, plats, drawings to distinguish
between work completed and proposed.
c. A site or location map that is sufficiently detall4d to guide agency personnel unfamiliar with the area to the site.
d. A copy of the deed (with state application only) or other instrument under which the applicant claims file to the affected properties.
a. The appropriate application fee. Check or money order made payable to DENR.
f. A list of the names and complete addresses Of the adjacent waterfront (riparian) landowners and signed return receipts as proof that such
owners have received a copy of the application and plats by certified mail. Such landowners must be advised that they have 30 days in
which to submit comments on the proposed pmje6t to the Division of Coastal Management.
him
PrTon&
A
Name Al C_ 5 A re- CA 010fc-e, Phone No.
Address //C W Jones Sf, GPs /arch A/C 7LP
bon
00
a.
7
g. A list of previous state or federal permits Issued for work on the project tract. Include permit numbers, permittes, and Issuing dates.
h. Signed consultant or agent authorization form, If applicable.
1. Wetland delineation, If necessary.
J. A signed AEC hazard notice for projects In oceanfront and inlet areas. (Must be signed by property owner)
k. A statement of compliance with the N.C. Environmental Policy Act (N.C.G.S. 11 3A 1 -10), If necessary. If the project Involves expenditure
of public funds or use of public lands, attach a statement documenting compliance with the North Carolina Environmental Policy Act.
I understand that any permit issued in response to this application will allow only the development described in the application.
The project will be subject to the conditions and restrictions contained in the permit.
I certify that I am authorized to grant, and do in fact grant permission to representatives of state and federal review agencies to
enter on the aforementioned lands in connection with evaluating information related to this permit application and follow-up
monitoring of the project.
I further certify t at the injbrmaflon provided in this application is truthful to the best of my knowledge.
Date Print Name Y,
Signature M IV FR
Please indicate application attachments pertaining to your proposed project. rrr
FEB 2 6 2013
❑DCM MP-2 Excavation and Fill Information ❑DCM MP-5 Bridges and Culverl s
[1DCM MP-3 Upland Development
COASTAL WNAMIWENT
,Zp,Qr-, F1 C'ITY
OCM MP-4 Structures Information EL
252-808-2808 :: 1-888-4RCOAST *: www.necoastalm2nagement.not
0
Form DCM MP64
STRUCTURES
(Consbaction wNMn Public Trust Areas)
Attach this forth to Joint Application for CAMA Major Permit, Form DCM MP -1. BWWM 1ii +Complete all other sections of the Joint
ApplicatiOrr that relate to this proposed project. Please include all supplemental infomtatiat.
1. DOCKING FACILITY/MANNA CHARACTERISTICS
a. (i) Is the doddng rhtarb a:
,fcortenencial OPubweOv nt OPrvate/Cmnunurhity
c. (1) Dock(s) arWor pier(s)
(0) Number
(B) Length
(IV) Width
(v) Fioaffiv ❑Yes ONo
e. (I) Are Pladbmm included? 1pya ❑No
If yes: 3
(8) Number
(ill)�
Qv) Width 1�
(v) Floating Dyes ❑No
Note: Roofed areas are calckdated from ddpline d/marnsfo &
g. p) Number of slips Posed
3'3
!r of SIPS cuing
1. Chedcthepropossdhrpe'ofsittr> .9-,,,' Lh„ uJ
O Land cut and access flannel
Oopen water dredgIng for basin and/or darnel
filDW wain; no dnrdgi rg required
please describe:
k. Typical boat IsnP: %0 )- q
m. 0) Will the fadnty have tie plings?
Oyes []No
(0) If yes number of tie pilings?
❑ This section not sppficable
b. p) Will the facility be open to the general public?
JOYss ❑No
d. W Are Finer Piers lnckded? ❑Yes Alo
If yes
(6) Number
(19) LOOP
(Iv) WHdth
(v) Roaring OYes ❑No
E 0) Are Boaffills included? OYes PNo
ff yes:
(11) Number
UP Length
Qv) width
h. Chedc all the types of services to be provided.
O Full service, Including travel tilt and/or raft, repair or
mairhtenanoe service
❑ Doclogs. foal. and marks supplies
O Dodoge CW sips' only. number of slips:
O Dry storage; number of boats:
❑ Boat ramp(s); number of boat ramps:
J9 other. please describe:
A;- p w� '60- t;
). - Descdbe the typical boats b be served (e.g., opdir runabout,•
darter boats, sail boats. mixed types).
I. M Will the facilltybe open to the general public?
Oyes IRrvo
FEB 2 6 20113
E! !
Attach this forth to Joint Application for CAMA Major Permit, Form DCM MP -1. BWWM 1ii +Complete all other sections of the Joint
ApplicatiOrr that relate to this proposed project. Please include all supplemental infomtatiat.
1. DOCKING FACILITY/MANNA CHARACTERISTICS
a. (i) Is the doddng rhtarb a:
,fcortenencial OPubweOv nt OPrvate/Cmnunurhity
c. (1) Dock(s) arWor pier(s)
(0) Number
(B) Length
(IV) Width
(v) Fioaffiv ❑Yes ONo
e. (I) Are Pladbmm included? 1pya ❑No
If yes: 3
(8) Number
(ill)�
Qv) Width 1�
(v) Floating Dyes ❑No
Note: Roofed areas are calckdated from ddpline d/marnsfo &
g. p) Number of slips Posed
3'3
!r of SIPS cuing
1. Chedcthepropossdhrpe'ofsittr> .9-,,,' Lh„ uJ
O Land cut and access flannel
Oopen water dredgIng for basin and/or darnel
filDW wain; no dnrdgi rg required
please describe:
k. Typical boat IsnP: %0 )- q
m. 0) Will the fadnty have tie plings?
Oyes []No
(0) If yes number of tie pilings?
❑ This section not sppficable
b. p) Will the facility be open to the general public?
JOYss ❑No
d. W Are Finer Piers lnckded? ❑Yes Alo
If yes
(6) Number
(19) LOOP
(Iv) WHdth
(v) Roaring OYes ❑No
E 0) Are Boaffills included? OYes PNo
ff yes:
(11) Number
UP Length
Qv) width
h. Chedc all the types of services to be provided.
O Full service, Including travel tilt and/or raft, repair or
mairhtenanoe service
❑ Doclogs. foal. and marks supplies
O Dodoge CW sips' only. number of slips:
O Dry storage; number of boats:
❑ Boat ramp(s); number of boat ramps:
J9 other. please describe:
A;- p w� '60- t;
). - Descdbe the typical boats b be served (e.g., opdir runabout,•
darter boats, sail boats. mixed types).
I. M Will the facilltybe open to the general public?
Oyes IRrvo
Form ®CM MP-4 (Structures, Page 2 of 4)
2. DOCKING FACILffMARINA OPERATIONS [3 This section not applicable
a. Check each of the following sankery facilities that will be included in the proposed project
13 Office Toilets �c
[3 Toilets for pOm; Number: : Location: 4/0 � t / /L �C.J /1 ��S e-
[3 Showers
❑ BoatholdbV tank pumpout; Give type and location: r-
b. Describe treatment type and disposal location for all sanitary wastewater. _
c. Describe the disposal of solid assts, fish offal and trash. F E B 2 6 2013
- :, -:-
d. How will overboard discharge of sewage from boats be controlled?
4Z h
e. (i) Give the location and number of No Sewage isdnrge° signs proposed
e
pi) Give the location and number of Twnwft Mail"- signs proposed.
t Describe the special e Y_ _ gppticable, for containing industrial type pollut ants, such as paint, sandblasting waste and petroleum products.
g. Where will residue from vessel maintenance be disposed oft
h. Give the number of channel markers and 'No Wake' signs proposed.
1. Give the location of
uhndingfa cilities, and des cri b afety measures � planned 'to 1 pGr. ote ci j area � 1w�ates r qua%lit/yK . o � / /XJ/P L o+^ /a z/t Tgfl v/ Ar %
7 -
j. What will be the marina poky on ovemight and live- aboard dockage?
IL Describe design measurr 1l 4urnote boat basin ffushing?
I. If this project Is an expansion of an wdsdrhg marina, what types of services are arrrerhty Wovided?
252-808-2808:- 1- 888- 4RCOAST :: www.nccoastaimanagement.net revised: 1212T/06
m. Is the madnaldocMV fft proposed whin a pdnw y or secondary momy area?
Dyes
n. Ile the � (�(Y P VPDB d Within or a0werd tD any 8I �
1 Ialyft am?
Dyes 1,,(1lCW_
o. Is the madnekbol ft tecmty Proposed witidn or adjacent to coastal (CM submerged enualic vegetatlon (SAVI shop bo fig,
rn
(SB), or other wetlands (ft)? f<any bons are cracked, pnovide the number of square feet affected.
OCW OSAV [�3B
OWL plane
P . Is ft Proposed mertrnaldoddng feclMY located within or within close pm*nity to any s1wM leases? Dyes �No
If yes, give the n� and address of ft F(S), and give One pm b* to fhe lease.
L. BOATHOUSE enduft covered fits) 06isswilon not appffcwe
a Q) Is the boathouse structure(s):
Ocommerdal D Oftwela Cmuminity
(In Number
(M) Longth
(w) Wkun
Nate: Rbotlyd areas are cafadated iron dhnwdM
GROIN (ag., wood, swoose, etc Ka rock groin, use upLZ Excavation and F67) P 1hls secODn not appfk &
a p) Number
(6) Length
(M) V&Vl
BREAKWATER (e.g., wood, dm4Dh, etc) - 9618 seckn not app/kabfa
a. Length
c Mwdnmm distance beyond NHW, NWL or wauends
b. Average defence from NHW, NWL. or wedads
& MOORING RUNGS and BUOYS 0 This secddn notapplkable
a Is on structuve(s): r b. Number
UPubod6mmnent Vrftw e/Commnmhy
C- Distance to be placed beyond shoregm 42LJ:lo
Note: lhts should be measured from marrsh�edg% rT present:
2-Sp 1 P-041 J
f oo {'ea "? /f y As f A oy
e. Arc of the wAl g �a J h 1 J / S !
„I loan s — as
Or'fer mgr-$ so ,
d. Desaipdan of buoy (coW, bnsanp w. size. Now. eta.)
Ace r t',�5
pit W
FEB 2 6 2013
o. Is the madnekbol ft tecmty Proposed witidn or adjacent to coastal (CM submerged enualic vegetatlon (SAVI shop bo fig,
rn
(SB), or other wetlands (ft)? f<any bons are cracked, pnovide the number of square feet affected.
OCW OSAV [�3B
OWL plane
P . Is ft Proposed mertrnaldoddng feclMY located within or within close pm*nity to any s1wM leases? Dyes �No
If yes, give the n� and address of ft F(S), and give One pm b* to fhe lease.
L. BOATHOUSE enduft covered fits) 06isswilon not appffcwe
a Q) Is the boathouse structure(s):
Ocommerdal D Oftwela Cmuminity
(In Number
(M) Longth
(w) Wkun
Nate: Rbotlyd areas are cafadated iron dhnwdM
GROIN (ag., wood, swoose, etc Ka rock groin, use upLZ Excavation and F67) P 1hls secODn not appfk &
a p) Number
(6) Length
(M) V&Vl
BREAKWATER (e.g., wood, dm4Dh, etc) - 9618 seckn not app/kabfa
a. Length
c Mwdnmm distance beyond NHW, NWL or wauends
b. Average defence from NHW, NWL. or wedads
& MOORING RUNGS and BUOYS 0 This secddn notapplkable
a Is on structuve(s): r b. Number
UPubod6mmnent Vrftw e/Commnmhy
C- Distance to be placed beyond shoregm 42LJ:lo
Note: lhts should be measured from marrsh�edg% rT present:
2-Sp 1 P-041 J
f oo {'ea "? /f y As f A oy
e. Arc of the wAl g �a J h 1 J / S !
„I loan s — as
Or'fer mgr-$ so ,
d. Desaipdan of buoy (coW, bnsanp w. size. Now. eta.)
Ace r t',�5
.i
IFEB 2 6 2013
Description of Moorings
The mooring field for the waverunner' would consist of two 50' lines with a 15 lb anchor on
each end and 4 evenly spaced pennants attached to the line with 4" floats. The two lines would
be laid parallel to each other feet apart.
The mooring field for the pontoon and sailboats would consist of two 100' lines with a 221b
anchor on each end and 4 evenly spaced pennants attached to the line with 4" floats. The two lines
would be laid parallel to each other 50' apart as shown on the drawing.
The individual moorings would each consist of two 50' lines with a 22 lb anchor connected
to a central mooring buoy of 12"
Foam ®CM MP-4 (Structures, gage 4 of 4)
7. GENERAL
8. Of re($) b y Ones 00 .50-L 3�v ,Na -fib►
Note: For buoy ormooft pNM, use an; of swing hrduding knglh
Of veSML
c. Width of water body
—J* A /C-s
e. p) Win navigational aids be required as a result of the project?
[]Yes Jpio ❑NA
Qi) if yes, explain what type and how they vr<0 be ingiiemented.
b. Progn ty of re(s) to adjacent doddng Wattles.
d. Water depth at waterwaid end of structure at NLW or NWL
& OTHER 07his section not applicable
a. Give complete descrlpdm-
Data
/,)-3
Project Nam / 2 rA/
Applicant Name
Za
Applicant S(gnatrrre
I FEB 26 2013
262-808-2808:: 1- 888- 4RCOASY :: vmw.nccoastalmanasrement.net revised: 12/27106
67
250 I 'L X15 L,(Jrs
6 ra e5i! 11 - - -1 j-
A y
5
RE flViE
0 e_
-P.6pos
FEB 21 6
'E
COASTAL M i
c NAG MAT
Tji QT)(-!
$ed
z YkAtf
00
J
)77
Pock-
J--- --- L
T
F�444__ �ILp
SIA V
I V
1
i
Fil
Cl
C+�
ell
Vi clyl If�
of
FEB 2 6 2013
N
wet tt,-x- 611 6,ctnS f/o 'mi
v ��
-j m -T
f lvi
Lw I
�x�
Y 41 /—,V It I/ -
OVer4
(v J1,,r4 9,g'' `'s
F 5 0,4 r� M90 y, h g
A t._4li Grfc_� aC-
j + aoo,
FEB 26 2013