HomeMy WebLinkAboutNCC201748_NOT Closeout Documents (2)_20210519STORMWATER CONTROL MEASURE (SCM) CERTIFICATION
As -Built Certification
Chris Bostic , attest that this certification, for the Culver's Kannapolis Project, has been
reviewed by me and is accurate, complete and consistent with the information supplied in the plans,
specifications, engineering calculations, and all other supporting documentation to the best of my
knowledge. I further attest that to the best of my knowledge the As -Built Plans have been prepared based
on an accurate account of the SCM and appurtenances installed during construction and any deviations
from the approved construction plans were analyzed and verified to not adversely impact the performance
of the SCM during the approval process of the construction plans. Although other professionals may have
developed certain portions of this submittal package, inclusion of these materials under my signature and
seal signifies that I have reviewed this material and have judged it to be consistent with the proposed
design.
i ii rrrir
CARa�'ff.
SEAL: •� SEAL
�'. OJ2582
DocuSigned by:
1111012020
[C0MSf6,L1r OL. f j6&
3971981624734DD_.
(Date) (Signature)
Engineer: Chris Bostic
Firm: Kimley-Horn & Associates, Inc.
Firm License 4: F-0102
Address:421 Fayetteville Street
Suite 600
Raleigh, NC 27601
A-12 Appendix A