Loading...
HomeMy WebLinkAboutNCC201748_NOT Closeout Documents (2)_20210519STORMWATER CONTROL MEASURE (SCM) CERTIFICATION As -Built Certification Chris Bostic , attest that this certification, for the Culver's Kannapolis Project, has been reviewed by me and is accurate, complete and consistent with the information supplied in the plans, specifications, engineering calculations, and all other supporting documentation to the best of my knowledge. I further attest that to the best of my knowledge the As -Built Plans have been prepared based on an accurate account of the SCM and appurtenances installed during construction and any deviations from the approved construction plans were analyzed and verified to not adversely impact the performance of the SCM during the approval process of the construction plans. Although other professionals may have developed certain portions of this submittal package, inclusion of these materials under my signature and seal signifies that I have reviewed this material and have judged it to be consistent with the proposed design. i ii rrrir CARa�'ff. SEAL: •� SEAL �'. OJ2582 DocuSigned by: 1111012020 [C0MSf6,L1r OL. f j6& 3971981624734DD_. (Date) (Signature) Engineer: Chris Bostic Firm: Kimley-Horn & Associates, Inc. Firm License 4: F-0102 Address:421 Fayetteville Street Suite 600 Raleigh, NC 27601 A-12 Appendix A