Loading...
HomeMy WebLinkAbout20130319 Ver 1_Application_20130322STATE OF NORTH CAROLINA e4%-,@ �.'r, �:�. J o1 �L9PJps�p� 0��S 3 ,t� �(JT 9irR'Q'N. DEPARTMENT OF TRANSPORTATION J� P. O. Box 25201, Raleigh, NC 27611 -5202 TONY TARA PAT McCRORY SECRETARY GOVERNOR PHONE: 919- 733 -2520 March 20, 2013 Mr. Monte Matthews U. S. Army Corps of Engineers Z.�0' 1 3 0 3 1 9 Raleigh Regulatory Field Office 3331 Heritage Trade Drive, Suite 105 Wake Forest, NC 27587 Subject: Nationwide Permit #14 Replace Bridge #130 on SR 1308 with RCBC Ashe County, North Carolina Project Number: 17BP.11.R.6 (DWQ Permit Fee: $240) Dear Mr. Matthews: The North Carolina Department of Transportation is scheduled to replace Bridge #130 with a reinforced concrete box culvert at the same location. The existing bridge is 21' long by 18' wide. Stream slope is 0.98 %. Sills will be installed on the inlet and outlet of both barrels to prevent head cutting and retain natural substrate material. Base flow will be isolated to one barrel to facilitate aquatic life passage during low flow conditions. Mitigation will be provided through EEP. No on -site detour is proposed. Stream impacts are tabulated below. Stream Impacts: 2 @ 9'x 4'x 40 (within 96 #130 21'x 18' bride 42' RCBC RR limits 54 Perm. FilMprap Impacts Total Project Impacts = 96 = 96 feet feet The replacement of the existing bridge constructed nsructed approximately 20 feet upstream of g will be 1 dewatering. An impervious sandbag dike the existing structure to create a small pool. Clean water will temporarily be pumped around or piped through the construction area and will be discharged downstream. Any dirty water located P. O. Box 250, N. WII.KEnm, NC 28659 PHONE (336)667 -9111 FAX (336)6674549 Mr. Monte Matthews Bridge 4130 on SR 1308, Ashe Page 2 March 20, 2013 inside the construction area will be pumped into a silt bag if necessary. Once the new structure is in place, the impervious dike will be removed and preconstruction streambed elevations will be restored. Construction of this project will require impacts to waters of the United States in the New River Basin. The existing bridge crosses a UT to Cabbage Creek (Class: C, Trout, ORW). This project was reviewed for the presence of threatened and endangered species in September 2012. The subject project will have no effect on any federally listed endangered plant or animal species. Cultural resource compliance work has been completed and no surveys were required. The project impacts are not significant in nature and should not remove or degrade existing water quality uses. Stormwater will be routed through grass or rock lined ditches, depending on the ditch line slope. Total land disturbance will be less than 1 acre. Pipe sizes used will be the minimum necessary to create a safe roadway. By utilizing the erosion control measures outlined in the attachments to this application, downstream water quality standards will be protected. All appropriate BMPs will be used during construction. By copy of this electronic letter, it is requested that Mrs. Marla Chambers with the North Carolina Wildlife Resources Commission comment directly to you concerning the 404 Nationwide Permit application with a copy sent to me. By copy of this electronic letter, it is requested that the Division of Water Quality, 401/Wetlands Unit, issue the appropriate permit for construction of this project. It is requested that any comments related to the 401 certification be forwarded directly to me with a copy sent to the US Army Corps of Engineers. We would like to begin construction as soon as possible. If further information is required, please let me know. Your early review and consideration will be appreciated. Sincerely, %6ve' Heath Slaughter Division Environmental Officer Enclosures cc: Monte Matthews, US Army Corps of Engineers Marla Chambers, NCWRC Amy Chapman, Division of Water Quality Amy Euliss, Division of Water Quality Mr. Monte Matthews Bridge #130 on SR 1308, Ashe Page 3 March 20, 2013 Mike Pettyjohn, PE, Division Engineer David Wayne, PE, Bridge Maintenance Engineer Jami Guynn, Division Bridge Program Manager Heath Slaughter, Division Environmental Officer Neil Trivette, Roadside Environmental Field Operations Engineer Office Use Only: Corps action ID no. DWQ project no. Form Version 1.3 Dec 10 2008 Pre - Construction Notification PCN Form A. Applicant Information 1. Processing 1 a. Type(s) of approval sought from the TEND Corps: Section 404 Permit ❑ Section 10 Permit 1b. Specify Nationwide Permit (NWP) number: 14 or General Permit (GP) number: 1 c. Has the NWP or GP number been verified by the Corps? ❑ Yes ® No 1 d. Type(s) of approval sought from the DWQ (check all that apply): ® 401 Water Quality Certification — Regular ❑ Non -404 Jurisdictional General Permit ❑ 401 Water Quality Certification — Express ❑ Riparian Buffer Authorization 1 e. Is this notification solely for the record because written approval is not required? For the record only for DWQ 401 Certification: ❑ Yes ® No For the record only for Corps Permit: ❑ Yes ® No 1f. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts? If so, attach the acceptance letter from mitigation bank or in -lieu fee program. ® Yes ❑ No 1 g. Is the project located in any of NC's twenty coastal counties. If yes, answer 1 In below. ❑ Yes ® No 1 h. Is the project located within a NC DCM Area of Environmental Concern (AEC)? ❑ Yes ® No 2. Project Information 2a. Name of project: Bridge #130 on SR 1308 2b. County: Ashe 2c. Nearest municipality / town: Ashland 2d. Subdivision name: 2e. NCDOT only, T.I.P. or state project no: 17BP.11.R.6 3. Owner Information 3a. Name(s) on Recorded Deed: NCDOT 3b. Deed Book and Page No. 3c. Responsible Party (for LLC if applicable): 3d. Street address: 801 Statesville Road 3e. City, state, zip: North Wilkesboro, NC 28659 3f. Telephone no.: 336 - 903 -9202 3g. Fax no.: 336- 667 -4549 3h. Email address: j hslaughter@ncdot.gov Page 1 of 10 PCN Form — Version 1.3 December 10, 2008 Version 4. Applicant Information (if different from owner) 4a. Applicant is: ❑ Agent ❑ Other, specify: 4b. Name: 4c. Business name (if applicable): 4d. Street address: 4e. City, state, zip: 4f. Telephone no.: 4g. Fax no.: 4h. Email address: S. Agent(Consultant Information (if applicable) 5a. Name: 5b. Business name (if applicable): 5c. Street address: 5d. City, state, zip: 5e. Telephone no.: 5f. Fax no.: 5g. Email address: Page 2 of 10 PCN Form — Version 1.3 December 10, 2008 Version B. Project Information and Prior Project History 1. Property Identification 1 a. Property identification no. (tax PIN or parcel ID): 1 b. Site coordinates (in decimal degrees): Latitude: 36.43975 Longitude: - 81.65434 (DD.DDDDDD) (- DD.DDDDDD) 1 c. Property size: 0.27 acres 2. Surface Waters 2a. Name of nearest body of water (stream, river, etc.) to proposed project: UT to Cabbage Creek 2b. Water Quality Classification of nearest receiving water: C; Trout ORW 2c. River basin: New 3. Project Description 3a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application: Substandard bridge to be replaced in a rural area 3b. List the total estimated acreage of all existing wetlands on the property: 0 acres 3c. List the total estimated linear feet of all existing streams (intermittent and perennial) on the property: 60 linear feet 3d. Explain the purpose of the proposed project: Upgrade substandard stream crossing 3e. Describe the overall project in detail, including the type of equipment to be used: See attached cover letter. 4. Jurisdictional Determinations 4a. Have jurisdictional wetland or stream determinations by the Corps or State been requested or obtained for this property / project (including all prior phases) in the past? Comments: ❑ Yes ® No ❑ Unknown 4b. If the Corps made the jurisdictional determination, what type of determination was made? preliminary ❑ Final 4c. If yes, who delineated the jurisdictional areas? Name (if known): Agency /Consultant Company: Other: 4d. If yes, list the dates of the Corps jurisdictional determinations or State determinations and attach documentation. S. Project History 5a. Have permits or certifications been requested or obtained for this project (including all prior phases) in the past? ❑ Yes ® No ❑ Unknown 5b. If yes, explain in detail according to "help file" instructions. 6. Future Project Plans 6a. Is this a phased project? ❑ Yes ® No 6b. If yes, explain. Page 3 of 10 PCN Form — Version 1.3 December 10, 2008 Version C. Proposed Impacts Inventory 1. Impacts Summary 1 a. Which sections were completed below for your project (check all that apply): ❑ Wetlands ® Streams - tributaries ❑ Buffers ❑ Open Waters ❑ Pond Construction 2. Wetland Impacts If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted. 2a. 2b. 2c. 2d. 2e. 2f. Wetland impact number — Type of impact Type of wetland Forested Type of jurisdiction (Corps - 404, 10 Area of impact Permanent (P) or (if known) DWQ — non -404, other) (acres) Temporary T ❑Yes ❑ Corps W1 E] P El T ❑ No I ❑ DWQ El Yes El Corps W2 P ❑ T ❑ ❑ No ❑ DWQ ❑ Yes ❑ Corps W3 ❑ P ❑ T ❑ No ❑ DWQ El Yes El Corps W4 P ❑ T ❑ ❑ No ❑ DWQ F1 Yes [I Corps W5 ❑ P ❑ T ❑ No ❑ DWQ ❑ Yes El Corps W6 ❑ P ❑ T ❑ No ❑ DWQ 2g. Total wetland impacts 2h. Comments: 3. Stream Impacts If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this question for all stream sites impacted. 3a. 3b. 3c. 3d. 3e. 3f. 3g• Stream impact Type of impact Stream name Perennial Type of jurisdiction Average Impact length number - Permanent (P) or (PER) or intermittent (Corps - 404, 10 DWQ — non -404, stream width (linear Temporary (T) (INT)? other) (feet) feet) S1 ®P ®T RCBC, Riprap & Dewatering UT to Cabbage Creek ® PER ❑ INT ® Corps ® DWQ g 96 El PER PER ❑ S2 []PMT ❑ INT ❑ DWQ [I PER El Corps S3 ❑ P ❑ T ❑ INT ❑ DWQ El PER [:1 Corps S4 El P [] T ❑ INT ❑ DWQ ❑ PER El Corps S5 ❑ P ❑ T ❑ INT ❑ DWQ F1 PER El Corps S6 ❑ P ❑ T ❑ INT ❑ DWQ 31L Total stream and tributary impacts 96 3i. Comments: Page 4 of 10 PCN Form — Version 1.3 December 10, 2008 Version 4. Open Water Impacts If there are proposed impacts to lakes, ponds, estuaries, tributaries, sounds, the Atlantic Ocean, or any other open water of the U.S. then individually list all open water impacts below. 4a. 4b. 4c. 4d. 4e. Open water Name of waterbody impact number — (if applicable) Type of impact Waterbody type Area of impact (acres) Permanent (P) or Temporary 01 ❑P ❑T 02 ❑P ❑T 03 ❑P ❑T 04 []PEI T 4E Total open water impacts 4g. Comments: 5. Pond or Lake Construction If pond or lake construction proposed, the complete the chart below. 5a. 5b. 5c. 5d. 5e. Wetland Impacts (acres) Stream Impacts (feet) Upland Pond ID Proposed use or purpose (acres) Flooded Filled Excavated Flooded Filled Excavated Flooded number of pond P1 P2 5f. Total 5g. Comments: N/A 5h. Is a dam high hazard permit required? ❑ Yes No If yes, permit ID no: 5i. Expected pond surface area (acres): 5j. Size of pond watershed (acres): 5k. Method of construction: S. Buffer Impacts (for DWQ) If project will impact a protected riparian buffer, then complete the chart below. If yes, then individually list all buffer impacts below. If any impacts require mitigation, then you MUST fill out Section D of this form. 6a. ❑ Neuse ❑Tar- Pamlico El Other: Project is in which protected basin? ❑ Catawba ❑ Randleman 6b. 6c. 6d. 6e. 6f. 6g. Buffer impact, number — Reason Buffer Zone 1 impact Zone 2 impact Permanent (P) or for Stream name mitigation (square feet) (square feet) Temporary impact required? ❑Yes B1 ❑P ❑T ❑ No El Yes B2 ❑P ❑T ❑ No El Yes B3 ❑P ❑T ❑ No 6h. Total buffer impacts 6i. Comments: Page 5 of 10 PCN Form — Version 1.3 December 10, 2008 Version D. Impact Justification and Mitigation 1. Avoidance and Minimization 1 a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing project. The culvert length is the minimum needed to improve safety at this location. 1 b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques. All appropriate BMPs will be used during construction 2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State 2a. Does the project require Compensatory Mitigation for impacts to Waters of the U.S. or Waters of the State? ® Yes ❑ No 2b. If yes, mitigation is required by (check all that apply): ❑ DWQ ® Corps 2c. If yes, which mitigation option will be used for this project? ❑ Mitigation bank ® Payment to in -lieu fee program ❑ Permittee Responsible Mitigation 3. Complete if Using a Mitigation Bank 3a. Name of Mitigation Bank: 3b: Credits Purchased (attach receipt and letter) Type Quantity 3c. Comments: 4. Complete if Making a Payment to In -lieu Fee Program 4a. Approval letter from in -lieu fee program is attached. ❑ Yes 4b. Stream mitigation requested: 42 linear feet 4c. If using stream mitigation, stream temperature: ❑ warm ❑ cool ®cold 4d. Buffer mitigation requested (DWQ only): square feet 4e. Riparian wetland mitigation requested: acres 4f. Non - riparian wetland mitigation requested: acres 4g. Coastal (tidal) wetland mitigation requested: acres 4h. Comments: 5. Complete if Using a Permittee Responsible Mitigation Plan 5a. If using a permittee responsible mitigation plan, provide a description of the proposed mitigation plan. Page 6 of 10 PCN Form — Version 1.3 December 10, 2008 Version 6. Buffer Mitigation (State Regulated Riparian Buffer Rules) — required by DWQ 6a. Will the project result in an impact within a protected riparian buffer that requires ❑ Yes ® No buffer mitigation? 6b. If yes, then identify the square feet of impact to each zone of the riparian buffer that requires mitigation. Calculate the amount of mitigation required. 6c. 6d. 6e. Zone Reason for impact Total impact Multiplier Required mitigation (square feet) (square feet) Zone 1 3 (2 for Catawba) Zone 2 1.5 6f. Total buffer mitigation required: 6g. If buffer mitigation is required, discuss what type of mitigation is proposed (e.g., payment to private mitigation bank, permittee responsible riparian buffer restoration, payment into an approved in -lieu fee fund). 6h. Comments: Page 7 of 10 PCN Form — Version 1.3 December 10, 2008 Version E. Stormwater Management and Diffuse Flow Plan (required by DWQ) 1. Diffuse Flow Plan 1 a. Does the project include or is it adjacent to protected riparian buffers identified ❑ Yes ® No within one of the NC Riparian Buffer Protection Rules? 1b. If yes, then is a diffuse flow plan included? If no, explain why. ❑ Yes ❑ No Comments: 2. Stormwater Management Plan 2a. What is the overall percent imperviousness of this project? % 2b. Does this project require a Stormwater Management Plan? ❑ Yes ® No 2c. If this project DOES NOT require a Stormwater Management Plan, explain why: Disturbing less than 1 acre 2d. If this project DOES require a Stormwater Management Plan, then provide a brief, narrative description of the plan: ❑ Certified Local Government 2e. Who will be responsible for the review of the Stormwater Management Plan? ❑ DWQ Stormwater Program ❑ DWQ 401 Unit 3. Certified Local Government Stormwater Review 3a. In which local government's jurisdiction is this project? ❑ Phase II ❑ NSW 3b. Which of the following locally - implemented stormwater management programs ❑ USMP apply (check all that apply): ❑ Water Supply Watershed ❑ Other: 3c. Has the approved Stormwater Management Plan with proof of approval been ❑ Yes ❑ No attached? 4. DWQ Stormwater Program Review ❑ Coastal counties ❑ HQW 4a. Which of the following state- implemented stormwater management programs apply ❑ ORW (check all that apply): ❑ Session Law 2006 -246 ❑ Other: 4b. Has the approved Stormwater Management Plan with proof of approval been ❑ Yes ❑ No attached? 5. DWQ 401 Unit Stormwater Review 5a. Does the Stormwater Management Plan meet the appropriate requirements? ❑ Yes ❑ No 5b. Have all of the 401 Unit submittal requirements been met? ❑ Yes ❑ No Page 8 of 10 PCN Form —Version 1.3 December 10, 2008 Version F. Supplementary Information 1. Environmental Documentation (DWQ Requirement) 1 a. Does the project involve an expenditure of public (federal/state /local) funds or the ® Yes ❑ No use of public (federaUstate) land? 1b. If you answered `yes" to the above, does the project require preparation of an ❑ Yes ® No environmental document pursuant to the requirements of the National or State (North Carolina) Environmental Policy Act (NEPA/SEPA)? 1c. If you answered `yes" to the above, has the document review been finalized by the State Clearing House? (if so, attach a copy of the NEPA or SEPA final approval ❑Yes ❑ No letter.) Comments: 2. Violations (DWQ Requirement) 2a. Is the site in violation of DWQ Wetland Rules (15A NCAC 2H .0500), Isolated Wetland Rules (15A NCAC 2H .1300), DWQ Surface Water or Wetland Standards, ❑ Yes ® No or Riparian Buffer Rules (15A NCAC 213 .0200)? 2b. Is this an after- the -fact permit application? ❑ Yes ® No 2c. If you answered "yes" to one or both of the above questions, provide an explanation of the violation(s): 3. Cumulative Impacts (DWQ Requirement) 3a. Will this project (based on past and reasonably anticipated future impacts) result in ❑ Yes ® No additional development, which could impact nearby downstream water quality? 3b. If you answered `yes" to the above, submit a qualitative or quantitative cumulative impact analysis in accordance with the most recent DWQ policy. If you answered "no," provide a short narrative description. 4. Sewage Disposal (DWQ Requirement) 4a. Clearly detail the ultimate treatment methods and disposition (non- discharge or discharge) of wastewater generated from the proposed project, or available capacity of the subject facility. N/A Page 9 of 10 PCN Form — Version 1.3 December 10, 2008 Version 5. Endangered Species and Designated Critical Habitat (Corps Requirement) 5a. Will this project occur in or near an area with federally protected species or ❑ Yes ® No habitat? 5b. Have you checked with the USFWS concerning Endangered Species Act ❑ Yes ® No impacts? ❑ Raleigh 5c. If yes, indicate the USFWS Field Office you have contacted. ❑ Asheville 5d. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? GIS and visual observation 6. Essential Fish Habitat (Corps Requirement) 6a. Will this project occur in or near an area designated as essential fish habitat? ❑ Yes ® No 6b. What data sources did you use to determine whether your site would impact Essential Fish Habitat? WRC will comment 7. Historic or Prehistoric Cultural Resources (Corps Requirement) 7a. Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation ❑ Yes ® No status (e.g., National Historic Trust designation or properties significant in North Carolina history and archaeology)? 7b. What data sources did you use to determine whether your site would impact historic or archeological resources? Project was reviewed by the OHE. 8. Flood Zone Designation (Corps Requirement) 8a. Will this project occur in a FEMA- designated 100 -year floodplain? ® Yes ❑ No 8b. If yes, explain how project meets FEMA requirements: This project is located within a Limited Detailed Study. It meets the requirements of the Memorandum of Agreement, between NCDOT and FEMA, as a Type 2a - Minor Impacts. There was a decrease of 0.16' in the surface water elevations of the 100 -year storm event between the existing and proposed bridges. 8c. What source(s) did you use to make the floodplain determination? This comes from the Effective HEC -RAS model, FIS Report and DFIRM Panel. J. Heath Slaughter 3/20/13 Applicant/Agent's Printed Name Date Applicant/Agent's Sig re (Agent's si nature is valid only if an authorizati6K letter from the applicant is rovided. Page 10 of 10 PCN Form — Version 1.3 December 10, 2008 Version 1 W •' O 1 .� O N .• J O K N 6 Q w • W W ► • ` �� � O C.r/ `� W �� w Iry W �.�'�- � •_ � q O tt i I X08K1N !, p m W� Iwo- ot�l ;� z ca M w + W 1_ I-4 E'a' r i� _ to (N 0 co �~ T U1 03 Z i C 7.3 + W CA a :0 C-1 � i Cc'r si co co 1z ' ti� (N to -4 CD "' °� i� � �' to •. t Jove b 11Q , W La IO -► IV CO 1-44 cp a fV a1 4 w w W i wf ♦♦� Ica i T to i UP co w4 N V W � 06.0— w I "Zi I W�l OF 7 j • f`r ',�.�'j �, ` .1`5.1, ?' .�' {,! /r .. ��,- ' :�;. � _ i';� , i �', �{ .•a.,��,� l n`J` _ - . - " - ...- _ -- .. - ' Son= ILA A YP �x ­3 ., , TA; KAY 46, jt' Wr- t— OAK woos -VA on -VOM Won _J1`111 4 41 -7 ore- WO °? J €J r4Aff A - - --------- � JAI 'N - I 7 MAN law Mott' 4%, JF lit 0>0 Ago IN Vol v ITS? v My _Wo 0 Novi N, J TOW A A. Sw An 41, f 17 i14 WS AT I- _7 J\ r . , J, pSll j"I HHM 10 Omni Q I , 1 v Q !Ipntl CH", .................... fps Ann, It- 1-- AND l Mrs? IS - Nil 11111 1 I rnI Al n r S i �> LPN" fHi SIN Ott 1 a, fu tool �s f :' & j INS wak am not; him Rit Too _I ,_ .1 ';: -, �- ':�:�,.__ , ter; �". -: - -: • ro ^1 a 1-14 j ! :l $!: PIT 07, Et ;. D y m �• ` •iit i "Iii, I r P � . ... . . I .. .. ,.�,.� ; 4, �:,�.�. -�, - ,- �� -�• -,. •.,,�� � ;� -� -may � �•�: } ��� 1 Ir CP .......... , vv a a AW-11 /01 si AFt U KIM" ps- 41 in K N so TIMM,, 'M14, I � 10-7 ogo" Via AP4 do vow'. Q "14 Ic WIN q9 ­lY V u¢ A A %T CD -7a KtI 4 it, 13 ,o f �•� _ S �7 14P ">=�_ z a •� y ° c o 9 .S 1Cv � D ' •l: 1 �' �° � 0 0 P � ;� •$5 ��' � _ � 1 i � °�° � ��� " °T'� a °i��.p� ry c °'r .o 0. A � ,' r J((T� ^ ✓c �:� F' °+° ' N `_•� +'''h tit=.'." ° ff G o DN' `' -� n :o° _ Jy /3 ,'✓ � �° �'s `�9" `Y '�cy� °�> �'+. 1 .^�` 1 - a-p „'P,•..e� „r;tia ` ➢`�'`i �'��` � -' �r ” `L� � ° �— �'_�oG^ 6 t� + +�{t � r� \1„ �' .i" n•y °,s�.•a. rrl rU 3 ,•.,;�wJ °n +• "z*�.ry» 'm' `�` �''., �-;,> 1� {J• r- - yr ^i%�b E - °'o,p a. �� ry�, ".;�, �r•L' ." q�+z�. ;� ° o �4,, _�f` Fp�•�t q "♦t�. ^+ . �, +„ • �; 3+w� +}'�i`'`,°� "^; 3�' #;0i Y�Q° RY�',t�.•Egy�� - °i o . ° ,i; °o � E'�°u `� r •' �'� R`t '�a�rC.t'�• .r �,S •`: ���a?,t,�`D ya ��'� ^�'��. ^�`�,` ^��9�a,r �S� °eau <'tc�'; ° ,o ,•ei,� J b' r,. ,t ,n ° ,. {. �, i. r`..•.N .���.,- _� °i..+ �, 4 °0„ °,,;�i�'3'�� ".i�4a,,;o° ''Ct"';�'`#�,'',, �E,c. � )�, °J t o r � �� ^�, t Ci c- .'� 4+ � � ate,.. '� i�� •"� ` `M,�'=H��'�''r..t�; ",,;��t�,";` � to ; d a t ':•v v ° �� n�. °>f %+'�'Y��'' ^',,k2y", �+ 1 `%�d'o'•y hy¢t.,�n. "e."n ?,'vz, 3'•b%.ti'rh E° ¢ tlt� v04�ry`�,+ C�`*,"�o° —�'-vq �. m •��,�r ,� ^n Y ?.i, ` ^. +�1 -�0�y� �'a�.� �o�`..b�j,��„'` =�tiE, �'" nag �, ^ d� o� �'i� :S'•10;� -r3• h+;o `e'T- ?'r-oo� °`"'�.��a� "o,;i. r ;`, +ti .}°a °�2� ,W'� -.. �� ¢ bo � ° �. =eo+? •." .° .� ��.� tf"�'9 ad ",qi�� .i ° ti's ° '� ° �,�jj4 0 � .. R•�� r t � 'Y 9�� �¢oo °�,a., °�. o ° .. � ° U�v; �' �lv�g �, � 'ij ° aYp�S''�e�t���l� t �� ,t ��a• a � �`kA�3o,,c��' "��� Qo n�,,,ti - �c ��w o�c A �° , °�° '" � d' °` o �, S,� r �ti t eta � �'� �� ° _° n.• u„trv���` n• � .k' ° c � � [l' ��� jam{• f V , h; ' � rl O" � ` � © J 4�•„i_�`i^', "�7 `�- �oV:��X'�` vg ���444�: , ni C7p0 � Ti K pc. u` .!. ��o Q Q,cV °o ° °'i✓1"'�7+ aS•�'�it�,ir�r \ +},`- �.'?,o, ,r�s, ,,,Sttr>xv,- w,C{���al• a rk.,,ti � "4,�J' .i, p .�,, p , )cu%_ 2 §ms zU) m27g E \2 }&b© m Cl) _CLw E w�roc m $ �# /E §.6 �3ofƒ § (\ \!� �\ � ■ � e t « � - � Q ® � k\ /k ƒ - IL 1:} k� ■ ui 0. k o r E CU /' / LU � { \ / } d k x) � \ w \ E =gig /LZ Epp_ a =Eo [LT, S * I eA \ �e �w j_2 kj (75/ & a S/ \� § \ \2 e �/5/2013 :\Hqdraul ics\CADD\PSH\040130- hyd-psh-PER02.dgn 8/17/99 00 00 :00 00 i10 ".0 ;�2 10 (4 th) 0 10 'o Lrl _ _1__11_ �_ _{ O- —17 -- �__ 'lo m O z .0 �o 0 0 3: 7-i z zo > >' > n c 11 z > ILL, an> C. 8 - I I llN 01:8M + + + 0. 0 + Mr. T71- I" p 9 P. ff O. _:P 00 w 0 '0 > 4 - ------- 11 . . . . . v W. z N z 0 W- 0 -2. + > an Ln II I 7n + -thl - -n� C) w w w M 1. eoT T cm rn 7 w > . ... .. 7 7 - - - - - - L -0 c > m m c X > > > 3 m 4tc 7 A z z w P w Fu C9 19 0 0 > r) > :�: - L, 0 r) i- -1 A -T- . . . . . . . . . . . 4-- 1E Ln A= og 0 Q) _4 --4 zZ 7 tc C'): Lq z rOe ci C) A 7- > 2 n E cr) --D LY, --JLn C Z\ A 0- C) rn > + t--d- 0-'1 =; I = -_ -_- -�� r�_o.•W - -_ - =1_� -_-t-' F-I•I- r- -1-�- _ -- -_-__-� S p z a� � `� � Q m Ln W ��_ _- -- -� 7- - -. ° ° -1 z-- ��Ll=- {- �- I- �{ -� =I �1,�1� 71 7 - �--JO- _L- ! x / � \n �s"-�. ( � � N I � � O x 7 T- 0 RD z c) -4 + c o =1 0 z __�_��>_t�.� �= }__ice- 7- -7 .7 O- ___i__- f-- ��___, -_�_O L�- �__�,�__._}_____- -�-i-__�00_ � O -4 .-tt 4-1 Ln LA ZF I- r z z z O� P- z z m Z at Z z 0 0 > z > R 0 z 0 N 0 o 0 ir, > z lz -i 7- L T J -T- c x - 0 tz Z� z IC 0 I( 0 o 0 O. D 00 'o 0 ;10 w 10 -tl 0 10 Ul 0 10 of Z 0 0 0 1 1 P / ]/ LUIJ : \Hycraul lcs\ CADD \PSH \040130_hyd_psh_PER01.dgn IN 'N N 'N IN IN 'N �N IN 00 OD oo I OD O i`w 0 1A 0 io cn 0 o ° ° 0 - _ -- - - _ —= T-o - v o Zte-- - - = - - t { i !^ 1 ` I fi I � � f � --�.: ' ii I - - � _ o z p _ - � _ - _ a=1 i 1 ' — ---- - ` m o N n y e m t 0 O w m N m o w t r A 0 A - V - o D ' � I 1 t — �- - --- - ' _ m . : ,•. ', . ' � OVlw m O J JN oA �aro b b � 0 or o Nl n L � L O J o o + - � - - ff O A . � _ - ~ � j IW m1� w J m A m A n O N 0 :' � n _ - _ - a . f 1 _ — = �i c- W-OO O N � mmyA �W S 0 m A _z�+y r i Z -i O; l� 1 `Z1 Om W N N m w IpprO O0 � J A { fA I I � _ -_ t0 m mV O m Im r'oA tV_ - n Oo - 1 �n .o { II a t _ � , - - _ 1 - I;•-;: . .'�,,_ _ - — lw w w w V uW VO0 � lJ r:m J y - n � 0 -l; _ T! i +t i ' - - � _- _ �— T O Io m 'm w Im O O O 0� w O Ia — z D -�-.n n = - : , - - - I { L { r - _W lm N VZ —m vJ A Ootw N aw _w - 0 --o o + + a o i + - � L F '( -_- =1 i•I h �- b O2 N A m 0N lo Ow N m tw A - ,L wW V � � tA �- - -o s o 0 O - Il � ttl � -- �- 1��� I_ - -- ttA V m � W O� N � l0vm wYA Olm o � J- + nD i p o o ° -- +l I If i � { ��1 ,: j: i1f i! . _ -W O W m W N m W N tw N w m � J -- �n -a ♦ • 0 -;,p 'i �-- - - _ p (NO � 1 ° rD _ + V A w r- s!2 N N oo rIf- - ' - -� -- = D n Q 4— -' Tl T-- 1 - 4- Q0 .L o }- ba i < D n T 1 m ' / it rn / / a J, • = �- r_ =- - -i- -- - -- _ W-rat__ T'l�� i=- � -� °� =t o- �I'- +- -�_•� - -' -L - _�'i-I -- ' --I- � - A 0 00 m o ' 00 �O .p hD 00 10 ° O 0 O �O O 0 O 8/17/99 ;z Z z p z zo E3 i m >' p0 nN m� z ° 0 p D Z .I a � I I / 0 N I A / D n T a � Dm N F D rnm m r) D D N n x N 3 D > N D m to °o w� 0 Loll Ln I /l�l m \ r N i% � II Ln /XN Z i i I. * p / I I /� A Z cn v' vp i � � \�� 54'gp•1392'W I Z N _- �n I N 0 - 0 Q — s" N n as Ca V O S I 0 0 0 o � Po i0 8z �n v z` S A A xr so mo m r z m >< n m ti az 8t" O o z o N n o 0 0 o a ti S tti x D -4 r D l=7 z> oz z� �7 m z xm pn O 0 O O 0 -- _ '- _�-- -'I -- f-- --L- }- I - -+- F- -I-� H -- •--r -- -I- -� •�- -I -f?- I ' - � -_�- t- r 144] 00 m o ' 00 �O .p hD 00 10 ° O 0 O �O O 0 O 8/17/99 ;z Z z p z zo E3 i m >' p0 nN m� z ° 0 p D Z .I a � I I / 0 N I A / D n T a � Dm N F D rnm m r) D D N n x N 3 D > N D m to °o w� 0 Loll Ln I /l�l m \ r N i% � II Ln /XN Z i i I. * p / I I /� A Z cn v' vp i � � \�� 54'gp•1392'W I Z N _- �n I N 0 - 0 Q — s" N n as Ca V O S I 0 0 0 o � Po i0 8z �n v z` S A A xr so mo m r z m >< n m ti az 8t" O o z o N n o 0 0 o a ti S tti x D -4 r D l=7 z> oz z� �7 m z xm pn O 0 O O 0