HomeMy WebLinkAboutNCC202156_NOT Closeout Documents_20210517North Carolina Department of Environmental Quality
Land Resources: 450 W. Hanes Mill Road, Suite 300, Winston-Salem, NC 27105
(336) 776-9800
County: Guilford Project: AT&T High Point, NC (AOIPKA2) River basin: Cape Fear
Person financially responsible: Bellsouth Telecommunications, LLC Project #: GUILF-2020-021
Address: 675 W. Peachtree St. NW Ste 27310, Atlanta, GA
1. Project Location: W. Gate City Blvd., High Point
Pictures: No
2. Weather and soil conditions: 70's, Clear, Workable
3. Is site currently under notice of violation? No
4. Is the site in compliance with S.P.C.A. and rules? Yes
5. Violations:
Initial inspection: No
If no, check violations below:
6. Is the site in compliance with NPDES Permit NCG010000 Construction Stormwater requirements?
Describe:
7. Has sedimentation damage occurred since last inspection? No If Yes, where? (check all that apply)
Degree of damage:
8. Contact made with (name): Jeff Seagle Title: Sr. Contract/Sourcing
Inspection report: Sent Report Date given/sent: April 27, 2021
9. Corrective action needed:
10. Comments: Permanent ground cover sufficient to restrain erosion has been established. No additional
self -monitoring or self -inspections are required. Project is in compliance and released under the
SPCA. Termination of coverage under the NPDES General Stormwater Permit for Construction
Activities (NCGO1) must be requested by the permittee via a Notice of Termination (NOT). The
NOT is available at: https://edocs.deq.nc.gov/Fonns/NCGOI-Termination.
Please note that this correspondence must be uploaded as part of completing the NOT process.
Reported by: Kimberly Turney Others present:
Date of inspection: April 26, 2021 Time arriving on site: 1:00 PM Time leaving site: 2:30 PM
Yes