Loading...
HomeMy WebLinkAbout20071841 Ver 5_EEP Receipt_20130311 (2)OWStem haincemeht PROGRAM RECEIPT March 11, 2013 Lew Bleiweis Asheville Regional Airport Authority 61 Terminal Drive Suite 1 Fletcher, NC 28732 Project: Asheville Airport Expansion Phase 2 County: Buncombe DWQ# 07 -1841 COE #: 2010 -00036 EEP #: 20956 Amount Paid: $130,47100 Check Number: 20413 01- 1841 Y 5 The North Carolina Ecosystem Enhancement Program (NCEEP) has received a check as indicated above as payment for the compensatory mitigation requirements of the 401 Water Quality Certification/Section 404 /CAMA Permit(s) issued for the above referenced project This receipt serves as notification that your compensatory mitigation requirements assigned to NCEEP associated with the authorized activity as specified below have been satisfied You must also comply with all other conditions of this certification and any other state, federal or local government permits or authorization associated with this activity including SL 2009- 337, An Act to Promote the Use of Compensatory Mitigation Banks, as amended by S L 2011 -343 The NCEEP, by acceptance of this payment, acknowledges that the NCEEP is responsible for the compensatory mitigation requirements indicated below associated with the project permit and agrees to provide the compensatory mitigation as specified in the permit Mitigation responsibility assigned to the NCEEP is nontransferable The mitigation will be performed in accordance with the N C Department of Environment and Natural Resources' Ecosystem Enhancement Program In -Lieu Fee Instrument dated July 28, 2010 River Basin Stream Credits Wetland Credits Buffer I& II HUC (linear feet) (acres) (Sq Ft ) Cold Cool Warm Ri arian on-Riparian Coastal Marsh French Broad 0 174 0 090 0 0 0 06010105 Refunds of payments made to NCEEP are only approved under certain conditions All refund requests must be submitted in accordance with EEP's refund policy at www nceep net If you have any questions or need additional information, please contact Kelly Williams at (919) 707 -8915 Sincerely, Michael Ellison Acting Director cc Karen Higgins, NCDWQ Wetlands /401 Unit Amanda Jones, USACE - Asheville, Tyler Crumbley, USACE - Raleigh Susan Wilson, NCDWQ - Asheville Norman Divers, Charah Inc Rebekah Newton, agent File Rfftori;1r5... L ... Prot", 0" .ftate, e�� NCDEIR North Carolina Ecosystem Enhancement Program, 1652 Mad Service Center, Raleigh, NC 27699 -1652 / 919 - 707 -8976 / www nceep net U.S. ARMY CORPS OF ENGINEERS Wilmington District Compensatory Mitigation Responsibility Transfer Form Permittee" Asheville Regional Airport Authority Project Name Asheville Airport Expansion Action ID SAW- 2010 -00036 County Buncombe Instructions to Permittee The Permittee must provide a copy of this form to the Mitigation Sponsor, either an approved Mitigation Bank or the North Carolina Ecosystem Enhancement Program (NCEEP), who will then sign the form to verify the transfer of the mitigation responsibility Once the Sponsor has signed this form, it is the Permittee's responsibility to ensure that to the U S Army Corps of Engineers (USACE) Project Manager identified on page two is in receipt of a signed copy of this form before conducting authorized impacts, unless otherwise specified below If more than one mitigation Sponsor will be used to provide the mitigation associated with the permit, or if the impacts and /or the mitigation will occur in more than one 8 -digit Hydrologic Unit Code (HUC), multiple forms will be attached to the permit, and the separate forms for each Sponsor and /or HUC must be provided to the appropriate mitigation Sponsors Instructions to Sponsor- The Sponsor must verify that the mitigation requirements shown below are available at the identified site By signing below, the Sponsor is accepting full responsibility for the identified mitigation, regardless of whether or not they have received payment from the Permittee Once the form is signed, the Sponsor must update the appropriate ledger and provide a copy of the signed form to the Permittee and to the USACE Bank /In -Lieu Fee Program Manager The Sponsor must also comply with all reporting requirements established in their authorizing instrument Permitted Impacts and Compensatory Mitigation Requirements Permitted Impacts Requiring Mitigation* 8 -digit HUC and Basin 06010105, French Broad River Basin Stream Impacts (linear feet) Wetland Impacts (acres) Riparian Riparian Riparian Warm Warm Cool Cold Non - Riparian Non - Riparian Coastal Riverine Riverme Non- riverine 174 174 09 09 *If more than one mitigation sponsor will be used for the permit, only include impacts to be mitigated by this sponsor Compensatory Mitigation Requirements, 8 -digit HUC and Basin 06010105, French Broad River Basin Stream Mitigation (credits) Wetland Mitigation (credits) Riparian Riparian Warm Cool Cold Non - Riparian Coastal Riverine Non- riverine 174 09 Mitigation Site Debited (List the name of the bank to be debited For umbrella banks, also list the specific site For NCEEP, list NCEEP If the NCEEP acceptance letter identifies a specific site, also list the specific site to be debited) Section to be completed by the Mitigation Sponsor Statement of Mitigation Liability Acceptance I, the undersigned, verify that I am authorized to approve mitigation transactions for the Mitigation Sponsor shown below, and I certify that the Sponsor agrees to accept full responsibility for providing the mitigation identified in this document (see the table above), associated with the USACE Permittee and Action ID number shown I also verify that released credits (and /or advance credits for NCEEP), as approved by the USACE, are currently available at the mitigation site identified above Further, I understand that if the Sponsor fails to provide the required compensatory mitigation, the USACE Wilmington District Engineer may pursue measures against the Sponsor to ensure compliance associated with the mitigation requirements Mitigation Sponsor Name North Carolina Ecosystem Enhancement Program Name o p nsor's Au on d resentative tVCi' ��� VV( 1 rot W 90t Sign of sor's Authorized Representative Date of Signature at r Page 1 of 2 Form Updated 2 October, 2012 USACE Wilmington District Compensatory Mitigation Responsibility Transfer Form, Page 2 Conditions for Transfer of Compensatory Mitigation Credit • Once this document has been signed by the Mitigation Sponsor and the USACE is in receipt of the signed form, the Permittee is no longer responsible for providing the mitigation identified in this form, though the Permittee remains responsible for any other mitigation requirements stated in the permit conditions • Construction within jurisdictional areas authorized by the permit identified on page one of this form can begin only after the USACE is in receipt of a copy of this document signed by the Sponsor, confirming that the Sponsor has accepted responsibility for providing the mitigation requirements listed herein For authorized impacts conducted by the North Carolina Department of Transportation ( NCDOT), construction within jurisdictional areas may proceed upon permit issuance, however, a copy of this form signed by the Sponsor must be provided to the USACE within 30 days of permit issuance NCDOT remains fully responsible for the mitigation until the USACE has received this form, confirming that the Sponsor has accepted responsibility for providing the mitigation requirements listed herein • Signed copies of this document must be retained by the Permittee, Mitigation Sponsor, and in the USACE administrative records for both the permit and the Bank /ILF Instrument It is the Permittee's responsibility to ensure that the USACE Project Manager (address below) is provided with a signed copy of this form • If changes are proposed to the type, amount, or location of mitigation after this form has been signed and returned to the USACE, the Sponsor must obtain case -by -case approval from the USACE Project Manager and /or North Carolina Interagency Review Team (NCIRT) if approved, higher mitigation ratios may be applied, as per current District guidance and a new version of this form must be completed and included in the USACE administrative records for both the permit and the Bank /ILF Instrument Comments /Additional Conditions: The mitigation required in this form is for phase II of the mitigation plan This form replaces the previous form dated February 15, 2013 which mistakenly omitted 0 9 acre of required wetland mitigation This form is not valid unless signed by the mitigation Sponsor and USACE Project Manager For questions regarding this form or any of the conditions of the permit authorization, contact the Project Manager at the address below USACE Project Manager: Amanda Jones USACE Field Office Asheville Regulatory Field Office US Army Corps of Engineers 151 Patton Avenue, Room 208 Asheville, North Carolina 28801 -5006 Email amanda d Jones @usace army mil JONES.AMANDA JONES signed D JONES AMANDA D Government DN c =US o =US Government ou =DoD .D.1242835090 -ONES AMANDA D 1242835090 Date 2013 02 25 14 07 42 05'00' USACE Project Manager Signature February 25, 2013 Date of Signature Current Wilmington District mitigation guidance, including information on mitigation ratios, functional assessments, and mitigation bank location and availability, and credit classifications (including stream temperature and wetland groupings) is available at http //ribits usace army mil Page 2 of 2 The Wilmington District is committed to providing the highest level of support to the public To help us ensure we continue to do so, please complete the Customer Satisfaction Survey located at our website at http //regulatory usacesurvey com/ to complete the survey online